HomeMy WebLinkAboutSW5240401_Plansheet - Misc. Detail_20240404 a
MAINTENANCE NOTES:
1) INSPECT MATTING WEEKLY AND AFTER SIGNIFICANT RAIN
EVENTS.REPAIR IMMEDIATELY.
2)GOOD CONTACT WITI I GROUND MUST BE MAINTAINED,
AND EROSION MUST NOT OCCUR BENEATH MATTING.REPAIR
AND SECURE AS REQUIRED IF D-z"LkGED OR UNDERCUT.3)MONITOR AND R SEEDING SCHEDULE
REPAIR AS NECESSARY UNTIL A'1'12"INTERVALS.
SLOPE SURFACE SHALL BE SMOOTH BEFORE' IF THERE IS A BERM AT THE TOP OF SLOPE, GxoUNDcovER IS ESTABLISHED. STAPLING/STAKING PATTERN AS
PLACEMENT FOR PROPER SOIL CONTACT. ANCiiOR UPSLOPF. OF THE.BERM. PER MANUFACTURERS MINIMUM REQUIREMENTS FOR SLOPE STABILIZATION
SPECIFICATIONS. STABILIZED WITH GRASS 3:1 AND FLATTER
Y STABILIZED WITH SHRUBS OR VINES 3:1 TO 2:1 DESIGN GROUP
.,R ^, STABILIZED WITH RIPRAP 2:1 TO 1.5:1
MIN. 2" ; {',,;:'�_,� STABILIZED WITH RETAINING WALL STEEPER THAN 1.5:1
ANCHOR IN 6„ X „ MIN. TRLNCH WHEN USED IN CONJUNCTION
STAPLING PATTERN AS OVERLAP , AND STAPLE AT 12" INTERVALS. WITH CHECK DAMS OR
PER MANUFACTURERS q WATTLES,INSTALL,MATTING DATE TYPE PLANTING RATE
PO BOX 2007
RECOMMENDTAIONS � �'� FIRST. AUG. 15 — NOV. 1 TALL FESCUE 300 LBS./ACRE
NOV. 1 — MAR. 1 TALL FESCUE 300 LBS,/ACRE Wake Forest, NC 27588
f _ MIN. 6" OVERLAP. & ABRUZZI RYE 25 LBS,/ACRE Telephone: 919.280.0354
LIME,FER'ITLIZE,AND SEED MAR, 1 — APR. 15 TALL FESCUE 300 LBS,/ACRE
MATTING SHOULD BE USED IN ALL BEFORE INSTALLATION. APR. 15 — JUN. 30 HULLED COMMON BERMUDAGRASS 25 LBS./ACRE
' ^r 4= JUL. 1 — AUG. 15 TALL FESCUE AND 125 LBS./ACRE
�. DITCHES AND ANYWHERE *** 0eeeegageeeBe
BROWNTOP OR GERMAN MILLET 35 LBS./ACRE C^�0/aa
STAPLE OVERLAPS MAX. S" SPACING. CONCENTRATED RUNOFF IS CONVEYED. `\ /1 C
IN CHANNELS,ROLL OUT STRIPS OF NETTING PARALLEL TO THE SLOPES (3:1 T❑ 2:1) mmm0\00Q •0M S/ ` �mm
DIRECTION OF FLOW AND OVER THE PROTEC11VE MULCH. m \e•
BRING MATERIAL DOWN TO A LF.VFI. MAR. 1 — JUN. 1 SWITCHGRASS 3.5 LBS./ACRE CD A
DO NOT STRETCH BLANKETS/MATTING AND BIG BLUESTEM 7 LBS./ACRE m 7,
AREA,'TURN T'HE END UNDER 4��AND MAR. 1 — APR. 15 ADD TALL FESCUE 120 LBS./ACRE
TIGHT-ALLOW THE ROLLS TO CONFORM TO ANY STAPLE AT 12" INTERVALS. I MAR. 1 — JUN. 30 OR ADD WEEPING LOVEGRASS 10 LBS./ACRE e• mm
MAR. 1 — JUN. 30 OR ADD HULLED COMMON BERMUDAGRASS 25 LBS./ACRE •• •• ��00
IRREGULARITIES. JUN. 1 — SEP. 1 ***TALL FESCUE AND 120 LBS./ACRE ee�// °• ••°° 0
***
LIME. FERTILIZE, AND SEED BEFORE INSTAi.LATION. I� II BROWN OR GERMAN MILLET 35 LBS. ACRE eea M C
� \� ANCHOR
FOR SLOPES LESS THAN 3H:1V,ROLLS MAY BE t / e
PLANTING OF SI IRUBS,TREES,FTC. SI IOULD OCCUR ����\�I II� A 12-INCII TRENCII � SEP. 1 - MAR. 1 SWITCHGRASS 3.5 LBS./ACRE
PLACED IN HORIZONTAL STRIPS. AND BIG BLUESTEM 7 LBS./ACRE
AFTER INSTALLATION. 12-inch AND TALL FESCUE 120 LBS./ACRE
overlap , NOV. 1 — MAR. 1 ADD ABRUZZI RYE 25 LBS./ACRE P L 1 M I NARY
APPLY MATTING TO BOTTOM AND SIDESLOPES OF DITCH. JOIN STRIPS BY ANCHORING
MAINTENANCE NOTES: MATTING MUST BE INSTALLED UP TO AND OVER CREST OF AND OVERLAPPING CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR
SIDESL.OPES,AND ANCHORED IN A TRENCH AS SHOWN ABOVE. ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF NOT FOR CONSTRUCTION
1) INSPECT MATTING WEEKLY AND AFTER SIGNIFICANT RAIN EVENTS. REPAIR IMMEDIATELY. DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER FOR REVIEW ONLY
2) GOOD CONTACT WITH GROUND MUST BE MAINTAINED,AND EROSION MUST NOT OCCUR BENEATH LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE.
