HomeMy WebLinkAboutNCC240955_ESC Approval Submitted_20240403 Stone, Jonathan
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Monday, March 25, 2024 3:43 PM
To: Stone, Jonathan; Sullivan, Vinnie
Subject: [EXTERNAL] NC DEMLR - FROF Application Approval CRM:0104138
Attachments: Application Report - Monday, March 25, 2024 338 PM.pdf; ALAMA-2024-0111 Mebane 44kV.pdf
*** CAUTION! EXTERNAL SENDER *** STOP. ASSESS. VERIFY!! Were you expecting this email?Are grammar
and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do
not click links, open attachments or enter your ID or password.
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
03-25-2024
Duke Energy Carolinas, LLC
525 S.Tryon St.
Charlotte, NC 28202
RE: Project Name: Mebane 44kV-Switch Rebuild
Acres Approved: 1.99
Application ID: PA-003566
Permit Number:ALAMA-2024-0111
Address:W Center St
City: Mebane
County:Alamance
River Basin:Cape Fear
Stream Classification: NSW: Nutrient Sensitive Waters;WS-V:Water Supply V
Plan Type: New Plan
Dear Duke Energy Carolinas, LLC,
1
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee.After
the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please direct questions about theeNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to
speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR
prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 48 .01201
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a
site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste
2
Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a
facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of
Water Resources rules and regulations. [15A NCAC 4B .0110]
4.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved
erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary
to stop sediment from leaving this site. [15A NCAC 4B .0115]
5.The NCGO1 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1
fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures,
including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and
removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, El - Assistant Regional Engineer
Winston Salem Regional Office
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachments: Certificate of Approval
FRO Application Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
U Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC,27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
3
CERTIFICATE OF PLAN APPROVAL
TATE
Ny,Y]q th5 l ',1
i ��A / O 1,
,it4("14V t:tkiit
%,,k._ii___. :i;1 el
s QUA:
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
Mebane 44kV - Switch Rebuild
W Center St Mebane, NC 27302
3/25/2024 ALAMA-2024-0111
Date of Plan Approval DEQ Project Identifier
Certificate of Coverage Number: