Loading...
HomeMy WebLinkAbout20061804 Ver 5_Plan Set_20151209 From:Devane, Boyd Sent:Wednesday, December 09, 2015 10:57 AM To:Strickland, Bev Subject:copy of drawings Attachments:Evergreen Phase One - Plan Set.pdf Please file this in 06-1804V5. Note to files: this is the entire set of plans and includes many that were not needed. It includes CE 09, details for the bioretention cell, which was mistakenly omitted from the original submittal. From: Kevin Varnell \[mailto:kvarnell@stocksengineering.com\] Sent: Friday, December 04, 2015 2:09 PM To: Deborah Shirley <dshirley@sandec.com>; Mike Stocks <mstocks@stocksengineering.com> Cc: Devane, Boyd <boyd.devane@ncdenr.gov> Subject: RE: Where are the Detailed design drawings? Debbie / Boyd, See the attached plans for Pod 10. Is CE-09 not what you are looking for? Sincerely, Stocks Engineering, PA J. Kevin Varnell J. Kevin Varnell The electronic files provided by Stocks Engineering, PA (hereinafter referred to as Stocks) to receiving parties are for convenience purposes only. The receiving party agrees not to use these drawings and data, in whole or in part, for any purpose other than the referenced project. The electronic media is furnished without guarantee of compatibility with the receiving party’s software or hardware, and Stocks sole responsibility for the electronic media is to furnish a replacement for defective disks within thirty (30) days after delivery to the receiving party. Use of these materials for modification, extension or expansion of this project or on any other project, unless under the direction of Stocks shall be without liability to Stocks and Stocks subconsultants. Because data stored in electronic media form can be altered, either intentionally or unintentionally, by transcription, machine error, environmental factors, or by operators, it is agreed that the receiving party shall indemnify, defend, and hold harmless Stocks, Stocks subconsultants, and the officers and employees of any of them from and against any and all claims, liabilities, damages, losses and costs, including, but not limited to costs of defense, arising out of change or modifications to the data in electronic media form in the receiving party’s possession of released to others by the receiving party and for any use of the electronic media and printed hard copy drawings and specifications outside the license granted by this provision. All electronic files shall be verified with hard copy drawings. Should the receiving party disagree with statements contained herein, please advise us in writing within ten (10) days after receipt of the data that you will not be using the electronic file or this disclaimer stands as written. Refusing the terms stated above forfeits the right to utilize this electronic data. From: Deborah Shirley \[mailto:dshirley@sandec.com\] Sent: Friday, December 04, 2015 1:58 PM 1 To: Kevin Varnell; Mike Stocks Cc: Devane, Boyd (boyd.devane@ncdenr.gov) Subject: FW: Where are the Detailed design drawings? Kevin/Mike: Please see email from Boyd below. Please keep me copied so that I can add any additional info to my file. Thanks, Debbie Deborah Edwards Shirley Soil & Environmental Consultants, PA 919-846-5900 (office) 919-673-8793 (mobile) www.SandEC.com  THINK BEFORE YOU PRINT From: Devane, Boyd \[mailto:boyd.devane@ncdenr.gov\] Sent: Friday, December 04, 2015 1:52 PM To: Deborah Shirley Subject: Where are the Detailed design drawings? I just realized that there were no detailed design drawings of the bioretention cell proposed for POD 10-Phase One. We have not records of receiving them. If you will send PDFs, I will review them. Call me at 919-931-8631 if you have questions. 2 EVERGREEN PHASE ONE -POD NE 10 - 3 2 LOTS �e-170VX/�vL7Cr70i�C�l � PLANNING: JOHNSTON COUNTY PLANNING DEPARTMENT. 309 E. MARKET STREET SMITHFIELD, NC 27577 CONTACT: MR. BERRY GRAY (919) 989-5150 BERRY.GRAY®JOHNSTONNC.COM PUBLIC UTILITIES: JOHNSTON COUNTY PUBLIC UTILITIES PO BOX 2263 309 E. MARKET STREET SMITHFIELD, NC 27577 CONTRACT: MRS. CHANDRA COATS (919) 209-8333 CHANDRA. COATSOJOHN STON N C.COM EROSION CONTROL: JOHNSTON COUNTY PUBLIC UTILITIES PO BOX 2263 309 E. MARKET STREET SMITHFIELD, NC 27577 CONTACT: MR. CARLOS BAGLEY, PE (919) 209-8333 CARLOS.BAGLEYO JOHNSTONNC.COM UTILITY AGENCIES= WATER & SEWER: AQUA NORTH CAROLINA 202 MacKENAN COURT CARY, NORTH CAROLINA 27511 CONTACT: PEGGY SUE DODGE (OFFICE) 919.653.6963 JACKIE JACKSON (FIELD) 919.624.2348 NATURAL GAS PIEDMONT NATURAL GAS 250 FIVE POINTS ROAD DUDLEY, NC 28333 MR. LEE WILLIAMS 919 750-3906 MR. MARCUS THOMPSON (919) 920-0257 ELECTRIC DUKE ENERGY P.O. BOX 1551 RALEIGH, N.C. 27602-1551 MR. JOHNNY HOUSE (919) 269-2548 LOCATION- EVERGREEN PHASE ONE SIDE YARD POD NE10 REAR YARD FLOWERS PLANTATION MAX BUILDING HEIGHT: JOHNSTON COUNTY, NC PROPOSED LOT COUNT: 32 LOTS PHASE ONE COUNTY- JOHNSTON PIN: 169900-48-7158 DB/PG 1247/634 ZONING: FLOWERS PLANTATION PUD ACREAGE- ±36.9 AC. - ENTIRE PARCEL CS -06 ±10.2 AC. - PHASE ONE PROPOSED USE- RESIDENTIAL SETBACKS: FRONT YARD 20' SIDE YARD 5' REAR YARD 15' MAX BUILDING HEIGHT: N/A EX. IMPERVIOUS AREA 0.00 Ac. PRO. IMPERVIOUS AREA ±3.40 Ac. (33.27%) LANDSCAPE AREA ±6.82 Ac. (66.73%) DISTURBED AREA 9.2 Ac. BEFORE YOU DIG, CALL 0�0 D D NORTH CAROLINA ONE CALL CENTER www.ncocc.org FLOWERS PLANTATION JOHNSTON COUNTY, NORTH CAROLINA SUBMITTED TO AQUA - APRIL 15, 2015 INDEX COVER COVER SHEET CE -01 FLOWERS POD NE10 - OVERALL - EVERGREEN CE -02 EVERGREEN PHASE ONE SUBDIVISION CE -03 EVERGREEN STREET 'A' PLAN & PROF/LE CE -04 EVERGREEN STREET 'B' PLAN & PROF/LE CE -05 EVERGREEN ENTRANCE - BUFFALO ROAD WIDENING CE -06 EROS/ON & SEDIMENTATION CONTROL PLAN CE -07 EROS/ON CONTROL NOTES AND DETAILS CE -08 EROS/ON CONTROL NOTES AND DETAILS CE -09 B/ORETENT/ON DETAILS CE -10 EVERGREEN PHASE ONE - GRAD/NG PLAN D-01 AQUA UTILITY DETAILS 1 D-02 AQUA UTILITY DETAILS 2 CS -01 `R / STREET 'A' CROSS-SECT/ONS CS -02 STREET 'B' CROSS-SECT/ONS CS -03 STREET 'B' CROSS-SECT/ONS CS -04 STREET 'B' CROSS-SECT/ONS CS -05 STREET 'B' CROSS-SECT/ONS CS -06 STREET 'B' CROSS-SECT/ONS ELEMENTARY IVER DELL / SCHOOL EVERGREEN PHASE ONE 9�0 oyo OPS/ OQO yh 5- POND NC 42 POND) PERCY FLOWERS \ \ / • � STORE POND ' V/C/N/TY MAP 1. TOPOGRAPHICAL DATA PERFORMED BY TRUE LINE SURVEYING. 2. THE CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OF FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. THE OWNER SHALL PAY ALL COSTS IN CONNECTION WITH ALTERATION OF OR RELOCATION OF ANY EXISTING FACILITIES. 3. ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 4. ALL STRUCTURAL FILL MATERIAL SHALL BE FREE OF ALL STICKS, ROCKS, AND CLUMPS OF MUD. 5. UNUSABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR IN AN APPROVED SOLID WASTE LANDFILL. 6. PROPOSED ROADWAY CONSTRUCTION WITH WATER AND SEWER. STREETS TO HAVE STANDARD 30" VALLEY CURB. PRIVATE STREETS. 7. THERE IS EXISTING UNDERGROUND WATER, SEWER, ELECTRICAL, OR FIBER OPTIC ON-SITE OR WITHIN CLOSE PROXIMITY. CONTRACTORS SHALL CALL 811 48 HOURS PRIOR TO DIGGING. CONTRACTORS SHALL DIG WITH EXTREME CAUTION. 8. CONCRETE SUB SHALL BE RESPONSIBLE FOR ALL SCORE JOINTS AND EXPANSION JOINTS. CONTRACTOR TO SUBMIT PROPOSED SCORE JOINT PLAN TO THE ENGINEER PRIOR TO POURING. 9. CONTRACTOR TO FURNISH ALL PAVEMENT MARKINGS AS SHOWN. 10. LOCATION OF UNDERGROUND UTILITIES ARE APPROXIMATE AND MUST BE FIELD VERIFIED. CONTACT THE NC ONE CALL CENTER AT LEAST 72 HOURS PRIOR TO DIGGING ® 811. TRUE LINE SURVEYING HAS ONLY LOCATED THE UTILITIES THAT ARE ABOVE GROUND AT THE TIME OF FIELD SURVEY. UNDERGROUND LINES SHOWN HEREON ARE APPROXIMATE OR AS REPORTED BY VARIOUS RESPONSIBLE PARTIES. THE SURVEYOR DOES NOT GUARANTEE THAT ANY UNDERGROUND STRUCTURES SUCH AS UTILITIES, TANKS AND PIPES ARE LOCATED HEREON. 11. ALL PIPE LENGTHS ARE HORIZONTAL DISTANCES AND ARE APPROXIMATE. 12. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND/OR LOCAL STANDARDS IMPOSED BY LOCAL UTILITY, NCDOT, JOHNSTON COUNTY, AND FLOWERS PLANTATION. 