Loading...
HomeMy WebLinkAboutWQ0004972_Response to Notice_20240408Kimley»>Horn April 8, 2024 Ms. Jennifer F. Graznak, Assistant Regional Supervisor Water Quality Regional Operations Section, NCDWR, NCDEQ Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 RE: Notice of Violation Tracking Number. NOV-2024-LV-0248 Permit No. WQ0004972 Forest Lake Preserve WWTP Davie County Ms. Graznak, As requested in your letter dated March 20, 2024, and received by MHC TT LP on April 1, 2024, we are providing an updated schedule for the capacity expansion at this facility. As previously discussed, the facility was unaware of the high flows until the meter change -out last summer. A facility replacement was near design completion when it was discovered that the previously recorded flows were significantly different than actual. In response the Owner immediately worked to develop a plan for the expansion of the facility. At this time a plan has been developed to add a second treatment train to the facility. The existing treatment system has a rated capacity of 40,000 gpd. The facility is currently limited to 24,400 gpd in capacity due to the limitations of the effluent sprayfield. The proposed expansion will include a 60,000 gpd treatment train and will include the improvements required to produce reclaimed water. This allows for a more effective expansion of the sprayfield. The facility and sprayfield are still currently in design, and in the interest of expediting this process as much as possible, the owner is early procuring the equipment to expedite schedule as much as possible. The design is in the final stages of coordination with the manufacturers and field investigations for the sprayfields are underway. Based on our current design and planned construction, we offer the following schedule to complete the facility: • Design completion: June 30, 2024 • NCDEQ permitting: July — September 2024 • Construction commencement: October 2024 • Construction is anticipated to be completed within 9 months: June 2025 Kimley>>> Horn Page 2 o However, if portions of the sprayfield can be commissioned early we could get these completed to expand the facility disposal capacity to remain in compliance up to the treatment capacity limit of 40,000 gpd until the remainder of the facility is constructed. If you have any questions or require additional information, please feel free to contact me at steve.romano(a)-kimley-horn.com. Thank you in advance for your time and consideration. Sincerely, Kimley-Hor Associates, Inc. i eve Romano, P.E. Vice President