Loading...
HomeMy WebLinkAboutSW3230803_Supplement-EZ Form_20240405 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name MCCOY FARM 2 Project Area(ac) 61.97 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 2.4 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No (NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 2 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: HY NGUYEN,PRINCIPLE&ENGINEER 28 Organization: DPR DESIGN 29 Street address: 919 BERRYHILL RD. 30 City,State,Zip: CHARLOTTE,NC 28208 31 Phone number(s): 704-340-0641 32 Email: JMCGIVERN@DPR.DESIGN Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer CItiA Irruiiiirrr. N9.9; e4 SEAL et 030523 i — Signature of Designer ° !GINEF' ta \�otiR wino" p Hy guy 8/12/2022 Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 SAND FILTER- SAND FILTER- 4 Type of SCM SAND FILTERS SCM 1 SCM#2 5 Total drainage area(sq ft) 1,402,632 1128204 274428 6 Onsite drainage area(sq ft) 1,367,932 1096504 271428 7 Offsite drainage area(sq ft) 34,700 31700 3000 8 Total BUA in project(sq ft) 581962 sf 495970 sf 120522 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 430000 sf 343140 sf 86860 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 151962 sf 121130 sf 30662 sf 11 Offsite BUA(sq ft) 34700 sf 31700 sf 3000 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) sf sf sf -Sidewalk(sq ft) 33431 sf 24738 sf 6262 sf -Roof(sq ft) sf sf sf -Roadway(sq ft) 88137 sf 67511 sf 17089 sf -Future(sq ft) sf sf sf -Other,please specify in the comment box below(sq ft) 30394 sf 23700 sf 6300 sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf sf sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf sf sf 16 Existing BUA that is already permitted(sq ft) sf sf sf 17 Existing BUA that will be removed(sq ft) sf sf sf 18 Percent BUA 36% 44% 44% 19 Design storm(inches) 1.0 in 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 81500 cf 58000 cf 23500 of Simple Method, Simple Method, Simple Method, 21 Calculation method for design volume Schuler Schuler Schuler ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Other BUA=Cluster Mailbox and Entry Monuments. Note:Future for HOA area is part of the OTHER BUA values. SAND FILTER 1 Drainage area number 1 2 2 Minimum re uired treatment volume cu ft 32083 sf 29162 sf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yco Yco 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the No No design volume? 9 What is the method for dewatering the SCM for maintenance? Other Other 10 If applicable,will the SCM be cleaned out after construction? N/A N/A 11 Does the maintenance access comply with General MDC(8)? _ Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes SAND FILTER MDC FROM 02H.1056 I � 18'SHWT elevation(fmsl) 589 608 19 Type of sand filter(open or closed) _ Open Open 20 If closed,will the filter will be pre-cast or pour-in-place? 21 If closed,top of grate elevation(fmsl) _ 22 Is this sand filter designed to attenuate peak flows? Yes Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 25000 cf 6000 cf 24 Will there be a permanent pool in the sediment chamber? No No 25 Bottom of the sediment chamber(fmsl) 596.00 612.00 26 Area of the sediment chamber(square feet) _ 25000 sf 5600 sf _ 27 Physical depth of the sediment chamber(inches) 12 in 12 in 28 Ponding depth in the sediment chamber,above any permanent pool (inches) _ 29 Elevation of top of weir between chambers(fmsl) 597 613 Sand Chamber 30 Volume that can be retained in the sand chamber(cubic feet) 21025 cf 10475 cf 31 Bottom of the sand chamber(fmsl) _ 595.00 611.50 32 Area of the sand chamber(square feet) 8050 sf 2650 sf 33 Physical depth of the sand chamber(inches) _ 24 in 18 in _ 34 Ponding depth in the sand chamber,above the sand surface 24 in 18 in (inches) 35 Elevation of the bypass device(fmsl) I 597 613 _ 36 Type of bypass device Outlet structure Outlet structure with Orifice with Orifice. _ 37 Mechanism for distributing flow over the sand surface RIP-RAP BERM RIP-RAP BERM 38 Sand specification for sand chamber ASTM C-33 ASTM C-33 _ 39 Depth above underdrain pipe(inches) 12 in 12 in 40 Will the media be maintained to drain at least two inches per hour at Yes Yes the sand surface? 41 Is at least one clean-out pipe provided at the low point of each Yes Yes underdrain line? 42 Will clean-out pipes be capped? Yes Yes ADDITIONAL INFORMATION 43 Please use this space to provide any additional information about the sand filter(s): SCM#2 only has an impermiable liner to protect against SHWTE infiltration. Dewater:these are sand filters;there should be no need for dewatering;if there is a complete failure of the sand media then any excess water would have to be pumped out;refer to DEWATERING DETAIL on CDs,C3 series. Sand Filter 1 11:35 AM 4/3/2024