13. ALL CONSTRUCTION AND MATERIALS SHALL MEET JOHNSTON COUNTY, AQUA, AND NCDOT SPECIFICATIONS AND STANDARDS, LATEST EDITION. ALL WORK WITHIN NCDOT RIGHT-OF-WAY SHALL MEET THE SPECIFICATIONS AND STANDARDS OF NCDOT. 14. ALL CONCRETE PIPE IS TO BE ASTM C-76, CLASS III WITH RAM-NEK, UNLESS OTHERWISE NOTED. 15. THIS PROPERTY IS NOT LOCATED IN A FLOOD HAZARD ZONE. 16. WETLANDS AND PONDS ARE DENOTED ON-SITE. NO IMPACTS TO WETLANDS ARE ANTICIPATED. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK ZONE TRAFFIC CONTROL IN OR ADJACENT TO NCDOT RIGHT-OF-WAY. ALL SIGNS, PAVEMENT MARKINGS AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST EDITION. 18. PRIOR TO PLACING CABC STONE BASE, THE CONTRACTOR SHOULD NOTIFY THE PROJECT ENGINEER TO INSPECT AND PROOF ROLL THE SUBGRADE. ANY STONE PLACED WITHOUT PRIOR APPROVAL WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 19. DESIGN FIELD CONDITIONSQ UITE EASILY MAY VARY FROM THAT REPRESENTED IN THE INITIAL SOILS REPORT AND/OR TOPOGRAPHICAL REPORT. ISOLATED AREAS MAY SHOW UP WEAK AND ADVERSE SOILS OR GROUNDWATER CONDITIONS MAY BE DISCOVERED THAT WERE NOT REVEALED DURING THE INITIAL SOILS INVESTIGATION. THEREFORE, THE OWNER/CLIENT IS TO BE AWARE THAT STOCKS ENGINEERING WILL NOT AND CANNOT BE HELD RESPONSIBLE FOR ANY FAILURES TO EITHER A STREET OR PARKING LOT PAVEMENT DESIGN UNLESS WE CAN BE FULLY AND TOTALLY INVOLVED IN THE CONSTRUCTION PROCESS WHICH MAY INCLUDE, BUT MAY NOT NECESSARILY BE LIMITED TO, TESTING SUBGRADE AND BASE DENSITY, ENGAGING THE DESIGN ENGINEER FOR THE EVALUATION OF THE SUBGRADE AND FOR THE OBSERVATION OF PROOF ROLLING SUBGRADE AND BASE AT VARIOUS STEPS OF CONSTRUCTION, OPPORTUNITY FOR THE DESIGN ENGINEER TO CALL IN A SOILS ENGINEER FOR CONSULTATION AND ADVICE ETC. - STEPS WHICH TAKEN ALTOGETHER WITH THE INITIAL DESIGN SHOWN ON THE PLANS, CONSTITUTE THE COMPLETE DESIGN OF THE ROAD, STREET OF PARKING AREA (PRIVATE OR PUBLIC). THE DESIGN ENGINEER MUST BE GIVEN THE FULL LATITUDE AND OPPORTUNITY TO COMPLETE THE DESIGN BY FULLY PARTICIPATING IN THE CONSTRUCTION PROCESS. PLAN DESIGN IS A SMALL PORTION OF THE DESIGN AND CANNOT BE SEPARATED FROM THE CONSTRUCTION PROCESS IF THE OWNER'S/CLIENT'S DESIRE IS TO HAVE THE DESIGN ENGINEER STAND BEHIND THE COMPLETED DESIGNED PROJECT. 20. ALL UTILITY SERVICES, (POWER, TELEPHONE, CABLE, ETC.) ARE PROPOSED TO BE UNDERGROUND. DO NOT SOD, SEED OR MULCH DISTURBED AREAS UNTIL ALL UNDERGROUND UTILITIES HAVE BEEN INSTALLED. 21. SITE LIGHTING IS TO BE INSTALLED BY DUKE ENERGY. 22. PROPERTY IS TO BE SERVED BY AQUA (WATER & SEWER), EXISTING MAINS ARE INSTALL. ALL SERVICES PROPOSED ARE SERVICE TAPS. 23. THE BUILDING SETBACK LINES SHOWN ON THIS PLAT ARE FOR THE ENGINEER'S USE IN ESTABLISHING MINIMUM LOT FRONTAGES AT THE SETBACK LINE AND FOR RESERVING SUFFICIENT BUILDING AREA. BUILDING CONTRACTORS ARE TO VERIFY LOT LINE SETBACKS BEFORE SETTING FORMS OR DIGGING FOOTINGS. THERE ARE NO AGENCY IMPOSED SETBACK LINES AT FLOWERS. 24. REGULATORY SIGNS, STOPS SIGNS AND ADA SIGNS SHALL BE MANUFACTURED FROM HIGH INTENSITY REFLECTIVE MATERIALS. 25. ALL EXCESS TOPSOIL AND UNCLASSIFIED EXCAVATION IS TO BE HAULED OFF-SITE, UNLESS OTHERWISE DIRECTED BY THE OWNER. 26. ALL SITE CONSTRUCTION MUST BE INSPECTED BY THE PROJECT ENGINEER AT THE FOLLOWING STAGES: A. COMPLETION OF GRADING SUBGRADE PRIOR TO PLACING STONE BASE. B. COMPLETION OF STONE PLACEMENT PRIOR TO PAVING. C. FINAL INSPECTION WHEN ALL WORK IS COMPLETE. 27. THE SURVEYOR DID NOT VISIBLY SEE ANY CEMETERIES IN ANY OPEN AREAS UNLESS OTHERWISE NOTED. 28. THIS PROPERTY DOES NOT DEPICT ENCUMBRANCES THAT ARE FOUND DURING A THOROUGH TITLE SEARCH. 29. ALL HVAC UNITS FOR THE PROPOSED BUILDING WILL BE SCREENED FROM PUBLIC RIGHT OF WAY. 30. ALL CURB AND GUTTER TO BE 30" STANDARD VALLEY CURB AND GUTTER. ALL CURB AND GUTTER WITHIN NCDOT R/W SHALL BE 30" STANDARD CURB AND GUTTER. 31. ALL CURB AND GUTTER AND SIDEWALK CONCRETE IS TO BE MINIMUM 3,000 PSI AT 28 DAYS, AIR ENTRAINED. 32. ALL DIMENSIONS ARE TO FACE OF CURB UNLESS INDICATED OTHERWISE. 33. PROVIDE HANDICAP SIGNS, MARKING AND RAMPS AS SHOWN. 34. HANDICAP RAMPS ARE TO MEET "ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES" AS DETAILED IN THE FEDERAL REGISTER, VOLUME 56, NUMBER 144 DATED JULY 26, 1991, RULES AND REGULATIONS ACTIVATED JANUARY 26, 1992. FOR ADDITIONAL INFORMATION, REFER TO THE NC STATE BUILDING CODE VOLUME 1-C, "MAKING BUILDINGS AND FACILITIES ACCESSIBLE TO THE USEABLE BY THE PHYSICALLY HANDICAPPED", 1991 EDITION. ALL STREET RETURNS TO HAVE H.C. RAMPS. H.C. RAMPS SHALL MEET CITY OF CLINTON AND NCDOT STANDARDS/SPECIFICATIONS. 35. CONTRACTOR SHALL NOT POUR ANY CONCRETE BEFORE FORMS ARE INSPECTED BY THE PROJECT ENGINEER AND/OR OWNER. ANY CONCRETE THAT HAS NOT BEEN APPROVED BY THE ENGINEER AND/OR OWNER WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. Owner/DevelOp er- NOT TO SCALE The Riverdell Company 4880 NC 42 East Clayton, NC 27520 Contact= Rebecca Flowers 919.553.3084 (v) Representative= Cary Chandler 919.427-5466 (c) caryoflo wersplan to tion. com FOR GOD SO LOVED THE WORLD THAT HE GAVE HIS ONLY BEGOTTEN SON, THAT WHOSOEVER BELIEVETH IN HIM SHALL NOT PERISH, BUT HAVE EVERLASTING LIFE. JOHN 3:16 36.ALL AREAS NOT COVERED BY BUILDING OR PARKING SHALL BE COVERED WITH 4" MINIMUM OF TOPSOIL, FREE OF ROOT MATTER AND ROCKS AND GRASSED. 37.CONTRACTOR SHALL SAW -CUT TO PROVIDE SMOOTH TRANSITIONS WHERE EXISTING ASPHALT AND/OR CURB AND GUTTER IS TO BE REMOVED. 38.THE CONTRACTOR SHALL PROVIDE ALL THE MATERIAL AND APPURTENANCES NECESSARY FOR THE COMPLETE INSTALLATION OF THE UTILITIES. ALL PIPE AND FITTINGS SHALL BE INSPECTED PRIOR TO BEING COVERED. 39.ALL HANDICAP SPACES ARE TO RECEIVE A HANDICAP SIGN AND HANDICAP SYMBOL PAINTED ON THE ASPHALT. NOTE STALLS TO RECEIVE `VAN ACCESSIBLE' SIGNAGE. 40.THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PRECISE BUILDING DIMENSIONS AND EXACT UTILITY ENTRANCE POINTS. 41.INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS AND FIELD CONDITIONS WHEN POSSIBLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY DIGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS WELL IN ADVANCE OF TRENCHING. IF THE CLEARANCES ARE LESS THAN SPECIFIED ON THE PLANS OR 12 INCHES, WHICH EVER IS LESS, CONTACT THE PROJECT ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 42.THE CONTRACTOR SHALL INCLUDE IN HIS CONTRACT PRICE THE REMOVAL AND DISPOSAL OF ANY EXCESS TOPSOIL/UNCLASSIFIED HE DETERMINES IS NOT REQUIRED TO PERFORM THE FINAL GRADING AND LANDSCAPING OPERATION. 43.THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL REQUIRED/NECESSARY SHEETING, SHORING, AND SPECIAL EXCAVATION MEASURES REQUIRED ON THE PROJECT TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THE DRAWINGS. THE OWNER, SAMPSON COUNTY, CITY OF CLINTON & STOCKS ENGINEERING ACCEPT NO RESPONSIBILITY FOR THE DESIGN TO INSTALL SAID ITEMS. 44.THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE DAILY RECORD KEEPING OF THE AS -BUILT CONDITION OF ALL OF THE UNDERGROUND UTILITIES, CONSTRUCTION STAKEOUT ASSOCIATED WITH THE PROJECT. 45.ALL WATER LINE AND SEWER LINE INSTALLATION SHALL CONFORM TO THE STANDARDS AND DETAILS OF THE STATE OF NORTH CAROLINA DEPARTMENT OF HEALTH CONSTRUCTION PERMIT, JOHNSTON COUNTY AND/OR AQUA. 46.ASPHALT PAVEMENT SHALL BE SMOOTH, WITH STRAIGHT OVERLAPPING SEAMS, FREE OF SEGREGATION, STAINS, BIRD BATHS, AND IMPERFECTIONS. ASPHALT PATCHING, SKIN PATCHES, OR RE -HEATING AND ROLLING WILL NOT BE ALLOWED. AREAS THAT ARE NOT ACCEPTABLE TO THE OWNER/ENGINEER WILL BE SAWCUT AND REMOVED. NO PATCH SMALLER THAN 200 SF WILL ALLOWED AND THE SAWCUTS MUST FALL ON A PAINT LINE OR EXISTING SEAM. 47.THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ALL MATERIAL AND LABOR ASSOCIATED WITH THE TESTING OF THE WATER AND SEWER LINES REQUIRED BY THE STATE OF NORTH CAROLINA DEPARTMENT OF HEALTH & AQUA. 48.THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DE -WATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PLANS. 