HomeMy WebLinkAbout20150394 Ver 1_Inspection_401_20151210Wetland Inspection Report
Project Num: 20150394 Version: 1
Project Name: NCDOT - Replacement of Bridg
County: Alamance
Location: NCDOT - Replacement of Bridge 253 on SR 2178
Latitude: +35° 57' 17"
SW Plan Location
Site Owner Name NC DOT Division 7
Inspection Date: 11/19/2015
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Title:
❑ Not Compliant
Status: Issued
Project Type: Replace bridge with culvert
Region: Winston-Salem
Longitude: -79° 20' 14"
Phone:
Phone: 336-776-9703
page: 1
Site Number: 20150394
Inspection Date: 11/19/2015
Owner: Tippett, Lyndo
Inspection Type: Site Inspection (DOT)
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: Project was built as planned.
Reason for Visit: Routine
Yes No NA NE
� ❑ ❑ ❑
� ❑ ❑ ❑
� ❑ ❑ ❑
page: 2