HomeMy WebLinkAboutNCC241005_Site Plan or Location Map_20240404 STANDARD SEDIMENT AND EROSION CONTROL PLAN
FOR SINGLE FAMILY LOTS APPLICABLE CONDITIONS ,
1. THIS STANDARD PLAN IS FOR LOTS WITH A DISTURBED AREA OF LESS THAN 1 ACRE AND A TOTAL SITE , I
DISTURBANCE LESS THAN 5 ACRES. IF THE DISTURBED AREA IS GREATER THAN 1 ACRE(ON A SINGLE
LOG OR MULTIPLE LOTS THAT ARE MASS GRADED)A CUSTOM EROSION CONTROL PLAN MUST BE
PREPARED AND SUBMITTED ONLINE FOR THE 30-DAY REVIEW CYCLE AND PAY THE EROSION CONTROL B.M.2023,PGS.115-116
PLAN REVIEW AND GRADING PERMIT FEES.
2. THIS STANDARD PLAN IS FOR LOTS THAT ARE"FINISHED, PAD READY".OR AT FINAL GRADE. MASS
GRADING WITH FULL STABILIZATION HAS ALREADY OCCURRED OR MASS GRADING WILL NOT OCCUR.
3. THE STANDARD PLAN IS NOT FOR THE SITES LOCATED IN A HIGH QUALITY WATER(HOW)ZONE AND
PROPERTIES THAT CONTAIN JURISDICTIONAL WETLANDS OR STREAMS WITHIN 100 FEET OF THE LOTS.
AS I I I ill I a 1 I ilm
4. THIS PLAN SHALL NOT BE USED WITH LOTS THAT HAVE OFF-SITE SEPTIC EASEMENTS OR IF ANY PART OF
THE SEPTIC SYSTEM OR REPAIR AREA IS LOCATED WITHIN 10 FT.OF A PROPERTY LINE.
5. ADDITIONALLY,THIS PLAN SHALL NOT BE USED FOR LOTS WITH.
A. BASEMENTS
B.GREAT THAN 5 FT.OF ELEVATION BETWEEN THE TOE OF SLOPE FOR EACH LOT AND/OR LOTS WITH
GREATER THAN 10FT. ELEVATION DIFFERENCE OF THE DISTURBED AREA FROM FRONT TO BACK
C.CONCENTRATED FLOW/SWALES BETWEEN THEMI
D.STORMWATER CONTROL MEASURES(SCMS)FOR THE INDIVIDUAL LOT
E. RECEIVING OFFSITE CONCENTRATED STORMWATER.
API 111
18 19 CAK64
0
1,
6N7-UR6CT ial%
TYPICAL CONSTRUCTION SEQUENCE FOR SINGLE 16 a
FAMILY LOTS SEDIMENT AND EROSION CONTROL 4
1. WAKE COUNTY RESERVES THE RIGHT TO REQUIRE A SITE SPECIFIC EROSION CONTROL PLAN TO BE 0
PREPARED AND SUBMITTED FOR THE 30-DAY REVIEW CYCLE. o2
2. AS OF APRIL 1,2019 APPLICANTS MUST APPLY ONLINE FOR NCG-01 PERMIT COVERAGE FROM NCDEQ. Q
THIS REQUIREMENT IS IN ADDITION TO THE WAKE COUNTY LAND DISTURBANCE PERMIT. /�0
3. OBTAIN ALL NECESSARY PERMITS AND CERTIFICATES. DOWNLOAD STANDARD SEDIMENT AND EROSION 1 /CONTROL PLAN FOR SINGLE FAMILY LOTS FROM WWW.WAKEGOV.COM.
4. INSTALL TREE PROTECTION FENCE IF REQUIRED.INSTALL GRAVEL CONSTRUCTION ENTRANCE,SILT
FENCE,SILT FENCE OUTLETS AND ADDITIONAL MEASURES AS NEEDED.CLEAR ONLY AS NECESSARY TO 1 \
INSTALL DEVICES. PROVIDE GROUND COVER FOR ALL DISTURBED AREAS. \)
5. CALL ENVIRONMENTAL CONSULTANT FOR AN ONSITE INSPECTION BY THE ENVIRONMENTAL
CONSULTANT TO OBTAIN A CERTIFICATE OF COMPLIANCE. LOCATION MAP
6. BEGIN CONSTRUCTION,BUILDING,CLEARING AND GRUBBING. MAINTAIN EROSION CONTROL DEVICES AS 1" =500'
NEEDED.
7. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCHING
LININGS,ETC.
8. WHEN CONSTRUCTION IS COMPLETE,AND ALL AREAS ARE PERMANENTLY STABILIZED AND EROSION
CONTROL MEASURES ARE REMOVED,CALL ENVIRONMENTAL CONSULTANTS FOR AN INSPECTION.
9. OBTAIN A CERTIFICATE OF COMPLETION.
SURVEY NOTES:
1. ALL EASEMENTS, RIGHT-OF-WAY'S, BUFFERS, SETBACKS
\\\�\�0\tttCA1///0//// AND ADJOINERS,ETC.,REFERENCED FROM BOOK OF MAPS
�.cN°°°°°RQ�,i��� 2023,PAGES 115-116 UNLESS OTHERWISE NOTED.
e OS/ °° 2. SURVEYOR HAS MADE NO INVESTIGATION OR
.• e°QO O7°°ems % INDEPENDENT SEARCH FOR EASEMENTS OF RECORD,
• ° Q. SEAL r - ENCUMBRANCES, RESTRICTIVE COVENANTS, OWNERSHIP SHEET INDEX:
L-3841 TITLE EVIDENCE OR ANY OTHER FACTS THAT AN
• e r Q ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE.
° -y, 0 ° C-00 COVER SHEET
y C-01-C-04 EROSION CONTROL PLAN
�°° suR� °°' C-05 QUAD &SOILS MAP
tYIIIIT\P•°�\gel'el'Yl Ta Goy
fJ, ff. A-01 -A15 EROSION DETAILS
Al c/ REVISIONS
DATE:02/12/2024
TAYLORTHE PURPOSE OF THIS PLAN IS FOR PERMITTING PURPOSES WAKE COUNTY STANDARD SEDIMENT AND EROSION DRAWN BY: BR
LAND CONSULTANTS, PLLC ONLY AND SHOULD NOT BE CONSIDERED ASA CONTROL PLAN FOR SINGLE FAMILY LOTS COVER SHEET
Nsmar
License#P-0829 CERTIFIED BOUNDARY SURVEY. OVERLOOK AT MT. VERNON, PHASE 3, LOTS 4, 16, 18 & 19 SHEET C 00
1600 Olive Chapel Rd.,#140
Apex,NC 27502 (919)801-1104 BARTONS CREEK TOWNSHIP, WAKE COUNTY, NC
Z:\Projects\LegacyHomes\Overlook-21065\Dwg\PHASE-310verlook-PH-3-OVERALL-EROSION-SP.dwg
LAKE ADVENTURE COURT
EX. 50'PRIVATE STREET AND _
SITE DATA UTILITY EASEMENT— JI — — — \ J/
/ _ / — , / — 370 — `
CLIENT LEGACY CUSTOM HOMES / / ,
SITE ADDRESS 1425 LAKE ADVENTURE COURT _1�S 73_56'11"E 170.50' /
�LD —LD -LD -LD -LD -LD -LD-LD -LD
PIN 0891-12-2115 /
1 �1 B.M.2023,PGS.115-116
DEED REFERENCE D.B. 19265,PG.2350
SUBDIVISION OVERLOOK AT MT.VERNON, IQ �I
PHASE 3,LOT 4 I I LOT 4 I I
PLAT REFERENCE BM.2023, PGS. 115-116 A 47,090 S.F.
LOT SIZE 1.08 ACRES I-'
I 1.08 Ac. I1
ZONING R-40W F dIEXISTING USE VACANT I
0II EROSION AND SEDIMENT CONTROL
II gl
.=.
d APPROVED PLAN
I I II DATE
It PERMIT NO. S-
SURFACE WATER CLASSIFICATION I II Wake County Environmental Services
STREAM INDEX: 27-15.5-(1) M r Sedimentation &Erosion Control
STREAM NAME: UNAMEDTRIBUTARYAT - II
� dI (919) 856 7400
CAMP ADVENTURE 2 `_i'I - i 7 — 11—
OPEN SPACE �
STREAM CLASSIFICATION: WS-IV,B;NSW 2 I / / 1 -
RIVER BASIN: NEUSE o r
/ — — -360—N _ / i
N i7k. ° ENVIRONMENTAL CONSULTANT
/ EFFECTIVE:8/23/17 SIGNATURE
Z
I / �I LOT 5
IQ _- � 1
J� N
I
LEGEND - 11 dI N
I-' 366I
330 EXISTING CONTOURS II I II
LD LIMITS OF DISTURBANCE 1!