49.NATURAL GAS IS AVAILABLE. COORDINATE INSTALLATION WITH PEIDMONT NATURAL GAS. 50.TESTING BY CONTRACTOR: CONTRACTOR SHALL EMPLOY AT HIS EXPENSE AN OUTSIDE INDEPENDENT SOIL TESTING SERVICE EAPPROVED BY THE OWNER TO PERFORM SOIL TESTING AND INSPECTION SERVICE FOR QUALITY CONTROL TESTING DURING ARTHWORK OPERATIONS. COPIES OF RESULTS OF TESTS SHALL BE SUBMITTED BY THE TESTING SERVICE DIRECTLY TO THE CONTRACTOR, THE OWNER, AND THE STRUCTURAL ENGINEER. --THE TESTING SERVICE WILL CLASSIFY PROPOSED ON-SITE AND BORROW SOILS TO VERIFY THAT SOILS COMPLY WITH SPECIFIED REQUIREMENTS AND TO PERFORM REQUIRED FIELD AND LABORATORY TESTING. (MINIMUM REQUIRED SOIL BEARING CAPACITY IS NOTED ON THE STRUCTURAL DRAWINGS). --IN PAVED AND BUILDING SLAB AREAS, THE TESTING SERVICE SHALL MAKE AT LEAST ONE FIELD DENSITY TEST FOR EACH 2000 SQUARE FEET OF FILL IN EACH COMPACTED FILL LAYER. IF A TEST SHOULD FAIL TO MEET REQUIRED DENSITY, THE CONTRACTOR SHALL RE -COMPACT THAT LAYER. THE SOIL TESTING SERVICE SHALL PERFORM ADDITIONAL TESTS AT THE CONTRACTOR'S EXPENSE TO SHOW THAT THE FAILED LAYER HAS REACHED THE REQUIRED COMPACTION. --IN FOUNDATION WALL AREAS, THE TESTING SERVICE SHALL MAKE AT LEAST ONE FIELD DENSITY TEST FOR EACH 100 FEET OR LESS OF WALL LENGTH OF FILL IN EACH COMPACTED FILL LAYER, WITH NO LESS THAN TWO TESTS ALONG A WALL FACE. IF A TEST SHOULD FAIL TO MEET REQUIRED DENSITY, THE CONTRACTOR SHALL RE -COMPACT THAT LAYER. THE SOIL TESTING SERVICE SHALL PERFORM ADDITIONAL TESTS AT THE CONTRACTOR'S EXPENSE TO SHOW THAT THE FAILED LAYER HAS REACHED THE REQUIRED COMPACTION. 51.COMPACTION: COMPACT EACH LAYER OF BACKFILL AND FILL SOIL MATERIALS AND THE TOP 12" OF SUBGRADE IN CUT AREAS TO 98% OF MAXIMUM DENSITY AS DETERMINED BY ASTM D698 FOR STRUCTURES, SLABS, AND PAVEMENTS AND 90% OF MAXIMUM DENSITY FOR LAWNS OR UNPAVED AREAS. 52.THE BUILDING CONTRACTOR AND THE SITE WORK CONTRACTOR ARE TO COORDINATE THE INSTALLATION OF DRAINAGE PIPES AROUND THE BUILDING STRUCTURE. 53.ANY RELOCATION OF EXISTING UTILITIES WILL BE AT THE COST OF THE OWNER. THE WILL NOT ACCEPT RESPONSIBILITY FOR DAMAGES TO CURB AND GUTTER OR STREET IMPROVEMENTS INSTALLED PRIOR TO UNDERGROUND SERVICES, NOR WILL THE CITY ABSORB THE COST FOR BORINGS TO INSTALL UNDERGROUND SERVICE, PAVEMENT PATCHING OR DAMAGE TO LANDSCAPING. THESE WILL BE THE RESPONSIBILITY OF THE DEVELOPER/OWNER. 54.FIRE DEPARTMENT VEHICULAR ACCESS TO ALL STRUCTURES UNDER CONSTRUCTION SHALL BE PROVIDED AT ALL TIMES. IN AREAS WHERE GROUND SURFACES ARE SOFT OR LIKELY TO BECOME SOFT, HARD ALL WEATHER SURFACE ROADS SHALL BE PROVIDED AND MAINTAINED. 55.ADDRESS NUMBERS, BOTH COMMERCIAL AND RESIDENTIAL, MUST BE POSTED ON THE FRONT OF THE STRUCTURE NEAREST TO THE MAIN ENTRANCE IN A POSITION TO BE PLAINLY LEGIBLE, VISIBLE, AND UNOBSTRUCTED FROM THE STREET OR ROAD FRONTING THE PROPERTY. 56.DISTURBED AREA IS OVER 1 ACRE AND A FORMAL SEDIMENTATION & EROSION CONTROL PLAN APPROVAL WAS REQUIRED AS A CONDITION OF CONSTRUCTION PLAN APPROVAL. THE SEDIMENTATION & EROSION CONTROL PLAN PROVIDED SHOULD BE REGARDED AS MINIMUM REQUIREMENTS; ADDITIONAL MEASURES SHALL BE PUT IN PLACE AS NEEDED TO ENSURE THAT NO SEDIMENT IS RELEASED FROM THE SITE. 57.(CONSTRUCTION/SITE PLANS) WATER AND SEWER PERMIT APPLICATIONS HAVE BEEN APPROVED BY THE DEHNR. PERMIT NUMBERS ARE AS FOLLOWS: WATER PERMIT NUMBER: TO BE DETERMINED SEWER PERMIT NUMBER: TO BE DETERMINED 58.COPIES OF ALL PERMITS AND APPROVED PLANS MUST BE KEPT ON SITE IN A PERMIT BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING CONSTRUCTION. THIS INCLUDES APPROVED CONSTRUCTION PLANS, APPROVED EROSION CONTROL PLANS, ENCROACHMENT AGREEMENTS, DRIVEWAY PERMITS, WATER/SEWER PERMITS, ETC. 59.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL NCDOT, JOHNSTON COUNTY, AQUA AND NCDENR STANDARDS AND SPECIFICATIONS. 60.MAINTAIN MINIMUM 3' COVER FOR ALL WATER PIPE. 61.WHERE WATERLINE CROSSES: A. SANITARY SEWER: WATERLINE SHALL CROSS ABOVE AND MAINTAIN 2' VERTICAL SEPARATION OR 10' OF HORIZONTAL SEPARATION. IF THIS SEPARATION CANNOT MAINTAIN OR IF WATERLINE PASSES BELOW SEWER LINE THEN BOTH WATERLINE AND SEWER LINE SHALL BE CLASS 50 DUCTILE IRON PIPE FOR A MINIMUM OF 10' EACH SIDE OF CROSSING. B. STORM SEWER: WHERE WATERLINE CROSSES ABOVE MAINTAIN 1' VERTICAL SEPARATION, WHERE WATERLINE CROSSES BELOW MAINTAIN 2' VERTICAL SEPARATION. IF THIS SEPARATION CANNOT BE MAINTAINED WATERLINE SHALL BE CLASS 50 DUCTILE IRON PIPE FOR MINIMUM OF 10' EACH SIDE OF CROSSING. 62.WHERE SANITARY SEWER CROSSES STORM MAINTAIN 2' SEPARATION. IF THIS SEPARATION CANNOT BE MAINTAINED SANITARY SEWER SHALL BE CLASS 50 DUCTILE IRON PIPE FOR MINIMUM OF 10' EACH SIDE OF CROSSING. 63.REFERENCE NC 15A, 18C, .0906 FOR ADDITIONAL CROSSING INFORMATION. THIS CRITERIA SHALL BE MET AT ALL CROSSINGS. Civil Engineering Stocks Engineering, P.A. 1100 Eastern Ave. P.O. Box 1108 Nashville, NC 27856 252.459.8196 (v) 252.903-6891 (c) Contact: Mike Stocks, PE mstocksestocksengineering.com Surveying: True Line Surveying, P.C. 205 West Main St. Clayton, North Carolina 27520 919.359.0427 (v) Contact- Curk Lane, PLS curke truelinesurveying. com 00�c0 0 0) 00 0 U) I o '0-0) � "0 (�\ LQ ^ V v Lr) 04 CJ Z W H i dg W W z rrHnn �.J z W z 0 1) Q N U� O Z 0 W H L Q XO J Wm= V/ ooQ 1/� �a_Z BLN=C-1874 coo z V � M V I �! CZ LLA O Z Z � O Z� LLAOn ZA Z RM Lai CZ y W W W �i Cz Z� 'FESS 0'• SEAL 19843 • •NG I NES; • pG`� 1�'4/15/15 '91AELlilt i eX cJ COVER SHEET REVISIONS FILE NO. 2015-004 HORZ. SCALE: NONE VERT. SCALE: NONE COVER BEFORE YOU DIG, CALL 0 D NORTH CAROLINA ONE CALL CENTER www.ncocc.org \ \1 POD #: NE -12 - / \ \\\\ N: . 44.2 a c. /'X\ IV //' jl �'/ / / \y Fn // /`���`` "i•_ /i\ I L' -j- cy \ \ \\ P` / / / / / � /�`�• :�� y���\ �` - •�� \ / � ` / / / / '+ / � � / I\ � i / / . % 3/ ��s --._.- -_� �---------- 'vim/'� J' �' `\ 0 gala - _=_� �.------- - " �^ / \\ \ / \ .� -��INV OUT- 33.1(1' SSAIF!i\ 1 tP / \ INV OUT=22 .88'� /� - / / I INV IN=2 08' \ \\ \ \ / ' ' // ' - �-' \ �`C--� -}'��I t• ` /may �= \ �I,�/.�.✓/ / �'�'"\ � // � ��- I IAH 50 IN b2' 5.� -_53 54 iCay261 4 -56_ `�. / `/ ( .� // / \ \ // / J a 2t �r..;,a.` INVSMV \ ,Y". / , 449 / 1a 1759- IW/ Out ..7•,8' SSMH / /' / ,',/ / � '� (, (� � - �� \ /�� SF_ ; _ U. \\ \\ TOP=276.78' / / - \ ,0.47,Ac. 1 - j \ '� I I / I / (-� IMJ IN=271.39' / // % .'� /- v '"/i' d5 -�\ `f r INV UUT=271/.1/" 57, \ \ \ \ \ / / / / i �% _./ X46; vc / �_ r-�`_� �� '�•I I\ \ \ I / I I / , \ \ \ -47 46 r. ' ,ck .//•'�\\• iii _� �1 !^fc `---��_ _ �-� ` - ---/ / �\ \\ \\ \ \\ \(/'' PODJ: NE -1 A ----' as G: Mac. 1\ W TOP -285.64' N: .�.3ac. \ INV our=27s.ea � � � _./; I \ / � -4�;\99_ I 7,200 SF 7,853 SF / \ I I t i ' I \ �\ / / ' ` \ 96 9 8 An. I I\Q.1 ,Ac , I \ ~ \ \ \ _ 1 I \ {� 0.17 Ac. �-+--0ha-Ao-? \ \, 1 / I \ ` •� \i. ` 0.18 Ac. 181- _ \ Imo` / \ \ I 1 ? Nom^ ,/---r 1 1 \ \a \ I I I , /-^13,249 SF / / \ / I I s \ \ / i/ / _ \ \ \ I I 1 / , I I I CROSSING #14 16 1 1 \ \ \ \ / / ` 95 \ \ 1` `�"L_1 \�-Z- �`----'-------'i , / I / 1 \ a c 1 s \ \ J \ =--- / 0.30 A\ 43 Y / / �. 7 BYa�F- \ - - - \ 10,E 1�8 S 0.17 Ac. i �\ \\ \ C� / \ a i Ilc t7 \� / i // / \ \ I \ % a / "o, 111 l l I l l / i \ `� `- 14,264 SF 1 \ t t 1!.326 SF /�` \ / I /1 / / ..` `} _ a:510.�SP'``� 0.33 Ac- \ 1 \ 1 am \ / / `\ \\ / I .\ V;rAc. I I \ , 1`•1 0.2c An. / \\� / / / / i' „ \ \ I , \ I 1 ! 159 1 f i / / i 1 os ` \ \ \ i 7sas SF- \ / I /�1 I I / 107 \ / 0.18 Ac. �\ `\ \ )!1 1 �`�..` /� i!� /ate' \18 \ / / T) 0. Ac. �`\``\ /� \ a / i 10,1`@0 SF `�\ \ //'`\`` /// 1111 /dry / ^ .�0'y ,• �- . 023 `Ac. / / , / < HEADWAIAI AT \, \ \ \ \ `� s \ \ / / / f \ \ ` , 7 6743 SF \`\ i J / / / 6D I I I l • \ \ / 0,471 SF . / INVERT OF 1 T l�� _ v / i' \ _� _ i f /, i`,` ,\ \ , c 9 t "� s `l �! \ \ 0.1 a C. id INVERT ELEV.-�2. \ ) / \ _]c ' _-'- �/ / / 9_ `�24 AC. \ `\ \ .1 �� ✓ 48073 3F/ // _\' '\. \`„/ �/ / / 1 I (\\' 0.1 /Ac. // > / /., ;c '� c. / \ a .^1 // / ! / / / / �. l Iii ( % llv \ � /�/ S 1 ! / i \ \ % i ' \\ \\, \ �� \\ �a 11 y�`v -•,�) 1 19 10 i3 14.136 SF 5,170 SF 0.3 0.35 Ac. , e Y C--1Bfi7 sF '\ 7q.%170.S Ac. > 1,0 A / / 105 / // / / �.' l 1631 ' - \ \�. \ I i ^T �' /i/// /l // // //%�\�••.i`_�\ `•// , _- �`. 