Loading...
HomeMy WebLinkAboutSW5230901_Design Calculations_20240404 WET POND SIZING DATE 4/4/2024 •• •.� PROJECT NAME PROJECT NO TIMMONS GROUP NCNG CB BOM Yard 42324 °°""°'°"""`°""°"'°"" LOCATION BY Stem,NC Jake Lewis POND A Drainage Area,(DA)= 8.10 ac Impervious Area c=0.95 4.47 ac Pervious Area c= 0.30 3.63 ac Cc= 0.66 CN= Permanent Water Quality Pool % Impervious= 55.1 Permanent Pool Design Depth= 3.00 ft SA/DA Ratio= 1.94 (from Tbl. 1.1) Required Surface Area= 6,858 sf Permanent Pool Volume Req.= 20,574 cf Temporary Water Quality Pool Design Storm Rainfall 1.00 in (Typically 1-in) Runoff Coeff.(Rv=0.05+0.009(%Imperv.))= 0.55 in/in Required Volume(design rainfall)(Rv)(DA)= 16,056.94 cf Surface Area Provided: Permanent Pool Max.Depth= 4.00 ft Area of Pond Bottom(Above PSS)= 6,884 sf (EL=452.0) Area Bottom of Shelf= 9,361 sf (EL=457.0) Area of Permanent Pool= 10,466 sf (EL=457.5) Area Top of Shelf= 11,489 sf (EL=458.0) Perm.Pool Volume Provided= 33,300 cf > 20,574 OK Avg.Perm.Pool Depth Provided(Eq.3). 3.18 ft > 3.00 OK Surface Area at 1"Storage Volume= 16,122 sf (EL=1203.1) 1"Storage Volume Provided= 22,159 cf > 16,057 OK Percent of Full Size 138% Temp.Storage Depth above Dewatering Hole= 1.50 ft Diameter of Dewatering Hole= 2.00 in Detention(Draw-Down)Time = 3.6 days (2-5 days Required) T days=(Temp.Storage Vol Req/(0.6*A*(2`g*(h))^1/2)`86400 (where h=one third temp.storage depth measured to centroid of orifice) Max Drawdow Rate= 0.13 cfs Permanent Pool Volume= 33,300 cf > 20,574 OK Forebay Volume Required= 4,995 cf Forebay Volume Provided= 5,127 cf 15.4% OK Table 1.1 SA/DA Ratios 85%TSS efficiency Permanent Pool Depth(ft) %Impervious 3.0 4.0 5.0 6.0 10 0.51 0.43 0.37 0.30 20 0.84 0.69 0.61 0.51 30 1.17 0.94 0.84 0.72 40 1.51 1.24 1.09 0.91 50 1.79 1.51 1.31 1.13 60 2.09 1.77 1.49 1.31 70 2.51 2.09 1.80 1.56 80 2.92 2.41 2.07 1.82 90 3.25 2.64 2.31 2.04 s:\1319\0001\talcs\PondSize-Wet Pond-piedmont-90 tss-BOM printed:4/4/2024 9:08 AM Page 1 of 2 DATE POND A Main Pool Permanent Pool Volume Stage(ft) Elevation Area(sf) Storage(cf) Top of Sed.Stor.in Main Pond -4.00 452.50 6,884 -3.50 453.00 7,218 3,525 -2.50 454.00 7,907 11,088 -1.50 455.00 8,621 19,352 -0.50 456.00 9,361 28,343 Inside of Shelf Elev. 0.00 456.50 10,466 33,300 Normal Pool Elev. 0.50 457.00 11,489 38,788 Outside of Shelf Elev. Forebay Volume Stage(ft) Elevation Area(sf) Storage(cf) -4.00 452.50 644 0 Top of Sed.Stor.in Forebay -3.50 453.00 770 354 -2.50 454.00 1,058 1,268 -1.50 455.00 1,390 2,492 -0.50 456.00 1,765 4,069 0.00 456.50 2,467 5,127 Normal Pool Elev. Total Pond Stage/Storage Detail Stage(ft) Elevation Area(sf) Storage(cf) 0.00 456.5 12,926 0 Normal Pool Elev. 0.50 457 14,489 6853.8175 Water Quality Elevation 1.50 458 16,122 22159.3175 2.50 459 17,815 39127.8175 3.50 460 20,414 58242.3175 s:\1319\0001\calcs\PondSize-Wet Pond-piedmont-90 iss-BOM printed:4/4/2024 9:08 AM Page 2 of 2 Project