MATTING. REPAIR AND SECURE AS REQUIRED IF DAMAGED OR UNDERCUT. ***TEMPORARY — RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT
3) MONITOR AND REPAIR AS NECESSARY UNTIL GROUNDCOVER IS ESTABLISHED. VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT
BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT.
DETAIL,NUMBER DETAIL,NUMBER
STANDARD MATTING INSTALLATION (SLOPES) STANDARD MATTING INSTALLATION z
J
Region of Species or Mixture Adaptation Maintenance O
Varieties f ^ �
Adaptation Annual Mowing Mowing v� a
Shade Heat Cold Drought Wear Fertilizer Height F T
Cool Season Grasses: (lbN/100oftz Frequency) (in.) *ADDITIONAL SODDING V v
Kentucky blugrass blend' Mountains Kentucky bluegrass good fair good good good 2.5-4 2 med. Lill X:
Kentucky bluegrassi good good good good good 2.5-3 3 high INSTRUCTIONS CAN BE FOUND l_
Tall fescue blend Adventure,Brookston, Mountains Tall fescue "SODDING"
Falcon,Finelawn, and Piedmont Tall fescue good good goad good good 2.5-3.5 3 high IN SECTION 6.12 SODDING OF (V O
Galway,Houndog, THE NCDEQ DEMLR EROSION In Z
Jaguar,Olympic,Rebel Hybrid Berrnudagrass poor good poor excel. excel. 5-6 1 high J Z
AND SEDIMENT CONTROL r1 z
Tall fescue/Kentucky Mountains Centipedegrass fair good poor good poor 0.5 1 low
bluegrass and Piedmont St.Augustinegrass good good poor good poor 2.5 2-3 med. PLANNING AND DESIGN MANUAL. TREATED TIMBER S WA L E CHECK DAM SEEDBED PREPARATION
Warm Season Grasses: Zoysiagrass fair good fair excel. good 1.5 1 high 0 J
J J
Hybrid Bermudagrass Vamont,Tifway,Tifway Piedmont and Adapted from Carolina Lawns,NCAES Bulletin no.AG-69. 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF
II&Trfgreen Coastal Plain MAINTENANCE NOTES:
sail to detetrunte the exact requirements for lime and 1) Al'1'LiR l+1RS'1'WLLK V4'A'1'ER AS NLCESSARY'1'O (L AVAILABLE. Z � >
Soil
Zoysiagrass Emerald,Meyer Piedmont and preparation—Test MAINTAIN ADEQUATE MOISTURE IN TIIE,ROOT 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. U0 = Ln 1—
fertilizer. Soil tests may be conducted by the State soil testing lab or a reputable
Coastal Plain ZONE AND PREVENT DORMANCY OF SOD.WATER 3. REMOVE ALL LOOSE ROCK, ROOTS,AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH Z � , ^
commercial laboratory. information on free soil testing is available from the MORE DURING SUMMER MONTHS. I 1 AND UNIFORM. Q (D
Centipedegrass No improved varieties Piedmont and Agronomic Division of the North Carolina Department of Agriculture or the 2)DO NOT REMOVE MORE THAN 1/3 OF SHOOT IN 1Q 4. APPLY AGRICULTURAL LIME, FERTILIZER,AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL(SEE J Z O
Coastal Plain Agrtcultural Extension Service. Where sodding must be planned without soil ANY MOWING.MAINTAIN GRASS HEIGHT BETWEEN I *) J U
ng soil amendments may be sufficient: BELO W
StAugustinegrass Raleigh Piedmont and tests the followi 2-3 INCHES UNLF.SS OTHERWISE,SPECIFIED. I 5. CONTINUE TILLAGE UNTIL AWELL-PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 0 z
Coastal Plain •Pulverized agricultural limestone at a rate of 2 tons/acre(100 lb/1,000 3)AFTER FIRST GROWING SEASON,ESTABLISHED 1 INCHES DEEP. z
ftr) SOD REQUIRES FERTILIZATION;MAY ALSO REQUIRE 4 L U
