Loading...
HomeMy WebLinkAbout20240504 Ver 1_Site Plan_20240403 (2)cz tr c • m 2; C: ip 01 4,1 %,A2 6­50f so, Bog —0, 66.78 ­111-97 WES= "Is -too JOAS 03 t"."tpl.m as G=:81 ..MST !!'IMP 224 39 z z Am 3 n z is z . . . . . . I I . . . . . . . . . ITT" � . . . . . . . .... . . . . . . . . . . .41 Z.,Sum m::2 99s:8 9 I.El—L R.. Is 114 -2s z 21V '71 mq 41q- It- 45. :n: MSI. 299 .Zts 54'. mgo st" V21; _pp 21 .111h 11 w. 8,a,2 I S:- MI_ !Full Pond/ N Ulu " -'1c 6 -7(,0 I 0 take � S Te42-S P�6 Aef7)A- ,�-q 44k- per, a so, bxfi�e� ... . .... .... ...... F.--;Iistlrg Ducif full!!Ot lb —M.rm —'r, ft UlUater Level Pi rap • fall Pond/ Nvu t 3nm dea,l"3 -11 ;oral f5 19'-10" D z Ln s a. co !Full Pond/ M Lave Shu" -7GO ZDAJC d. In, Lake. Ot Pu,` erg ,) S7e-4s Pub A-eFA- Gsiis¢irg Doc.: may' C Betom fdl Pond/ NVJI. rull 1Vn/ NOT wr2ter kGri ova f.9 pond/ Nmu Haft. .d,tt and CIMA.3 Plan V, �, -- I = = = sf `,arth smio., `;I—L f 1.jj*.%j.j 5�,jee _'ante; Raleigh. 27049-1417 D z c s m m a 0 0 X J O 0 n m N LA n D r m I I O Irk d Np ti� 24' 34' OR 35' OR 36' +1_ MAS E MENOS 23'-1" 19'-10" (At l°bd1A� dLaice /N®6°mat Wat;rL@jfe1) Full Pond/ l"b — E? EZ�% pC,f0c tVmVI J-V% L 8/,Sj-j jj P(easa approxirnatel Item, such dS V sketch xzo the f®ltovuin i11f®rr�ation1�,� 2®f�-a�20®ft)�0 � A p �.. All Pr0POSed v� fP.,0 96gfe C/Im� 2, Location ofrl r00ii®n 3. Location Of Flo Pap o� titito he PIace�9h®�� the Full l�® 4. Location �frart o by placed below $ha P�11 pond/ IPIVormal Water Level elevatlon S• location ®fan pY®dosed rUCtura8 such a� buildl�v��g r�tatnln� waling ��� Y excavation Or dredging A / 1V®real UUagar Lat,�l elevation 6� LoCati0n ®i COnStructlon access COrrrid®ralow ghe Full pond docks, a•ke, ®rr�al IA/ater Level elevation FORM! SSGP 10.2013 Sage J ®f a 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 7. Will work be conducted from land? j From water? r7 &. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: fu � 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land- wa rd Permanent impacts (including back fill, excav9 rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 11. Signature By signing below, I, as the project proponent, certify to the following: ® The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief © The project proponent hereby requests that the certifying authority review and take action on this OWA 401 certification request within the applicable reasonable period of time 3/� ley Owner/Ag s Signat re° 115A NMC Q2� 0502Ei J1 Date 'Agent's s' is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation ' �`�•�rti:6"'u1.•.�i1zr�:�ai�F�sie?>L�.�[t`� '�'it E rt�ti�t�E�E;tt�FGsu��s?a 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): -,5, Oe �► ,n 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 7. Will work be conducted from land? Q From water? CD S. Total amount of impacts below the normal pool lake level / normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet lands ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: RD' Temporary impacts (temporary clearing, construction corridor) in square feet: NIr 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 11. Signature By signing below, I, as the project proponent, certify to the following: o The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o The project proponent hereby requests that the certifying authority review and take action on this CW,4.401-.wtifiutiocnre4uest wi__�the applicable reasonable period of time i Owner/ nt's Sign re' .Ni AcG-2H .l�b2MI ®ate °Agent s signo ure is valid only if on outhori7ation letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation �`?^:c:.ta av:anbc..�tittxF klx! aia�Su.o[,r :: vatns [2an., iA. �aMln�utvlin�t. �'Y(>•ltLt�t7 Nor 1V; s "f 1 !Full Pond/ M Lave Shu" -7GO ZDAJC d. In, Lake. Ot Pu,` erg ,) S7e-4s Pub A-eFA- Gsiis¢irg Doc.: may' C Betom fdl Pond/ NVJI. rull 1Vn/ NOT wr2ter kGri ova f.9 pond/ Nmu Haft. .d,tt and CIMA.3 Plan V, �, -- I = = = sf `,arth smio., `;I—L f 1.jj*.%j.j 5�,jee _'ante; Raleigh. 27049-1417 D z c s m m a 0 0 X J O 0 n m N LA n D r m I I O Irk d Np ti� 24' 34' OR 35' OR 36' +1_ MAS E MENOS 23'-1" 19'-10" 7 w N o7(D � si u rm N z u ^ ' s z z > • W 3'' F H N 0 gg y 4 z L «. z t o ¢ Y W~ O J O w J CC D: (J o f ¢x=� u aJ wW U i Q`. � \ •i O \\ b 6st66.li ' \ ♦6k p�230.96 r 00 04 0�C 626.66 602-60C so, Bog = +' OL'EOt ..-. pc91!•t �05 m ...� M1nb 64 6t �U tp.gi.e6 ( 66.79 ( N=111 •97 iL'i9= NI9-f09 P=126.22 Ps si J .: 0,7 `ry♦ bb 4 ' ZZ!!i r m. R• O' o gat, 1— "7 w m Z o0o cat • t o z e •• ct `.