Loading...
HomeMy WebLinkAbout20151268 Ver 1_Site Plan_20151210Montgomery IC ounty, North Carolina I a 0 itq I I -..oa, U k Iii! I a i I & 09 kj Ira C/0 TWO BOBS, LLC December, 2014 o� REVISED. ■DECEMBER 2015 T� �O ,•••.•`�y DES/G,�''•.,��� ••••.•`�.��► �ARp��,,,, G)� :h`v oRP01Q�rF. :2� ESS, y Z EA L n : SEAL FT SR 1,369 ad 2003 r ►� = 18197 I SHEET INDEX 71 1. KEY MAP - OVERALL SITE Cp 2. LAYOUT PLAN 3. GRADING & EROSION CONTROL PLAN 4�- 4. PLAN & PROFILE s 5. EROSION CONTROL DETAILS220 1n �0 US • • BUS. 2 'S TE' Civil / Environmental NC 24/27 TO BOBBINS Design & Consulting To BISC0E 107 EAST DAVIS STREET SMITHFIELD, NORTH CAROLINA 27577 VICINITY MAP VOICE (336) 308-9613 No SCALE 1010 \ \ \ PROFILE–PUMP STATIO B ACCESS ROAD 4 /opo \� 77 L.F. 60" RCP 3 I @ 1.0% _ I I , I I I I ' I I I I If , i \ / A PROFILE – PRIMARY / / 4 ACCESS ROAD S'�°o; \ 62 L.F. 18 l I II l RCPT @ \ 1.0%i , I I , EXISTING ARV _RI RAISE TOP TO FIN. RAD I T. 4 FOR D TAILS 4- _ _ 8_4 L.F. X18" I RCP @ 1.0% LEFj- T NEW ORN A \ (:S, --__ -_ 60 0 60 120 180 \\_---_ Scale: I" = 60' 1.5" NCDOT 9.5C 2.5" NCDOT PAVED 19.013 BINDER SHOULDER1' PAVED 8 28' (14' LANE WIDTHS///// IDTHS SHOULDER 8' 6' FUTURE SHOULDERSHOULDER DITCH FORCE 1 4" PER FT. MAIN 1 " PER FT. 1/4 PER FT. 1 " PER FT. FUTURE �� `�M _ -III=II I -III -III III=III III=11-III-III=III-III = _ "' %%' FUTURE ELECTRIC �` — III=1 1=III-III=III-III=III=III=1111=III III=III=III=111 - I GAS LINE TELEPHONE - ® 1:1 FUTURE �® TYP �, 8" COMPACTED FUTURE �-- ELECTRIC CABLEFUTURE--,----'I AGGREGATE BASE 2 'If FUTURE .�11'f COURSE UNDER WATER � CABLE T.V. 3 4 4 ASPHALT LINE 4 3 3 2 ��► �� MIN.- MIN. COMPACTED FUTURE GRAVITY SEWER SUBBASE (DEPTH VARIES) PAVED TYPICAL SECTION — EDGEWOOD ENTRANCE ROAD A PAVED SHOULDER MATCH EXIST. NO SCALE – 2 NEW PAVEMENT NOTE TO CONTRACTORS.' �-UTI LITY- f WIDTH VARIES STRIP ALL TURN LANE AND ENTRANCE ROAD CONSTRUCTION SHALL 1.5" NCDOT CONFORM TO THE SPECIFICATION AND TESTING REQUIREMENTS 6' 9.5C ON THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHOULDER2.5" NCDOT (NCDOT). TESTING AND REPORTING SHOULD BE INCLUDED IN 1 / 4" PE R FT. 19.013 BINDER CONTRACT PRICING TO PERFORM THE WORK, AND SUCCESSFUL 1" PER FT. EXISTING PAVEMENT COMPLETION AND ACCEPTANCE OF THE WORK BY NCDOT SHALL �— BE GROUNDS FOR FINAL PA YMENT FOR ALL RE -LA TED 3'1 CONSTRUCTION. TURN LANE AND ENTRANCE ROAD ARE SLATED =I II=I I I= 1=I I E= I I=III TO BE RELEASED TO THE NCOOT UPON SUCCESSFUL REVIEW 1 :1 Ill =1 I=1 I I -I I =1 I I- 1=1 I IE: I 1=1 I AND ACCEPTANCE BY NCDOT. N I-111 I I=111= - _ - 8" COMPACTED AGGREGATE BASE COURSE UNDER ASPHALT WATER/SEWER COMPACTED LINE SUBBASE TYPICAL SECTION — RIGHT TURN LANE NO SCALE I I � Z o / /4 c121 l l I OF > - .'I ; II In , \ ��• ° 2 44N6- /zo 3pT'�`�E_'E�EASE Z 1 YP/ SAVEDo "' M PLOPp TO �L1,q�cEM�4/r>/ I y J a 4 P SET h, N Q Z � I � J \_ W O Ld us co Y- bi wr__ fl� Lo V)(10 N V) z Q co w 00 0 w 0 LL_ (o W I=— 0 U) v c W \_— --- go �c� W a O _ m a LL Ld Tv _ _ :o) I _ _ W — E _ \ PROJECT NUMBER 14-HONC-ROAD-01 DESIGNED BY \ JWW DRAWN BY JWW 40 0 40 80 120 CHECKED BY JWW SCALE Scale: 1" = 40' 1 "=60' ENLARGED VIEW DATE 10-24-14 2 OF 5 .dwg 1:1 \FM w--�W-W W W W W\w\w .. _FM-FM�fw M_ w W-_ __ `"'-Fu_ `. W F 3d 3d 3d `\W\ _ _fM�F?1 -W�w W w W W W W w� 3d 3d�3d�3d�3d�3d 3„ 7d W\W\W� F1w W W w w _--- 3d 3d 3d- m 3 j W��W i - �., - 3d 3d 3d I-7d 3d-�3 DISTURBED LIMITS \ m m (TYPICAL) I I F SEDIMENT FENCE m 5 TYPICAL m m (WRAP AROUND I TOP & SIDE I I SLOPES OF FES I m m I I L SEDIMENT FENCE m TEMP. CONSTRUCTION A 5 STONE OUTLET m m ENTRANCE 5 (INSTALL AT I LOWEST SECTION I I m 18 RCP m m OF SILT FENCE) W/ FES INV. 545.241 I m '^ I SKIMMER BASIN W E BAFFLES (TYPICAL) 5 TEMPORARY DIVERSION B DITCH (TYP) 5 18" RCP W/ FES- - / I i DISTURBED LIMITS IN X3.0 I i m I (TYPICAL) DIVERS/ON R _ 'f0/NTS -A m •• II I I �• � 4 APRON •.` / 545 7 �L - I --------------------- �,SB-% PROFILE -PRIMARY A SEDIMENT FENCE F ACCESS ROAD 4 WRAP AROUND TOE 5 DISTURBED LIMITS TEMPORARY DIVERSION DITCH B (TYPICAL) TO SB -3. ESTABLISH GROUND 5 RRA -2 COVER WITHIN 7 DAYS CHANNEL EXCELSIOR MATTING LINED DITCH C 60" RCP W/ FES INV. 526.79 5 l C-1 �_ �D- 7VAj �_=yam // / �� / / / / ��� ♦• •=. / r r �.r r._ �i6i�■■■nuil i= w ��/�� _ IIID �►�Ilil �R,::� 0do DISTURBED , TDD A J CONSTRUCTION SEQUENCE w W w X. 1 OBTAIN EROSION CONTROL PERMIT - 3d� 3,1 3 3d -3d- 2. INSTALL PERIMETER EROSION CONTROL DEVICES. 3. REQUEST INSPECTION FOR PERIMETER INSTALLED EROSION CONTROL DEVICES. PROFILE -PUMP STATION B 4. CLEAR AND GRUB SITE. ACC S ROAD 4 WETLANDS/ i o ��• ' o / / 5. INSTALL REMAINDER OF EROSION CONTROL DEVICES 6. GRADE SITE (LAND DISTURBING PROCEDURES). 7. MAINTAIN EROSION CONTROL DEVICES, A MINIMUM OF WEEKLY AND AFTER EVERY RAIN. 8. LAND DISTURBING PROCEDURES COMPLETED AND SITE STABILIZED. / / l 9. REMOVE TEMPORARY EROSION CONTROL DEVICES. 10. REQUEST FINAL INSPECTION FOR EROSION CONTROL / ACCEPTANCE. CLEAN WATER DIVERSION DITCH B / / / TO DIVERT UPLAND SHEET FLOW 5 .�.• '/ AWAY FROM DISTURBED AREAS U EXCELSIOR MATTING LINED DITCH C • �' // �` LINE W/ MATTING & ESTABLISH 5 GROUND COVER IMMEDIATELY A 5'-4" DRAINAGE AREA #4 BARS DIAGONAL TO SEDIMENT FENCE' (8) BARS MIN. 6" < 0.1 AC. O DIVERSION DITCH HIGH POINTS / •/ /I TYPICAL CI MANHOLE FRAME I AND COVER - I I i o Z I• ' •• •. -� - - 555 .._..-..-..-.._.._.._..-.._.._ ..-..- ..�..-..-..- `- WETLAND IMPACT AREA 0.048 ACRES \\ I I I I Op II S�'�-•� C VERT INLET C •.� CONTROL LEGEND F TEMPORARY DIVERSION DITCH B SEDIMENT FENCE 77 LF 60" RCP © 1.10% OR 5" PRECAST CONCRETE (L 3 WL - PROTECTION 3 �••-•_, _ �.•�•. /•• _.._ - ••�'_ /'� 5 TO SB -3. ESTABLISH GROUND 5 TYPICAL \ FM - FORCEMAIN IIIA �� _ ,�•• /•' COVER WITHIN 7 DAYS (WRAP AROUND 60" RCP W/ FES \ CAP - A STANDARD DROP INLE �.•_''� TOP & SIDE SLOPES OF SB -2) INV. 527.64 \ RCP - REINFORCED CONCRETE PIPE EXISTING TREE LINE BOX DETAIL EXCELSIOR MATTING LINED DITCH C CORRUGATED PLASTIC PIPE RIP -RAP CHANNEL I.� PROPERTY LINE •,i•'' �.��''� .�• 5 TOP BOX ELEV. 546.5= ,. THROATELEV. 545.4=. �.•�' .�p 18" RCP INV. OUT- 543.5 /•' % I I /'• '(O,.i' STONE CHECK DAM II I I D CLOTH & GRAVEL 5 INLET PROTECTION /•' / DETAIL (TYP) SEDIMENT BASIN 6 / /• CLEAN WATER DIVERSION DITCH B TO BE REMOVED & TO DIVERT UPLAND SHEET FLOW 5 i •I I L„�• I FINAL GRADES `� DISTURBED LIMITS AWAY FROM DISTURBED AREAS ESTABLISHED UPONTYPICAL ( ) EXCELSIOR MATTING LINED DITCH C I I STABILIZING DISTURBED LINE W/ MATTING & ESTABLISH 5 • II I AREAS GROUND COVER IMMEDIATELY I I I I I I I I , I 50 I I i i /I VIII EXCELSIOR MATTING LINED DITCH f C LINE W/ MATTING & ESTABLISH 5 GROUND COVER IMMEDIATELY. SB -6 AREA: ESTABLISH FINAL DITCH GRADES FOLLOWING REMOVAL OF SB -6 AND LINE W/MATTING & ESTABLISH ARRRFVIATIC)NS rd EXCELSIOR MATTING C ON CUT SLOPE 5 50 100 150 Sccle: I" = 50' GROUND COVER WITHIN 7 DAYS. - GRADING & EROSION CONTROL GENERAL NOTES -- -FE- - -- CONSTRUCTION/CLEARING LIMITS CENTER LINE PROPERTY LINE (FE) -TDD - TEMPORARY DIVERSION DITCH (TDD) SEDIMENT FENCE SECTION NUMBER OR DETAIL LETTER ABC 123 SHEET NUMBER (WHERE SECTION/DETAIL APPEARS OR WHERE SECTION/DETAIL WAS TAKEN FROM) ®mm 9 CLOTH AND GRAVEL mm® INLET PROTECTION RIP -RAP APRON OUTLET PROTECTION (RRA) 0 CULVERT INLET PROTECTION (CIP) 44 STANDARD DOT ROCK SILT SCREEN, STONE CHECK DAM "NYI-3 YARD INLET / CATCH -BASIN J JCT- 5 MANHOLE OR STORM PIPE JUNCTION TBM TEMPORARY BENCH MARK 1. TEMPORARY OR PERMANENT SEEDING SHALL BE COMPLETED WITHIN 2 WEEKS FOLLOWING LAND DISTURBANCE. SEE EROSION CONTROL DETAIL SHEET FOR SEEDING REQUIREMENTS AND GENERAL CONSTRUCTION SEQUENCE. 2. SEE EROSION CONTROL DETAIL SHEET FOR TEMPORARY SEDIMENT TRAP AND CULVERT OUTLET STABILIZATION SIZING. 3. EXCELSIOR MATTING SHALL BE PLACED IN DITCHES AND OTHER AREAS THAT EXHIBIT MULCH DISPLACEMENT FROM VELOCITY SCOUR. 4. ALL TEMPORARY DIVERSION DITCHES SHALL HAVE GROUND COVER ESTABLISHED WITHIN SEVEN (7) DAYS OF BEING CONSTRUCTED PER NCGO1 SECTION IIB (2). 5. ALL CLEAN WATER DIVERSIONS SHALL BE IMMEDIATELY LINED WITH EXCELSIOR MATTING AND IMMEDIATELY SEEDED TO ESTABLISH GROUNDCOVER. �eI I9 's w209woIwEON � elAa'Helw* 1. THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO AVOID THE SILTING OF STREAMS, LAKES OR OTHER WATER COURSES DUE TO THE CONSTRUCTION OF THIS PROJECT. 2. EFFECTIVE EROSION CONTROL MEASURES SHALL BE INITIATED PRIOR TO THE COMMENCEMENT OF CLEARING, GRADING, EXCAVATION, OR OTHER OPERATIONS THAT WILL DISTURB THE NATURAL PROTECTION. 3. THE EROSION CONTROL DETAILS SHOWN HEREIN ARE FOR THE CONTRACTOR'S REFERENCE. THE DETERMINATION OF WHICH DETAIL IS APPLICABLE AS THE WORK PROGRESSES SHALL BE AS SHOWN ON THE PLANS OR MADE BY THE ENGINEER. 4. ALL DITCHES SHALL BE STABILIZED AS SOON AS IS PRACTICABLE TO MINIMIZE EROSION. EXCELSIOR MATTING SHALL BE PLACED IN DITCHES AND OTHER AREAS THAT EXHIBIT MULCH DISPLACEMENT FROM VELOCITY SCOUR. 5. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 6. PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETIONS OF CONSTRUCTION OR DEVELOPMENT. 7. GROUNDCOVER MUST BE PROVIDED WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING. 8. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES IN A GOOD, WORKING STATE OF REPAIR UNTIL THEIR USE IS NO LONGER WARRANTED. AT THAT TIME, THE EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS TO CAUSE NO STREAM SILTATION. 9. WHERE CULVERT PIPES ARE TO BE INSTALLED UNDER ROADWAY, THE CONTRACTOR SHALL INSTALL THE CULVERTS AS RAPIDLY AS IS PRACTICAL, BACK FILL IMMEDIATELY AND RIP RAP THE UPSTREAM AND DOWNSTREAM SIDES OF THE STREAM CHANNEL. PERMANENT OUTLET PROTECTION SHALL BE PROVIDED AT ANY CULVERT THAT IT PASSES UNDER OR OVER IF THE CULVERT AREA IS DISTURBED. 10. ALL DISTURBED ROAD DITCHES OVER 3% WILL BE LINED WITH HIGH VELOCITY EXCELSIOR MATTING AND PERMANENT SEEDING UNLESS OTHERWISE NOTED. 11. SEE EROSION CONTROL DETAIL SHEET FOR TEMPORARY SEDIMENT TRAP SIZING AND CULVERT OUTLET STABILIZATION. B CLEAN WATER DIVERSION DITCH \ 5 TO DIVERT UPLAND SHEET FLOW \ AWAY FROM DISTURBED AREAS \ C EXCELSIOR MATTING LINED DITCH \� 5 LINE WITH MATTING & ESTABLISH \ GROUND COVER IMMEDIATELY WETLANDS \ \ \ \ \ \ 3' 12' SHOULDER 1 " PER FT. 1/4" PER FT. EXiST1NG GRACE 6" COMPACTED AGGREGATE BASE COURSE UNDER ASPHALT COMPACTED SUBBASE 5" THICK PRECAST REINFORCED CONCRETE SLAB (SUPPORTED ON CORNERS) 3" RADIUS (4) SIDES ® 8" ON CENTER EACH WAY THROAT OPENING, (4) SIDES 8" x 8" BRICK PIER AT EACH CORNER TWO COURSES HIGH 6" THICK CONCRETE PAD WITH #5 BARS @ 8" ON CENTER EACH WAY OR PRECAST BOTTOM SECTION F_ Ld rl--- F n V) N � VU 0 I 00 Q w 00 F- LIJ r1 0L CO Ld F_ n 0 () 8" MASONRY WALLS (EITHER yr Z o Z INVERT PIPE LP - LIGHT POLE v � a o a WQ vWa SOLID BRICK OR SOLID BLOCK) PP - POWER POLE GRADING AND EROSION CONTROL LEGEND HYD - HYDRANT OR 5" PRECAST CONCRETE (L 3 WL - WATER LINE 3 3 3 FM - FORCEMAIN SS - SANITARY SEWER LINE CAP - CORRUGATED ALUMINUM PIPE CONSTRUCTION ENTRANCE/ EXIT, RCP - REINFORCED CONCRETE PIPE EXISTING TREE LINE CPP - CORRUGATED PLASTIC PIPE RIP -RAP CHANNEL PL - PROPERTY LINE JCT - JUNCTION TDD - TEMPORARY DIVERSION DITCH EXISTING FENCES ii,�;i;i��iri�;ii;/ii;�ri EXCELSIOR MATTING SF - CB - SILT FENCE CATCH BASIN YI - YARD INLET SB -1 MH - MANHOLE N GV - GATE DRAINAGE COURSE - STORM DRAIN LINE CO - SANITARYVSEWER CLEANOUT 2 m� 0 LF - LINEAR FEET Oa. TEMPORARY SKIMMER BASIN CONC - CONCRETE W/ BAFFLES INV - INVERT EXISTING GROUND CONTOUR FIFE - FINISHED FLOOR ELEVATION ELEV - ELEVATION Iv C7 MIN - MINIMUM 778 MAX - MAXIMUM PROPOSED GRADE CONTOUR ROCK DAM ELECT - ELECTRIC DIP - DUCILE IRON PIPE HC - HANDICAP CULVERT (C) -- -FE- - -- CONSTRUCTION/CLEARING LIMITS CENTER LINE PROPERTY LINE (FE) -TDD - TEMPORARY DIVERSION DITCH (TDD) SEDIMENT FENCE SECTION NUMBER OR DETAIL LETTER ABC 123 SHEET NUMBER (WHERE SECTION/DETAIL APPEARS OR WHERE SECTION/DETAIL WAS TAKEN FROM) ®mm 9 CLOTH AND GRAVEL mm® INLET PROTECTION RIP -RAP APRON OUTLET PROTECTION (RRA) 0 CULVERT INLET PROTECTION (CIP) 44 STANDARD DOT ROCK SILT SCREEN, STONE CHECK DAM "NYI-3 YARD INLET / CATCH -BASIN J JCT- 5 MANHOLE OR STORM PIPE JUNCTION TBM TEMPORARY BENCH MARK 1. TEMPORARY OR PERMANENT SEEDING SHALL BE COMPLETED WITHIN 2 WEEKS FOLLOWING LAND DISTURBANCE. SEE EROSION CONTROL DETAIL SHEET FOR SEEDING REQUIREMENTS AND GENERAL CONSTRUCTION SEQUENCE. 2. SEE EROSION CONTROL DETAIL SHEET FOR TEMPORARY SEDIMENT TRAP AND CULVERT OUTLET STABILIZATION SIZING. 3. EXCELSIOR MATTING SHALL BE PLACED IN DITCHES AND OTHER AREAS THAT EXHIBIT MULCH DISPLACEMENT FROM VELOCITY SCOUR. 4. ALL TEMPORARY DIVERSION DITCHES SHALL HAVE GROUND COVER ESTABLISHED WITHIN SEVEN (7) DAYS OF BEING CONSTRUCTED PER NCGO1 SECTION IIB (2). 5. ALL CLEAN WATER DIVERSIONS SHALL BE IMMEDIATELY LINED WITH EXCELSIOR MATTING AND IMMEDIATELY SEEDED TO ESTABLISH GROUNDCOVER. �eI I9 's w209woIwEON � elAa'Helw* 1. THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO AVOID THE SILTING OF STREAMS, LAKES OR OTHER WATER COURSES DUE TO THE CONSTRUCTION OF THIS PROJECT. 2. EFFECTIVE EROSION CONTROL MEASURES SHALL BE INITIATED PRIOR TO THE COMMENCEMENT OF CLEARING, GRADING, EXCAVATION, OR OTHER OPERATIONS THAT WILL DISTURB THE NATURAL PROTECTION. 3. THE EROSION CONTROL DETAILS SHOWN HEREIN ARE FOR THE CONTRACTOR'S REFERENCE. THE DETERMINATION OF WHICH DETAIL IS APPLICABLE AS THE WORK PROGRESSES SHALL BE AS SHOWN ON THE PLANS OR MADE BY THE ENGINEER. 4. ALL DITCHES SHALL BE STABILIZED AS SOON AS IS PRACTICABLE TO MINIMIZE EROSION. EXCELSIOR MATTING SHALL BE PLACED IN DITCHES AND OTHER AREAS THAT EXHIBIT MULCH DISPLACEMENT FROM VELOCITY SCOUR. 5. THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 6. PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETIONS OF CONSTRUCTION OR DEVELOPMENT. 7. GROUNDCOVER MUST BE PROVIDED WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING. 8. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES IN A GOOD, WORKING STATE OF REPAIR UNTIL THEIR USE IS NO LONGER WARRANTED. AT THAT TIME, THE EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS TO CAUSE NO STREAM SILTATION. 9. WHERE CULVERT PIPES ARE TO BE INSTALLED UNDER ROADWAY, THE CONTRACTOR SHALL INSTALL THE CULVERTS AS RAPIDLY AS IS PRACTICAL, BACK FILL IMMEDIATELY AND RIP RAP THE UPSTREAM AND DOWNSTREAM SIDES OF THE STREAM CHANNEL. PERMANENT OUTLET PROTECTION SHALL BE PROVIDED AT ANY CULVERT THAT IT PASSES UNDER OR OVER IF THE CULVERT AREA IS DISTURBED. 10. ALL DISTURBED ROAD DITCHES OVER 3% WILL BE LINED WITH HIGH VELOCITY EXCELSIOR MATTING AND PERMANENT SEEDING UNLESS OTHERWISE NOTED. 11. SEE EROSION CONTROL DETAIL SHEET FOR TEMPORARY SEDIMENT TRAP SIZING AND CULVERT OUTLET STABILIZATION. B CLEAN WATER DIVERSION DITCH \ 5 TO DIVERT UPLAND SHEET FLOW \ AWAY FROM DISTURBED AREAS \ C EXCELSIOR MATTING LINED DITCH \� 5 LINE WITH MATTING & ESTABLISH \ GROUND COVER IMMEDIATELY WETLANDS \ \ \ \ \ \ 3' 12' SHOULDER 1 " PER FT. 1/4" PER FT. EXiST1NG GRACE 6" COMPACTED AGGREGATE BASE COURSE UNDER ASPHALT COMPACTED SUBBASE 5" THICK PRECAST REINFORCED CONCRETE SLAB (SUPPORTED ON CORNERS) 3" RADIUS (4) SIDES ® 8" ON CENTER EACH WAY THROAT OPENING, (4) SIDES 8" x 8" BRICK PIER AT EACH CORNER TWO COURSES HIGH 6" THICK CONCRETE PAD WITH #5 BARS @ 8" ON CENTER EACH WAY OR PRECAST BOTTOM SECTION F_ Ld rl--- F n V) N � VU 0 I 00 Q w 00 F- LIJ r1 0L CO Ld F_ n 0 () 8" MASONRY WALLS (EITHER yr Z o Z INVERT PIPE Lu o � J v � a o a WQ vWa SOLID BRICK OR SOLID BLOCK) a V 3 OR 5" PRECAST CONCRETE (L 3 3 3 3 3 3 MAY BE USED, (4) WALLS N - STORM DRAIN LINE z 2 m� 0 o Oa. Iv C7 0 STANDARD DROP INLET A W �� 121 2� Irl W W � oc� NO SCALE-m��WQv.Za 1' THICK #57 STONE 3' f FLOOD STORAGE ZONE SEDIMENT STORAGE ZONE Lon 8' � so� �o W OQ JQ JI\ Z= _ W e o ze °oro °oma R, fir o v3 ern eW eW �v i N ') v Ln o NATURAL GROUND o a Z J a SECTION A -A - - - - FLOWVIP yr Z o Z INVERT PIPE Lu o � J v � a o a WQ vWa rr j V ob W a Hy= TYPICAL SECTION PUMP STATION ACCESS ROAD B INVERT PIPE W � 0 a M NO SCALE - A A a Z� Z W Z J?Z �� 0 Q FLOW -I( Z a v o 0 V / i 00 CLASS "B" RIP -RAP = W C3 = NOTE: DIMENSIONS ARE MINIMUM UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. PLAN MAINTENANCE REQUIREMENTS: PROJECT NUMBER 1. INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. 14-HONC-ROAD-01 2. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBUENT RAINS. DESIGNED BY 3. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVED ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR JWW DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS DRAWN BY AROUND THE INLET. JWW CULVERT INLET PROTECTION CHECKED BY NO SCALE JWW SCALE AS NOTED DATE 10-24-14 3 OF 5 .dwg 1:1 I I I I I —=�3d3d� 3d3d�3d3d 3d 3d -3d q I I I � III i i I ( I I II I I m I I I I II I m F I I I m I I i I m / I I I I I I v I I I\ f I m r / I I m m I I I mm m I ad --- Q --------- 33d�3d�3d 8 �3 0.4 3� 3d� PT Sta 12+41. 10( PC Sta r 3g PROFILE—PRIMARY A ACCESS ROAD — m V / A_j BOP Sta = 0+00.00 I ' i I I m ------- ------ --- I_F, --Am -- - -- ----_ -- --� _ -- -- -- - - - -- - - I � -- � PRIMARY & PU-MP STATION ACCESS ROADS - PLAN VIEW SCALE: H: 1 "=50'. V: 1 "=5' I I I I - --3d 3�d3d _ � 3d 3d 3d 3d 3d — 3d PROFILE MP STATION B / ACCESS ROAD — A c) Q) V I+ \ \ �� \ I I w I I oo c" / w � III A`4 / T, C, w C) w PROFILE — PRIMARY ACCESS ROAD SCALE: H: 1"=50'. V: 1"=5' urve Length = 100.00 us co Li •.ado ........'�c,% ,,,,''1j/.111111••x`',,,, 14.29 I E .87 00 o. o% 535 II ° M10). M 535 p ~ w n + � EXl lNG G DE p9 (oo FUTURE CONSM VC77ON �a Q> II II QUi j (nw Q> H J N r Lo — +r7 O� �_ D � » N w NLo 530 00 +� o M � � II I + 530 uj AW ?� II II II II II II o II II II II v z '00 555 (nW NW V)W 00O N X o 0 w W U H _j FL + 129 > tZ� a -a- FL N __ >> 555 o � u' V> + O co O II II N co > > 525 Q > PROP SED G A E 525 + rnO + o w —D.57% w fZ O + �O O O + a- a - Q�N — Length 1= 50.01)_ 0.0 C rve er gth = 45.00 Curve K = 117.34 = 12.70 _ 520 � E = 0.18 E = 0.10 520 _1+00 0+00 1+00 2+00 3+00 rve L ngth 200.00 N`� w w i w rn ori t C cwn �' I I I + N n II IIK = 4 .41 550 Q II II Q = — .08 a c) -i J 550 I H III _j —_ oz :5 \ Q> o 545pill-1.3 o � 545 % 1.2 % oQ O_ O 0 + rr) 3.02 w N +C))O 8" RCP STA. +91.5 ll I 0) cp op II> II + u i o L INV. LEV. 54 3.2 Q I Q J (n O \ Q + O M Ln 540 c< Li — II c~i: °' II I 540 = > Q U II I Q � > \ \ > —rve _ \ U) L`' n = 6.29 > a a E _ .66 > 535 I 535 O.bb7o 530 530 525 525 K = 313.51 E C.73 520 I 520 —1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 PROFILE — PRIMARY ACCESS ROAD SCALE: H: 1"=50'. V: 1"=5' PROFILE — PUMP STATION ACCESS ROAD SCALE: H: 1 "=50'. V: 1 "=5' ,,,�1111111111j, I urve Length = 100.00 us co •.ado ........'