Loading...
HomeMy WebLinkAbout20150620 Ver 1_Staff Comments_20151118Burdette, Jennifer a From: Johnson, Alan Sent: Wednesday, November 18, 2015 3:56 PM To: Gregg Antemann (gregg@cws-inc.net); 'kelly@cws-inc.net' Cc: William Elliott - USACE (william.a.elliott@usace.army.mil); Kichefski, Steven L SAW; Burdette, Jennifer a; Montalvo, Sheri A Subject: UNC Charlotte The "current" UNC project DAVIS LAKE 15-0620, is on Hold in BIMS. It is now an INDIVIDUAL permit. Davis Lake is an existing pond in the middle of campus. NO new stormwater discharges, outfalls are proposed to this pond. Basically some reconfiguration and enlargement of the pond, with the construction of a "forebay". There are other proposed projects (discussed during a previous site visit) that should be included under or with the project. I have asked for the other projects that have been constructed in the past, so that we can link the past project (that taken individually, may not or didn't required 401 notification). As well as an overlay of the master plan (proposed) to the existing conditions. Much of the work at the site is all part of a Master Plan and like the Charlotte Airport, should be consider as a single project with multiple phases. I only find one other project 11-1096 in BIMS that we issued a 401. Jennifer, I have no other comments regarding the project. Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.