Loading...
HomeMy WebLinkAboutNCG080624_DMR Upload Review_20240405 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 3/28/2024 12:05:19 PM(DMR Submittal) Submit by Brittany.Cook 4/5/2024 2:50:05 PM(DMR Submittal Review) • The task was assigned to DEMLR SW Admin for DMRs 3/28/2024 12:05:20 PM • Brittany.Cook assigned the task to Brittany.Cook 4/1/2024 10:08:14 AM DEQStormwater NPDES Permit Discharge Monitoring Report (DMR) Upload DMR Submittal from 3/28/2024 Permit and Facility Information: ..................................................................................................................................................................................................................................................................................................................................................................................................... Permit Number* Enter COC or Individual Permit Number NCG080624 Must begin with NCS or NCG Facility Name:* Fedex Freight-CLT Owner/Operator Fedex Freight Inc Name:* County:* Mecklenburg Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments. Reason for not yet If applicable: reporting data Due to a misunderstanding of permit requirements and delay of submitting DMRs, through eDMR for the attached DMRs are being submitted using the DMR Upload method.This was this permit: recommended by the Regional Field Office.The facility is being set up in the eDMR system. Future results will be uploaded correctly. Monitoring Period Information: ..................................................................................................................................................................................................................................................................................................................................................................................................... Monitoring Period What is the YEAR of the sample date(s)? Year:* 2023 DMR Upload* Click the upload button or drag and drop files here to attach document. 20230303_DMR_CLT.pdf 251.73KB 20230620_DMR_CLT.pdf 250.28KB 20230928_DMR_CLT.pdf 252.89KB 20231218_DMR_CLT.pdf 251.88KB Only PDFs are accepted. Comments: The facility conducted sampling as required by the permit, but due to a misunderstanding of permit requirements,the attached DMRs are being submitted past due. * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; o I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66, Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); o I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit this DMR Upload form. Full Name:* Nina Schittli Name of person submitting this form Email Address:* nschittli@blymyer.com Phone Number:* 510-521-3773 Signature: 4.5�/� ' Date:* 03/28/2024 Review Review Date: 04/05/2024 Confirm Permit No.* Correct the permit ID number if needed. NCG080624 Confirm DMR Year* 2023 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be Yes accepted?* No(Explain why below) Do Central Office No staff need to be Yes alerted?* Do Regional Office No staff need to be Yes alerted? Type of Permit* General Ensures DMR(s)filed correctly.