� � d9l• I1b �q4 • � ' cr x 11 W V t4�1 Os\ m N• � L Y N � \ \ cr Im 1 ao`�0w !o u, t53 31_ $•eN,mAna� as 92, ..MST emr oW .�01 wm m.mm mNe: mm: o-�:� ymwema++wmnAn .m.$ h mtl1 0% lg WpS �Ns rVW W o1 wwo� m •m �l JO to. .mm o a W . 54 ::z:3 m s 3 N moo M'dm "' :��s a m :a: Ao _M `-: uw e.oama »aoo 0 000 .............. � o � ��u b� m c �m �a�o� wimu o� s rc y mmm ♦ wmmw� W W o my mm Ar.. . `m ...:N o m-.m--.- 9::z: �:aa �:::: � ::::::zmmmA wwm _$�. `� '''_ �' y A pp pp 11pp ��jj A' yy _ _.. .A..Q ... .. ...aw wwwwwa N�nw Ne. P.^ NwwNN W uy '6' r9 Y.Y1r 0 0 0 0 0 0 0 0 m A o AAA O O O O O O Y L q Wq.. a S W eeyy 11�� N 2 O1_-O m1W6 56�iO� i CATAWAA R110f nn.% o �UFFER NOTIFICATION FORM Project Name/address: Owner: Print Contractorlagent: Ai I Signature Pririt LA {[.e (�,rM/ T LL L ianat The approval is for the purpose and design described in your application. Impacts not indicated in the application is a vio►ation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 ar,u! 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping anu sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] L'eacfies, in;pervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved uy the Divisioi-i. Tne e are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] VVorlk to be conducted prom land must indicate an access and indicate any trees that are to be removed. The wort: corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction rr,acerial muse be uatside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges musi ue ac the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow a'c non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] nowied cr ,cnt 0:-: PV0eification MA—C D,:ter,, hereby state that I have been informed of the Catawb -',ny vvork cone ed in the buffer, not specifically stated in the application and as roved by the Division of VVater Resources (DWR), is a violation and subject to enforcement. Due diligence will be suci. cr:c,t ti,e Alan will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting �j`(jS Date: CATAWBA RIPAMAN BUFFER N®TIF9Ce4T6®RI F�R9i41 Project ► Varne,/address: � � p / 57�6 FAST / 3PJ Owner:,Contractor/agent: Signatu The approval is for the purpose and design described in Your application is a violation of the Buffer Rule. Site specific work should berprordedl npthetappl applicas not tion. O' 1 .0506 an 115A NCAC 02B .0243(8)] C Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation unless approved. Exception, those •frees that are severely undermined along the immediate shoreline can be removed. PJiinirrial shapi;ig &n,) sloping along the immediate shoreline is allowed. [15A NCAC 02B .0 )' 243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 in Pe'--viaus patios, impervious walkways, etc. are not allowed in the buffer unless specifically a pproved uy hie i7ivis10 7��crc are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] p y VVork io be conducted iron) land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction r(,a"Ee gal muse be outside the puffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] S ormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormw discharges nwst ue at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow ati non-elvelocities to the lake. [15A NCAC 02B .0243(5), (6)] ater v-��:�i�5*„e' PRJ9e�d�=C-i,fJc"'6'8i� �;' IF�Fi�%j?��'��'i�i'➢ herepy state that I have been informed of the Catawba is Griar. " :;`'" .','Y wor'l: concucted in the buffer, not specifically stated in the application and arov by the DivisiOrr Of VUacer Resources (DWR), is a violation and subject to enforcement. Due diligence will be y'``'` suc�s r'° =' e :.,"ruz:tion will be built within substantial compliance and intent of the 401 Wateprp approved Quality Certification and Buffer Rules, the approved plan(s) andsp ecification(s), and other supporting i'�7c?t8rialS. ignazure `C+- Date: L AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. ) 97 ;L PLAN NO. �r PARCEL ID: `% or-b STREET ADDRESS: 3 8 800e&ZK l� /vr //7 Please print: Property Owner: — H:2MA S , V, j S Tp Property Owner:+C The undersigned, registered property owners of the above noted property, do hereby authorize 'T 4A-6of Contra or / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): - S,AYvlrr� -- Telephone: 7 dLf We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Date: 3 � g /j`j Authorized Signature Date: