HomeMy WebLinkAbout20151278 Ver 1_Application_20151210Corps Submittal Cover Sheet
Please provide the following info:
1. Project Name: BridQe 100541, SR 2788 Crooked Creek Road
2. Name of Property Owner/Applicant: NC DOT
3. Name of Consultant/Agent:
*Agcnt authorization needs to bc attached.
4. Related/Previous Action ID number(s):
5. Site Address: N/A
6. Subdivision Name:
7. City: Black Mountain
8. County: Buncombe
9. Lat: 35.56800 Long: -82.26899 (Decimal Degrees Please )
10. Quadrangle Name: Black Mountain
11. Waterway: Glade Creek
12. Watershed: Broad River
13. Requested Action:
X Nationwide Permit # 14
General Permit #
_ Jurisdictional Determination Request
_ Pre-Application Request
I�he following information will be completed by Corps office:
AID:
Prepare File Folder Assign number in ORM Begin Date
Authorization: Section 10 Section 404
Project Description/ Nature of Activity/ Project Purpose:
Site/Waters Name:
Keywords:
Transportation
December I l, 2015
Ms. Lori Beckwith
US Anny Corps of Engineers
I51 Patton Avenue, Roorn 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #14
Bridge 100541, SR 2788 Crooked Creek Road
State Project No. 17BP.13.R.1 10
Buncombe County, NC
Dear Ms. Beckwith:
PAT McCRORY
Govrrnor
NICHOLAS J. TENNYSON
s��rerary
I have enclosed a set of plans, a PCN application for N WP # 14, and a viciniry map relative to the
proposed bridge replacement project on SR 2788 Crooked Creek Road, Buncombe County, NC.
We propose to replace the existing 20'6" timber bridge with double barrel box culvert (2@9'x6')
sills to maintain low flow within a single barreL Stream slope at the site is 0.50%. CulveR
installation will result in permanent impact to 82 linear feet of Glade Creek; floodplain bench
construction will permanenYly iinpact an additional 70 linear feet. Temporary impacts to 151 feel
of the creek are due to a temporary impervious dike diversion during culvert construction. The
stream is approximately I Ofeet wide with a predominately gravel and cobble substrate. Glade
Creek is classified as Class C, Tout.
Existing channel morphology will be maintained upstream and downstream of the culvert.
Riparian vegetation will be reestablished along disturbed areas associated with the project.
Stonnwater will be dive�ted through grass-lined ditches or vegetated buffers prior to entering
streams.
This project may impact potentially suitable northern long-eared bat (Myods septentrionalis)
(NLEB) summer roosting habitat. Tlierefore, a may affect, not likely to adversely affect is
requested for the NLEB. Minor tree clearing will be performed for the project. The existing
bridge is constructed of timber abutments and steel beams. The crown to bed measurement
(distance from travel surface to streambed) is 6 feet Clearance between the bottom of the bridge
and the stream surface is approximately 4 feet. A survey of the bridge did not reveal any
evidence of usage by bats. No effect on the remaining Buncombe County list of federally
protected species (threatened or endangered) or designated critical habitat will occur. Marella
Buncick of US Fish and Wildlife Service is copied on the application for review.
�Nothing Compares�-
Sw�eofNotlhCarolina I Depatlmen[ofTranspotlalion I UivisionThineen
55 Orange Shee� � PO Box i219 I Ashesille, NC 25802-3279
8282SI6171 T
Ms. Lori Beckwith
Page —2 Bridge 100541, Buncombe County
December I l, 2015
As a part of the 401 Certification process, the project was processed through the DOT
Programmatic Agreement for Minor Project as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a). No Historic Resources will be affected.
E3y copy of this letter, we request Marla Chambers, North Carolina Wildlife Resources
Commission Western Region Coordinator, to comment directly to the Corps concerning the
pennit request.
By copy of this letter, we are asking the Area Roadside Field Operations Engineer, to comment
on the above project. Glade Creek is classified as Class C, Trout. The project will not require a
trout buffer variance.
By copy of this letter, I am forwarding one electronic copy of the application package to
Kristi Lynn Carpenter, NC Division of Water Resources, Transportation Permitting Unit
with cc to Kevin Barnett, NC DWR Asheville Regional Office for review and comment.
