HomeMy WebLinkAboutWQ0031396_Compliance Evaluation Inspection_20240405 SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED April 5, 2024 Jack Minski Email: jack@futura-capital.com Lake Point Properties on Santeetlah LLC SUBJECT: Reconnaissance Inspection Report Santeetlah Lakeside WWTP Non-discharge Permit No. WQ0031396 Graham County Dear Permittee: The North Carolina Division of Water Resources conducted a reconnaissance inspection of the Santeetlah Lakeside WWTP on 4/5/2024. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in Non-discharge Permit No. WQ0031396. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Reconnaisance Inspection Report". The following operational issues were identified during the inspection that need to be addressed during system startup: • Permit Condition III.16: The turbidity and flow meters were calibrated over a year ago and will need to be calibrated again prior to system use. Note that the actuating valve that diverts flow to the upset storage tank still needs to be calibrated and tested for functionality. If you should have any questions, please do not hesitate to contact Melanie Kemp with the Water Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at melanie.kemp@ncdenr.gov. Sincerely, Melanie Kemp, Environmental Specialist Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS: Reconnaissance Inspection Report Ec: Laserfiche Jose Rosado (Site Contact), Tim Barbee (Wastewater Consultant) Compliance Inspection Report Permit:WQ0031396 Effective:03/13/23 Expiration:07/31/24 Owner :Lake Point Properties on Santeetlah LLC SOC: Contact Person: Region: County: Directions to Facility: Graham Asheville Jose F Rosado Effective:Expiration:Facility:Santeetlah Lakeside WWTP 14 Marina Dr Lake Santeetlah NC 28771 Title:Phone:305-447-8697 Hwy.19 through the Nantahala Gorge. Turn right onto Hwy. 129 to Robbinsville. Continue on Hwy. 129 through Robbinsville to Lake Santeetlah.Turn left onto Thunderbird Mtn. Rd. Go past Santeetlah Marina. The facility is located on the left. Secondary ORC(s): 828-586-5588Phone:989074Certification:Mark Fredrick TeaguePrimary ORC: SI,WW2,System Classifications: On-Site Representative(s): Related Permits: Secondary Inspector(s): Primary Inspector: Inspection Date:Exit Time:Entry Time: Phone: 04/04/2024 11:00AM 12:00PM Melanie Kemp Facility Status: Permit Inspection Type: Reason for Inspection:Inspection Type: Not CompliantCompliant Follow-up Reclaimed Water Reconnaissance Question Areas: Miscellaneous Questions (See attachment summary) Page 1 of 3 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0031396 04/04/2024 Reconnaissance Lake Point Properties on Santeetlah LLC Follow-up Inspection Summary: On April 4, 2024, Melanie Kemp from the Asheville Regional Office performed a follow-up site visit of the Santeetlah Lakeside WWTP (Non-discharge permit WQ0031396). Tim Barbee (WW contractor), Jose Rosado (site developer), Jack Minski (owner), and Jorge Cadena (property owner) were on-site to assist with the inspection. After an initial start-up inspection in July 2022, multiple issues were noted and corrected, and the permit was modified from construction-only to operational (issued March 2023). At the time the permit was issued, the system was mostly operational. For the past year, Environmental Inc. has been performing weekly site visits, but no wastewater has been flowing through the WWTP. One residence is nearly fully constructed and will be connecting to the WWTP in mid-May of this year. The following items were noted during the inspection: •The drip system was repaired a full year ago and will need to be monitored during system startup to ensure there has been no additional damage in the last year that might lead to ponding/runoff from the drip fields during dosing cycles. Tim Barbee will be performing quarterly site visits to assist Environmental Inc. with the drip fields. •Per permit condition II.7, a moisture sensor has been installed on the outside of the treatment building to prevent dosing during precipitation events or wet conditions. •The back-up generator was repaired, and it is recommended that a service provider is contracted to ensure the generator is adequately maintained and topped-off with fuel. •The WWTP is furnished with an auto-dialer, but it should be noted that the unit is not connected or functional. •The chemical injection unit that was furnished with the WWTP is not in use and, after consulting with an engineer, there are no plans to utilize it moving forward. •Baseline groundwater sampling was performed in July 2022, and groundwater sampling will be required moving forward, per permit requirements. The following items require attention during system startup: •Permit Condition III.16: The turbidity and flow meters were calibrated over a year ago and will need to be calibrated again prior to system use. Note that the actuating valve that diverts flow to the upset storage tank still needs to be calibrated and tested for functionality. The ARO will perform a full inspection in Fall of 2024, in coordination with Tim Barbee and Environmental Inc., to ensure all system components are fully operational. The current permit is in the process of being renewed. Page 2 of 3