Loading...
HomeMy WebLinkAboutNCC241011_Site Plan or Location Map_20240404 ' " v — " <., , , T1 / / 1 �.j,/, - . , . .., . __— _ ___ . ' � \.\ ,..... v PRO1 \ ,_ ii..„.1.. \ ,II ^, 5�-1:' -'''': --'-- .—. ' O 1112_1/14--4 / \ ` • °/ �1 NIII�I®���IAeiga, `p.©pl�eTfow ICINITY MAP o/ r `• / c / rj, �IIIC�1111111 >, ,._ 4 "=z000',� �, EOM / ' � Oi "Jt(�,, OVERALL SITE SUMMARY / //j• • \ \ /� p/ ./ 4, �, �r , ��I4 �,� ,m,// ii- e ail 511 / NUMBER OF UNITS PROPOSED-236 / / ` ' 4 3 e,••� �s /at 0 CURRENT LAND USE—VACANT • \ �W, • � Q/ SITE AREA 19.87 AC x.`YZN CARP' , , ,1• SEAL g 63R�� ti 4I ��A,,` �1 0" r�`�� .� © pee `� / CURRENT ZONING—PD(PLANNED DEVELOPMENT) _ yQ- v� \ \ `D'FjY .7j ,��. r a:-14 *g% L � S�� / PDP#—PD-11-22 0507701 ���/ O -., Nil. ....,,,„ / PROPOSED DENSITY—11.68 DU/ACoonnummo Pt ` � �� ;`� :5.'<i'......,--,"/„.1.----: ��� •1---------"/nrllJT:*V'c_s'_u_•.:1)r':_'T_c"_.._Il / / PARKING SUMMARY CONSTRUCTION • - ' ' ,r� /' %/��/ �= s$�` o 'm�� � Ilk � ;� p� ,71�, .01191112r SET I \ ,,, / // ���/ ,,,2P.Ati gyp"'' = O ` vA `,, � / UNIT TYPE NUMBER OF UNITS MIN. REQUIRED// j � 0 ©�� , N��°�„ ' r✓,y���,,, / ,,s �i \ 1 BEDROOM 100 1.0 SPACES/UNIT , • / I i I1 1-/ 14 � -, � 0., ,W 2 BEDROOM 96 2 SPACES/UNIT Q o � �° �� / / LEGEND 3 BEDROOM 40 2 SPACES/UNIT ©��;&� r.,1...:::::•1::::::;,.,7_,E1:1;.:::::11:717;;::."'-` ,/ h , ; . � / / DESIGNED BY KIMALEY HONN Xb/ /� ` _��` ® / \ REQUIRED VISITOR PARKING= 1 SPACE/S UNITS = 48 SPACES v` • ;.. �,.i wErtttx¢BARscI nnm Ywouxmo sRnr.Roes, _ / \ � -..�Ir � � \ uRROWuIExm raR uGRe nrare,nnon RR�cwwnc "r OM` ':� ._:.��� . - ,' — � SAD�i�o ni�wwes�smren gr.[R o oMFn n[us _ _ N M O /�� / ' ,.�. � � � TOTAL REQUIRED - 100+ 192+ 80 + 48- 420 SPACES �Z� �/ cq / S V� 1. 7ODIMENSIONAL STANDARDS PER PDP PER PDP APPROVAL, THERE WASNAS171 PARKIING SPOTDREDUCTION A O\ O= �OMINIMUM LOT WIDT30oo SF APPROVED FROM THE REQUIREME T L STED N THE U O. ,!� 7w7 �"M °�'/ 1 0, © MINIMUM LOT WIDTH: 20' WO.' • - , . f TOTAL ��1I` I / / MINIMDEuSD�iN�cTSETenc s. 5, PARK NGEQUIRED =PROVIDED 403 SPACESg8 SPACES W W 3 .. 3 3 :I:INTERIOR: 15' a V F ;✓ .. - „". REAR: 10' GARAGES FRONDED 13 SPACES E. x , ;wl1 ^ / x W H. ' I, • y,I / ` — \ MAXIMUM BUILDING HEIGHT. 40 TOTAL PARKING PROVIDED 411 SPACES P I / "\ / MAXIMUM IMPERVIOUS CODER: 90% p"' I •• A R x • �/ A / c"oo c, KEY NOTES: _l / / R / ` OA SEGMENTAL BLOCK RETAINING WALL. TO BE DESIGNED BY OTHERS W M ` O c �wm^ \ O HC RAMPS REQUIRED AT ALL HC PARKING AND WHERE A RUNNING SIDEWALK MEETS ? • THE CURB.(TYP) /j . / / / © BLACK VINYL-COATED CHAINLINK FENCE(MIN.4'TALL.MAX 6'TALL) ' / / / / pD HEAVY DUTY PAVEMENT(SEE PAVEMENT SECTION ON C 7.0)I I 0 • y / 0 O 24"STANDARD CURB AND GUTTER INSIDE DEVELOPMENT. • • COMPACTOR/RECYCUNG CENTER SHOWN FOR GENERAL PURPOSES ONLY. ��//�� /'/ G OWNER/CONTRACTOR SHALL COORDINATE ELECTRICAL SERVICE AND SIZE OF V1 z / O ENCLOSURE V4TH ARCHITECT AND COMPACTOR MANUFACTURER.COMPACTOR TO BE E-I r, • g // COMPLETELY SELF CONTAINED UNIT.COMPACTOR RAMP TO UTILIZE HANDRAILS WITH �1 w 0 s5 /. { • / / , MAXIMUM SLOPE OF 8.3%BEFORE LANDING.SEE DETAIL ON SHEET C-7.1. /"1 <4 Z svF Is /O e FENCE GATE ENTRANCE I� U CAST IN PLACE FOUNDATION WALL TO EXTEND 10'PAST EXTENTS OF BUILDING.TO W W Q-I = / — URBAN IRANSITON HIGHWAY CORRIDOR BOUNDARY JO BE COORDINATED WITH THE STRUCTURAL ENGINEERING DRAWINGS. � Z I_ STON H1gIWAY '_ __ --/ © FENCE AROUND POOL AREA I-1 P4 Z O .tl4 UGpRWDE µOWNDARY —4,,. — / — — � /1� 3 Z Li 7���yyyy„,, �U�µN=➢ON N=ONWAy O CONCRETE A SIDEWAELK SSEE DETAL ONOCIRED IN ALL PARKING SPACES THAT F�LI = - � I BWno"7OS ADA COMPLIANT SIDEWALK WITH HANDRAILS.MAX SLOPE OF 8.3%FOR NO LONGER 13 I� a ` / THAN 30 LINEAR FEET BEFORE PROVIDING A 5'LONG PAD AT MAX 2R SLOPE. I--I ON HAND RAIL REQUIRED.SEE GRADING PLAN C-3.1 AND C-3.2 FOR CONTOURS I-1 E1 Z U %'/ SHOWING HOW TO ENSURE THESE MAX SLOPES.EVERYWHERE ELSE WITHOUT �N1 ` D HANDRAILS.SIDEWALK SHALL NOT EXCEED 5%SLOPE. W <F�I W • ` • O TOTAL WETLANDS DISTURBANCE FOR PROPOSED SPINE ROAD TO BE UNDER ODD W FLI Q d P AC.NATIONWIDE PERMIT TO BE OBTAINED FROM ARMY CORPS OF ENGINEERS O �o CLOSE OUT PHASING SCHEDULE: BEFORE WORK TO BEGIN. Cn ` 0 -/ 0 ROAD WORK ON US HWY-1 AND TERMINATION OF ST JOSEPH ROAD REFLECTED ON 0' / , PHASE 1. O KIMLEY HORN"KNOLLWOOD OFFSITE IMPROVEMENTS"PLAN ON SHEETS R0.00 TO ,� SITE COMPLETELY BROUGHT TO GRADE.ALL HORIZONTAL UTILITIES(STORM,WATER, R6.04 ` I / I SEWER)INSTALLED.SPINE ROAD CONNECTION TO US HWY 1 AND SITE ACCESS TO �.. SPINE ROAD COMPLETED AND FUNCTIONAL PER FIRE ACCESS REQUIREMENTS. RIGHT OF WAY DEDICATIONS FOR THE PHASE 1 ROUNDABOUT DESIGN.AT THE TIME Li BEFORE CERTIFICATES OF OCCUPANCY CAN BE ISSUED,ALL HORIZONTAL UTILISES SOUTHERN PINES DEEMS THE PHASE 2 BUILD OUT OF THE ROAD TO BE NECESSARYG ONLY THE 2 ,THE DEVELOPER ASSOCIATED WITH THAT BUILD OUT WILL BE ` I ,® O (LANE SPINE ROAD STORM,WATER, AAND ROUNDNITARY ABOUT.FUTURE EXPANSION)AND THE SPINE ROAD(TO 4 LA E SPINE ROAD ® RESPONSIBLE FOR SUBMITTING A E ROADWAY PLANS TO CONNECT TO THE Q ROUNDABOUT AND DEDICATING ADEQUATE RIGHT OF WAY ON OPPOSITE SIDE OF 0 • IS NOT PART