Please charge the application fee of $240.00 to WBS element # 17BP.13.R.110. Please
forward comments directly to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
Roger D. Bryan
Division 13 E�rvironmental Officer
Enclosures
cc: J.J. Swain, Jr., P.E.
Chris Medlin, P.E.
Ben DeWit, CPESC
Kevin Barnett
Marla Chambers
Marella Buncick
o��F W A TF9OG
uj 9
� r
O Y
Office Use Only:
Corps aclion ID no.
DWQ projecl no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the X Section 404 Permit ❑ Section 10 Permit
Corps:
1b. Specify Nationwide Permit (NWP) number:l4 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? X Yes ❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes X No ❑ Yes X No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation X Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes X No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No
2. Project Information
2a. Name of project: Bridge 100541, SR 2788
2b. County: Buncombe
2c. Nearest municipality / town: Black Mountain
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state 17BP.13.R.110
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if N/A
applicable):
3d. Street address: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: North Carolina Department of Transportation
4b. Name: J.J. Swain, Jr., P.E., Division Engineer
4c. Business name N.C. Department of Transportation
(if applicable):
4d. Street address: 55 Orange Street, P.O. Box 3279
4e. City, state, zip: Asheville, NC 25802
4f. Telephone no.: 828-251-6171
4g. Fax no.: 828-251-6394
4h. Email address: rdbryan@ncdot.aov
5. Agent/Consultant Information (if applicable)
5a. Name: N/A
5b. Business name N/A
(if applicable):
5c. Street address: N/A
5d. City, state, zip: N/A
5e. Telephone no.: N/A
5f. Fax no.: N/A
5g. Email address: N/A
Page 2 of 10
B. Project Information and Prior Project History
7. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1 b. Site coordinates (in decimal degrees): Latitude: 35.56800° N Longitude: - 82.26899° W
1 c. Property size: 0.1 acres
2. Surtace Waters
2a. Name of nearest body of water (stream, river, etc.) to Glade Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C, Trout
2c. River basin: Broad
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Exisling bridge on SR 2788 surrounded by low density residential area, pasture, and forest..
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
200
3d. Explain the purpose of the proposed project:
Replace existing 20'6" timber/steel bridge with a double barrel box (2@9' x 6') culvert with sills. Low flow will be
maintained within a single barrel.
3e. Describe the overall project in detail, including the type of equipment to be used:
A permanent impact to 82 linear feet of Glade Creek will be necessary for culvert construction with 70 of rip rap for
floodplain bench construction at inlet and outlet. A temporary impact of 151 linear feet will be necessary for an
impervious dike to dewater the work area during construction. Equipment used will include excavator, crane, and
trucks.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ❑ Yes X No ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): N/A Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes X No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes X No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands X Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type ofjurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora T
W1 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WZ � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3 c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number- (PER)or (Corps-404,10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ❑ P X T Impervious Dike Glade Creek X PER X Corps 10 151
❑ INT ❑ DWQ
S1 X P❑ T Rip Rap Bench Glade Creek X PER X Corps 10 70
❑ INT ❑ DWQ
S1 X P❑ T Culvert Glade Creek X PER X Corps 10 82
❑ INT ❑ DWQ
S2 � P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S3 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S5 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 303
3i. Comments:82 feet of permanent culvert impact, 70 feet of permanent impacts for floodplain bench, 151 feet of temporary
impacts for dike. Total project footprint is 151 feet.
Page 4 of 10
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑P❑T
02 ❑P❑T
03 ❑P�T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
PondlD Proposed use orpurpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
Sf. Total
Sg. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
Sj. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Bufferimpact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem orar T im act re uired?
61 ❑P❑T ❑Yes
❑ No
62 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Minimized length of culvert and added sills to maintain low flow in a single barrel within the structure. Stream gradient is
low (0.50%) which will allow for assimilation of natural stream bed material within the culvert. Water velocities within the
culvert do not exceed velocities within the stream for 2 and 10 year events.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
N/A
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for X Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this X Payment to in-lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. X Yes
4b. Stream mitigation requested: 82 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool X cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? X Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No.