-I
- - DRAINAGE DIRECTION -
II II
II / N 350—/
I„ d1
C .— II
NOTES: . OI
• LOT GRADES WILL CONFORM TO EXISTING / III
TOPOGRAPHY.
\ / 2
• TOTAL DISTURBED AREA= ±45,348 S.F. (1.04 AC.) -� 26 I�I
0 >\ 3aN I
?6�P,� �1
LOT
LOT DISTURBED AREA DRAINAGE NOTES al al an a al a
(ACRES) PATTERN TYPE / N 73°54'34"W 118.61'
/ , - I
4 1.040 TYPE"A" N/A // I
OPEN SPACE 3
Al REVISIONS
DATE:2/12/2024
LTAYLOR THE PURPOSE OF THIS PLAN IS FOR PERMITTING PURPOSES WAKE COUNTY STANDARD SEDIMENT AND EROSION DRAWN BY: BR EROSION CONTROL
LAND CONSULTANTS, PLLC ONLY AND SHOULD NOT BE CONSIDERED ASA CONTROL PLAN FOR SINGLE FAMILY LOTS COMMON PLAN
Nsmar
License#P-0829 CERTIFIED BOUNDARY SURVEY. OVERLOOK AT MT. VERNON, PHASE 3, LOTS 4, 16, 18 & 19 0 20 SHEET C-01
1600 Olive Chapel Rd.,#140
Apex,NC 27502 (919)801-1104 BARTONS CREEK TOWNSHIP, WAKE COUNTY, NC
SCALE: 1" =40
k dit
At \ 111 11141AleiAA‘lik ill
9 _ , . . .. a . V 7
::_z_j 1 ,ii,...umir .4,...,
..
_ sm.- --.41,h,
—441,144,7 .
1 lihb,11 _ &Nib - - mr-
AISOAT/7/4414 ' AS 4i6w .
\LC e L., ak....e. ,...00...4111
) ''s -. 41Lbp-fiN144N CeB IIP
a• W tr6• .' Ihr pl(air a t Di i'
.WO4giva ."SAM I' MA -.-'''--- ' - . •L - - -""-n.I 1 Aibli.,1111111111101111
C 1 01* v '',' - . AIM" WhikaL '11%
V N4 fr.--' -iti- _4160000.
hill : 4 ,*A.p. Nriip,Aftw I
e. r i _
KL 4ft,41411* ,,,,, , 0 P F
Irspogr
eC , 0 !Awl .,. ripe. A
4..._
tOilw-di. 1
lep,:b„ iiiirovl 4f400.4 , 4_,,oi.y PIW ftly, - k--,...1-41*- diiiIMIM a lir*
I.Al ill 4414 4mi
illf 1 . _ GI Iv
44froist* 4,1,^4
Avi
*rill :, ,,„ 74.,,,, 1 Op
r%.-- ,,,,,, ott,..,,....,,iri‘w,ok
kp ii 0 rlblta I,%4 , I
ail -•% .,,,,, 1 mit
rAN _ iii ut. /*Aiwa MMUILUI rl
iliPIIII4Alkill
USGS QUAD MAP OVERLAY NRCS SOILS MAP OVERLAY
1" = 400' 1" = 400'
L TAYLOR WAKE COUNTY STANDARD SEDIMENT AND EROSION DATE
02/12/2024 QUAD & SOILS
wr LAND CONSULTANTS, PLLC CONTROL PLAN FOR SINGLE FAMILY LOTS OVERLAYS
License#P-0829
1600 Olive Chapel Rd.,#140 OVERLOOL AT MT. VERNON, PHASE 3, LOTS 4, 16, 18 & 19 SHEET C-05
Apex,NC 27502 (919)801-1104 BARTONS CREEK TOWNSHIP, WAKE COUNTY, NC
STANDARD SEDIMENT AND EROSION CONTROL PLAN
WAKE COUNTY STANDARD SEDIMENT AND FOR SINGLE FAMI Y LOTS APPLICABLE CONDITIONS
EROSION CONTROL PLAN FOR SINGLE 1. This standard plan is for lots with a disturbed area of less than 1 acre and a
total site disturbance less than 5 acres. If the disturbed area is greater than 1
FAMILY LOTS acre (on a single lot or multiple lots that are mass graded) a custom erosion
control plan must be prepared and submitted online for the 30-day review
cycle and pay the erosion control plan review and grading permit fees.
2. This standard plan is for lots where mass grading with full stabilization has
— already occurred or mass grading will not occur. Mass grading is the grading
or clearing of land for multiple lots by mechanical means across property
lines.
1 = ,- - 3. The standard plan is not for sites located in a High Quality Water (HQW)
1 alba
Zone.
TABLE OF CONTENTS " ''_ ,r �*Th
4. Additionally, this plan shall not be used for lots with either:
a. Lots with equal to or greater than 15 ft. elevation difference of the disturbed
STANDARD SEDIMENT AND EROSION CONTROL PLAN -
A-1 �A o� er/5, area from highest elevation to lowest elevation point across the disturbed
TYPICAL INDIVIDUAL LOT SEDIMENT&EROSION CONTROL A-Z ro V V�p
MEASURES DE'PAII. .-A-- -
area.
LOT NOS.,DISTURBED ACREAGE AND DRAINAGE PATTERN A 4 lilt / e
C�,
TYPE=ABLE 444'
'r, b. Concentrated flow/swales/ditches on or within 25 ft. of disturbed area,
4 �ilitok
STANDARD TEMPORARY SILT FENCE DETAIL A-4 ",s,. except roadside ditches/swales.
STANDARD TEMPORARY SILT FENCE OUTLET DETAIL A-5 I , CrAir - �y
STANDARD RESIDENTIAL CONSTRUCTION ENTRANCEDETAIL A-S
'''?It
A-7
STANDARD INLET PROTECTION DETAIL 14 �� ID a;*4110r k le '
�� � l ry�`
STANDARD CHECK DAM DETAIL A � Y NT ,1�
s TYPICAL CONSTRUCTION SEQUENCE FOR SINGLE
A-S .t, •
STANDARD WATTLE DETAII. �� � '!� �
ROLLED EROSION CONTROL PRODUCT INSTALLATION DETAIL A-10 WNo_NW w3/4 FAMILY LOTS SEDIMENT AND EROSION CONTROL
STANDARD TREE PROTECTION FENCE DETAIL A-11 Ifs P�4 `R
T \ 1. Wake County reserves the right to require a site specific erosion control plan
NCGOI GROUND STABILIZATION AND MATERIALS HANDLING A-12 ` �
NCGSI SELF-INSPECTION,RECORDKEEPING AND REPORTING A-13
to be prepared and submitted for the 30-day review cycle.
411
SEEDING REQUIREMENTS A-14
' Barns Lake Middle Creek 2. As of April 1, 2019 applicants must apply online for NCG-01 Permit
IIII
Vf coverage from NCDEQ. This requirement is in addition to the Wake County
OTHER NOTES,REFERENCES AND ACKNOWLEDGEMENTS A-15
V land disturbance permit.
f Q. A
Crr�eQk J .
'
„ 3. Obtain all necessary permits and certificates. Download standard sediment
and erosion control plan for single family lots from www.wakegov.com.
4. Install tree protection fence if required. Install gravel construction entrance,
, silt fence, silt fence outlets and additional measures as needed. Clear only as
necessary to install devices. Provide groundcover for all disturbed areas.
5. Call Environmental Consultant for an onsite inspection by the Environmental
PROJECT NAME: Consultant to obtain a Certificate of Compliance.
WAKE COUNTY PROJECT NO.: 6. Begin construction, building, clearing and grubbing. Maintain erosion control
DATE OF PERMIT ISSUANCE: devices as needed.
DATE OF PERMIT EXPIRATION: 7. Stabilize site as areas are brought up to finish grade with vegetation, paving,
ditch linings, etc. Provide groundcover for denuded areas per NPDES Ground
Stabilization Timeframes.
8. When construction is complete, and all areas are permanently stabilized and
NOTE- ANY PERFORMANCE RESERVATIONS REGARDING THE SEDIMENT erosion control measures are removed, call Environmental Consultant for an
/11.1.1.1.11111 CONTROL PLAN (PERFORMANCE BASED) OR CRITICAL AREAS, A FIELD inspection.
WW....k-' REVISION OR AN ENGINEER STAMPED CUSTOM PLAN MAY BE REQUESTED. 9. Obtain a Certificate of Completion.