Information Complete this sheet if required by your reviewing authority. Contact them for any questions. Grey boxes/text are optional. SNAPv4.2.0 LOCATION Project Name(optional): NCNG Camp Butner BOM Yard Parcel ID(optional): 86900128714 Submission Date(optional): 4/5/2024 date Nutrient Management Watershed: Falls Lake menu Local Jurisdiction/Reviewing Agency: Stem menu Subwatershed: Upper_Falls menu Project Latitude Coordinates(optional): 36°11'38.4"N N Phosphorus Delivery Zone: Neuse- Upper 03020201 menu Project Longitude Coordinates(optional): 78°47'25.6"W W Nitrogen Delivery Zone: Falls- Upper menu PROJECT DETAILS Development Land Use Type: Industrial menu Disturbed Area: 466,435 ft2 Part of Common Development Plan? .no yin Project Activity: Redevelopment menu Designated Downtown Area? no yin Project Drains to SA Waters? no yin Public Linear Road/Sidewalk Project? .no yin Pre-Project Land Use: forest menu Project Owner Type: State non-NCDOT menu Project Description(optional): STORMWATER DETAILS (Falls ONLY)Onsite Reduction%Req. 30% % Project Uses LID/Runoff Volume Match? no yin Existing BUA/Development Onsite? yes yin Local Gov't nutrient req's same as State? yes yin Local Gov't cutoff date for Existing BUA: 12/01/2006 date Project Drains to Regional SCM? no yin Nitrogen Export Rate Target: .2.20 lb/ac/yr Total Nitrogen Offset Credits Needed: 0.0 lb/yr Phosphorus Export Rate Target: 0.33 lb/ac/yr Total Phosphorus Offset Credits Needed: 0.0 lb/yr SNAP v4.2.0 Project Area and Offsite Land Cover Characteristics Precipitation Oxford Station: Copy ' Paste VALUES ONLY for Best Results Click here to scroll down to error messages on this sheet. — PROJECT AREA LAND COVERS TN EMC (mg/L) TP EMC (mg/L) Pre-Project Area (ft2) Post-Project Area (ft2) Change pre-to-post(ft2) 1 Roof 1.18 0.11 0 Roadway 1.64 0.34 0 Parking/Driveway/Sidewalk 1.42 0.18 57,710 225,400 167,690 Protected Forest 0.97 0.03 587,650 587,650 0 Managed Pervious/Landscaping 2.48 1.07 400,786 220,170 -180,616 Offsite or Existing Roof 1.18 0.11 0 Offsite or Existing Roadway 1.64 0.34 0 Offsite or Existing Parking/Driveway/Sidevin 1.42 0.18 0 Offsite Protected Forest 0.97 0.03 0 Offsite Managed Pervious I 2.48 1.07 0 CUSTOM LAND COVER 1 0 CUSTOM LAND COVER 2 0 CUSTOM LAND COVER 3 0 LAND TAKEN UP BY SCM 1.18 0.11 12,926 12,926 Total (Regulated & UnReg)Area 1,046,146.00 1,046,146.00 Project (Regulated)Area 1,046,146.00 1,046,146.00 SCM Characteristics Stormwater Control Measure (SCM) Characteristics Click here to go to Copy ft Paste VALUES ONLY SCM101's Land Cover Data SNAP v4.2.0 for Best Results Catchment ID 1 1 1 Drains to Drains to SCM ID 101 102 103 7 Type of SCM Wet Pond rHydrologic soil group at SCM location C ' SCM Description ftDesign Storm Size(inches/24hrs) 1.00 ■ Percent of Full Size 138% Annual Effluent 79% 0% 0% Annual Overflow 7% 0% 0% I. %Annual ET/Infiltrated 14% 0% 0% ElCustom%Annual Effluent A r� Custom%Annual Overflow rCustom%Annual ET/Infiltrated 1 l SCM Effluent TP EMC(mg/L) 0.13 0.00 0.00 III SCM Effluent TN EMC(mg/L) 0.86 0.00 0.00 ■ Custom Effluent TP EMC 1.1 Custom Effluent TN EMC r SCM Land Cover TP EMC(mg/L) 0.11 0.00 0.00 L SCM Land Cover TN EMC(mg/L) 1.18 0.00 0.00 r'This SCM Drains to Numbered SCM 0 0 0 Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to SCM 101 SCM 102 SCM 103 Catchment 1 Catchment 2 Catchment 3 Catchment 4 Catchment 5 Catchment 6 Error Check-Missing SCM Area: SCM Characteristics Error Check-Min/Max Size: II— Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: - SCM ID: 101 102 103 TArea Draining Directly to Area Draining Directly to Area Draining Directly to SCM Drainage Area Land Covers SCM 101 (ft2) SCM 102 (ft2) SCM 103 (ft2) Roof Roadway Parking/Driveway/Sidewalk 194,512 Protected Forest 17,650 Managed Pervious/Landscaping 127,848 Offsite or Existing Roof Offsite or Existing Roadway Offsite or Existing Parking/Driveway/Sidewalk Offsite Protected Forest Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM 12,926 TOTAL AREA DRAINING TO SCM (ft2): 352,936 0 0 CATCHMENT AREA(ft2): 352,936 SCM Characteristics Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: IIIError Checks-SCM Type: SCM ID: Allowable Total Land Use Total Land Use Area Post-Project Untreated SCM Drainage Area Land Covers z Area to be Treated Based z Treated By All SCMs(ft ) z Land Area (ft2) on Post-Project Areas(ft2) ..roof 0 0 0 Roadway 0 0 0 Parking/Driveway/Sidewalk I 194,512 225,400 30,888 Protected Forest 17,650 587,650 570,000 Managed Pervious/Landscaping I 127,848 220,170 92,322 Offsite or Existing Roof 0 0 0 Offsite or Existing Roadway 0 0 0 Offsite or Existing Parking/Driveway/Sidew 0 0 0 Offsite Protected Forest 0 0 0 Offsite Managed Pervious 0 0 0 CUSTOM LAND COVER 1 0 0 0 CUSTOM LAND COVER 2 0 0 0 CUSTOM LAND COVER 3 0 0 0 LAND TAKEN UP BY SCM 12,926 12,926 0 TOTAL AREA DRAINING TO SCM (ft2): 352,936 1,046,146 693,210 CATCHMENT AREA(ft2): Nutrient Export Summary Landcover Et SCM Data Review Errors/Advisories Avg Annual precip(in) = 44.46 Total (Regulated+ 1,046,146 Unregulated)Area (ftZ)= Project(Regulated) 1,046,146 Area (ftZ) = Net BUA(Project Area 2 167,690 Net BUA indicates new development or expansion. BUA only ft )_ Custom Landcovers are present: no Total Nitrogen Export Target 52.84 Scaled to Project Area (lb/yr): Total Area Total Area Project Area Project Area (Onsite+ Post-Project Post-Project Nutrient Export Summary (Onsite Only) Offsite) before before Pre-Project Pre-Project Treatment Treatment Area (All Landcover Types) (acres) 24.0162 24.0162 24.0162 - 24.0162 Percent Built-Upon Area (BUA)(%) 6% 6% 22% 22% Built-Upon Area(BUA) (sqft) 57,710 57,710 225,400 225,400 Annual Runoff Volume(ft3/yr) 347,609 347,609 891,802 891,802 Annual Runoff%Change 157% _ 157% Total Runoff Change(cuft/yr) 544,193 544,193 Total Nitrogen EMC(mg/L) 1.50 1.50 1.40 