OF THIS PROJECT AND NOT TO BE BUILT BY DEVELOPER)MUST BE SPINE ROAD FROM THE RESIDENTIAL DEVELOPMENT IN ORDER TO CONNECT TO THE O NIP- I O COMPLETED.THE OFFSITE IMPROVEMENTS TO ST.JOSEPH ROAD AND US HWY 1 SPINE ROAD. MUST ALSO BE COMPLETED BEFORE VERTICAL CONSTRUCTION IS TO BEGIN. • • r VERTICAL CONSTRUCTION OF THE FOLLOWING BUILDINGS TO TAKE PLACE IN THE OU INSTALL 54"HIGH FENCING AT STEEP DROP OFF PER TOSP REQUIREMENTS FOLLOWING ORDER:CLUBHOUSE,COMPACTOR,BUILDING 1,BUILDING 9,BUILDING 8, y GUARDRAIL.SEE KIMLEY HORN SPINE ROAD PLANS FOR DETAIL. • _ _ POOL AND CABANA,MAINTENANCE BUILDING,6 CAR GARAGE.VERTICAL O Z O • ,I dI - _. .II44 vmr ` . — — - CONSTRUCTION TO BE FINALIZED WITH ALL UTILITY SERVICE TIE INS.ALL PARKING O THE SPINE ROAD ASSOCIATED WITH THE DEVELOPMENT HAS BEEN DESIGNED BY j�1j ��, — " f� — — — —-— —- —-— __ —= •_ ASSOCIATED WITH THESE BUILDINGS SHALL BE INSTALLED WITH FINAL UFT AND X KIMLEY HORN.FOR ALL ITEMS ASSOCIATED WITH THE SPINE ROAD DESIGN,PLEASE O 0- - —_ —__ — - — — — —- -—-— — —— —--- — _---- SITE CAN REMAIN STONED UNTIL COMPLETION OF THOSE ADDITIONAL SEE THE KIMLEY HORN SPINE ROAD DESIGN PLANSET. -. -_ - ST J0 1 IJE-RD BUILDINGS. STRIPING MEET 10 O ...� � DAD END OF SPINE ROAD TO BE PROPERLY MARKED AND BARRICADED.SEE SPINE THE SOUTHERN PINES FIRE TRUCK REQUIREMENTS.ALL OTHER 0 1 — ' — — E W — — — _ _ OY ROAD DESIGN PLANS. o ��A/ — _ _ PHASE 2: z — —— �� VERTICAL CONSTRUCTION OF THE FOLLOWING STRUCTURES TO TAKE PLACE IN THE —— US / FOLLOWING ORDER:BUILDING 7,BUILDING 6,BUILDING 2,BUILDING 3,7 CAR ————————— ! GARAGE,PLAYGROUND/PUTTING GREEN.VERTICAL CONSTRUCTION TO BE FINALIZED WITH ALL UTILITY SERVICE SE INS.ALL PARKING ASSOCIATED WITH THESE BUILDING �.» L_----- 'e SHALL BE INSTALLED WITH FINAL UFT AND STRIPING AND MEET THE SOUTHERN } PINES ARE TRUCK REQUIREMENTS.ALL OTHER PARKING ON SITE CAN REMAIN 00 STONED UNTIL COMPLETION OF THOSE ADDITIONAL BUILDINGS. GRAPHIC SCALE o GENERAL NOTES: PHASE 3: z BOUNDARY AND EXISTING TOPOGRAPHICAL INFORMATION WAS PROVIDED BY LKC ENGINEERING DATED 2/10/23 Woo 0 50 loo 200 400 VERTICAL CONSTRUCTION OF THE FOLLOWING STRUCTURES TO TAKE PLACE IN THE [`] - II FOLLOWING ORDER:BUILDING 4,BUILDING 5,PICKLEBALL/TENNIS COURTS,GRILLING PAVILION,DOG PARK,SMOKING PAVILION.CONSTRUCTION TO BE FINAUZED WITH ALL UTILITY SERVICE TIE INS.ALL PARKING ASSOCIATED WITH BUILDINGS SHALL BE C_1 .0 ( IN FEET) INSTALLED WITH FINAL UFT AND STRIPING AND MEET THE SOUTHERN PINES ARE li 1 inch= 100 ft. TRUCK REQUIREMENTS.POND CLOSEOUTS WILL OCCUR AT THE END OF PHASE 3.