10 8AA3F\\�`` `\ 1 \ / / / / /,/ //r.. / Il / :>< 1> - f I / r i incl I i 12 \ \� 7 / I _ / / / \ 51.,3 5,F_ 9.3x7 SF / 1 9,600 SF / 39 / / f / / / / `l-_� / / `� \ \� .+ 11 / ,� ,. ! / / /� /- / // / / / T, / t✓/ 1 \ \ 0.22 Ac. \ \ �, 8,11 -SF / #' U. `P, `. , I I // / / / / (/! I e �. , \ 0.22 Ac. / / `// / / i\\` `x Y \ 1 1 1 / ) \I / 106 . , / / / / / / / i / (k\ �11.013�F`' \ / / / / /84 / / •\\ \ \ ,` q�C\ \ / y I , ^.\`` / / /, 1 /� �� / C^ 0.25 Ac. _/ I / / f / / / . ✓ , r- __� -/�/ / / / l i/ / /;' / / / / `� , /' 0,62 ac. \9C70 SF `21 I %' /7-`- 7� / A / /i / 0 c // i r-�\ /'� / l Y`(� / /// // / 1 / I -(/ 1021 Ac. / �4�.I� 0.22 Ac. I /38 // /i / ' /I / C_l ' , // /�� `�4 }�• / / / / , /�,/ / / / / / / I I I / / ✓ / \ +';185 I T 8,982 SF /--%� V t I/ ss 22 ` a 8,056 SF 021 Ac. ?/ \ 1 0.18 Ac. / / // // I / 1 / / // 1 I / `/ /7,868 tF t, i / \ \ \CFa t✓ I \ j� /37 / / 1 K / / \ ' v� \f \ /iossysF/ i 6,, / \ ��_ I; I .( ./ l I I I I 1111%// �j,./ /13.ou \\ y (7 \ \ / 0.2¢' Ac. / / 1 6"// / // / `y ` 3` Pineville East \�\ \io.\ y/ . 9 / s / ' / Ar /i`. / J� 8.890 \ \ �. 23 \ / / / / 1 / I �``�` , .� SF I �`� �`I"� I / / // / / / / / / /` \ / > \\ 6.099 SF /_-' ,( f / 26.1 ac. :'\ ,✓ \ O.aO Ac/ \ \\ \ 0.16 Ac. ;�- 9 _ /1// �/ // / �/' �c• ; �, I / ! % �/ ` //F133/Ac.F��a \\8UF \ `` s \\ \ \�X' - _ `\ _ /! 4;686 SR/ // /..- \ (^`\ P...117 \ , \ 94 _ y 0.2 �Ac. 1 I l / a z sF > \\ \ 7 ozD / / .� \ /0J / 3 SF/ \ C..E Ac. ' I `. `� 1 i I l / / 'fC• i�`` .. \'• �1.. \ '' \ \ s \\y '� `\ / //35 // \ / C \� 85 1�`\ ' ` / 17.43 7 21 \ r 6.794 SF- \� a a73 s�` > ` / 7 ozo SF / / _;r8 Ac. .� \ \ I 119 / / ✓ , / 1 / / / / I \020 Ac. �• / / \ \ ; \ ` Vii!%JJ%`'` 0.?6 \` 'C �\) �` / /0.25 Ac.. / 1 I G 7/215/SF �`y `✓ / �'/ / / I �I,. I I/ I 1 /1t7�-- =-�'_' / •\ s \ \ � �� .'= : `\ '� ,. � 3a / \ / ` ' 8 \\ / `\ /0.17/Ac./ i / / \ / / 6 \ s 26 \ < )Sr SF ) \ v<' 6.72 SF ,i / / /// / /„ / / 70/ \ a,896 SF 7,020 SF `> i' 0.18 Ac. \ \ / `\ 0.1 Ac. ,'\ / `.( / / / / / / 11.58✓! SF \ / 0.16 Ac. ^ `� \ \ `\ �. \�'/ I 0.27/ Ac. \ // •\ ` \ � / \ -tea-/ J\` \ \/:' %4873 \ \ 8,9 -SF- �� - d• <\ 0.18 Ac. `: ^ \ \ / l/U.1//AC./,' ' i/ ` `\\ \ tI 021 Ai. i..` sir 0.16 Ac. '/ 72 '4 ` ` `\ \`\ 3 \ / ` / / �/ % % // �� // 0.25/Ac. / (• I \ \\ \ 01a SF `) v ♦y \� �_ 7.020 SF`\\\75� AcFy` 6„ •X\ ' / J3 0.21 Ac. �` C\ ` s \ OAR Ac. \� / \\/ \\ \/ / / / // // ` / / 6 \\ \\ %• 9.028 SF \ : \ \\ 36 _ 0.20/ ;F \ \ / / / /7, / / 7 21 SF \ \ 021 C. \ ` \ / %� / w Aa. \• \ V �v v 7,043 SF x.163 SF \ \ \ / / / / O.i9 Ac. \ \ * \0.16 Ac. \\ / / \'\ \ 9.030 SF \ �. �o \ / // �/ / / / 76 - / 0.21 Ac. ^\ \ 'a \ �� \ / �/ I / / / / /.� 10,561 SF h 5 S. / I /77 Ac. a.24A/. / - I ----- - --- --/ \ / '/ // / / < \'i ! / 1. -\ 'A/lf,149 gF . ` / - - - - - - - - - - - - - - cV 79 80G.040 SF �•\ t /' \i Q�W 1�1\ 0.21 Ae 19,983 SF// .`,(y` : 60.-i SF `\ \ / l r - / - - - - POD: #NE 8 0.40 Ac, ,` 0.1' Aa1X6 ✓ n`. �,� // -I `TH 'Lots -- - - - - - - - _-"--- - 1 - - - - - - N: 12.1 pc. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - \ - - - - - - - - - - - - - - - - - - - - - - - \ \ I i \\ \ - - - - - - - - - - - - - - - - - - - - - \ 1 1 �\,\ SCALE: 1 " = 100' !!!7 01111111-11111111-1111 0 100 200 250 300 CARO �FESS/0"- /4, ,�- SEAL 19843 �/� G IN ES�,S`��`�` 4-15-15 AA E I��A��` ` . /�QAS I 00 00 60 r, CO Icy O I rn O N'd-04 (n 04" v � � �N.. Z wJ H =x0 12�m W W Z (H V Z W Ld Z 00 V) Z i Q N U hoz 0LLI T_ x a0> M= V1 006 vl �dZ CE -01 BEFORE YOU DIG, CALL a0 \ D NORTH CAROLINA ONE CALL CENTER www.ncocc.org i 8" HEADWALAI AT i INVERT OF 18TORef;6 1• i INVERT ELEVAW2.W- ' SCALE: 1" = 60' (POD BOUN 15' MBSL I I I I I I I I I I I I I I I I J ¢ 100 0 M 7,200 SF m i_ 0.17 Ac. X \ U�)I \ I I O i 8" HEADWALAI AT i INVERT OF 18TORef;6 1• i INVERT ELEVAW2.W- ' SCALE: 1" = 60' (POD BOUN 15' MBSL I I I I I I I I I I I I I I I I J ¢ 100 0 M 7,200 SF m i_ 0.17 Ac. ILO U�)I I I O I I I I I I I I N I I 20' MBSL I I L --------------J R/W I 60' (TYPICAL) 30" ROLL CURB \ � --% /' /• /////. / \---T�� -tee/ /,�\ /- // PODS NE-11�'---/ /� /'" �' -' � CV / o �F� 45 / G: MCC. SSMH TOP=285.64' / (. ` ( / I N : 3 a a . INV OUT=279.84' \�\� /1 �o I / - L_ \ 144 00 1 275_\ i / ,c'I 16 1` \\\�� \\ / 43 1014.19 SF Ms \ \\ �, ,z+• -j \ \\\ \ - - - ` X0.24 Ac. I Vo // i' 15 rn /�i/ / \ \ \ \ 14,264 SF 94 ° i 1: \ / •���� \ I , / / / / / \ \� �7�510 2rF' \ \ \ \ \ iP 1 „326 SF / F}' \ \ I / / / / , \ \ \ v v z � v 1 �� .I 0. 7/Ac. 0.,.3 Ac. \1\ �\ km 0.26 Ac. \ / / / / `\ \\ / 42 \\295- 11 � �1 ��\\ ?moo / /�I / `�\\`�'' / / / / q3- 24,513 SF `\ \\ \ �� \ \ \ -5110 SF 0.56 Ac. \\ \\//\' w 21.99 34.3 W s\ /� o�� 10 11 0 SF \\ / / / / / /i �/ / / /\ `\ / 0.17 Acs / `\, 0'23 AC \ / / / / / r, ' j\\ `\\ / / \ \ \_�- _ 41 / \/ YJ f ' / / / % // -7 �e4.ir - _ / / I � / �/ /8,073 8F / / / ` --0.1-7-AC. > /117 \ \ \ \ X300\ ��\\ \� 19 a�`� ,/ ////�// / / / /// //// /�\�\ `�� i, • / I1 c 14.136 S. I `� I I 5,170 �F \\ �!` y \� 0.32 .Ac. N !\ \ W` 1 % \\ 0.35 Ac. I i ATO j J / /� / / i / 7, , M1 \ / `.>> v ->< / \\\ o Q, --\ / / / / / \� 90 \ \ 12 \ s \\ \ I ! /� / / 1 20 / / / / i i/ 0.'r 'A,(,./ \, 9,387 SF \ \ / 39 / \ . \ w Q / 19, 600 SF / / \ / / 0.22 Ac. � \ \ I 3 <,\\\\ 0.22 Ac. 8,119/SF �\\ \ `. w \ I / 0.1� AP, / / / `/ I ' i i 112 0 SI / 9,070 SF j � o� / / ." � 1 9,694 SF I � // / / V � / / I / 0. 7 c/ / � � � \\ .•\ 0.21 Ac. & �_- \ 0.22 Ac. /I ' / \ \ •� 1 ''\\ ®� \ / s /P_ \\ 1. / /503 ,SF 0.20/Ac./ ' 10 \ s 22 -� ---f I / y 27 Ac \ \ < sI 8 982 SF \ w 1 1 8,056 SF _____/_-- -_ /I I / 7,613 SrF i / \ \� i 111 0.21 Ac. \ I 0.18 Ac. / 37 \\ I /',.�9" '''\\\ \y Al, \\ 10,86 SF \\ �_� ''� I \ �\ �� \ \ / 0.25 Ac./ �V •\ Pineville East \\� \ �/ \\ sw \ 23 \\\ `\ / / / // 1 �\ �87 GJ V�� -C \ 8,8.j0 SF C < \- - v 7,337 SF ;1 • \' /i / �� \ \ 6,999 SF �\ / /_, ,� / \ / \ �J \ 114 2 6.1 a c . \ \ if, 0.20 Ac/ \ �'\ \ 0 16 A '� \ / - l / �' / \ 0.17 Ac/ 1'� a 1 /\/ $ \\ g \ \ \v /'' \\ j / x,686 86 w \� -2A S ` / 0.21/Ac. / �' / \ \ \ \ 8� 2 SF \\ \ 295 \ / / L / \ \ 6,798 SF \ t�\ \ 7 020 SF _ / / 16 Ac. \\ \ \ \\ \\����/\\ y <��j 0335 � SF/ ease nyv 85 \ / \\ S \ \ \ ,i \ w 2 \ l / 6,794 SF I 8,873 3 SF \ \� 7 020 SF j\� / / %.� $ Ac./ a /\\� 0.16 Ac./� \ 0.20 \ / 34 8 6 \\ S 26 \\ �,ZO�SF ,% �� 6,72 SF 8,896 SF ��� 7,020 SF \� 0.18 Ac. /^\ / `\ 0.1 Ac. 0.20 Ac. \ 3 •\ \ \ \C, \ �\.\ m� ^ 0.16 Ac. \ / •• \ •,�- \ 5 \\ Sw \ �� `„t ��'' \\ \' ��' 7,857 SF / �� � \\ /_33-v �,'' � 87 lSF \ / _ - - 27 \ < 0.18 Ac. \ /0.17/Ac./," / 8,94�SF -305- s!' 7,020 SF -305_ 0.2.1 Ac. .'\ 0.16 Ac. �' 28 \\ 1 / 9,0?8 SF �� \ �' \\ \\ 7,5,93 SF\ Y� O \ \\ \ \ 0.21 Ac. , \\ 3 \\ 00i60AcF �'�' / I I \\ \\0/17 Aci./`\ 6 ♦ \ / / // '/ . / X310- �// /�/ \\ a_ \\ S I \ \ l \� 5/? _ �310- o \\ �/' 1 \\ 7,29 SF ,z i \ 9,028 SF 0.21 Ac. /'\ s \ 3 \ ��I �Y y \ \ 9,090 SF \\ \ < 0.21 Ac.�' X, /2,8 2 \ \\ \.i / \ �\ o_ le ♦ i / ///j` �/0.18'Ac. / W WATER SERVICE ` \ \ \ \ewe l \ 9,530 SF / \ S `ro. ( / / / \� ////71 / \ A � 0.22 Ac. o /� ; 0 / 4 / ��'\\ 1' / ,�/ y / •,OVSF OS SEWER SERVICE \\ \ �.\'� \ � `'SP / �/T \' \\ / / / //\ i( 0!2.Z1 / \ ie W \/0.26 ooN a s \ / 4F80 `\ 9,040 SF��� 0.21 82 81 foo 0 19,906 SF / \\\ 7,603 SF \ 9� \ /\ 0.46 Ac// \ \ 0.17 Ac. 50' R/W \ \ I \ 25' BB 13 HALT SEE DETAIL FOR CURB GEOMETRY -,lir \ \ \ \\ \ \ 8" CABC I I -1 I II I II I Iil_I I I=1 I II I I SANITARY S.S. MANHOLE SEWER FLOW R/ R/W WATER LINE (12", 8" or 6") R/ FIRE HYDRANT 3 3 IN ACCORDANCE WITH GEOTECHNICAL REPORT. ROLL CURB CROSS SECTION SCALE: 1 " = 60' 0 60 120 150 180 GENERAL NOTES: (LOCAL JURISDICTION) 1. Any discrepancies in layout should be brought to the Engineer's attention prior to construction. 2. Written dimensions supercede scaled dimension. All dimensions are edge of pavement or face of curb, unless noted otherwise. 3. All materials, installation, testing and inspection of water and sewer utilities to meet current Johnston County standards. 4. All streets noted as "PUBLIC" shall meet NCDOT minimum standards for subdivision streets. All other shall meet the criteria shown. 5. All lots to be served by public water and public sewer. 