Loading...
HomeMy WebLinkAboutNC0066516_Compliance Evaluation Inspection_20240403FJQUAY-VAR ! NA north caro6nc April 3, 2024 Danny Smith Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ 1617 Mail Service Center, Raleigh, NC 27699-1628 RE: COMPLIANCE EVALUATION INSPECTION Terrible Creek WWTP NPDES NCO066516 Town of Fuquay-Varina Wake County Dear Mr. Smith, Mike Wagner Public Utilities Director MWagner@Fuquay-Varina.org The Town of Fuquay-Varina appreciates the opportunity to respond to the inspection evaluation report dated March 4, 2024. It is our intent that this response will provide sufficient additional information regarding the Division's request for the following information: • Provide a detailed account of the repairs undertaken to repair BNR unit #2 and clarifier unit #1 and a schedule for repairs to be completed. TOFV Response: Since the time the 3.0 MGD treatment facility was placed into service, the Town has had numerous failures related to the mixers. Also, in 2022 and 2023, the Town started experiencing problems with the two clarifiers. Enclosed is Exhibit A and Exhibit B that will provide a detailed repair timeline for the BNR mixers and Clarifier # 1. • Provide details on the repairs that remain to be completed on BNR unit #1 and anticipated scheduled for the repairs to be completed. TOFV Response: Due to past mixer failures on both BNRs, Hayward Gordon decided to replace all fourteen (14) mixer pedestals with heavier, more robust pedestals. Also, replacement blades were ordered for the mixers in BNR #1 that had failed. On 3/3/24, the mixer blades and mixer pedestals were installed by an authorized Hayward Gordon technician. The same technician came back on 3/31/24 and grouted the mixer pedestal bases and Hayward Gordon requested that we allow a week for the grout to cure. The mixers are expected to be placed back into service on 4/5/24. Public Utilities Town of Fuquay-Varina 134 N. Main Street, Fuquay-Varina, NC 27526 (919) 552-1028 fuquay-varina.org Once the biological activity and process control parameters return to normal in BNR#1, plant staff will take down BNR#2 for inspection purposes and to schedule installation of seven mixer pedestals. The Town will also inspect mixer blades to ensure each one is still intact. As demonstrated the treatment personnel were responsive and took immediate action to respond to the equipment failures and initiated corrective action with the manufacturer's representatives. We believe this letter demonstrates the Town's commitment to comply with the NPDES permit and to ensure the treatment plant equipment is properly maintained and functioning as intended. Please do not hesitate to contact me if you have any questions or concerns. Sincerely, Michael Wagner Public Utilities Director Enclosures: Exhibit A and Exhibit B Cc: file Adam Stephenson, ORC Exhibit A-BNR Mixer Repair Timeline 7-26-18 changed oil in mixers BNR # 1 7-27-18 changed oil in mixers BNR 2 10-21-18 mixer 1-3 fault overcurrent Warranty Request November 15, 2018, Mixers 1-3 and 1-4 are inoperable and keep faulting on overcurrent 12-4-18 Hayward Gordon onsite to perform warranty work 12-10-18 Reset mixer 1-2 12-19-18 overloads changed out on small mixers 12-27-18 mixer 1-4 overload turned up 12-28-18 Mixer 1-3 and 1-4 tripping out 1-11-19 Mixer 2-5 faulted, tripped 3-11-19 Mixer shafts are wobbling 3-26-19 Mixers grinding and shafts wobbling 4-28-19 First new gear reducer on site "We apologize for the issues you have experienced with our mixers. As discussed, we have ordered a new gear reducer to swap out which we are confident will be a solution to the problem. Once we see that this solves the problem, we will swap out the other 13 reducers. Please find the anticipated schedule: Reducer Parts Arrive at the HG Factory: 3-25-2019 HG Assembly and Painting Ship: 4-8-2019 Installation and Testing: 4-15-2019 (2 days)" 6-19-19 mixer gear reducer swapped out and motor replaced 8-8-19 mixer 2-3 off excessive gearbox movement 8-28-19 drained BNR 2 to inspect for rags on mixer blades 10-14-19 all mixer gearboxes swapped out 11-4-19 mixer 1-4 tripped 11-12-19 mixer 2-5 faulted on overcurrent 11-18-19 Hayward Gordon (Mike) on site for mixer 1-6 repair 12-4-19 mixer 1-3 tripped 12-11-19 mixer 2-5 tripped 12-18-18 mixer 1-4 tripped 12-26-19 mixer 2-5 tripped 1-14-20 Mixers 1-2, 1-3, and 2-4 are out of service, they continue to trip out - I am sending a follow up email to David Caton about these 1-16-20 Mixer 1-5 gearbox is moving and noisy 1-28-20 mixer 1-7 out of service sheared bolt 2-3-20 Hayward Gordon techs on site troubleshooting mixers 2-25-20 mixer 2-3 shears bolt off at base plate 3-5-20 repaired sheared anchors and modified gearbox plate 5-4-20 Mixer 1-7 has a major oil leak 5-6-20 Mixer 1-4 bolt sheared at base 5-14-20 Mixer 2-2 leaking oil 5-26-20 Hayward Gordon tech repairs oil seals and adds stabilizing bolts 5-30-20 mixer shears bolt at base plate 6-19-20 Bolt is sheared on gearbox footing 6-30-20 Hayward Gordon tech. postponed visit and repair until tomorrow 8-11-20 conference call with Hayward Gordon 9-14-20 vibration analysis on all mixers and shaft deflection readings 11-19-20 Hayward Gordon replacing 3 gear reducers 2-3-21 HG tech on site evaluating three new gear reducer replacements 2-28-21 HG evaluated the operation of those mixers with shaft deflection measurements, vibration ect., and those mixers look good so far. 6-2-21 HG tech on site evaluating mixer performance 6-14-21 drained BNR 1 6-17-21 HG techs on site inspecting mixers 1-19-22 • Removed existing motors • Removed all gear boxes and loaded for haul away • Installed new gear boxes and new 1" thick adapter plates with new hardware at gearbox base • Installed new anchors where needed due to failed anchors • Re -installed motors • Re -installed shaft guards • On Saturday, bumped the 13 mixers that were complete which resulted in some tripping on overload at initial start 2-11-22 HG tech on site welding all mixer pedestals and bases 9-8-22 new coupling installed 3-5-23 (3) new base plates installed on BNR 2 7-26-23 replaced lip seal 9-11-23 deflection check on mixers 9-19-23 discovered broken mixer blades on BNR 1 2-21-24 broken mixer blades repaired 3-3-24 new mixer pedestals were installed on BNR 1, 3-31-24 grouting was finished on new mixers pedestals on BNR 1 4-5-24 plan to put BNR 1 back in service with new mixers Exhibit B-Clarifier 1 Repair Timeline 1-10-23 center column plate replaced with thicker one under warranty 2-21-23 clarifier 1 out of service 3-13-23 coating clarifier #1 6-7-23 Scum pump removed and rubber scum scraper replaced 4-26-24 set to receive new scum pumps 5-2024 Plan to install new scum pump and put clarifier back in service