WAKE
COUNTY
NORTH CAROLINA STANDARD SINGLE LOT SEDIMENT AND EROSION CONTROL PLAN A-1
REVISED: 1/2/2020
TREE PROTECTION FENCE
SILT FENCE i (SEE NOTES)
OUTLET ?' —SF- ' —SF- ' —3F- ' • TP TP TP TP ' —SF- ' —SF- ' —SF- ' ' ZF— ' ZF— ' ZF— ' —
��F- " �F- " �F-
N 1 1 //1 V41 0 y L y
SILT FENCE
N N N y N t t N L
L.
N y y ''.1( y N o
I
H N N L.
I y N N y
CONSTRUCTION I I I I --
RIGHT OF WAY ENTRANCE _ ,
N v v
-- •e -- s.'i — — - - __ d�'i
• • SILT FENCE • --• • • - ;
TARA8'RETURN !!' 8'RETURN ! • e
OUTLET ` _ J v ® �. . _ . .�� ► o�
— — — — •>e i SF . —/SF . O L — — SF — SF e. -i • • �. —SF—. _SF_ . ®. SE -- .S�— eii — —
WATTLES �1f�1�1• __=l» TOP OF SWALE <( <l < < �lI=MX .1=sa» «J_:_1Mtl�TJ <( < <( < '_,'_ ( <
AS NEEDED 1=1 ROADWAY ' I ROADWAY 1=1 ROADWAY ROADWAY LVJJ I ' ROADWAY
EDGE OF —
TYPE A PAVEMENT OR CURB TYPE B TYPE C TYPE D TYPE E
INLET PROTECTION CURB INLET
NOTES:
1. If required by Wake County, tree protection fence shall be 6. Construction entrance should be installed for each lot and field
installed along the rear property line when adjacent to riparian located.
LEGEND buffer zones, wetlands and/or 25 foot Tree and Vegetation 7. If the disturbed area is greater than one acre, a custom erosion
Protection Zone. If the lot is subject to a municipal planning control plan should be submitted for the 15-day review cycle. The
--_._ FLOW DIRECTION jurisdiction, then the builder is responsible for verifying the plan should address berms/diversions and sediment traps and
applicable tree protection standards and for installation of tree basins.
- SF SILT FENCE protection measures as required by the municipality. 8. If multiple lots share silt fence with none installed between the
> > DIVERSION DITCH 2. Install silt fence on low elevation sides of each lot and install silt lots, a revised plan will be required.
fence outlets shown on schematic/diagram and as needed. 9. Inlets downstream of disturbances should be protected, streets
WATTLE 3. Silt fence should be located at least 50 ft. upstream of water should be swept as needed when sediment is present, and erosion
features (ex. wetlands,ponds,creeks, streams,etc.). control measures removed or damaged by sub-contractors or
- TP TREE PROTECTION FENCE 4. It is the responsibility of the builder to ensure septic system utilities shall be re-installed at the end of the work day.
SILT FENCE OUTLET and repair areas are not impacted by silt fence installation. 10.Details for silt fence, silt fence outlet, construction entrance and
5. Install silt fence in accordance with Table 6.62a below from the other measures are provided on other sheets.
o INLET PROTECTION NCDEQ Erosion& Sediment Control Planning&Design Manual: 11.Erosion control details are not drawn to scale.
12.If lots are contiguous and have different land owners, lots can not
DRIVEWAY PIPE Table 6.62a Maximum Slope Length and Slope Grade for Silt Fence share the silt fences. Each lot should have individual silt fences.
13.For lots with diagonal drainage flow to one side, utilize
.`'1`''`-1'1`'dui
"`,,,..,"-':-""
D- 4=1, .v-• CONSTRUCTION ENTRANCE Slope Slope Length (ft) Maximum Area (ft2)
appropriate lot schematic/diagram and add a note in the Special
ecial
'. .'.'. .
''''' <2% 100 10,000 Notes section of table on sheet A-3 indicating the direction of flow
2 to 5% 75 7,500 and location of silt fence and silt fence outlet.
5 to 10% 50 5,000
10 to 20% 25 2,500
- >20% 15 1,500
cotA
'
NORTH • TYPICAL INDIVIDUAL LOT SEDIMENT & EROSION CONTROL MEASURES DETAIL A-2
REVISED: 1/2/2020
ENTER THE DRAINAGE PATTERN TYPE (TYPE A, B, C, D OR E)
DISTURBED DRAINAGE
LOT NO. AREA (ACRE) PATTERN TYPE SPECIAL NOTES
4 1 .04 A
•
•
•
011111.1
WAK
COUNT NORTH CAROLINN LOT NOS., DISTURBED ACREAGE AND DRAINAGE PATTERN TYPE TABLE
A-3
REVISED: 1/2/2020 (ADD MORE TABLE(S) IF NECESSARY)
8'-0" MAXIMUM
♦♦♦♦♦♦♦♦♦♦�♦♦♦♦♦/ SILT FENCE FABRIC * ;
MINIMUM 10 GAUGE . ♦♦♦4*♦♦♦♦�♦♦♦♦I • ,►♦�j♦♦♦♦♦j♦j♦j!` ,
♦♦♦♦�♦♦ INSTALLED STALLED TO SECOND fr�♦�♦♦♦♦♦��♦♦♦♦��♦
LINE WIRES ♦�♦�♦�♦�♦��►j�♦� WIRE FROM TOP i�♦�♦�♦�1j♦�♦���' MINIMUM 12—1 /2 GAUGE
x♦:♦:♦:♦:♦4- .:♦:�:♦:♦:I►♦:♦:, ♦; INTERMEDIATE WIRES
♦����♦i����♦i♦ice., ,••���♦i'i��♦i*��♦i�►�;
♦i♦i i#i�i♦i'i`. .�'i♦ice i �i♦i♦i�i'i♦i ♦i *
♦���������������������i�i�•♦.��- - - ,������������♦i����������i�����si♦i♦i�i' �- GRADE
ili i1 li II II 1 1 1 II 11 1 II 11 II II 11 Ili ili i1 li ili i1 11 II II IIIIII-11
-III
E firll-1iIII�I1 II FRONT VIEWIIII II-
1,111,111
- STEEL POST
NOTES: A WOVEN WIRE FABRIC
1. Use silt fence only when drainage area does not SILT FENCE FABRIC
exceed 1/4 acre and never in areas of concentrated
flow. _
2. Remove deposited sediment when 50% capacity is Cr)
reached and as needed to provide storage volume for FILL SLOPE
the next rain event and to remove hydraulic pressure N
on the silt fence. Z
3. Inspect silt fence weekly and after each 1" rain event.
N
' r`' GRADE
it
ii- _�!� li— t=711,1—Tii-
8'' MINIMUM COVER
Cuily
i.
SKIRT *
III iii11III
ANCHOR SKIRT AS DIRECTED
1 Eiii iii BY ENGINEER
SIDE VIEW
WAKE
COUNTY
NORTH CAROLINA STANDARD TEMPORARY SILT FENCE DETAIL A-4
REVISED: 1/2/2020
4' MIN, H SILT FENCE
I■■ q C7 Q Q q / -
C-7
t . , _ •
... r .. _ -'r J J l r •
- ..
TOP OF SILT FENCE _
MUST BE AT LEAST 1' - -- - -
ABOVE THE TOP OF -' "
THE WASHED STONE -- - - -
NOTES:
1. Remove sediment when half of stone outlet is FRONT VIEW ,
covered.
BURY WIRE FENCE,
2. Replace stone as needed to facilitate dewatering. FILTER FABRIC,
on low elevation areas STEEL FENCE POS AND HARDWARE
3. Stone outlets should be
placedCLOTH IN TRENCH
of silt fence and based on field conditions. STEEL FENCE POST
4. Per NCG-01, inspect outlet at least once a week and WIRE FENCE ► SET MAX 2' APART f 12" OVERLAP #57 STONE
— MIN. 18" INT❑ S❑LID AND SILT FENCE
after each 1,� p rain event. Complete any required HARDWARE CLOTH GROUND
repairs immediately. Freshen stone when sediment
accumulation exceeds 6 inches. Keep mesh free of
debris to provide adequate flow.
5. Hardware cloth and gravel should overlap the silt fence at FILTER OF #5 ••�
least 12 inches. WASHED STONE •.; I
U
I 3' FILTER FABRIC
❑N GROUND
°�Ooo o I
09 O O °oor00%�0
cb�Opb°g °Ocb° O
o°q�.j,O $on-1(V 80
o�V o o`bo O
• 0
..•.. O°c oocbocb°o°O��o° I -
I
BURY WIRE FENCE AND HARDWARE CLOTH BURY 6" OF UPPER EDGE OF
FILTER FABRIC IN TRENCH
!!!!!!!!!!::: SECTI❑ \ VIEW
WAKE
COUNTY
NORTH CAROLINA STANDARD TEMPORARY SILT FENCE OUTLET DETAIL A-5
REVISED: 1/2/2020
30-0" MINIMUM
BUT SUFFICIENT TO KEEP
SEDIMENT ON SITE NOTES:
A. 1. Install silt fence or tree protection fence adjacent to
construction entrance to direct vehicles to drive on stone.` i;=�,
_ 2. If mud is not removed from the vehicles traveling over the
•-'•-'�. �. ��1�1�1�I .�.sog vs TAP TP �o�����.���•�e���� '�*' stone, then the tires of the vehicles should be washed
-�_�_�_� � �.,�- - - -I-�-�- . . . :< before entering the public road or the construction entrance
741' `' • • �" •" • M'� 1 1 1 must be lengthened. Sweep streets immediately if mud is
� aeo
�1�1�1�I= ��oWitI� � • 1 ' I,
• • • .•_,. _- = 10-FT MINIMUM ORip tracked offsite onto public roads.
EXISTING .7-'•-'•-'•-'•-'•if: 2"-3" STONE TO BE USED .•;...0��4� - WIDTH OF PROPOSED 3. Maintain construction entrance in a condition to prevent
ROADWAY - -•-! (SURGE STONE OR RAILROAD LAL,17,,i6,;[2,..-4;74rer_7441,..7,� DRIVEWAY, WHICHEVER mud or sediment from leaving the site. Entrance will
+�iei IS GREATER. require periodic removal of sediment-laden stone and
•' "��4`;.-. .-:• • '• '•-'• • • •4W-1-' li esmi, replacement with fresh stone. Immediately remove all
-. 4. r e '0'*� �'�` ` ' `"�`� mud/sediment/rock tracked off the lot.
• 1I • • 1� • .I ••.. . I . • III • II,I_one1, I,I4
PLAN VIEW
NEW
CONSTRUCTION
30'-0" MINIMUM
EXISTING ROADWAY --.111111
% 411♦ V • ♦ v
• Us sw_w�w��- �� Os ovs �
c.
C -I`! �W v . c � � �°W*. ' . - .sue4. . -� - �'' - ' .. .f .
' * _ � - " ♦ .
' I I I—I
r
-I 1= 1 -1 1 -I I -I I �
1 1 1
it—III_ ii 6 MIN. , , , _ � �1 I —
-----------------------
FILTER FABRIC UNDER STONE
AKE CROSS SECTI - \
COUNTY
NORTH CAR°L , STANDARD RESIDENTIAL CONSTRUCTION ENTRANCE DETAIL A-6
REVISED: 1/2/2020
STANDARD METAL POSTS 2' IN GROUND
GALVANIZED
HARDWARE WIRE
EXTENDS TO TOP OF
■■■■■■■■■■■■■■■■■■► BOX i
■■■■■■■■■■■■■■■■■■■►
'■■■■■■■■■■■■■■■■■■■1
■■■■■■■■■■■■■■■■■■■, IL
■■■■■■■■■■■■■■■■■■r
■■■■■■■■■■■■■v- IR
-
■■■■■■■■■■■■r
III
■■■■■■■■■■■r
■■■■■■■■■■I iiii
■■■■■■■■■■1
E ■■■■■■■■IM■EMR
■■■■■■■■■■1 IR
`:■■■■■■■■■►
■■■■■■■■■■■\. 1■1
■■■■■■■■■■■■�. ..
•P■■■■■■P.■IE7\w . 1■■
•
Cam• !!■■■■■■■■■■■■■■1 p .mar.;,ell
.�+. o cP 1■■■■■■■■■■■■■■I ■ iI •
«<,oc ■■nit-�a■■■n■■� O�..t■k■'!• ° 0.0
`el ° • 0
11■■■■■■\C•i o 0
P
mMMIIIMEI O o
0
?...'.4 mimaalimmam.,,,
,c)G1@,a ot 1 onnoloc, • . U 6
Ili■\'LI••
50' ._i
iil■■■■I,m---,al'. '. FILTER OF #57
Quo • lmon is �• O WASHED STONE
• o C . .T•1. ��• tv 1T*; ,�1, '.� 12'_18„
.!,•,� A��1� I� r1��J A �1i��1 to ��, � ��� d�
rL o ow.. ` r,+�r� •C�r •°r•,��`� p MINIMUM AB❑VE
A. o�o•� `� Q •r °v. 4 �'•p Q T❑P ❑F THE I . . . . . Cu
pp �i�• !� vvN���O ��) B❑X O%°O oc°o OoO1?0 o°°o Oo OC°O 0Q0°0 o�°O oQ0°0 000 00 0-
�1 O. w 0 O�p• '• 00 0 00 0 po ° 00 0 a 00 0 o Ca 00
o �� r. •� 00 o O o0 00 0 p0 ° Oo 0°00o 00 O 00 o Oo O 0000p oCAoo
C� °cb .. ®O f o� O o o00Cj0000 000 Ooo o O (-qqoo o O o o0Q
®O �o M� o �y •�� ��' O°oo 0�O Ood�0 O°p 000 O 0000 00 O°�000 O O�o�° 0��'0°O°Oo
,� o +!'� o ° 0 8 ° 8 ° q � 8 ° 80 o0 0 00
•, t•� • ' Q o�o�o DDT 0�0�0� o�o � oqmo�-0 oCb0-0 OCQOpoO 0
�, �$o0 0 0 80 0 $°O o °O $°O o ° $°O o ° $°O o 00000 OS o ono 8
4'�� �m� o0000�i0 �o°�Cca ��c�c0c��,,,c•1,>:o o too�,o�gj0 o otoo-00 000,00-00�g0 6-pQ0-00 00RQO-000 puoo O °,p�ooroog°o
° ° b'�0 ° ° cY ° 0 b' ° 0 c? ° 0 cY 0 O 0 c O°0° 0 0o OI�Ooo 0 0 ob0 °0 o cbo�o o cbo�0 0 00�0 0
4' MAX
PLAN VIEW SECTION VIEW
NOTES:
Inlet protection will require periodic removal of sediment-laden
stone and replacement with fresh stone. Inspect periodically and
replace stone as needed. keep mesh free of debris to provide
adequate flow.
Oli -
WAKE
COUNTY
NORTH CAROLINA STANDARD INLET PROTECTION DETAIL A-7
REVISED: 1/2/2020
\111 11'1` TOP ELEVATI❑N ❑F ST❑RMWATER ; 0,5'-1'
_ #S WASHED 1 MAX. w
--1,1����= STONE 71
Q
% _ >
EXISTING SLOPE `11 �11'- \ - - - - - - '
I .I 1- I-III- II I I-
'/// A L B =III III =III-III / =III-I I I
#1 RIP-RAP
VARIES
SIDE VIEW
EXISTING SLOPES
�=f1
= II�IIIIIII' -
-III;III„
=1I VARIES -III-1
II-III_
IIIIIIIII I II I 1 =I NOTES:
III-III II-
=III-III 11-1
III=III=11 _ ,• 0.5 —1 III- 1. Check dams are used in channels to reduce erosion in drainage
1 all —11=1 ditches.
w —1 I11=1 -I 1 I IIlt=i 2. Height and width of the check dams are determined by existing
KEYED RIP RAP topography and sediment storage requirement.
I 3. Set spacing between check dams so that the elevation at the top
_ _ _ _ of the lower dam is the same as the toe elevation of the upper
— — — — — dam.
:III= —111=1 I _ 11 1 4. Wattles maybe used in lieu of check dams if theyare installed
—I 11, IIIIl-1 11=II1 lI I I,:I I #5 WASHED STONE and maintaied asper manufacture's specification. Wattle
1�IIiIlI1"-.II p
diameter should be specified based on channel cross section.
5. Inspect check dams at least once a week and after each rain
E R 0 N T VIEW event. Complete any required repairs immediately. Remove
sediment accumulation from behind check dams to prevent
damage to the channel vegetation. Flow should be maintained
through the dam.
AKE
COUNTY
NORTH CAR°Lim. STANDARD CHECK DAM DETAIL A-8
REVISED: 1/2/2020
„,, �Z ISOMETRIC
/ / / / / / / / / \ Air
VIEW
USE A MINIMUM OF 2 STAKES ON �.•.�:4 �:•;:�:, ` •:,:, TOP OF BANK
.00� 0••.•• USE A MINIMUM OF 4 STAKES ON �r o�•,. ,”
UPSL❑PE SIDE - �•�:. ;';;� D❑WNSL❑PE SIDE • k
I i:'.I. /**.',•**/�♦A�Ij S�,N%j�♦O,/%%//•• ' V►Oi��iik��,�4ll�!%�I .