1.40 Total Nitrogen Load Leaving Site(Ib/yr) _ 32.49 32.49 _ 78.11 78.11 Total Nitrogen Loading Rate(Ib/ac/yr) _ 1.35 1.35 3.25 3.25 Total Nitrogen%Change Pre-to-Post 140% 140% Total Nitrogen Change(Ib/yr) Pre-to-Post 45.61 45.61 Total Phosphorus EMC(mg/L) 0.31 0.31 0.20 7- 0.20 Total Phosphorus Load Leaving Site(Ib/yr) 6.70 6.70 10.96 10.96 Total Phosphorus Loading Rate(Ib/ac/yr) 0.28 0.28 0.46 0.46 Total Phosphorus%Change Pre-to-Post 63% -E_ 63% Total Phosphorus Change (Ib/yr)Pre-to-Post 4.25 4.25 SCM/Catchment Summary 1 SCM ID and Type Volume TN Reduction TP Reduction TN Out I TP Out Reduction(%) (%) (%) (Ibs/ac/yr) (Ibs/ac/yr) I Catchment 1 14.01% I 45.97% ‘ 42.60% 4.09 0.61 101:Wet Pond 14.01% 45.97% 42.60% 4.09 0.61 102:NA 0.00% 0.00% 0.00% 0.00 0.00 103:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 2 0.00% 0.00% _ 0.00% 0.00 0.00 201:NA 0.00% 0.00% 0.00% 0.00 0.00 202:NA 0.00% 0.00% _ 0.00% 0.00 0.00 203:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 3 0.00% 0.00% 0.00% 0.00 0.00 301:NA 0.00% 0.00% 0.00% 0.00 0.00 302:NA 0.00% 0.00% 0.00% 0.00 0.00 303:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 4 0.00% 0.00% _ 0.00% 0.00 0.00 401:NA 0.00% 0.00% 0.00% 0.00 0.00 402:NA 0.00% 0.00% _ 0.00% 0.00 0.00 403:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 5 0.00% 0.00% 0.00% 0.00 0.00 501:NA 0.00% 0.00% 0.00% 0.00 0.00 502:NA 0.00% 0.00% 0.00% 0.00 0.00 503:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 6 0.00% 0.00% _ 0.00% 0.00 0.00 601:NA 0.00% 0.00% 0.00% 0.00 0.00 602:NA 0.00% 0.00% _ 0.00% 0.00 0.00 603:NA 0.00% 0.00% 0.00% 0.00 0.00 1 SNAP v4.2.0 Errors/Advisories SCM Area (ft2) = 12,926 SCM Treated Area (ft2) = 352,936 Catchment Routing: No errors Treating Runoff from Existing BUA or Offsite: no Disturbed Area (ft2) = 466,435 Total Phosphorus Export Target 7.93 Scaled to Project Area (Ib/yr): Total Area Project Area Total Area Project Area Total Area Project Area Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project SCM-Treated SCM-Treated Untreated Untreated after Treatment after Treatment Area Only Area Only Areas Areas 24.0162 24.0162 8.1023 8.1023 15.9139 15.9139 22% I 22% 55% 55% 4% I 4% 225,400 225,400 194,512 194,512 30,888 _ 30,888 796,069 796,069 587,797 587,797 208,272 208,272 129% _ 129% 448,459 448,459 1.01 1.01 0.90 0.90 1.29 1.29 49.93 I 49.93 33.12 33.12 16.82 -t 16.82 2.08 2.08 4.09 4.09 1.06 1.06 54% 54% 17.44 I 17.44 0.15 0.15 0.14 0.14 0.18 0.18 7.27 7.27 - 4.97 4.97 2.31 2.31 0.30 0.30 0.61 0.61 0.14 0.14 8% 8% 0.57 0.57 === 1 Falls Lake ONLY: Onsite Reduction Compliance Check Nitrogen Phosphorus Onsite%Reduction Requirement 30% 30% Export Target Scaled to Area (Ib/yr) 52.84 7.93 Export Load Post-Project Before Treatment 78.11 10.96 Total Reduction Need (Ib/yr) 25.27 3.03 Onsite Reduction Need (Ib/yr) 7.58 0.91 Onsite Export Target(Ib/yr) 60.42 8.83 Project Area Post-Project After Treatment 49.93 7.27 1