6. A 10' utility, drainage and road maintenance easement is reserved along and adjacent to all street right of ways. 7. Flared end sections are to be used on both inlet and/or outlet ends of storm sewer unless otherwise noted. 8. Fire hydrants are to be installed as shown on plans. 9. Maintain minimum 3' cover for all water pipe. 10. Waterline pipe shall be C-900 class 200 PVC unless otherwise noted and installed a minimum of 4' off edge of pavement. 11. Corporation stops shall be rated a minimum of 300 PSI. 12. Where Waterline Crosses: A. Sanitary Sewer: Waterline shall cross above and maintain 2' vertical separation or 10' of horizontal separation. If this separation cannot maintain or if waterline passes below sewer line then both waterline and sewer line shall be class 50 ductile iron pipe for a minimum of 10' each side of crossing. B. Storm Sewer: Where waterline crosses above maintain V vertical separation. If this separation cannot be maintained or where waterline and/or sanitary sewer crosses below storm sewer, waterline and/or sanitary sewer shall be class 50 ductile iron pipe for minimum of 10' each side of crossing. 13. All gravity sewer line is SDR 35 PVC except as follows: All sewer line less than 3' deep or greater than 14' deep shall be minimum class 50 ductile iron. 14. Each prime contractor performing excavations or underground work shall be responsible for the location of any existing utilities in the area of their work. Notify the utility locator service (1-800-632-4949) at least 48 hours prior to commencing construction in order that existing utilities in the area may be flagged and staked. Contractor shall use all care necessary when working in areas known or suspected to contain underground utilities, including hand digging. 15. The contractor is responsible for relocating any existing utilities that conflict with the proposed construction. In addition, the contractor is responsible for repair and replacement of any utilities, curb and gutter, pavement, etc. that may be damaged during construction. Damaged items shall be repaired to at least the quality of the original workmanship. The contractor shall field verify depth of existing utilities and relocate if proposed grading causes utility cover to be less than minimum required. 16. All temporary erosion control measures shall be inspected after each rain event and necessary repairs shall be done as required. 17. Omitted. 18. Omitted. 19. Waterline to be pressure tested at minimum 175 psi. 20. Ductile iron pipe sanitary sewer must be interior coated with Sewper Coat or Protecto 401, per Johnston County requirements. 21. Contractor to test sewer & water line according to Aqua North Carolina's 2013 standards. 22. Contractor shall install stub outs for sanitary sewer which shall have a depth of no greater than 6' below the finished grade at the termination of the lateral. The location shall be marked by a 4" PVC turn -up at the end of the lateral. Contractor will mark all sewer services with an S"in the face of the curb. 23. Contractor shall install water services which shall have a depth of no greater than 6' below the finished grade at the termination of the service. Contractor will mark all water services with an "W" in the face of the curb. 24. Contractor to notify Aqua North Carolina 48 hours prior to beginning construction. 25. Contractor to notify Aqua North Carolina 48 hours prior covering any construction. R- DELL ELEMENTARY LOCATION OSCHOOL SKETCH NOT TO SCALE REVISED 6-5-15 C A I �0�'' �FESS/0, /if, SEAL 19843 /� GINE S4-15-15 C° 00 rn 00 ppr,(fl I rn � CX)O � I � O LO N'd-04 (n 04" v `N-, � C14 Z wJ H =XFn 12�O M W W Z H V Z W Ld (0 O 00 VI Z r - i Q N U 00 W O Z 0LL1 X Q O Ld M 2 0 C3 a- Z BEFORE YOU DIG, CALL 0 0 NORTH CAROLINA &NE CALL CENTER www.ncocc.org TC 308.92 DEPRESS TC -CS 128 LF 18" RCP ® D 1.0% W/6' FES PC STA 10+24.06 C/L ELEV. 308.38 STA 10+11.70 C/L ELEV. 308.44 STA 10+00.00 C/L ELEV. 309.03 40 DRY BORE & JACK W/24" ENCASEMENT & 12" C-900 I'. I go �21? III I I �I I 0SF 1 •s I\ 150b�-_--I I I~ INV.TC 305.58 I FES #1 S3 1 I N I l I I\ N 306.00 ? O SF I ? qc 1 I m •� STA 11+69.00 ----- TC 307.15- /1 W STOP I I 1 SIGN PRO. 5' S/W y1O CARRIER PIPE p TC 308.09 / I �I �I C.B. #2 - TOP 307.78 INV. IN 303.32 I INV. OUT 303.12 I 30' OFFSET LEFT - - - - 15' OFFSET LEFT EXISTING C/L - - - 15' OFFSET RIGHT - - - 30' OFFSET RIGHT TRANSITION FROM STA 10+48.59 30" STD. CURB 0 0 0 TC 308.18 TO 30" ROLL CURB 0 0 0 0 STA 10+89.86 0 II TC 307.72 STA 10+91.17 TC 308.46 ooll,� 1 0 STA 32.79 TC 307.07. 32 1 z Z In 0 Q Q c) 0 w � 1 0 I U) cn STA 10+45.56 0� / TC 308.9 STA 11+66.31 �.� V) 00v C) +Ic oz > I -68.64' TC 307.20 Flo Q ft� 0 STA 10+00 _ - - - - D cy �3: I +� I I + y� C/L ELEV. 309.03 O X10 �0 STA 11+56.77 S I STA 10+45.56 °'G� 307.37 n I TC 308.69 In �N STA 11+22.76 315 � I � I =10 0 0 � � I TC 307.73 -m c"! I I � N N I N ?9 I 3d STA 10+97.50 I I NCO N 315 o °' _ o I, TC 307.84 1 3 to n II J o STA 10+91.17 UO) 1 SA IAI STA 10+57.13 1o 6 TC 308.46 0 No 0 � o qc I TC 308.29 I II � II Q N I� Q Q II Q II O N II TC 305.65 j /� EntranceNtraNce Detai/ n Q CO Q II O I/ STA 12+98.50 Q II L w cn a�-- /� C/L ELEV. 302.82 1 47.45 SCALE: 1 = 50 1 J H N M u) c0 Q J LL *STA `� TC 30 .95 / 'TC 302.82 F= -i J J - cri1IF 1. ■ 130.5' 13. ' /� S / 59.0 J 59.0' STA 12+15.82 -------- - - -, rC/L ELEV. 306.00 /_ 112" C-900 PC T�1+68.85 1 `fiM.H. #5 r DR 14 PVC WATER o I3p5-C/L ELEV. 307.15 1 1 TOP 306.00 I INV. OU f 295.82 1 X30 I I o TC 307.78 �`-DEPRESS TC 1 v 7_!2i I 8 �.I �0�60 82 1 I 1 )601 i 1 n?7 p sF 906 i .1 >' J SF I 15 \ �-4c,- F6 c.4 SF I / / 46 TZg INV.Y -III I I I� I I FES #30 ----------- I-----j-- i 300.00 MOo I \\ I uumb BWtvace cross section NOT TO SCALE VPI STA = 12+00.00 VPI STA = 14+00.00 VPI STA = 18+00.00 VPI STA = 21+00.00 VPI STA = 23+00.00 VPI EL = 307.50 VPI EL = 298.00 VPI EL = 290.00 SCALE: 1 " = 50' VPI EL = 279.00 VPI EL = 282.00 gl =-0.50% g1 = -4.75% g1 = -2.00% g1 = -3.67% g1 = 1.50% g2 = -4.75% g2 = -2.00%„ „ g2 = -3.67% 0 50 100 125 150 g2 = 1.50% g2 = -2.00% CURVE LEN = 200.00 CURVE LEN = 200.00srRffr CURVE LEN = 200.00 CURVE LEN = 200.00 CURVE LEN = 200.00 K = 47.05 K = 72.73 K = 120.00 K = 38.71 K = 57.14 E = 1.06 E = 0.69 E = 0.42 E = 1.29 E = 0.88 REVISED 6-5-15 ��` , C A 1104 SEAL 19843 41 NciNEE�C�'��.4-15-15 SEL S �. 11 iGZQ 10%% cJ ■ 00 00 00 ACO W 1T V/ ' J � CIO 0 �I� NLO �04 Ur04 "' 04 04 Lij Z w�J H =X0 CLAM W W Z rH V Z W Ld (0 VZ 00 ) Z r - i Q N U W O Z LLI T_ a > X o mm V1 00Q vl Jaz CE -03 0 0 0 0 0 0 0 0 ooll,� 1 0 0 1 �l0 1 0 o In 0 0 1 0 I 1 0 0� +Ic I +0 I Flo I + 0 I I +� I I + X10 �0 �2N °'G� In �N 315 � I � I =10 0 1 � -m c"! I I � N I N I N00 N I I NCO N 315 II II � II II II II II Q Q II Q II Q II Q II Q II Q II Q II H J H J H J J F= -i J J - (n 1 w 1 (n w 1 I (n w 1 (n w (n w (n w (n w (n w a_ 1 a 1 U U 1 1 U 0 1 I- I- 0 I- 1- I- u �- >= >> 310 310 \, �g 18"RCP 1 -0.507. - I 145' 7 �1�\� 1 _ 305 --{___-- BEND BEND D M m I _ _ 305 _ ---------- \� I I 1wil 24" MIN. O \ 1 c; WIF I BAV END 1 m 1 \ J 1 1 \ 300 w BEND O 300 iLd, 0O Ld w Ld N z Ld�_ I I >I - wQ �� I I NSI IJ I _ - 295 �� yQ o I I NI J I \N _ - 295 _ 71 �U) N D� I �O o F , w� 2. - _ u oo� Qz 0)� I I NI I I X> ON I I mCL �I I N = 1< I I I I x I��cl _ _� 290 0 x QW�- o J oQ 0 �I o (V �U- ��m 290 �w --I Z' I INNa I c I _ I I�0o C' H Q 285 Isom 285 280 _`- ,__- 280 - __ 275 I I I I I I I I I I I I I I I I I I I I I I I I I I 275 rn N O o0 -t CD Ln O Ln O 00 I m 00 00 CD O O O O O O O, 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 ■ 00 00 00 ACO W 1T V/ ' J � CIO 0 �I� NLO �04 Ur04 "' 04 04 Lij Z w�J H =X0 CLAM W W Z rH V Z W Ld (0 VZ 00 ) Z r - i Q N U W O Z LLI T_ a > X o mm V1 00Q vl Jaz CE -03 C14 I X -- r I� I -- - I / I I - I T- \ ■ \ I F- III I I jilille TCp A�W I 1 O T p v\^GII Ib Q I>I / ^ Q/ i NSIR 10+12.00 �I I I 'I N m I �I O I N �\ I - � I p -/L ELE'J. 3C5.75 I I O mp'�!