�c,% ,,,,''1j/.111111••x`',,,, 14.29 E .87 o. o% 535 II ° M10). M 535 p ~ w n + � EXl lNG G DE p9 (oo �a Q> II II OLo (nw Q> H J N r Lo +r7 O� �_ D � » N w NLo 530 00 +� o M � � II I + 530 uj II II II II II II o II II II II v z '00 (nW NW V)W 00O N U H _j FL + 129 > tZ� a -a- FL >> __ >> II II > > 525 Q > PROP SED G A E 525 w —D.57% a- a - Length 1= 50.01)_ 0.0 C rve er gth = 45.00 Curve K = 117.34 = 12.70 520 E = 0.18 E = 0.10 520 _1+00 0+00 1+00 2+00 3+00 PROFILE — PUMP STATION ACCESS ROAD SCALE: H: 1 "=50'. V: 1 "=5' ,,,�1111111111j, I us co •.ado ........'�c,% ,,,,''1j/.111111••x`',,,, WIC fl� Lo V)(10 N VU 0 5; Q w Op 0 r1 0 L_ 0 () o., 0 a 3 a m z O F 3 a o � W U o m s w D �o �U i 0 a O a oc z cl)J °a z (1)O M j v J oc a o Vm0LLJ a0W =�� v H— x wad(.) cc az a oc a a zWo .J a LL Z J a 0 w v a m � a = W_ 0 — ix PROJECT NUMBER 14—HONC—ROAD-01 DESIGNED BY JWW DRAWN BY JWW CHECKED BY JWW SCALE 1 "=60' DATE 10-24-14 4 OF 5 1 A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. IF THIS LOCATION IS SUBJECT TO SEEPAGE OR HIGH WATER TABLE STABILIZE FOUNDATION WITH GEOTEXTILE FABRIC. 2 THIS ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 3 ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 4 WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. MAINTENANCE REQUIREMENTS: INSPECT CONSTRUCTION ROADS AND PARKING AREAS PERIODICALLY FOR CONDITION OF SURFACE. TOPDRESS WITH NEW GRAVEL AS NEEDED. CHECK ROAD DITCHES AND OTHER SEEDED AREAS FOR EROSION AND SEDIMENTATION AFTER RUNOFF -PRODUCING RAINS. MAINTAIN ALL VEGETATION IN A HEALTHY, VIGOROUS CONDITION. SEDIMENT -PRODUCING AREAS SHOULD BE TREATED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT n NO SCALE VENT FLOAT OUTLET END ` CONNECTED TO PIPE THROUGH DAM OR RISER STRUCTURE INLET SCREEN/DOOR' BARREL PIPE OR "ARM" ORIFICE INSIDE NOT INCLUDED WITH SKIMMER NOTE: INLET SCREEN SUPPLIED BY USER SCH 40 PIPE VARIES ON LARGER SKIMMERS SEDIMENT BASIN TO USE 1.5" SKIMMER (1.5" HEAD), USING 1.0" ORIFICE. SKIMMERS TO BE FAIRCLOTH SKIMMERS OR EQUAL AS APPROVED BY ENGINEER. TYPICAL SKIMMER INSTALLATION DETAIL SCALE: NONE APPLICABLE TO ALL TRAPS INLET 1' MIN. FREEBOARD 6" MIN. SPILLWAY ELEV. SUPPORT POST, " OUTLET ARMOR LINED SPILLWAY SPILLWAY 2' MIN. LEVEL CROWN BERM ALL DIVERSION DITCHES MUST HAVE GROUND COVER WITHIN ,7 DAYS FILL BERM WITH 6" d50 RIP -RAP IN AREAS WHERE EQUIPMENT MUST CROSS DIVERSION NOTE: THE DIVERTED RUNOFF SHOULD BE RELEASED THROUGH A STABILIZED OUTLET, SLOPE DRAIN, OR SEDIMENT TRAPPING MEASURE. MAINTENANCE REQUIREMENTS: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TEMPORARY CLEAN WATER DIVERSION DITCH B NO SCALE IN CHANNELS, ROLL OUT STRIPS OF MATTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH MATTING NORTH AMERICAN GREEN MODEL C-125 OR EQUAL LINE SPILLWAY WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC 2 HORI:1 VERT. MAX. SLOPE -ALL EMBANKMENTS EARTHEN EMBANKMENT INSTALL STAPLES STAPLES ACCORDING TO RECOMMENDED NORTH AMERICAN GREEN STAPLE PATTERN OR MANUFACTURER'S STAPLE EQUAL. (NP) .G_ 18" OVERLAP (TYP) JOIN STRIPS BY ANCHORING AND OVERLAPPING AS SHOWN ANCHOR MATTING IN 6" TRENCH (TYP) MAINTENANCE - 1. Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. J. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. if erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover is established. EXCELSIOR MATTING NO SCALE - BAFFLE (TYP) IT11', 1 I INLET, FLOW 24 INTO 5 RHS COMPACTED SOIL German Millet ............. .40 FROM DITCH W/O� i EXCAVATION WIRE TO PREVENT1 SUPPORT W/RE6' WIDE OVERFLOW OUTLET 1 - (PLACE ON SAGGING 1 CLASS I RIPRAP LOWER SIDE TOP SPILLWAY OF DITCH) _ ELEV. 2:1 SLOPE seedbed and cover the seed OR FLATTER SKIMMER OUTLET SKIMMER 259 IF SURFACE AREA ALL DIVERSION DITCHES MUST HAVE GROUND COVER WITHIN ,7 DAYS FILL BERM WITH 6" d50 RIP -RAP IN AREAS WHERE EQUIPMENT MUST CROSS DIVERSION NOTE: THE DIVERTED RUNOFF SHOULD BE RELEASED THROUGH A STABILIZED OUTLET, SLOPE DRAIN, OR SEDIMENT TRAPPING MEASURE. MAINTENANCE REQUIREMENTS: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TEMPORARY CLEAN WATER DIVERSION DITCH B NO SCALE IN CHANNELS, ROLL OUT STRIPS OF MATTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH MATTING NORTH AMERICAN GREEN MODEL C-125 OR EQUAL LINE SPILLWAY WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC 2 HORI:1 VERT. MAX. SLOPE -ALL EMBANKMENTS EARTHEN EMBANKMENT INSTALL STAPLES STAPLES ACCORDING TO RECOMMENDED NORTH AMERICAN GREEN STAPLE PATTERN OR MANUFACTURER'S STAPLE EQUAL. (NP) .G_ 18" OVERLAP (TYP) JOIN STRIPS BY ANCHORING AND OVERLAPPING AS SHOWN ANCHOR MATTING IN 6" TRENCH (TYP) MAINTENANCE - 1. Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. J. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. if erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover is established. EXCELSIOR MATTING NO SCALE - BAFFLE (TYP) IT11', 1 I INLET, FLOW 24 INTO 5 RHS inches. German Millet ............. .40 SUPPORT ROPE TO BOTTOM OR SIDE STAKE TO W/O� i INLET ZONE WIRE TO PREVENT1 SUPPORT W/RE6' WIDE OVERFLOW OUTLET 1 - 35.x' OF SURFACE AREA SAGGING 1 CLASS I RIPRAP FIRST CHAMBER TOP SPILLWAY 25% OF SURFACE AREA _ ELEV. 128.5 seedbed and cover the seed SECOND CHAMBER SKIMMER OUTLET SKIMMER 259 IF SURFACE AREA TO NEW CATCH OUTLET ZONE COIR MESH OR SIM/LAR, STAPLED OR BASIN e 159 OF SURFACE AREA TRENCHED INTO BOTTOM OR SIDE If Slopes Are 10' Or Less In MAINTENANCE REQUIREMENTS -SEDIMENT TRAP: MAINTENANCE REQUIREMENTS -BAFFLES: INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2") INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY OR GREATER RAINFALL. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ORIGINAL REQUIRED REPAIRS IMMEDIATELY. DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT THE CONTAMINATED PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. PROMPTLY. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT BELOW THE LOW POINT OF ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STRORAGE DEPTH. IMMEDIATELY. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVED THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE THE ADJOINING AREAS AND STABILIZE PROPERLY. CHECK THE FABRIC LINED SPILLWAY FOR AREA TO GRADE, AND STABILIZE IT. DAMAGE AND MAKE REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE Tall Fescue & S P I LLWAY. Feb. 15 -Apr. 30 Scar SEDIMENT BASIN SCHEDULE z 00 4 - STEEL SUPPORT POST WITH HOG WIRE BACKING < COMPACTED FILL 00 �FL� 8„ MIN. II z II } I 4" �- FENCE FABRIC 00 JMIN. V oG TYPICAL CROSS SECTION 5 SEPARATE DOUBLE ROW \ INSTALLATIONS ON 3'-5' CENTERS 6' 0 C MqX NCDOT #5 OR #57 WASHED STONE 9 -GAGE HARDWARE LOTH (1/4" MESH PENINGS) PLAN PAGE 6.51.2 REV. 6/06 OF THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. Seeding Mixture Species. Rate (Ibs/acre) Disc the area to be seeded to a minimum depth of 4-6 inches. German Millet ............. .40 Remove all loose rock, roots, etc., leaving surface smooth and uniform. In The Piedmont And Mountains, A Small Stemmed Sudangross May Be Apply lime and fertilizer evenly and incorporate into the top 4-6 inches Substituted At A Rate Of 50 Ib/acre. of soil by disking or other suitable means. Operate machinery on the contour. Seeding Dates Seed on a freshly prepared seedbed and cover the seed lightly by raking or Mountains May 15 - Aug. 15 chain dragging; then firm the surface with a roller or cultipacker to provide Piedmont May 1 - Aug. 15 good seed contact. If Slopes Are 10' Or Less In Ott ` i Coastal Plain April 15 - Aug. 15 Mountains Aug. 15 - Dec. 15 Than 3:1 �! • • Mulch all seeded areas immediately and anchor mulch. t 0. I t Soil Amendments Follow Recommendations Of Soil Tests Or Apply 2000 Ib/acre Ground PLANTS & MIXTURES PLANTING RATES/ACRE PLANTING DATES 12 Agricultural Limestone And 750 Ib/acre 10-10-10 Fertilizer. Tall Fescue 80 - 150 lbs/acre Aug. 15 -Oct. 15 Flatter Than 4:1 Soil Amendments 532.0± Feb. 15 -May Mulch compliance impracticable." (Section II.B(2)(b)) EC Manual SB -3 0.29 Apply 4000 Ib/acre Straw. Anchor Straw By Tacking With Asphalt Tall Fescue & 50 lbs/acre Feb. 15 -Apr. 30 Scar Netting Or A Mulch Anchoring Tool. A Disc With Blades Set Nearly Sericea Lespedeza 60 lbs/acre Nov. 1 -Feb. Unscar. Straight Can Be Used As A Mulch Anchoring Tool. 42 528.0± 284 And 1000 Ib/acre 10-10-10 Fertilizer. Tall Fescue & 60 lbs/acre July -August Maintenance Browntop Millet or 30 lbs/acre 108 Refurtelize If Growth Is Not Fully Adequate. Re -Seed, Refertilize And Sorghum -Sudan (Millet & Sorghum must 180 Mulch Immediately Following Erosion Or Other Damage. Hybribs be kept 10-12" max. height) 200 Temporary Seeding Summer Tall Fescue & 70 lbs/acre Nov.1-Jan. 0.27 Ryegrain 25 lbs/acre 195 2:1 (Keep annuals cut Netting Or A Mulch Anchoring Tool. A Disc With Blades Set Nearly 392 4" x 8" to 10-12") m - N FENCESeeding FABRIC STEEL 4' MAX 19 HARDWARE CLOTH Mixture Species. Rate (lbs/acre) Weeping Lovegrass 5 lbs/acre Nov.1-Jan. SUPPORT POST I -GAGE I Rye (Grain).................................120 None WITH HOG WIRE BACKING (1/4" MESH OPENINGS) 759 RANGE- ANGERRA-1 Common Bermudagrass 8-12 lbs/acre (hulled) April 15 -June 30 A (TYPICAL) Water (HOW) 7 Days None Seeding Dates 15-20 lbs/acre (unhulled) Feb. 1- March N/A • RRA -2 If Slopes Are 10' Or Less In Ott ` i NCDOT #5 OR #57 Mountains Aug. 15 - Dec. 15 Than 3:1 �! • • ° Slopes 3:1 or 14 Days t 0. I t WASHED STONE Coastal Plain And Piedmont Aug.5 - Dec. 30 g Seedbed Preparation & Soil Amendments ° All Other Areas 12 . `. `. (V 14 Days l t Flatter Than 4:1 Soil Amendments 532.0± * "Extensions of time may be approved by the permitting authority •; compliance impracticable." (Section II.B(2)(b)) EC Manual SB -3 0.29 tt tt tt 0.60 Follow Soil Tests Or Apply 2000 Ib/acre Ground Agricultural Limestone 209 2:1 6 527.0 242 525.0 42 528.0± 284 And 1000 Ib/acre 10-10-10 Fertilizer. 0.30 SB -4 0.15 0.10 0.31 180 108 2:1 6 Mulch 180 541.0 20 544.0± 200 1.5 Apply 4000 Ib/acre Straw. Anchor Straw By Tacking With Asphalt Seeding Mixture Species. Rate (lbs/acre) 0.27 0.27 0.55 486 195 2:1 6 Netting Or A Mulch Anchoring Tool. A Disc With Blades Set Nearly 392 4" x 8" 240 m - N 1.5 Straight Can Be Used As A Mulch Anchoring Tool. Tall Fescue....................................80 NOTES: TRENCH 0.16 7.19 v 2,518 2:1 6 Maintenance Sericea Lespedeza ..........................20 1. SUPPORT POST: 1.33 POUND/LINEAR FEET STEEL WITH HOG y Repair And Refertilize Damaged Area's Immediately. Topdress With 50 Kobe Lespedeza..............................10 WIRE BACKING. m � I / Of Nig y TEtd Temporary lb/acre Nitrogen In March. If It Is Necessary o Extend Seeding Notes 2. FENCE FABRIC: EXTRA STRENGTH SYNTHETIC FILTER FABRIC 0.49 Cover Beyond June 15, Overseed With 50 lb acre Kobe (Piedmont And (1) After Aug. 15, Use Unscarified Sericea Seed. OR PERVIOUS SHEET OF POLYPROPYLENE, NYLON, POLYESTER SEC ION Coastal Plain) Or Korean (Mountains) Lespedeza In Late February Or (2) Where Periodic Mowing Is Planned Or A Neat Appearance Is OR POLYETHYLENE YARN MEETING SPECIFICATIONS AS SHOWN 264 Early March. Desired, Omit Sericea And Increase Kobe Lespedeza To 40lb/acre. IN TABLE 6.62B OF N.C. EROSION AND SEDIMENT CONTROL (1) UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING INLET. Temporary Seeding Schedule For Fall. (3) To Extend Spring Seeding Dates Into June, Add 15 Ib/acre Hulled PLANNING AND DESIGN MANUAL. (2) DRIVE 5' STEEL POSTS 2' INTO THE GROUND SURROUNDING INLET, MAXIMUM OF 4' APART. Bermudagrass. However, after Mid-april, It Is Preferable To Seed 3. IF FENCE FABRIC JOINTS ARE NECESSARY, SECURELY FASTEN (3) SURROUND POSTS WITH WIRE MESH HARDWARE CLOTH AND SECURE APPROPIATELY Temporary Cover. THE FABRIC ONLY AT A SUPPORT POST WITH OVERLAP TO THE AT TOP, MIDDLE, AND BOTTOM. PLACE A 2' FLAP OF WIRE MESH UNDER GRAVEL NEXT POST. 4. ANCHOR BOTTOM OF FENCE FABRIC IN TRENCH WITH BACKFILL FOR ANCHORING AS RECOMMENDED. Seeding Mixture Species. Rate (lbs/acre) Nurse Plants Between May 1 And Aug.5, Add 10 Ib / German Millet Or 15 OF COMPACTED SOIL OR GRAVEL. (4) PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF Y 9• acre 16" AND SMOOTH TO AN EVEN GRADE. Rye Grain 120 Ib/acre Sundagrass. Prior To May 1 Or After Aug. 15 Add 40 Ib/acre MAINTENANCE REQUIREMENTS: (5) ONCE THE CONTRIBUTING AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT Annual Lespedeza (Kobe In Piedmont Rye (Grain). AND ESTABLISH FINAL GRADING ELEVATIONS. And Coastal Plain, Korean In Mountains........................................50 INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER (6) COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUNDCOVER. Seeding Dates EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. Omit Annual Lespedeza When Duration Of Temporary Best Possible MAINTENANCE REQUIREMENTS. INSPECT INLETS AT LEAST WEEKLY AND Cover Is Not To Extend Beyond June. Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, AFTER EACH SIGNIFICANT (% INCH OR GREATER) RAINFALL EVENT. Late Winter: Feb. 15 - Mar. 21 Feb. 1 - Apr. 15 Fall Is The Best For Tall Fescue And Late Winter For Lespedeza. DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO Seeding Dates; Overseeding Of Kobe Lespedeza Over Fall Seeded Tall Fescue Is Very PROVIDE ADEQUATE FLOW FORSUBSEQUENT RAINS. TAKE CARE NOT TO Mountains Above 25000 ft = Feb. 15 -May 15 Effective. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADUQUATE DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. Below 25000ft. = Feb 1 - May 1 STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE REPLACE STONE AS NEEDED. Piedmont = Jan 1 to May 1 Soil Amendments ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE Coastal Plain = Dec. 1 - Apr. 15 Apply Lime And Fertilizer According To Soil tests Or Apply 4000 DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE INLET CONTROL DEVICE - CLOTH & GRAVELSoil G Amendments Ib/acre Ground Agricultural Limestone And 1000 Ib/acre 10-10-10 SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE NO SCALE Follow Recommendations Of Soil Tests Or Apply 2000 lb/acre acre Ground Fertilizer. IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN Agricultural Limestone And 750 Ib/acre 10-10-10 Fertilizer. Mulch PROPERLY STABILIZED. Mulch Apply 4000 Ib/acre Straw. Anchor Straw By Tacking With Asphalt Apply 4000 Ib/acre Straw. Anchor Straw By Tacking With Asphalt Netting Or A Mulch Anchoring Tool. A Disc With Blades Set Nearly Netting, Or A Mulch Anchoring Tool. A Disc With Blades Set Nearly Straight Can Be Used As A Mulch Anchoring Tool. SEDIMENT FENCE Straight Cab Be Used As A Mulch Anchoring Tool. Maintenance F Maintenance Refurtelize In The Second Year Unless Growth Is Fully Adequate. May NO SCALE - Refurtelize If Growth Is Not Fully Adequate. Re -Seed, Refertilize And Be Mowed Once Or Twice A Year,But Mowing Is Not Necessary. Reseed, Mulch Immediately Following Erosion Or Other Damage. Fertilize, And Mulch Damaged Area's Immediately. La Temporary Seeding Schedule For Late Winter Permanent Seeding i I And Early Spring. Gentle Slopes, Average Soil, Low Maintenence Op �w SEDIMENT n FENCE PLAN 3 SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS ° Perimeter dikes, do (in) ado (ft) swales, ditches 7 Days None and slopes M/N. - MAX. 759 RANGE- ANGERRA-1 ° High Quality A 18 Water (HOW) 7 Days None Zones 4 N/A N/A RRA -2 If Slopes Are 10' Or Less In ° Slopes Steeper 7 Days Length And Are Not Steeper Than 3:1 30 Than 2:1, 14 Days Are Allowed ° Slopes 3:1 or 14 Days 7 -Days For Slopes Greater Flatter 18 Than 50 -Feet In Length ° All Other Areas 12 None (Except For Perimeters With Slopes 14 Days And HOW Zones) Flatter Than 4:1 208 532.0± * "Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable." (Section II.B(2)(b)) EC Manual GROUND STABILIZATION � REQUIREMENTS - APRON NO. Channel (C) or Apron (A) DIMENSIONS STONE WEIGHT RANGES (Ibs) do (in) ado (ft) w (ft) t (in) La (ft) d50 (in) M/N. - MAX. 759 RANGE- ANGERRA-1 RRA-1 A 18 4.5 4.5 9 11 4 N/A N/A RRA -2 C 60 N/A N/A 30 30 N/A 150 - 500 125 - 500 RRA -2 A 18 4.5 4.5 12 6 4 1 25 - 150 50 - 150 BASIN NO. DRAINAGE AREA (AC.) DISTURBED AREA (AC.) (0010) REQ.'D TRAP VOL. (CU. FT.) REQ.'D SURFACE AREA (SQ. FT.) SIDE SLOPES FT/FT WEIR LENGTH (FT.) DESIGN SURFACE ELEV. DESIGN SURFACE AREA (SF) DESIGN BASE ELEV. DESIGN BASE AREA (SF) DESIGN TOP OF BERM ELEV. DESIGN VOLUME (CF) SKIMMESIZE (NR) DESIGN ORIFICE DIA. (IN.) SB -1 1.65 1.08 3.39 1,944 1,187 2:1 6 544.0 1,250 542.0 714 545.0± 1,964 1.5 0.90 SB -2 0.82 0.49 1.69 882 590 2:1 4 531.0 648 529.0 208 532.0± 856 1.5 0.60 SB -3 0.29 0.29 0.60 522 209 2:1 6 527.0 242 525.0 42 528.0± 284 1.5 0.30 SB -4 0.15 0.10 0.31 180 108 2:1 6 543.0 180 541.0 20 544.0± 200 1.5 0.30 SB -5 0.27 0.27 0.55 486 195 2:1 6 540 392 538 240 541.0± 632 1.5 .3 SB -6 3.50 0.16 7.19 288 2,518 2:1 6 548.0 2,592 547.0 2,176 548.0± 2,384 1.5 1.0 SB -7 0.24 0.16 0.49 288 173 2:1 6 525.0 416 524.0 264 1 526.0± 1 340 1.5 .4 SKIMMER BASIN DETAIL E NO SCALE NOTE: d50 = MEDIAN STONE DIAMETER THE STRUCTURE SHALL BE MAINTAINED AND IS TO BE INSPECTED AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. RIP -RAP APRON OUTLET PROTECTION NO SCALE (PIPE OUTLET TO FLAT AREA) L%Q21120AIIIIIIIIIIIIIIS• ■ •■ •�i��►. 04aa FILTER FABRIC FILTER FABRIC SECTION A -A 9" MIN. 1.5' y f F -A MIN. LA STONE CHECK DAM K NO SCALE - 12" THICK LAYER OF -1'-6" MIN. #57 WASHED STONE FLOW 2.� 1 -5 MIN. ----_- I I-- 3 0 MAX. SEDIMENT SECTION A -A 2'- 0 SEDIMENT SECTION B -B 12" THICK LAYER OF P LAN MAINTENANCE REQUIREMENTS: INSPECT STONE OUTLET ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, RE -PLACE DISTURBED STONES AND REFRESH THE FILTER STONE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE FENCE AND OUTLET TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. SEDIMENT FENCE STONE OUTLET rL--N NO SCALE w (� N (0 V) U 0 Z OIO Q w Op 0 I- LTJ ^ Q L CO UJ 0 U) d Z 00 Ve ° :W •' 0H• ..... •••��g���. % w (� N (0 V) U 0 Z OIO Q w Op 0 I- LTJ ^ Q L CO UJ 0 U) d Z a co yr Z �aUj j a Uj W 0 Z W �o� J a o a a vWa j X ~ V Hy= W Z Z a Z o~c 0 J 0 ZWo �Z N U.W Z Z _ 0 0 //A� 0 J_ yr co �0a a - r I = W _ PROJECT NUMBER 14-HONC-ROAD-01 DESIGNED BY JWW DRAWN BY JWW CHECKED BY JWW SCALE 1 "=60' DATE 10-24-14 5 OF 5