•% ,• ••:'�, /`rr j�� �Ijv sy ���� .q♦j ! 1 •I��i;•�/�%�� eI .�,, :r_::e:::-...y:t':j,$���L:SoS,
.tk
•
♦ WATTLE '1111-n-. hN i ,0. i
FL❑W % •*$. :•;:,; ' i"•'&914r /%�V•.$: •' 4'�i � 0 .•t:!ii gig._ElEig : 3, D❑WNSL❑PE
�ri�'♦,;�•Q 1.S� ; �� MATTING`/ IG.. !i,� .! D❑WNSL❑PE
— `� ; ••• ' . �'....\Niy 4. !`44: p ' ! ;p• i i•s i MATTING
DITCH .��:0���� ..�..:�
SL❑PE� '....���, 0.������'
I I I I I \ 4T \ \ \ \ \ 43f;'� \ \ \ \ \
GROUND NOTES:
PLAN VIEW 1. Use a minimum 12-inch diameter excelsior wattle.
2. Use 24-inch long wooden stakes with a 2"x2" nominal cross section.
3. Install wattle(s) to a height on slope so flow will not wash around wattle and scour
slopes, or as directed.
MINIMUM 4 STAKES ❑N D❑WNSL❑PE 4. Install a minimum of two upslope stakes and four downslope stakes at an angle to
MIN, 2 STAKES ON UPSLOPE wedge wattle to ground at bottom of ditch.
5. Provide staples made of 0.125-inch diameter steel wire formed into a u-shape not
GROUND less than 12 inches in length.
11 1 1 1 1 1 1 I 6. Install staples approximately every 1 linear foot on both sides of wattles and at each
- III- - 1 ' end to secure it to the soil.
7. After installation of staples, check any gaps between wattles and ground with
_�1 matting.
MATTING -II rl 1 1-
V— DITCH SECTION VIEW
STAKES
WEAVE STAPLES THROUGH MESH ANGLE STAKES TO
MINIMUM 4 STAKES ON CASING OF WATTLE WEDGE WATTLE
MIN, 2 STAKES ON UPSL❑PE D❑WNSL❑PE ONTO GROUND
�� ,i'�`00�0`!�p,•pip�•p!� -p�';•p*p� i ;�p�i 0�0��
�� � 4I Ni ♦GR❑UND . � .v i0. ��*4*���*I T� kWATTL 1,. 'O% *44�**� �j ����� � MATTING
.;, `�� O .iO3; .d .�O0%!�00�
� ' *�wiw.�
� •�w1 _ MATTING
—1 1 1= �� — �- � iittfrr 0 —Ill I =I I I1 1— 1 1 1= -1pp- _ �= •' 1.
�� 0p 11-1111 III=11 = 1 1 -1 1=1 1= 1 =1 1—I 1=
1 Iv= I_ STAPLES STAPLES —I �—III—III—III_
1 II I I- II '- MATTING
!!!!!!!!!!:::
STAPLE INSTALLMENT_ STAKE INSTALLMENT
�, TRAPEZOIDAL DITCH SECTIONS CROSS SECTION
SECTION VIEW
WAKE
COUNTY
NORTH CAROLINA STANDARD WATTLE DETAIL A-9
REVISED: 1/2/2020
--m-- —i -
18" EXISTING
if
,,1 irEMEMETro Ti .,,,, / =IT_1 1 1111E111E
k I III 111=111=111% (MIN . ) GROUND
Hi= = I
A-, 3'. r i ii BACKF I L L
ii.!;,,-,,, ,„, , / i 11
,,..- r
Nve (1_4` " III
(
l Ni. --' ..---:- ( -- 7 3 a I 6"
- t-
ZIII=L1 ( -, (4 — — 111 (MIN.)-1"ff=111E77,-,, ei 14— LI 11 STAPLES ON
RI i= 1107,- (5 ( , , ill ,... .........,„
( 1 11E1 je. \\4\i\\.. ' • -• !'•I\./\\ \\)\\ 1 ' CENTERS
BIEHL i .[ `' 10 / =Hi
iiEwEii =IIIY, 4 -- .< (i et - . - ' IN TRENCH
=111E111E11 11 (
CO
,././ - .'..' . '-' ' i
1E111E1 '-111E1
LEW= '''"-.,,,,,i 4.-•7 1--—10" 111E111
111E111= . . ' , 11_111
111E111 • '' .1
ZWIND Mill.f=1•7•-11I 11...''',110
IIIEIIIE "..,"'''-,
--)-.1Thl 111E111-
IIIEW= f lEIIIEM
,,..
=111E111—111E111_ 10" c-r-' 111E111E1 I—UIEI // -LB" MIN
-rP -.7" c) 6" 1E111E111
111E111E1
STAPLE -I `-- ,•„, 11E111E111
CHECK 11E111E111=
MATTING SHALL BE STAPLES ON
PLACED IN TRENCH 1 ' CENTERS
MATTING IN DITCHES AND BACKFILLED IN TRENCH
DIAGRAV 0
17,''; '-'—'.
,;, 7-' ,=:,,, E,...11 _1_Elii_,,11Eliia
- -7, ,,. .. ..a
-
— -ir Stcple
'(:_
A3-- 7 Staole ChecK -)attern
1 10"
1 0"--1 1---
W .
-,
E 70 - L,,,,_
.---. --, __,. /30,
- 3' --
,-----4" (1)
-1- B
i Staple 1,. — N'
ir Check 7—Staple / 9 i
--- --- --- X
C) 7----
D I AG RAM
MATTING ON SLOPES DIAGRAM
...*.r............m.
AKE
COUNTY
NORTH CAROLIN'
ROLLED EROSION CONTROL PRODUCT INSTALLATION DETAIL A- 1 0
REVISED: 1/2/2020
NOTES:
1. All plants designated to be saved shall be protected by
fencing, as illustrated.
2. Install tree protection fence at tree drip line or at edge of
disturbed area, as shown on plans, prior to commencement
of construction.
3. Space tree protection zone signs a minimum of one every
300 feet. The size of each sign must be a minimum of 2' x
Q 2' and be visible from both sides of the fence. The sign
w must contain the following language in both english&
spanish:
Q "TREE PROTECTION ZONE, KEEP OUT".
o 4. There shall be no storage of material within the boundaries
_ CO of the tree protection fencing.
FENCE MATERIAL: D 5. Tree protection fencing shall be maintained throughout the
1- duration of the project.
z ORANGE, UV RESISTANT
HIGH TENSILE STRENGTH n
o__ 4‘ POLYETHYLENE LAMINAR o
BARRICADE FABRIC
o LLI
0
JATTACH SIGN �
TO POST -
X ( ( 0 ) ) ) t O( ( )( )c ( )( )( )( ).�O ) )( )( ( ( ( ) ) ) )( )( ( ( db ) )(
)( ( ( ( ) > > > )( ( )( ( )c ) ( )( )( )( )k )c > > )( )( ( ( c ) ) ) )( )( ( ( c ) > ) )(
)( ( ( ( ) ) ) ) )( ( )( ( )c )c )c ) )( )( )( )i c ) ) )( )( ( ( c ) ) ) )( )( ( ( c ) ) ) )(
c )( ( ( ( ) ) ) ) )( ( )( ( )c )c )c ) )( )O ) )( )( ( ( c ) ) ) )( )( ( ( c ) ) ) x_
)( ( ( ( ) ) ) ) )( ( )( ( )( )( )( ) )( )( ) TREE ) )( )( ( ( ( ) ) ) )( )( ( ( ( ) ) ) )(
)( )( )( )( ) ) ) ) )( )( )( )( )( )( 1 ( )( ) PROTECTION ) )( )( )( )( )( ) ) ) X )( )( )( )( ) ) ) )( 4'
)( ( ( ( ) ) ) ) )( ( )( ( )lli a ( )( 1 ZONE ) )( )( ( ( ( 1 ) ) )( )( ( ( c 1 ) 1 )( MINIMUM
)( ( ( Oi t000( )._ ( )c ) KEEP OUT ) )( )( ( ( ( ) ) ) )( )( ( ( ( ) ) ) )(_:,
)( ( ( ( ) ) ) ) X 1.---- MOB ) X X ( ( ( ) ) ) X X ( ( ( ) ) ) Xc X ( ( ( ) ) ) ) 1( X )( )( )c )( )( ) ( X ).mac ) ) )O( ( ( c 1 ) ) )O( ( ( ( 1 ) 1 )(
)( )( )( )( ) ) ) ) )( )( )( )( )( )( )( )c 1( )( )( ) )( ) ) 1( )( ( )( )c ) ) ) 1( )( )( )( )( ) ) ) 1(
L ) c--)c--)( ) ) ) ) )( ) nncrnc )c )( )( )( )( _Jr )nnn(—f-x- lcln n( J fl1�c )nnn( GRADE
-'11 III 111-111=1 H I I-111-111- 11-111-11 —I I I—I I I IIIIIIIII1111111 111111111 I 11-11 -111-111- 11-111-111-111-111—I-111-111-111-111-11 -111-111- 11— 11-111-111-111—
- - - - - - - - I 1 1 - I'
1 I I 1 I I I I I I I I I I I I I I I I l l�l l ll I I I I I I I I I I I I I I I I I I I I I—I I I I I I I I I I I I I I I I I I I I I I I I I—I I —I I I I I 1 I I I I I I I I I I I I I I I I I— I I— I I—I I I=1 I — I I--1 1-1 I
1 1 1 1 1 1 1 1 1 1-1 1 1- 1 1 � i ,, , I 1 I I I-I I I 1 1 1-1 1 1-1 1 1-1 1 1-i �i 1 1 1 1 1 1-1 1 1- 1-1 1 1- I-1 1 1 1 1 1 1 1 1 1 1 1 I—=-1 I I - — = -I I I 1-1 - _- 2' MIN.- =1 1 i-I 1 i-
i-111-111=11,_ _ L.
