Loading...
HomeMy WebLinkAbout_External_ FW_ SAW-2024-00365 Clarke Creek Greenway Phase A_ Request for Additional InformationCarpenter, Kristi From: Lipsky, Amber L CIV USARMY CESAW (USA) <Amber.L.Lipsky@usace.army.mil> Sent: Friday, March 8, 2024 7:04 AM To: Plummer, Mary B Subject: [External] FW: SAW-2024-00365 Clarke Creek Greenway Phase A: Request for Additional Information Categories: Red Category CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Mary, Per the RPOT file, you're the 401 PM for this site. Please see below as an FYI for the above mentioned project; I forgot to copy you. Best regards, Amber From: Lipsky, Amber L CIV USARMY CESAW (USA) Sent: Thursday, March 7, 2024 3:19 PM To: Kiker, Taylor <Taylor.Kiker@kimley-horn.com> Cc: Fox, Doug <Doug.Fox@kimley-horn.com> Subject: RE: SAW-2024-00365 Clarke Creek Greenway Phase A: Request for Additional Information Good afternoon, I have completed my review of the above referenced application and have the following questions/comments. Please provide one consolidated response. If you have any questions, let me know. General: 1. Could you please provide the T&E report that was sent to USFWS? 2. The Corps believes this project is more appropriate to verify under NWP 42. a. Can you confirm discharges at this location will comply with part "C. Regional Conditions Applicable to NWP 42" (i.e. will not result in above -grade fills that will result in an increased water surface elevation)? If they do, a "no -rise" certification from FEMA should not be necessary. 3. Please provide revised impact sheets where the area of grading/fill within wetlands is visually depicted on the plan sheet and profile. Using colors can be helpful for this. There's a lot of linework making it difficult to see impacts clearly. 4. Per the notation on the Wetland Data Sheets, please include a site map showing the sampling point locations. Please also include the location of the enclosed photos on the map. We're starting to request that a figure like this be included in all JD requests. Regarding impacts proposed under NWP 14: 5. On some sheets, a Temporary Construction Easement (TCE) is within a wetland. Are temporary impacts anticipated in these area? 6. Can you confirm the boardwalks will be elevated at least 3 feet to allow for high flow events? 7. Can you elaborate on the purpose and need for wetland fill/grading for Wetland Impacts 1, 3 and 4? Why can boardwalks not be used, or the limits of disturbance be shifted slightly, to avoid impacts to these areas? a. For example, Wetland Impact 3 shows impacts due to grading. Why does the fill line 'jut out' in these areas causing the impacts? Could you provide an additional plan view sheet showing the grading details with the existing wetland/grades and subsequent grading areas clearly depicted? 8. Regarding Wetland Impacts 5 and 6- Mechanized clearing, including the stumping of trees to facilitate the noted topsoil removal, is considered a permanent conversion impact. i. Why is the clearing area so extensive for Wetland Impact 5? ii. Please note since this would be considered a permanent impact, you would exceed the mitigation threshold for this project and the Corps will require evidence of mitigation credit availability for this project. Conversion impacts can be mitigated for at a 1:1 ratio. 9. Do the swale bridge details outlined on Sheet C-7.0 correspond to the bridges shown on sheet C-4.10 and C- 4.15? If so, the concrete footers and associated temporary shoring need to be accounted for in the wetland impacts. Otherwise, please provide bridge details for the bridges with footers in wetlands. Regarding impacts proposed under NWP 13: 10. Are proposed impacts within a riffle/pool complex? 11. Is the proposed discharge greater than an average of one cubic yard per running foot below the OHWM? a. To process this under the NWP 42, please provide the acreage of impacts below the OHWM due to these activities. 