�4 O I I O ry 1 �1 r� j '� -� I Al ^ `� �` ^� I I lb O L) O , 1 m p 1� I LO i� 1 \ '� O Q ! ^D I Jl O I m� O" ry I I/ p, N I I /N I I co"p• I I I Q7"p• / I [b" N I I\ Q7" N 1 �1 O (/ I h O" I p' I O' �^ I p' p I I W" -% I I I O I I I I I I I\ 0) I I 1 / / \ I D O' ; I; y I i i //i// I I I I i i i t 0 1 1 °'^p• i 1 M / // g I I III III W 1 I C.B. (DBL)TC 307.15 I I I I STA .M.H. 4+98.771 1TOP 97.50 TOP 98.19 L ELEV, 303.03 I LP STA 1 \ I II HP -ST-A -16-+-33-.9J5II � V297.5INV IN 284.86 1 1I C/L ELEI 1C/L ELEV. 298.34' STA 10+45.971 1 J __J L-----_--�I L___--_- L - ----- INV. OUT 284.66; 1 SCTA 16+37.03 1 1 h (00 1 1__Z --j LJL-T298.33 1 c -A 17+65.56 TC 305.58 L------- - C/L ELEV. 296 o / / / A MOP 306.00 _ f Z?, , \ - ,9•64 / R INV. OUT 297.02 I a.5 cT z -900 P C R 14 V'iATE - -_-_-_ -900 P C e'os �r -- DR i �'Zlb _J S6Z �� \\ TOP 295.32 / - / - - X299 LF 8" SDR 35 PVC S.S. ®3.0% 20 LF 18" RCP ®1.0% - - - - ��� i__INV. OUT 286.73 _ ! STA 10+00.00 ` - - C/L ELEV. 306.00 -� 0 2gg 77- 8 SDR 35 PV ®1.0% \ 5'R / \ / / / / / L• t9 .L l� Ly ,L' l9 ,L' l9 £•a£ 1 r \`` I lc, �� cis �, ii _ P,cp LF 4.. `. \ f TCA297 17`23 0� \ �. j h U `' l / / \ Q / \ 5 S�W ass PRO. , r- -----I r--------� r- ---- --, r-- c,, r �ti ev ------�--� �, -- --,------- -� CO r--- I I M.H. #4 I 1 I I I C.B. #8 I 1 STA 15 9.32 ��` rr" \ TC 296.29 \ 1 CA I 1 23.° ------- I I I I I TOP 302.69 I I / I I I/ I TOP 79.50 1 ITC 297.9 �� /i O� �RO �� o+ I rn I I INV. IN 294.03 I I I I A I I I \ 9 , CO cn ,GZ.+� ! PC ST 18 X60.79 / w o I STA 10+31.38 �I I i INV. N 292.80 \ •,2 /l hi, I /� I o ' I ! I INV. OUT 293.831 ✓ I I I I I I I / O \ T y cn c C/L LEV. 293.22 _ �- - -O6Z_ I TC 305.65 O V' >I I I P / INV. OUT 292.60 \ i O -n I - d I N 50'f W I cV ^'� Q I I I I I 1 1 I I I I I I STA 15 X98.58 \9 / q` c'R; \�� ��</��A �Lq F in w A I TC 29.,.22 I 1 / I ci PDNI I vl / II I WI C/L ELEV. 298.19 1 O \\�\'� R ^I z OD ( I o1 �C I of I of I n l '<') \�c� q 1 / 25' TC 304.95 �\"p I I of �C ! 'I CO I� 1 4� G' I I I I CO I 1 / / °o / `S'A\ 3 �FiL D� U U' 1 I I I ---3 I I I U �O U' I "V O T I I / I I M v I N / C.B. C' --- -� Lbs•4 t l- - I co C U• I I 'V G I I C/ O Q l �/ I I O P I I �/ p Q 1 1 �/ CO Q 7 \\ \ �G9 O c �j li n l - - N Q I I �/ Cu I I O ^O I I �,\ O^ I 7� /� ` /i' a \ s A \ , / ml / I���� -- V O Q I I �O O I I cp 1 I O W TOP E7.2� \ \ ,S �, 1 p Cp I I � ^^ II I^"o I I �\" I I Co" I I W" / T \\ !/ I I I I O' O' O' / Vii' INV. OUT 291.35> - --- \ �� \ z n / l 1 \ I S �I �\' O' O I I I I I I cn I I I / i/20Li \• J9 t / STA 18+87.86- 1-110 ` -J ----IJ ------J L -- ------J L ---------J I // // STA 21+50.64 i �^\ 'o / _ �/ C L ELEV. 292.72 � � \ \ O - J /------- TC 297.26 / / / 1 \ I \A, L-------- I S D 1 \ £8'64 £8'09 ,a£•o9 / / V V ,91'69 £s ss __ w TC 292.72 / /TOP 92.89 \�� \ N i 20 /�6Z ^00 ; C) 93 � �/Ia/r D� p / p / ,5`i INV. IN 287.15 a, GF a' DF U < q,, O" `\/ / C / O"p• INV. OUT 286.95 / �R 3 n�' �A�_j cn �/ - \ \ -,.� M.H. 1 � sS. / O v / j /STA 20+05.03 TOP 1L.38 / N O / ^�°/ TC 292.89 r--- 1 �. \ INV. !N 282.37 �\ r'p INV. OUT 282.17 1 EX. S.S. M.H. PC STA 20+02.66 / TOP 285.64 / �� �; \ LP STP 19+41.24 / O"p / // ELEV. 292.85 / / C.B. 5 (DBL) a C/L ELEV. 292.32 / / INV. OUT 279.84 / / TOP 92.32 �� � / / I PRO. IIVV. IN .280.24 i0 ! F 24" RCP ®0.64% / / INV. IN 286.50 0 0-� / / INV. CUT 286.40 / /w/ TC 292.32, / 2 ®. ^ co -98Z- - / // / `alb v Q c^\ -.A �` / 7o' / O" L- L----------------�N, INV. > / FES #4 / - 286.00 1 I � I v VPI STA = 12+50.00 VPI STA = 14+50.00 VPI STA = 17+00.00 VPI STA = 19+30.00 PROFILE LEGEND VPI EL = 304.55 VPI EL = 297.00 VPI EL = 299.00 VPI EL = 290.00 30' OFFSET LEFT g1 = -0.50% g1 = -3.78% g1 = 0.80% g1 = -3.91% - - - - 15' OFFSET LEFT o g2 = -3.78% g2 = 0.80% g2 = -3.91% g2 = 3.29% EXISTING C/L � CURVE LEN = 100.00 CURVE LEN = 150.00 CURVE LEN = 200.00 CURVE LEN = 260.00 // - - - 15' OFFSET RIGHT srRffr K = 30.57 K = 32.79 K = 42.44 K = 36.09 - - - 30' OFFSET RIGHT = a : E = 0.41 E = 0.86 E = 1.18 E = 2.34 BEFORE YOU DIG, CALL 0 0 NORTH CAROLINA ONE CALL CENTER www.ncocc.org `0;� CARP �i �O .�pF ESS/pNy'• 4, Q SEAL 19843 = !yGI`" 4-15-15 ELS �. C Co c 00r- co I.LI "' ,U-) 0 � I � LO N�04 (n 04" V env Z cq w�ui J H =X0 CL LLM W W z (H V z W Ld (0V)L0 0 z r- 0) 2< N U Woz LLI T_0ax M M >= 00Q V)Jaz CE -04 00 +0 I I I 00 0� I 0� 0� I fir,, ''� I Ln N0 I 00 ON I I I 0� I I I I I I I 10� I+N +0 O cDN� I I I n I N r7 1 m I Ln r cD I co I 00 I _m Ln I I I 0 INS 315 II 0 rn �10 II , �0 II �I -0 II N -0 II N rm II N II N II N 315 Q ~ II Q II Q ~ II Q11 Q 11 Q11 ~w Ln ro Q11 ~w Q II 0 Cnw 1 cnw mw cnw cn cn m wcnLd 00 I I I U1U 1 1 UU I- UU +� UU I+ 1 mm I I I >I> I >> I >> >> >> �� " " Nc 310 II N II N 310 -2.0 ,,ice_� � � ��I J NS M �o oq /� 00 _ I N 0) w w N ON F- 305 Q < o = a � <0 =m w0.50% w 305 co U) :i U) � U 1 1 6" C-900 �Iw I N J� , I PVCIDR 14 WATER Mm 1 \\ 3 %89 1 I a- 1 M > I I I L5 I I I m+ » N 300 "I �� \\ ___ ____ --_ - 0 � 0 N m C5 300 \\ - II 0.80 cn m 299 LF 8., SDR 35 PVC \ _ - / _ z} � \ \ 3 9 \\\ m� U J a_ m U , / _- S.S. ®, 0%45* .4. -- �._ _._.�I.-_/./ "'°° 'g -/ II BEND 295 \_ / �� 3'2 C-4 x9130Y I I I IJ Y mx \ \ \ ` -.-._ �// BEND __ ITO C.B. Y \ V) LLJ / 1v 11#8 w �° w� o \� ,� I I oR 45' \ 290 p a I I w BEND \ \ 290 z _ 01"' 29 9 xLd X° ��// RCp / BEND x o \\F X I I I 0) I I F 8 SDR _-_- 24 I I 40 w \ \O z10 I I 3S pVC co `° `° 10g 140 LF gF ES ®1.0% W� \ co a 3 \D 1 1 > > 1 SS 3,09 F B' I I - _j \ \ 285 zz - - To MANHOLE #1 SD 3g R P CSS ®4.Oy I lu 24" MIN. CL. z In zo dp ow \ ISI 285 _tt229 LF 8" 35 I PVC S.S.DR S ®1.0% 00 N J Z II col � --To MANHOLE 3):R::3-5--p- #®'•°% o C) 193 LF 8"_ S VC S.S II II II I I I I I I NI� 28o 0 z I 280 z fl z'Iz I I I I I I NN I I I I I I �co I I I I I I I I I z0 I I I I I I �0 I I I N I 275 z z z z c N 275 O CO C9 O C9 N 00 C9 O Ln O N Ln O) 00 C9 � O C9 O) o O C9 O 00 C9 00 m 00 Ln 00 N � 00 I\ O Ln I� 00 C� Ln z > C0 Ln Ln Ln N O 00 I\ I\ I\ 00 00 I\ C9 Ln N N N !� Ln o z O O O O O O O O C� C7) C7) C7) C7) C7) C7) C7) C7) C� C) C� C) C) C) CL w � � N N N N N N N N N N N N N N N 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 10+00 11+00 12+00 Co c 00r- co I.LI "' ,U-) 0 � I � LO N�04 (n 04" V env Z cq w�ui J H =X0 CL LLM W W z (H V z W Ld (0V)L0 0 z r- 0) 2< N U Woz LLI T_0ax M M >= 00Q V)Jaz CE -04 Z a U Z a cc E1 VARIES t22' 1.5" ASPHAL T �0VERLA Y t3.0% t5.0% EXISTING ROAD_ — — — _ _ _ _ EXISTING _I 1-4 GROUND — I I SAW–CUT EX. ROAD AS v NECESSARY FOR SMOOTH TRANSITION. B1 T Typical Sec tion NOT TO SCALE I � I I'v I ' I � I MILL ±50 LF TO payemeflt IMUCK OUT EXISTING DITCH AND PROVIDE SMOOTH I BACKFILL W/STRUCTURAL FILL. TRANSITION FOR OVERLAY. OVERLAY TH IS AREA. MUCK OUT EXISTING DITCH AND BACKFILL W/STRUCTURAL FILL. pilm9flieflt N8rklflff P/afl 1 TJT��l 1 nL I 1 9 $ 1 0 50 Z Z z w Z m 107 70 80 100 5 100 UB I UB TC RD TO RD L / IRD TO TC TO LVE; *�. _/// - - *11. - - - I EXISTING GROUND 150' TC LEGEND BEFORE YOU DIG, CALL 3" ASPHALT CONCRETE INTERMEDIATE COURSE, 0 Ifl 11 TYPE I -19.0B 0 D 5" ASPHALT CONCRETE BASE COURSE, B1 TYPE B25.OB @ AN AVERAGE RATE OF NORTH CAROLINA mNE CALL CENTER 684 LBS. PER SQUARE YARD. www.ncocc.org E1 1 1/2 1p ASPHALT CONCRETE SURFACE COURSE, O TYPE S9.5B (OVERLAY) Nffff4#1j? oa AWS.B. NOTES: U EXISTING PAVEMENT H Z 1. CONTRACTOR TO ENSURE POSITIVE DRAINAGE PRIOR TO POURING CONCRETE OT EXISTING EARTH Lij J Q U) w z 2. CONTRACTOR TO INCLUDE IN BASE BID THE BACKFILLING BEHIND CURB, OFFSITE C) O O DISPOSAL OF EXCESS MATERIAL, OFF–SITE BORROW, SEED, STRAW &TACK. 3. CONTRACTOR TO INCLUDE IN BASE BID THE w cn SAW–CUTTING, REMOVAL, &REPLACEMENT OF ASPHALT REQUIRED TO INSTALL CURB & GUTTER. O = 4. ASPHALT SHALL BE SAW–CUT TO PROVIDE SMOOTH EDGE TO PLACE CURB &GUTTER. 5. TWO–WAY TRAFFIC TO BE MAINTAINED AT ALL TIMES. ASPHALT OVERLAY AREA 6. WIDENING, STRIPING AND SIGNAGE TO MATCH NCDOT STANDARDS AND DETAILS LATEST EDITION. 