4 -1.--1 \'
1 .33 Ibs/LF STEEL POST
MINIMUM
ip:............ime
AKE
COUNTY
NORTH CAROLIN, STANDARD TREE PROTECTION FENCE DETAIL A- 11
REVISED: 1/2/2020
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH 1 EQUIPMENT AND VEHICLE MAINTENANCE ONSITE CONCRETE WASHOUT
THE NCGO1 CONSTRUCTION GENERAL PERMIT 1. Maintain vehicles and equipment to prevent discharge of fluids. STRUCTURE WITH LINER
Implementing the details and specifications on this plan sheet will result in the construction -A --�� visa;
2. Provide drip pans under any stored equipment. , �,. `
activity being considered compliant with the Ground Stabilization and Materials Handling ,"�'�, ..* 1 �I ,.
3. Identify leaks and repair as soon as feasible,or remove leaking equipment from the S. ,,, ,,,, i� ...�
sections of the NCGO1 Construction General Permit(Sections E and F,respectively). The ■ .n.Q
p Y)• project. w I��„�;i hi ',joi
permittee shall comply with the Erosion and Sediment Control plan approved by the I ii
ri
delegated authority having jurisdiction.All details and specifications shown on this sheet 4. Collect all spent fluids,store in separate containers and properly dispose as -- .46 �` j�,ivi,Z,��
may delegatedauthority jurisdiction.
hazardous waste(recycle when possible).
not apply dependingon site conditions and the having ��W
5. Remove leaking vehicles and construction equipment from service until the problem �."e'er•.%`.• s "`•'a,,.° raw.
"°'°""
has been corrected.
EIDL
1 MT."o."m' a'°"."'n' r'""`'�"`.'`'W""`"V°'m." `TIE W IDIVOR
SECTION E:GROUND STABILIZATION I I •n•m.nrvaw•..cn•o•w. NMI....MID.SOLID
IC NOM.M. LIMO MIMI
6. Bring used fuels,lubricants,coolants,hydraulic fluids and other petroleum productsSOLID MIMS IDS' `" MID.TO MVOS MOS.
Required Ground Stabilization Timeframes even ,�� „�,.,,�,•m,,� even 2• IIIMIDIWID
to a recycling or disposal center that handles these materials. CLOW••.,,.,,,a•..,=.VV ,.yp=,pp,..C„R
Stabilize within this ; K"""
many calendar Timeframe variations grl nW r,RA1(E1F.1E f8Y2 VACVf11T CTRIICTIiPF ABOVE GRAn ur STRUCTURE
Site Area Description days after ceasing LITTER,BUILDING MATERIAL AND LAND CLEARING WASTE
land disturbance 1. Never bury or burn waste. Place litter and debris in approved waste containers.
(a) Perimeter dikes, 2. Provide a sufficient number and size of waste containers(e.g dumpster,trash CONCRETE WASHOUTS
swales,ditches,and 7 None receptacle)on site to contain construction and domestic wastes. 1. Do not discharge concrete or cement slurry from the site.
perimeter slopes 3. Locate waste containers at least 50 feet away from storm drain inlets and surface 2. Dispose of,or recycle settled,hardened concrete residue in accordance with local
(b) High Quality Water 7 waters unless no other alternatives are reasonably available. and state solid waste regulations and at an approved facility.
HOW Zones None 4. Locate waste containers on areas that do not receive substantial amounts of runoff
(HOW) 3. Manage washout from mortar mixers in accordance with the above item and in
If slopesare 10'or less in length and are from upland areas and does not drain directly to a storm drain,stream or wetland. addition place the mixer and associated materials on impervious barrier and within
(c) Slopes steeper thang 3:1 7 not steeper than 2:1,14 days are 5. Cover waste containers at the end of each workday and before storm events or lot perimeter silt fence.
allowed provide secondary containment. Repair or replace damaged waste containers. 4. Install temporary concrete washouts per local requirements,where applicable. If an
-7 days for slopes greater than 50'in 6. Anchor all lightweight items in waste containers during times of high winds. alternate method or product is to be used,contact your approval authority for
length and with slopes steeper than 4:1 7. Empty waste containers as needed to prevent overflow. Clean up immediately if review and approval. If local standard details are not available,use one of the two
-7 days for perimeter dikes,swales, containers overflow. types of temporary concrete washouts provided on this detail.
(d) Slopes 3:1 to 4:1 14 ditches,perimeter slopes and HOW 8. Dispose waste off-site at an approved disposal facility. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
Zones 9. On business days,clean up and dispose of waste in designated waste containers. sections. Stormwater accumulated within the washout may not be pumped into or
-10 days for Falls Lake Watershed discharged to the storm drain system or receiving surface waters. Liquid waste must
-7 days for perimeter dikes,swales, PAINT AND OTHER LIQUID WASTE be pumped out and removed from project.
ditches,perimeter slopes and HOW Zones 1. Do not dump paint and other liquid waste into storm drains,streams or wetlands. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
(e) Areas with slopes can be shown that no other alternatives are reasonably available. At a minimum,
flatter than 4:1 14 -10 days for Falls Lake Watershed unless 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface install protection of storm drain inlet(s)closest to the washout which could receive
there is zero slope waters unless no other alternatives are reasonably available. spills or overflow.
Note:After the permanent cessation of construction activities,any areas with temporary 3. Contain liquid wastes in a controlled area. 7. Locate washouts in an easily accessible area,on level ground and install a stone
ground stabilization shall be converted to permanent ground stabilization as soon as 4. Containment must be labeled,sized and placed appropriately for the needs of site. entrance pad in front of the washout. Additional controls may be required by the
practicable but in no case longer than 90 calendar days after the last land disturbing 5. Prevent the discharge of soaps,solvents,detergents and other liquid wastes from approving authority.
activity. Temporary ground stabilization shall be maintained in a manner to render the construction sites. 8. Install at least one sign directing concrete trucks to the washout within the project
surface stable against accelerated erosion until permanent ground stabilization is achieved. limits. Post signage on the washout itself to identify this location.
PORTABLE TOILETS 9. Remove leavings from the washout when at approximately 75%capacity to limit
GROUND STABILIZATION SPECIFICATION 1. Install portable toilets on level ground,at least 50 feet away from storm drains, overflow events. Replace the tarp,sand bags or other temporary structural
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the streams or wetlands unless there is no alternative reasonably available. If 50 foot components when no longer functional. When utilizing alternative or proprietary
techniques in the table below: offset is not attainable,provide relocation of portable toilet behind silt fence or place products,follow manufacturer's instructions.
Temporary Stabilization Permanent Stabilization i on a gravel pad and surround with sand bags. 10. At the completion of the concrete work,remove remaining leavings and dispose of
•Temporary grass seed covered with straw or •Permanent grass seed covered with straw or 2. Provide staking or anchoring of portable toilets during periods of high winds or in high in an approved disposal facility. Fill pit,if applicable,and stabilize any disturbance
other mulches and tackifiers other mulches and tackifiers foot traffic areas. caused by removal of washout.