12. On Sheet C-4.10, does the 58 LF of bank stabilization refer to both sides of the bank? The arrow on the plan view only points to one side, but stream grading is called out on both sides of the profile view. Should the profile view call out on the right be for wetland grading? The riprap fill is also not depicted, only grading. Could you provide a profile view that includes where the rip rap is being placed and indicates the wetland fill/grading impacts as well? Thank you, Amber From: Fox, Doug <Doug.Fox@kimley-horn.com> Sent: Wednesday, March 6, 2024 12:19 PM To: Lipsky, Amber L CIV USARMY CESAW (USA) <Amber.L.Lipsky@usace.army.mil> Cc: Kiker, Taylor <Taylor.Kiker@kimley-horn.com> Subject: [Non-DoD Source] RE: SAW-2024-00365 Clarke Creek Greenway Phase A: Request for Additional Information Hey Amber, This shapefile shouldn't have any fill within the project boundary. Let me know if you need anything else! Best, Doug Fox Kimley-Horn 1 580 Kingsley Park Dr. Suite 125, Fort Mill, SC, 29715 Direct: 1 (803)-881-3371 1 Mobile: (828) 448-5656 Celebrating 16 years as one of FORTUNE's 100 Best Companies to Work For The electronic files ("Files") furnished by Kim ley -Horn to the intended receiver ofthe Files ("Receiving Party") are provided only for the convenience of Receiving Party and only for its sole use. Receiving Party agrees that it shall be bound by and subject to the terms of this notice. For any signed and sealed plans or final deliverables, if there are discrepancies between the Files and the hardcopy of the Files prepared by Kim ley -Horn, the hardcopy shall govern. Only printed copies of such documents conveyed by Kimley-Horn may be relied upon. Any use of these electronic Files will beat the Receiving Party's sole risk. Receiving Party accepts the Files on an "as is" basis with all faults. From: Lipsky, Amber L CIV USARMY CESAW (USA) <Amber.L.Lipsky@usace.army.mil> Sent: Wednesday, March 6, 2024 11:46 AM To: Fox, Doug <Doug.Fox@kimley-horn.com> Cc: Kiker, Taylor <Taylor.Kiker@kimley-horn.com> Subject: RE: SAW-2024-00365 Clarke Creek Greenway Phase A: Request for Additional Information Hi Doug, ible to live me a file that doesn't have the "fill"? Pic below for reference. a h Vw7k r: rf A3_ aRrt � i d. Thanks! From: Fox, Doug <Doug.Fox@kimley-horn.com> Sent: Wednesday, March 6, 2024 11:39 AM To: Lipsky, Amber L CIV USARMY CESAW (USA) <Amber.L.Lipsky@usace.army.mil> Cc: Kiker, Taylor <Taylor.Kiker@kimley-horn.com> Subject: [Non-DoD Source] RE: SAW-2024-00365 Clarke Creek Greenway Phase A: Request for Additional Information Good morning Amber, 3 Attached is a zipped shapefile of the project area. Please let us know if you need anything else! Best, Doug Fox Kimley-Horn 1 580 Kingsley Park Dr. Suite 125, Fort Mill, SC, 29715 Direct: 1 (803)-881-3371 1 Mobile: (828) 448-5656 Celebrating 16 years as one of FORTUNE's 100 Best Companies to Work For The electronic files ("Files") furnished by Kim ley -Horn to the intended receiver ofthe Files ("Receiving Party") are provided only for the convenience of Receiving Party and only for its sole use. Receiving Party agrees that it shall be bound by and subject to the terms of this notice. For any signed and sealed plans or final deliverables, if there are discrepancies between the Files and the hardcopy of the Files prepared by Kim ley -Horn, the hardcopy shall govern. Only printed copies of such documents conveyed by Kimley-Horn may be relied upon. Any use of these electronic Files will beat the Receiving Party's sole risk. Receiving Party accepts the Files on an "as is" basis with all faults. From: Lipsky, Amber L CIV USARMY CESAW (USA) <Amber.L.Lipsky@usace.army.mil> Sent: Wednesday, March 6, 2024 11:01 AM To: Kiker, Taylor <Taylor.Kiker@kimley-horn.com> Subject: SAW-2024-00365 Clarke Creek Greenway Phase A: Request for Additional Information Good morning Taylor, Could you please provide a shapefile of the project area? Since this is a long, linear project having one will help streamline my review. Thanks, Amber Lipsky (she/her) Regulatory Specialist, Charlotte Regulatory Field Office U.S. Army Corps of Engineers, Wilmington District 8430 University Executive Park Drive, Suite 615 Charlotte, NC 28262 Email: Amber.L.Lipsky@usace.army.mil Office: (704)510-1441 Mobile: (704)962-6947