7. ALL STRIPING TO BE THERMOPLASTIC PER NCDOT ASPHALT WIDENING AREA STANDARDS AND SPECIFICATIONS. ASPHALT MILLING AREA 8. CONCRACTOR IS RESPONSIBLE FOR THE LOCATION AND OR RELOCATION OF EXISTING UTILITIES, DRIVEWAY REPAIR, J � AND TRAFFIC CONTROL PER THE MUTC D, LATEST EDITION. PAVEMENT MARKING LEGEND TC 10 FOOT WHITE SKIP (4" @ 120 MILS) RD YELLOW DOUBLE CENTER LINE (4" @ 120 MILS) TO WHITE EDGELINE (4" O 90 MILS) UB LEFT/RIGHT TURN ARROW (90 MILS) SB NCDOT STOP BAR (24" CSD 120 MILS) Bffffale Road - Sm R. i 150' SCALE: I" = 30' 0 30 60 75 90 TO TO MILL ±50 LF TO PROVIDE SMOOTH TRANSITION FOR OVERLAY. OVERLAY THIS AREA. 1003 50' 0I 0 Z Z z a w � 0 cS N Z Z w w fn co SEAL 19843 . , i N , S�O�'`.�� 4-15-15 . JEL C Q�� X00 (o 0) 00"1 L, o 0)0) N '1- 04 r I� Lo.� V Lo vn04v z WSW J_ 0 m H =Qo aLL. M W W Z (H� V Z W Ln W co 00 Z r - j cV Q U Boz OX Q O J LLJ m= (A �y 0 < ��Z CE -05 0 M II H Z J Q Lij J Q U) w z N C) O O w cn O = W > w O J � M O N N to r N O n � 5 � I M N Q O � o w z �NM�MCO 0 Q�� X00 (o 0) 00"1 L, o 0)0) N '1- 04 r I� Lo.� V Lo vn04v z WSW J_ 0 m H =Qo aLL. M W W Z (H� V Z W Ln W co 00 Z r - j cV Q U Boz OX Q O J LLJ m= (A �y 0 < ��Z CE -05 BEFORE YOU DIG, CALL 0 D NORTH CAROLINA ONE CALL CENTER www.ncocc.org CONS TR CT A 162' LONG x 36' WIDE x 21-5' DEEP SKIM SEDIMENT BASIN W/P, 2" SKJII!ER, 4 BAFFLES, AND A 30' WIDE x 0.5�, DEER' CLASS C 1 I \ 1 1� IN 2 DAYS. /_- - -WP-RAP WEIR PEP, DETAIL. BA/S4N P @� INIE SHALLF�F:wVr, r:B�c I / / / � TlaP=285 64 / I /(INV OUT4279-_ 1 AV A I I 0 x11 / (\\ �� EXCELLIIOR to MArnNG\ w 15 0 1\b' R p 1300x' -295-IN $.. HEADWALAII AT � 1 / _ \\ w s - i INVERT OF 18 RL \\ \ \ / 701 _ > \ s INVERT ELEV.jW2.iPAT-- � 9 \X \ \�113 300 J \14,136 .,SF, 0.1 iroP 2$7.00 / / - - - - \ \ 14,1 0 SF \ ` >S32 P'C. -------_� / SILT FENCE / OUTLET `\\ 44 / / / / / J`\ —•`_ \ \275 A4 SCOUR RIP _ \HOLE w/ans � FOREE1. `A \ iP:3� RIP RAP / + \\\�\- \vim ) � 18" 43 \ r cP 0 10.0% w/6' FE/ 0.32 EXCELSIOR C"CMATTING 42 10,8 SF \ 18 ✓ /rte /8,073 8F \ EXCELSIOR E:? (MATTING S00 - \ \12 MATTING M 9,37 SF\ \ sw \ m\� I I I I I\ i� . \ 0.22\ Ac. - /0 I , a� of o ; 211- / 1 Ac. I o� `, I I 9,69411S I �I ao 0.122 18 98� SF / PS w a Cal 0 a 105 SF\ i '<'� - L-- / -�\; 10.21 Ac/ 0181 Ac. // /. /. I ■ / \ \ `\\'oma :/ II I \\\ `� / 37 / /10,86 SF 0.25 Ac. P i n e v�i a -e` East 23 /8,890 SF/ \ \ '2 6.1 a c. /- \ \ \, 0.70 Ac/ ,t- �\ \ r)1 r, SF :,% V \ 68 8 6 5F w \ �: ` _2g5h 0.21/Ac. / \ / \ 7,020 \ Al 1g' / TOPS �8 \ `' . `' 7 \ \ s s \\ �'% 8,0 SF 873 SFS \ w `� \� ��.. / / 0AB Ac. 70 0 SF \ V 0.20 'Ac. J, `' �� 6->a c- C EXCELSIOR EXCELSIOR` `� _ y\\ `,�. MATTING /\\\ MATTING \ \ `� - - \ `.� 34 / \ 6\ w \ \ s / /2_6 \ �__ $p� SF �96 S % _ \ _ \F \ 70.20-S� `• ..`` � / / 0.18 Ac. / - 3 - \ 0.20\ % 7)\ _ 0.16 Ac _33- sw 27 O \ �..\� 7,857 SF / 8,94�SF -305-- / -.27 —305_ 1 \� 0.18 Ac. / \ A i \ / �\ \\\�\ '\ �•21�4� � _,.,, s - 0.16 Ac. r / ��--112. / 11,013 sl - 0.25 l - 0.25 Ac. t X193 \ i _27 Ac 1 I 114 1 a 35 ►4 SF I 1' C' I 119 72 SF ,� \� / .1 Ac. , 87 AF <\ / 0.17/Ac. //' / �-' \� \`JI I \ \\\ 5-9 018 SF\7 020 SF 7,93SF 0.2 \0/17 Aci6. —310 __ / \ I�'f_' 7,29 SF PS Ac. 001, 3Q 01 15,218A�cF �%`� , `_1 \ 1 \ \ 7 \ •. � � ' °°29 `\ � SILT FENCE 7,Q43 SF \\ o" OUTLET // / / /// /\ i 016 Ac Oo 0.21 ic. ss/'\ /7/$62/SF / J / / // j\/ ,� /0.18' Ac.UA / \ \\ \ \ \ _ 10,561 SF ( ® ( / / \\\\\ �\ 0�4 Ac� /�� �� ?s ` �o� / 4 , '\\ \ \ ,/// j y '/q,807/Sl` / y\yy\� �� off/ /' / % � o ' \ \\/ / /,(XO!2Zl 9� / / INLET \\\ ` PROTECTION /./l / / / / / / //7,8 26 11L�/ / `� 80 F VA V A CONSTRUr. 710114 P �, / / 81/ /vv 9 C Hc.A OUTLET/l I h / SILT FF_NG • / / h \ h/ 82 / / EXCELSIOR �\ ` V,�� �� AV' \' // 8'x.10' MATTING CLASS B \ I'OUTLET / / 7 FROTEC 8N SILT FENCI , O'UTLET SILT FENCE\ \ \\\ \ (OUTLET �. SCALE: 1 " = 60' \ 1 0 60 120 150 180 EROSION LEGEND ■-11-0 SILT FENCE ■--E SILT FENCE OUTLET co CONSTRUCTION ENTRANCE ' o rI (D rn cfl n V) HARDWARE CLOTH 1.1. � 0 INLET PROTECTION \ NDN PS PERMANENT SEEDING (n 04"04 04 LO OCENTIPEDE SOD UJ .. J z H =Qo Ii TEMPORARY PIPE INLET PROTECTION CL ILL. M OUTLET PROTECTION W I --I20' W --0-0- NCDOT WATTLE z CONCRETE TRUCK WASH-OUT H —TD—TD TEMPORARY DIVERSION TOTAL AREA DISTURBED - 9.85 Ac. z - W ISKIMMER SEDIMENT BASIN I ^ Z) LO z m �w > N EXCELSIOR MATTING ����� CARO /��,, U W o Z (ALL SLOPES STEEPER THAN 31) �0: �pFESS��N9•;�'.9% LLI F Q 0 Q X J SEAL = w5: > 19843 = o m z (� o O .4: V) Q �lj� Nc I NES �C�' 4-15-15 a z CE -06 �� LOCATION 0 SK Notification of Land Resources Sediment and Erosion Control Self Inspection Program: NOT TO SCALE (D The Sedimentation Pollution Control Act was amended in 2006 to require persons responsible for land disturbing activities FF CO inspect a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is SITEFF II being followed. Rules detailing the documentation of these inspections took effect October 1, 2010. To simplify documentation of Self -Inspection Reports and NPDES Self -Monitoring Reports, a combination form is now availible. The new form was developed to satisfy the requirements of the Sedimentation Pollution Control Act and the NPDES Stormwater Permit for Construction Activities, NCG 010000. Beginning August 1, 2013, the Division of Energy, Mineral, and Land Resources is for both the SPCA the NPDES Stormwater Permit for Construction Activities, NCG ' z Q U' C) responsible administering and oR ♦ / / - 010000. The combined form should make it easier to comply with self -inspection requirements. r �,^ oLn O af > The Combined Self -Monitoring form is availible as a PDF and Word document from the Land Quality web site, / http_//portal.ncdenr.org/web Ir erosion / If you have questions, please contact the Land Quality Section at a DENR Regional Office. 42 \ ERCY FIAWERS 42 STORE 09 4 POND N n0 _ o 0;.,.^- Q o 04�\ o ,7,510 SF `\ �NM LO (0 ~ w / 0.17 Acs/ o r / ��--112. / 11,013 sl - 0.25 l - 0.25 Ac. t X193 \ i _27 Ac 1 I 114 1 a 35 ►4 SF I 1' C' I 119 72 SF ,� \� / .1 Ac. , 87 AF <\ / 0.17/Ac. //' / �-' \� \`JI I \ \\\ 5-9 018 SF\7 020 SF 7,93SF 0.2 \0/17 Aci6. —310 __ / \ I�'f_' 7,29 SF PS Ac. 001, 3Q 01 15,218A�cF �%`� , `_1 \ 1 \ \ 7 \ •. � � ' °°29 `\ � SILT FENCE 7,Q43 SF \\ o" OUTLET // / / /// /\ i 016 Ac Oo 0.21 ic. ss/'\ /7/$62/SF / J / / // j\/ ,� /0.18' Ac.UA / \ \\ \ \ \ _ 10,561 SF ( ® ( / / \\\\\ �\ 0�4 Ac� /�� �� ?s ` �o� / 4 , '\\ \ \ ,/// j y '/q,807/Sl` / y\yy\� �� off/ /' / % � o ' \ \\/ / /,(XO!2Zl 9� / / INLET \\\ ` PROTECTION /./l / / / / / / //7,8 26 11L�/ / `� 80 F VA V A CONSTRUr. 710114 P �, / / 81/ /vv 9 C Hc.A OUTLET/l I h / SILT FF_NG • / / h \ h/ 82 / / EXCELSIOR �\ ` V,�� �� AV' \' // 8'x.10' MATTING CLASS B \ I'OUTLET / / 7 FROTEC 8N SILT FENCI , O'UTLET SILT FENCE\ \ \\\ \ (OUTLET �. SCALE: 1 " = 60' \ 1 0 60 120 150 180 EROSION LEGEND ■-11-0 SILT FENCE ■--E SILT FENCE OUTLET co CONSTRUCTION ENTRANCE ' o rI (D rn cfl n V) HARDWARE CLOTH 1.1. � 0 INLET PROTECTION \ NDN PS PERMANENT SEEDING (n 04"04 04 LO OCENTIPEDE SOD UJ .. J z H =Qo Ii TEMPORARY PIPE INLET PROTECTION CL ILL. M OUTLET PROTECTION W I --I20' W --0-0- NCDOT WATTLE z CONCRETE TRUCK WASH-OUT H —TD—TD TEMPORARY DIVERSION TOTAL AREA DISTURBED - 9.85 Ac. z - W ISKIMMER SEDIMENT BASIN I ^ Z) LO z m �w > N EXCELSIOR MATTING ����� CARO /��,, U W o Z (ALL SLOPES STEEPER THAN 31) �0: �pFESS��N9•;�'.9% LLI F Q 0 Q X J SEAL = w5: > 19843 = o m z (� o O .4: V) Q �lj� Nc I NES �C�' 4-15-15 a z CE -06 CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE ON THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE 2. WIRE MESH WITH 1/2 -INCH OPENING OVER ALL BLOCK OPENING TO HOLD GRAVEL IN PLACE. 3. USE WASHED STONE PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. 4. INSTALL 1/4 IN. WIRE MESH HARDWARE CLOTH, AND METAL POSTS THAT ARE 5 FT. TALL. PLACE THE WIRE MESH A MINIMUM OF 3 FT. HIGH, AND THE STONE A MINIMUM OF 1 FT. HIGH. 5. BEFORE COMMENCING CLEARING & GRUBBING OPERATIONS, THE CONTRACTOR SHALL FIELD LOCATE ALL EX. INLETS WITHIN THE OPERATIONS AREA AND INSTALL INLET PROTECTION. (REFERENCE: EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 6.52) 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) DEWATERING / O0 OCJ-Q Ups _ o 0 ° 400 0 o00n � ° ""�' POo o -b o �cx SEE NOTE 4 ONCRETE BLOCK -2:1 SLOPE, WASHED STONE FILTER SEDIMENT BLOCK AND GRAVEL INLET PROTECTION SCALE: N.T.S. -- LJ � IT TOP AND BOTTOM STRAND EXTENSION OF FABRIC AND FILTER FABRIC SHALL BE 10 GAUGE MIN. WIRE INTO TRENCH NOTES 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 18" ABOVE THE GROUND SURFACE. 