• Hydroseeding •Geotextile fabrics such as permanent soil 3. Monitor portable toilets for leaking and properly dispose of any leaked material.
• Rolled erosion control products with or reinforcement matting Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
without temporary grass seed • Hydroseeding with properly operating unit.
•Appropriately applied straw or other mulch •Shrubs or other permanent plantings covered HERBICIDES,PESTICIDES AND RODENTICIDES
• Plastic sheeting with mulch 1. Store and apply herbicides,pesticides and rodenticides in accordance with label
• Uniform and evenly distributed ground cover EARTHEN STOCKPILE MANAGEMENT restrictions.
sufficient to restrain erosion 1. Show stockpile locations on plans. Locate earthen-material stockpile areas at least 2. Store herbicides,pesticides and rodenticides in their original containers with the
•Structural methods such as concrete,asphalt or 50 feet away from storm drain inlets,sediment basins,perimeter sediment controls label,which lists directions for use,ingredients and first aid steps in case of
retaining walls and surface waters unless it can be shown no other alternatives are reasonably accidental poisoning.
•Rolled erosion control products with grass seed available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of 3. Do not store herbicides,pesticides and rodenticides in areas where flooding is
POLYACRYLAMIDES(PAMS)AND FLOCCULANTS five feet from the toe of stockpile. possible or where they may spill or leak into wells,stormwater drains,ground water
or surface water. If a spill occurs,clean area immediately.
1. Select flocculants that are appropriate for the soils being exposed during 3. Provide stable stone access point when feasible. 4. Do not stockpile these materials onsite.
construction,selecting from the NC DWR List of Approved PAMS/Flocculants. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. with the approved plan and any additional requirements. Soil stabilization is defined
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved as vegetative,physical or chemical coverage techniques that will restrain accelerated HAZARDOUS AND TOXIC WASTE
PAMS/Flocculants and in accordance with the manufacturer's instructions. erosion on disturbed soils for temporary or permanent control needs.
1. Create designated hazardous waste collection areas on-site.
4. Provide ponding area for containment of treated Stormwater before discharging 2. Place hazardous waste containers under cover or in secondary containment.
offsite. "';
f'r'r,x\`, NORTH CAROL!NA 3. Do not store hazardous chemicals,drums or bagged materials directly on the ground.
5. Store flocculants in leak-proof containers that are kept under storm-resistant cover i 1
or surrounded by secondary containment structures. -h Environmental Quality
For questions and assistance, please contact NCDEQ at 919-707-3639.
NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING A- 12
PART Ill PART III PART III
SELF-INSPECTION,RECORDKEEPING AND REPORTING SELF-INSPECTION,RECORDKEEPING AND REPORTING SELF-INSPECTION,RECORDKEEPING AND REPORTING
SECTION A:SELF-INSPECTION SECTION B:RECORDKEEPING SECTION C:REPORTING
Self-inspections are required during normal business hours in accordance with the table 1.E&SC Plan Documentation 1.Occurrences that Must be Reported
below. When adverse weather or site conditions would cause the safety of the inspection The approved E&SC plan as well as any approved deviation shall be kept on the site. The Permittees shall report the following occurrences:
personnel to be in jeopardy,the inspection may be delayed until the next business day on approved E&SC plan must be kept up-to-date throughout the coverage under this permit. (a) Visible sediment deposition in a stream or wetland.
which it is safe to perform the inspection. In addition,when a storm event of equal to or The following items pertaining to the E&SC plan shall be kept on site and available for
greater than 1.0 inch occurs outside of normal business hours,the self-inspection shall be inspection at all times during normal business hours.
performed upon the commencement of the next business day. Any time when inspections (b) Oil spills if:
were delayed shall be noted in the Inspection Record. Item to Document Documentation Requirements • They are 25 gallons or more,
Frequency (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy • They are less than 25 gallons but cannot be cleaned up within 24 hours,
Inspect (during normal Inspection records must include: and does not significantly deviate from the of the approved E&SC plan or complete,date
business hours) locations,dimensions and relative elevations and sign an inspection report that lists each • They cause sheen on surface waters(regardless of volume),or
(1)Rain gauge Daily Daily rainfall amounts. shown on the approved E&SC plan. E&SC measure shown on the approved E&SC • They are within 100 feet of surface waters(regardless of volume).
maintained in If no daily rain gauge observations are made during weekend or
good working holiday periods, and no individual-day rainfall information is plan. This documentation is required upon the
order available,record the cumulative rain measurement for those un- initial installation of the E&SC measures or if
attended days (and this will determine if a site inspection is the E&SC measures are modified after initial (c) Releases of hazardous substances in excess of reportable quantities under Section 311
needed). Days on which no rainfall occurred shall be recorded as installation. of the Clean Water Act(Ref:40 CFR 110.3 and 40 CFR 117.3)or Section 102 of CERCLA
"zero." The permittee may use another rain-monitoring device (Ref:40 CFR 302.4)or G.S.143-215.85.
approved by the Division. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC
(2) E&SC At least once per 1. Identification of the measures inspected, plan or complete,date and sign an inspection
Measures 7 calendar days 2. Date and time of the inspection, report to indicate completion of the (d) Anticipated bypasses and unanticipated bypasses.
and within 24 3. Name of the person performing the inspection, construction phase.
hours of a rain 4. Indication of whether the measures were operating
event>1.0 inch in properly, (c) Ground cover is located and installed Initial and date a copy of the approved E&SC
24 hours 5. Description of maintenance needs for the measure, in accordance with the approved E&SC plan or complete,date and sign an inspection (e) Noncompliance with the conditions of this permit that may endanger health or the
6. Description,evidence,and date of corrective actions taken. plan. report to indicate compliance with approved environment.
(3)Stormwater At least once per 1. Identification of the discharge outfalls inspected, ground cover specifications.
discharge 7 calendar days 2. Date and time of the inspection,
outfalls(SDOs) and within 24 3. Name of the person performing the inspection, (d) The maintenance and repair Complete,date and sign an inspection report. 2.Reporting Timeframes and Other Requirements
hours of a rain 4. Evidence of indicators of stormwater pollution such as oil requirements for all E&SC measures
event>1.0 inch in sheen,floating or suspended solids or discoloration, have been performed. After a permittee becomes aware of an occurrence that must be reported,he shall contact
24 hours 5. Indication of visible sediment leaving the site, the appropriate Division regional office within the timeframes and in accordance with the
6. Description,evidence,and date of corrective actions taken. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC other requirements listed below. Occurrences outside normal business hours may also be
(4)Perimeter of At least once per If visible sedimentation is found outside site limits,then a record to E&SC measures. plan or complete,date and sign an inspection reported to the Department's Environmental Emergency Center personnel at(800)
site 7 calendar days of the following shall be made: report to indicate the completion of the 858-0368.
and within 24 1. Actions taken to clean up or stabilize the sediment that has left corrective action.
hours of a rain the site limits,
event>1.0 inch in 2. Description,evidence,and date of corrective actions taken,and 2.Additional Documentation to be Kept on Site Occurrence Reporting Timeframes(After Discovery)and Other Requirements
24 hours 3. An explanation as to the actions taken to control future In addition to the E&SC plan documents above,the following items shall be kept on the (a)Visible sediment • Within 24 hours,an oral or electronic notification.
releases. site and available for inspectors at all times during normal business hours,unless the deposition in a • Within 7 calendar days,a report that contains a description of the
(5)Streams or At least once per If the stream or wetland has increased visible sedimentation or a Division provides a site-specific exemption based on unique site conditions that make stream or wetland sediment and actions taken to address the cause of the deposition.
wetlands onsite 7 calendar days stream has visible increased turbidity from the construction
or offsite and within 24 activity,then a record of the following shall be made: this requirement not practical: Division staff may waive the requirement for a written report on a
(where hours of a rain 1. Description,evidence and date of corrective actions taken,and case-by-case basis.
accessible) event>1.0 Inch in 2. Records of the required reports to the appropriate Division (a) This General Permit as well as the Certificate of Coverage,after it is received. • If the stream is named on the NC 303(d)list as impaired for sediment-
24 hours Regional Office per Part III,Section C,Item(2)(a)of this permit. related causes,the permittee may be required to perform additional
(6)Ground After each phase 1. The phase of grading(Installation of perimeter E&SC monitoring,inspections or apply more stringent practices if staff
stabilization of grading measures,clearing and grubbing,Installation of storm (b) Records of inspections made during the previous twelve months. The permittee shall
measures drainage facilities,completion of all land-disturbing record the required observations on the Inspection Record Form provided by the determine that additional requirements are needed to assure compliance
with the federal or state impaired-waters conditions.
activity,construction or redevelopment,permanent Division or a similar inspection form that includes all the required elements. Use of
ground cover). (b)Oil spills and • Within 24 hours,an oral or electronic notification. The notification
electronically available records in lieu of the required paper copies will be allowed if 2. Documentation that the required ground stabilization release of shall include information about the date,time,nature,volume and
measures have been provided within the required shown to provide equal access and utility as the hard-copy records. hazardous location of the spill or release.
timeframe or an assurance that they will be provided as 3.Documentation to be Retained for Three Years substances per Item
soon as possible. 1(b)-(c)above
All data used to complete the e-NOI and all inspection records shall be maintained for a period (c)Anticipated . areport atleastten days re the dote theb
NOTE:The rain inspection resets the required 7 calendar day inspection requirement. of three years after project completion and made available upon request.[40 CFR 122.41] pY before of bypass,quality possible.
bypasses[40 CFR The report shall include an evaluation of the anticipated quality and
122.41(m)(3)J effect of the bypass.
