HomeMy WebLinkAboutNCG050450_NOI Inpsection Report_20240405 t;s Y
ROY COOPER fix' , a
Governor
��
i lr �
ELIZABETH S.BISER , , R
4��
Secretary h,v `
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
EInterim Director rwlnrn mentaiQuality
April 5, 2024
Southern Pipe Inc.
Attn: Bryan Mitchell,Owner
135 Random Drive
New London, North Carolina 28127
Subject: Compliance Evaluation Inspection
NPDES Stouuwater General Permit NCG050000
Certificate of Coverage NCG050450
Southern Pipe Inc. ;
Stanly County
Dear Mr. Mitchell:
On April 4, 2024, a site inspection was conducted for 135 Random Dr, Stanly County,North Carolina. A copy of
the Compliance Inspection Report is enclosed for your review. Mr. Bryan Patterson, the facility's Environmental
Manager, and Mr. Chris Wall, were present during the inspection and their time and assistance is greatly
appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater
General Permit NCG050450. Permit coverage authorizes the discharge of stormwater from the facility to receiving
waters designated as Town Creek, class C waters in the Yadkin Pee Dee River Basin.
As a result of the inspection, the facility was found to be compliant with the conditions of the NCG050450 permit.
Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during
the inspection.
Feel free to contact kathryn.peterson@deq.nc.gov or(704)235-2201 with any questions or concerns.
Sincerely,
DocuSigned by:
kaceitt kad
lit
ACFA867EC14A463... l.
for Jerry W. Eplin,PE
Regional Engineer
Land Quality Section
Enclosure: Compliance Inspection Report
c: Bryan Patterson, Environmental Manager
Southern Pipe Inc., 135 Random Dr,New London, North Carolina 28127
DEMLR NPDES Stormwater Permit Laserfiche File
ANorth Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
f Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
dit 704-235-2100
Compliance Inspection Report
Permit:NCG050450 Effective: 06/01/23 Expiration: 05/31/28 Owner: Southern Pipe Inc
SOC: Effective: Expiration: Facility: Southern Pipe Inc
County: Stanly 135 Random Dr
Region: Mooresville
New London NC 28127
Contact Person:Sonya Cato Title: Phone:919-980-1512
Directions to Facility:
From 52S,turn right onto Random Dr. cross railroad track and immediately turn left. located behind fiber composites.
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 04/03/2024 Entry Time 09:30AM Exit Time: 10:30AM
Primary Inspector:Kathryn S Peterson Phone: 704-663-1699
Secondary Inspector(s):
Stephanie Landers
Reason for Inspection: Other Inspection Type: Compliance Evaluation
Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC
Facility Status: Compliant ® Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 4
Permit: NCG050450 Owner-Facility:Southern Pipe Inc
Inspection Date: 04/03/2024 Inspection Type:Compliance Evaluation Reason for Visit: Other
Inspection Summary:
A compliance inspecton was completed for Southern Pipe Inc on April 3, 2024 at 9:30 AM. Kathryn Peterson and Stephanie
Landers completed a full compliance inspection in addition to responding to the facility's representative outfall request. Brian
Patterson and Chris Waller were present during the inspection. The facility requests that outfall 001 may be represented by
outfall 002.
The site is marked in compliance. However, there were a few documentation issues within the SWPPP. Employee training
has not be documented since 3/24/2022, an illicit discharge evaluation has not been documented since 9/20/2022,the list of
signifanct spills over the past three years is missing 2023 and the beginning of 2024,and the SWPPP itself has not been
updated since 9/20/2022. All of these items should be documented/updated/evaluated annually.
It is recommened that the ROS request be granted after documentation of the above is received, in addition to the sample
results from Q1 of 2024 for the facility's analytical monitoring requirement. Please send the required documentation to
kathryn.peterson@deq.nc.gov.After these are received, the ROS request may be processed.
Page 2 of 4
Permit: NCG050450 Owner-Facility:Southern Pipe Inc
Inspection Date: 04/03/2024 Inspection Type:Compliance Evaluation Reason for Visit: Other
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑
#Does the Plan include a General Location (USGS)map? ❑ 0 0
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ 0
#Does the Plan include a detailed site map including outfall locations and drainage areas? 0 0 0
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? El 0 ❑
#Does the facility provide all necessary secondary containment? ❑ 0 0
#Does the Plan include a BMP summary? 0 0 0
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 0 0
#Does the facility provide and document Employee Training? ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑
#Is the Plan reviewed and updated annually? 0 0 El
#Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 0
Comment: The SWPPP has not be updated since 09/20/2022, employee training has not been
documented since 3/24/2022, and the list of significant spills only includes 2019-2022. The
SWPPP and employee training needs to be reviewed/completed annually. The significant spill
list should include all spills from the past three years; if no spills have occured, document this
accordingly. Mr. Brian Patterson will send updated SWPPP documentation, updated employee
training records and an updated spill list to kathryn.peterson(a,deq.nc.gov as soon as possible.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ El ❑
Comment: Qualitative monitoring was done for the first half of 2023, but not for the second half of 2023.
Ensure to perform qualitative monitoring consistent with permit requirements.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ El ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? El ❑ ❑
Comment: The facility's permit under NCGO5 was recently renewed and now has analytical monitoring
requirements. Samples were taken last month for the Q1 sampling requirement, but the facility
is still waiting on the results. Results should be sent to kathryn.petersonna,deq.nc.gov once
recieved by the faciltV.
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ El ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
Page 3 of 4
Permit: NCG050450 Owner-Facility:Southern Pipe Inc
Inspection Date: 04/03/2024 Inspection Type:Compliance Evaluation Reason for Visit: Other
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ ❑
Comment: The last illicit discharge evaluation recorded is from 9/20/2022.The permit requries this to be
completed once a year. Ensure that the facility completes this evaluation and keeps a record of
the monitoring. Facility requested ROS, and it is recommened to grant the request.
•
Page 4 of 4