A large number of varieties exist—consult suppliers and your local s LIME.FOLLOW S01L'I'ES'I'RLCOMMENDA'I'IONS. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CC 0 �L
Agricultural Extension office for recommendations. *Fertilizer at a rate of 1,000 lb/acre(25 lh/1.00D ft)of 10-10-10 in fall or 1 I CU LTI PACK AFTER SEEDING. G Z
5-10-10inspring. ( I �2) 6tfX6tf TREATED TIMBERS 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. t2 1 Q
Flow SECURE TIMBERS 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, Q W L" LU DC
Equivalent nutrients maybe applied with other fertilizer formulations. These --�•—�-•--------� \
'°``�-- • Lay sod across the amendments should be spread evenly over the area.and incorporated into the I Lay sodinastaggered WITH #4REBAR IF POSSIBLE. IF STAND SHOULD BE OVER60%DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, J D > IL
�_. �.
directionofflow. top 4-8 inches of soil by disking.harrowing, or other effective means. If 1 —�J patternwrthstripsbutted 2 %I' WEEP HOLE FERTILIZER AND SEEDING RATES. LU
^_^w •� tightlyagainst each other.A I
topsoil is applied.follow,specifications given in Practice 6.04.Topsoiiing. ""l ' sharpened mason's trowel can 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER I''�
be usd to tuck down the ends PERMANENT COVER IS ESTABLISHED. 0 L U Z C)
Prior to laying sod, clear the soil surface of trash, debris. roots, branches, r and trim pieces.
�— stones,and clods larger than 2 inches in diameter. Fill or level low spots in f y 1 c LU
Use pegs or stables to fasten sod firmly at the 6-10" order to avoid standing water. Rake or harrow the site to achieve a smooth lam__j.-.'r.._`-_ l LU
ends of strips and in the center,or every 3-4 2 J 0
if the strips are long.When ready to mow, �� ^-_ and level final grade. Mktg Correct Butting—angled ends caused by the automatic *APPLY: AGRICULTURAL LIMESTONE-3 TONS ACRE
drive pegs or staples"ush with the ground. '-'--- -'-" DOWNSTREAM TOE PROTECTION / J 0
t t Peg or j sod cutting must be matched correctly.
_..ri Complete soil preparation by rolling or cultipacking to firm the soil. Avoid Incorrect 11 FERTILIZER 10 10 10 ANALYSIS AT800 01,000 LBS./ACRE \
using heavy equipment on the area,particularly when the soil is wet,as this 18 5' WIDE RAILROAD BALLAST 12" THICK SUPERPHOSPHATE-S00 LBS./ACRE OF 20%ANALYSIS SUPERPHOSPHATE / pC Z
may cause excessive compaction, and make it difficult for the sod to take 11 ON G EOTEXTI LE FABRIC MULCH-2 TONS(APPROX.80 BALES)SMALL GRAIN STRAW/ACRE Ln ED
lawANIn critical areas,secure root• I
CHOR-TACK WITH LIQUID ASPHALT AT 400 GALLONS/ACRE OR / �
µ+"'" a d V with I EMULSIFIED ASPHALT AT 400 GALLONS/ACRE. = O
I
.n.._.._..
etap les. l l i Z
--WF` .—- I, I
_ Z:) DC J
O O J
Roll sod immediately to Water to a depth of 4" Mow when the sod is es-
achieve firm contact as soon as the sod is tablished(2-3 wks).Set Z U(r1��t
with the soil. laid,and continue the mower high(2-3"). V
watering as needed. tLn
^
W
DETAIL NUMBER ^' 0
SODDING INSTRUCTIONS
DATE
3/4/2024
REVISIONS
1 3/28/2024
DRAWN BY I CHECKED BY
KAH I WHIM
SHEET TITLE
LU DETAIL SHEET
2
0
U
LU
K
SHEET NUMBER
Z
LU
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF YOUNGSVILLE, FRANKLIN COUNTY PUBLIC UTILITIES, AND NCDOT STANDARDS & SPECIFICATIONS AS APPLICABLE o C 7
U
Z
8 OF 8