PART II,SECTION G,ITEM(4) (d)Unanticipated • Within 24 hours,an oral or electronic notification.
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT bypasses[40 CFR • Within 7 calendar days,a report that indudes an evaluation of the
122.41(m)(3)] quality and effect of the bypass.
(e)Noncompliance • Within 24 hours,an oral or electronic notification.
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down with the conditions • Within 7 calendar days,a report that contains a description of the
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare(for example,times with extended cold weather). of this permit that noncompliance,and its causes;the period of noncompliance,
Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: may endanger including exact dates and times,and if the noncompliance has not
health or the been corrected,the anticipated time noncompliance is expected to
(a) The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur. The non-surface withdrawal environment[40 continue;and steps taken or planned to reduce,eliminate,and
CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance.[40 CFR 122.41(1)(6).
shall not commence until the E&SC plan authority has approved these items, • Division staff may waive the requirement for a written report on a
(b) The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III,Section C,Item(2)(c)and(d)of this permit, case-by-case basis.
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited,designed and maintained dewatering tanks,weir tanks,and filtration systems,
(d) Vegetated,upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item(c)above, ��._•_
(e) Velocity dissipation devices such as check dams,sediment traps,and riprap are provided at the discharge points of all dewatering devices,and t f-t a , NORTH CAROLI NA
(f) Sediment removed from the dewatering treatment devices described in Item(c)above is disposed of in a manner that does not cause deposition of sediment into waters of the United States.
•Environmental Quality
For questions and assistance, please contact NCDEQ at 919-707-3639.
NCGO1 SELF-INSPECTION, RECORDKEEPING AND REPORTING A- 13
Temporary seeding recommendations for late Winter/Early Spring Temporary seeding recommendations for Summer Temporary seeding recommendations for Fall
Seeding Mixture Seeding Mixture Seeding Mixture
Species Rate (Lb/acre) Species Rate (Lb/acre) Species Rate (Lb/acre)
Rye Grain (green) 120 German millet 40 Rye Grain 120
Annual lespedeza(Kobe in
Piedmont and Costal Plain) 50 Seeding dates: Seeding dates:
Piedmont- May 1 -Aug 15 Piedmont- Aug 15 - Dec 31
Omit annual lespedeza when duration of temporary cover is not to Coastal Plain- April 15- Aug 31 Coastal Plain- Aug 31 - Dec 31
extend beyond June.
Soil Amendments:
Seeding dates: Soil Amendments: Follow recommendations of soil tests or apply 2 tons/acre
Piedmont and Coastal Plain- January 1 - May 1 Follow recommendations of soil tests or apply 2 tons/acre ground agricultural limestone and 1,000 lb/acre 10-10-10
ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer.
Soil Amendments: fertilizer.
Follow recommendations of soil tests or apply 2 tons/acre ground Mulch:
agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Mulch: Apply 4,000/lb/acre straw. Anchor straw by asphalt tack,
Apply 4,000/lb/acre straw. Anchor straw by asphalt tack, netting or a mulch anchoring tool. A disk with blades set
Mulch: netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulching anchoring tool.
Apply 4,000/lb/acre straw. Anchor straw by asphalt tack, netting or nearly straight can be used as a mulching anchoring tool.
a mulch anchoring tool. A disk with blades set nearly straight can be Maintenance:
used as a mulching anchoring tool. Maintenance: Repair and maintain damaged areas immediately. Topdress
Re-fertilize if growth is not fully adequate. Reseed, re-fertilize with 50 lb/acre of nitrogen in March. If it is necessary to
Maintenance: and mulch immediately following erosion and other damage. extend temporary cover beyond June 15, overseed with 50
Re-fertilize if growth is not fully adequate. Reseed, re-fertilize and lb/acre Kobe (Piedmont and Costal Plain) in late February or
mulch immediately following erosion and other damage. early March.
Seedbed Preparation:
1. Chisel compacted areas and spread topsoil three inches deep over adverse
PERMANENT SEEDING REQUIREMENTS FOR soil conditions, if available.
SHOULDERS, SIDE DITCHES, SLOPES (MAX. 3:1) 2. Rip the entire area to six inches deep.
3. Remove all loose rock, roots and other obstructions, leaving surface
reasonable smooth and uniform.
Date Type Planting Rate 4. Apply agricultural lime, fertilizer and superphosphate uniformly and mix
300 lbs/acre with soil (see mixture below).
Aug 15 - Nov 1 Tall Fescue5. Continue tillage until a well-pulverized, firm, reasonably uniform sedbed is
prepared four to six inches deep.
Nov 1 - Mar 1 Tall Fescue & Abruzzi Rye 300 lbs/acre 6. Seed on a freshly prepared seedbed and cover seed lightly with seeding
equipment or cultipack after seeding.
Mar 1 - Apr 15 Tall Fescue 300 lbs/acre 7. Mulch immediately after seeding and anchor mulch.
8. Inspect all seeded areas and make necessary repairs or reseedings within the
Hulled Common 25 lbs/acre planting season, if possible. If stand should be more than 60% damaged, re-
Apr 15 - Jun 30 Bermudagrass establish following the original lime, fertilizer and seeding rates.
125 lbs/acre (Tall Mixture:
Tall Fescue AND Browntop Fescue); 35 lbs/acre 3 tons/acre in clay Limestone - 2 tons/acre
* Jul 1 - Aug 15 Millet or Sorghum-Sudan Browntop Millet); 30 Agricultural ( soils)
Fertilizer - 1,000 lbs/acre - 10-10-10
Hybrids*** lbs/acre (Sorghum- Superphosphate - 500 lbs/acre - 20% analysis
Sudan Hybrids) Mulch - 2 tons/acre - small grain straw
WAKEAnchor -Asphalt emulsion at 300 gallons/acre
COUNTY
NORTH CAROLIN' SEEDING REQUIREMENTS A- 14
REVISED: 1/2/2020
NOTES:
1. Construction details provided in this standard plan are NOT drawn to scale.
2. These details are for lots with less than one acre of land disturbance.
3. If the land disturbance on a single lot is greater than one acre, a custom
plan should be submitted for the 30-day review cycle that addresses
berms/diversions and sediment storage traps and basins.
4. This document is a guideline to control sediment onsite for single family
lots with a disturbed area of less than one acre. Additional sediment control
measures may be needed on a site-by-site basis.
5. Additional information on specification and installation guidelines can be
obtained from the State Erosion and Sedimentation Control Design Manual.
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control
REFERENCES:
City of Raleigh, Stormwater, Standard Details
https://www.raleighnc.gov/business/content/P1anDev/Articles/DevServ/DrawingsStandardDetailsIndex.html)
Delaware Erosion and Sediment Control Handbook
NCDEQ, Division of Energy, Mineral and Land Resources, Mooresville
Regional Office, Typical Lot by Lot Sediment and Erosion Control Plan.
NCDEQ Sediment and Erosion Control Design Manual, May 2013.
(https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit-guidance/
erosion-sediment-control-planning-design-manual)
Town of Cary, Standard Detail Drawings
(https://www.townofcary.org/business-development/developing-in-cary/standard-detail-drawings-2017)
Wake County, Sediment Control Details
(http://www.wakegov.com/water/stormwater/erosion/Pages/erosionspecs.a spx)
The Nau Company, Standard Single Lot Erosion Control Template
(www.thenauco.com)
NCDOT, Roadside Environmental Unit, 2018 Roadway Standard
Drawings, Division 16 Erosion Control and Roadside Development
AKE
COUNTY
NORTH CAROLIN OTHER NOTES, REFERENCES AND ACKNOWLEDGEMENTS A- 15
REVISED: 1/2/2020