000250 Post Construction Stormwater Program
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? N/A
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
X Other. N/A
3c. Has the approved Stormwater Management Plan with proof of approval been N/A
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
X Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A
5b. Have all of the 401 Unit submittal requirements been met? N/A
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Field survey of the project area and evaluation of current distribution data.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Current Maps/Database
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: Project will not impact water passage or flood zone beyond existing
conditions
8c. What source(s) did you use to make the floodplain determination? Current FEMA Maps
Roger D. Bryan n Q 12111/2015
P� (U
ApplicanUAgenPs Printed Name ApplicanUA nPs Signature Date
(AgenPs signature is valid only if an authorization letter from the applicant
is rovided.
Page 10 of 10
Y
i. i'.
.. ....... � ...
w£ tiY+:
5 �* A
� �
". eM .
�i�$��'f��l#31y'.�i 1;.3f ��71'{Si�l�.��'f�? �✓
ii�� �ta4 ini i�.� *'�d4 ik�arr;6'��v$ � vC'r� �;; ..
a�� "��_;v�������,��� :,� � .r"
..s, a� � �;. = ` ,, �
jP V�� =T. y � � .
h, � -_Y�:
��ll�/ l.kb�'���i 'r� . .
��lt� /
�Y . �
� k �� '
I•p
ii i �
1 l ' J
�! '1 � ' f 4
��3 �. .r � i` .
\ { J
� �.
�,a `�� t � �`
� �, - {
.i" 3!":�'�_G �'�w ,� .
Figure 1. Bridge 300541, Glade Creek, Buncombe County, NC.
�' - `'"— -- �
�" � '
� � - �-.�� N , ,. n��: �
�. � -- � � _ ..�..;- � ..� _ . �._._� � � ��<:., : �,, _
Figure 2. Bridge 300541, Glade Creek, Abutments and Structure photo, Buncombe County, NC.
�
>,� ;''
,:��
;;;�;�
Environmental
Quality
PAT MCCRORY
co�P�,�o.
DONALD R. VAN DER VAART
Sern tnry
Mr. Roger Bryan
NCDOT Division 13 Envimnmental Supervisor
North Cazolina Department of Transpor[ation
Post Office IIox 3279
Asheville, North Carolina 2R802
Dear Mr. Bryan:
December 4, 2015
Subject: Mi[igation Acceptance I.etter.
Division 13 Project, Replace Bridge Number ]00541 over Glade Creek on SR 2788
(Crooked Creek Road), Buncombe County; WBS Element 17B.13.R.110
The pwpose of this letter is ro notify you that the Division of Mitigation Services (DMS) will provide the
compensatory stream mitigation for We subject project. Based on the infoimation received on Novem6er 30, 2015,
the impacts aze located ia CU 03050105 of the Broad River basin in the Southem Mountains (Slvn Ew-Regioq and
are as follows:
Broad Stream Wetlands Buffer (Sq. Ft.)
03050105 Non- Coastal
SM Cold Cool Warm Fliparian ��� M�h Zone 1 Zone 2
Impacts g2 0 0 0 0 0 0 0 0
(feeUacres
This impact aud associated mitigation need were under projected by the NCDOT in the 2015 impact data.
DMS will commit to implemen[ sufficient compensatory stream mipgation credits to offset the impacts associated
with this project as determined by the regula[ory agencies using the delivery [nneline listed in Section F3.c.iii of the
In-Lieu Fee InsWment dated July 28, 2010. If ihe above referenced impact amounts are revised, lhen this
miqga[ion accep[ence letter vrill no longer be valid and a new mitigation accep[auce letter will be required from
DMS.
8420.
If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-
Sincerely,
�-I//p''''�"� '<�-�--�
Jam�s,B. Stanfll
Credit Management Supervisor
cc: Ms. Lori Beckwith, USACE - Asheville Regulatory Field Office
Mr. CLristopher D. Medlin, P,E., Division 13 Bridge Program Manager
Ms. Linda Fitzpatrick, NCDOT - PDEA
File: SR 2788 - Bridge 100541- Division 13
�`�Nothing Compares�
SlateolNoitl�Camline EnvimninenlalUualiry
1GO11Aail5erviceCente� i Raleigh,NorlhCa�olina2]6941601
914]07-6600