Loading...
HomeMy WebLinkAbout20150887 Ver 1_Approval Letter_20151208Water Resources ENVIRONMENTALaVALIN I PAT MCCRORY l Gd r DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Dov., December 8, 2015 - DWR # 15-0887 Transylvania County City of Brevard David Lutz, Public Services. Director 95 West Main Street - Brevard; NC 28712 Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS - Neely Road Pump Station and Flow Equalization Dear Mr. Lutz: You have our approval for the impacts listed below for the purpose described in your application dated August 13, 2015, and received by the Division of Water Resources (Division) on August 31, 2015, with additional information received on October 29, 2015 via email and November5,. 2015. These impacts are covered by the attached Water Quality General Certification Numbers 3884 & 3890 and the additional conditions listed below. This certification is associated with the use of Nationwide Permit Numbers 12-& 39 once they are - - - issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal,state or local permits before proceeding: with your project, Including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts: j15A NCAC 02H .0506(b) and/or (c)] Type of Impact Amount Approved Amount Approved , '..(units) (units) 'Permanent' Temporary Streams 1 t Division of Water Resources—Asheville Regional Office I 2090 US Hwy 70, 5wannanos, NC 28778 Phone: 828-2964500 \ FAX: 828-299-7043 Internet: httP:HPonal.ncde,r,olg/web/wgf.s 1 An Equal Opportunity\Affirreative Action Employer Neely Road Pump Station and Flow Equalization DWRN 15-887 t 4 (APPROVAL Page 2of5 I!- d S1 15 ft. S2 40 ft. - S3- - 23 ft. S10 22 ft. 511 110 ft. Wetlands W1 - 0.082 acres" W2 0.110 acres W3 0.055 acres 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization.If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. Visual monitoring of the project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever Is longer), -and then annually until the site is -. stable (particularly after storm events) and vegetation is successful. Any failures of structures, stream banks, or vegetation may require future repairs or replacement, :which requires coordination with the Asheville Regional Office to ensure the stability and water quality of the stream and downstream waters. [15A NCAC 02H .0506(b)(2) and (b)(3)1 4. Fueling, lubrication and general equipment maintenance should nottake place within 50 feet of waterbody or wetlands to prevent contamination by fuel and oils, [15A NCAC 02H.0506 (b)(3)1 S. The permittee shall require its contractors and/or agentsto comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of thls Certification. A copy of this Certification, - including all conditions' shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)1. Neely Road Pump SWdon and Flaw EquaI zationt DWRM 15-0887 401APPROVAL Page 3 of 5 i I 6. The proposed project must comply with the recommendations stated in the North Carolina Wildlife Resources Commission (NCWRC) comment letter dated September 24, 2015. 7. Natural fiber matting is recommended for streambank stabilization over plastic matting that can entrap small animals. [15A NCAC 02H .0506(b)(2)] 8. All temporary impacted areas will be restored to pre -construction natural conditions uponcompletion of the project. Native vegetation shall be used for wetland and stream bank. stabilization. [15A NCAC 021-1.0506 (b)(2) and (c)(2)] This approval and its conditions are final andbinding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition. form may be obtained from the OAH at httP://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8`:00am and 5:00pm, excluding official state holidays). _. - _.. _... The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for: the. OAH: If sending via US Postal Service: If sending-: via delivery service (UPS,. FedEx, etc):. Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711. New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 3 Neely Road Pump Station and Flow Equalization DWR#15-0887 401 APPROVAL Page 4 of 5 One (1) copy of the petition must also be served toDENR: Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Tim Fox at 828-296-4664 or, - tim.fox(@ncdenr.gov if you have any questions or concerns. G. Landon Davidson, P.G.; Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3884 & 3890 ,Certificate of Completion cc: Kelly Boone- CDM Smith (via email) David Brown —USACE Asheville Regulatory Field Office (via email)' Andrea Leslie NCWRC (via email) Bryan Tompkins - USFW (via email) Stan Aiken — Division of Energy, Mineral, and Land Resources (via email) DWR ARO 401 files DWR 401 and Buffer Permitting Unit G\WR\WQ\Transylvania\401s\Non-DOT\Neely Rd Pump Station\APRVL.404NeeIyRdPumpStatlon12-8-15.docx