3. INSTALL THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1" LONG, OR TIE WIRES. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8' APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY IN TO THE GROUND TO A MINIMUM OF 24". 6. EXTRA STRENGTH FILTER FABRIC WITH 6' POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. STAPLE OR WIRE THE FILTER FABRIC DIRECTLY TO THE POSTS. 7. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. BACKFILL THE TRENCH WITH COMPACTED SOIL OR GRAVEL PLACED OVER THE FILTER FABRIC. 9. DO NOT ATTACH THE FILTER FABRIC TO EXISTING TREES. 10. LOCATION OF TEMPORARY SEDIMENT FENCE SHOWN ON THE PLANS IS NOT EXACT. CONTRACTOR SHALL FIELD LOCATE TEMP. SEDIMENT FENCE AS CLOSE TO THE DOWNSLOPE EDGE OF THE LIMITS OF CLEARING & GRUBBING AS SPACE ALLOWS. TEMPORARY SEDIMENT FENCE (SILT FENCE SCALE: N.T.S. SUCTION 2" - 3" COARSE AGGREGATE GENERAL NOTES: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING W/2 INCH STONE. 6" MIN. J CONSTRUCTION ENTRANCE SCALE: N.T.S. JUM-16-2006 FRI 09:35 AM DENR RRO 6.30 FAX HO. 19195714718 ►'• Apply a good coverage of straw mukm b64ore inswung netting. anchor netting or mailing in a 6 -inch trerch at upper end of ngure &Wdchannel. C..anhr cal ti w mly and tnel owlon staple every 1 ft• just below anchor of "arary slat. than• llrwr. 6.30.3 W`W`W`WW W .WSW W. WWWWWWWW. I W W W W W W W W W INSERT DISCHARGE HOSE 5 INTO BAG �� W DEWATERING W W a. - - BAG W W W W W W W y i .Y i N W. i N W W W W W W W W W W W W W I IIIII V W W W W W W W v W Installation and Use: 1. Place Dewatering Bag on the ground or on a trailer over a relatively level, stabilized area. 2. Insert discharge pipe a minimum of 5ft. inside dewatering bag and secure with a rope wrapped 6 times around the snout over a 6 inch width of the bag. 3. Replace Dewatering Bag when half full of sediment or when the sediment has reduced the flow rate of the pump discharge to an impractical amount. Maintenance and Disposal: 1. Remove and dispose of accumulated sediment away from waterways or environmentally sensitive areas. Slit open Sediment Bag and remove accumulated sediment. Dispose of bag at an appropriate recycling or solid waste facility. OR; as directed by engineer or inspector. DEWATERING BAG SCALE: N.T.S. Rou out dlrecaa 0o not i ♦ii��iis'"`4111 - a _ 4 TE�MPORA.RY LINER ��C _ 7 SCALE: N.T.S. COMPACTED SOIL 2' MIN. EXCELSIOR MATTING z I I-1 I �-1 � I-1 I � -ISI-ISI-ISI ISI_ 6' TYP. CONSTRUCTION SPECIFICATIONS.- 1 PECIFICATIONS•1 REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MA TERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. J. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. OMI TTED. MAINTENANCE.- INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIA TEL Y STABILIZE IT TEMPORARY DIVERSION WITH EXCELSIOR MATTING NOT TO SCALE 12" OF #57 SILT FENCE WASHED STONE 1'-8" MIN. CLASS B S EROSION CONTROL 00 STONE 2.1 2' MIN. FILTER SILT FABRIC GROUND LINE UJ CROSS SECTION SEE PLAN TOP VIEW FRONT VIEW W201A 1. CLEAR & GRUB THE AREA AROUND THE SILT FENCE OUTLET AND PROPERLY DISPOSE OF DEBRIS. 2. PLACE GRAVEL TO THE SPECIFIC GRADE AS SHO WN PER THE DETAIL. 3. PROPERLY 0 VERL A P STONE BEYOND EDGES OF SIL T FENCE OPENING. MAIN TENANCE: INSPECT OUTLETS WEEKLY AND AFTER EACH RAIN EVENT IMMEDIA TEL Y REMOVE SEDIMENT FROM THE FL 0 W AREA AND REPAIR AS NEEDED. CAREFULLY CHECK OUTLETS FOR EROSION AND REPAIR IMMEDIA TEL Y. ENSURE THERE IS NO SCOURING APPARENT DOWNSTREAM OF OUTLET IMMEDIA TEL Y STABILIZE ANY AREAS THA T NEED REPAIR. SILT FENCE OUTLET SCALE: N.T.S. Erosion Control Maintenance Plan All erosion and sedimentation control measures shall be inspected weekly and after each runoff -producing rainfall event. Structures that shall be inspected include but are not limited to: Silt Fence and Fabric Inlet Protection Any fabric which collapses, tears, decomposes, or becomes ineffective shall be replaced immediately. Sediment deposits shall be removed when sediment behind the fence reaches 6". Seeding, Fertilizing, and Mulching Seeded areas shall be inspected for failure and necessary repairs and re -seeding shall be made within the same season. Block and Gravel Inlet Protection Inspect the barrier after each rain, remove sediment as necessary to provide adequate storage volume for subsequent rains. Upon stabilization of drainage area, remove all materials and any unstable soil, either salvage or dispose of properly. Bring disturbed disturbed area to proper grade, then smooth and compact it. Stabilize all bare areas around the inlet. Temporary Diversion Ditches Sediment shall be removed from the flow area immediately after each rainfall. Temporary Gravel Construction Entrance/Exit Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2 -inch stone. After a rainfall, immediately remove all objectionable materials spilled, washed, or tracked onto roadways. Sediment Basins and Pits Sediment shall be removed from the structure and the structure shall be restored to its original dimensions when 1.0' of sediment has accumulated in the structure. The sediment shall be disposed of off-site and the contaminated part of the gravel shall be replaced. The structure shall be inspected for damage and repaired accordingly. 8 C-7 FENCE EROSION CONTROL MAINTENANCE PLAN SCALE: N.T.S. CARO ESS/p' �4, Z;QQ N9�••9 ; SEAL 198434-15-15 = EL S C r ■ �° rn 00 C'0 co ■ 0 U-)� O '*Orn (�\ NDLO N V C% 04 L;j Z L; j J H= X O W W Z " Z W UJ U Z 00 Z r - i j CV i WOZ OQ XO J I w0°= o_o< V1 rCLZ CE -071 0 UJ 0 Z a I.I IL J J a Q U U Z LA > Of r ■ �° rn 00 C'0 co ■ 0 U-)� O '*Orn (�\ NDLO N V C% 04 L;j Z L; j J H= X O W W Z " Z W UJ U Z 00 Z r - i j CV i WOZ OQ XO J I w0°= o_o< V1 rCLZ CE -071 EROSION AND SEDIMENTATION CONTROL NARRATIVE PROJECT DESCRIPTION The purpose of this project is for construction of streets and utilities for Evergreen at Flowers Plantation. The project is owned by The Riverdell Company. The site is currently undeveloped. Approximately 9.58 acres will be disturbed during construction. The maximum fill will be 6-8 feet. The project is scheduled to begin construction in May 2015 with project completion and final stabilization by October 2015. The erosion and sediment control program for this project will include the installation of a suitable construction entrance, silt fence, outlet protection, inlet protection, and skimmer basins with temporary seeding of the site. ADJACENT PROPERTY The Riverdell Company owns most land adjacent to the proposed construction area. SOILS The soil at this site is a sandy clay. EROSION AND SEDIMENT CONTROL MEASURES All vegetative and structural erosion and sediment control practices shall be constructed and maintained by the contractor according to these plans and specifications and the minimum standards of the Dept. of Environmental Management, Land Quality Section and Johnston County.The contractor shall also follow any additional requirements as outlined by the Project Engineer. Structural Practices 1. Vehicle wheels shall be clean when leaving the site to prevent the tracking of mud on paved roads. 2. Construction Road Stabilization: Construction traffic shall be limited to stabilized areas. At a minimum, a temporary gravel construction entrance shall be provided as shown on this drawing. 3. Silt Fence: Silt fences shall be provided where shown and as needed on the site plan. These barriers shall be used to contain sediment. 4. Rip Rap/Gravel Filter Sediment Basins: Construct basin to the shape and dimensions shown in the details. The basin is to be placed below the existing ditch flow line by 2' with the berm built above as dimensioned. Management Strategies 1. Perimeter measures are to be installed prior to grubbing or grading. 2. Tail Ditches shall be stabilized immediately following their construction. As an alternate, rock check dams may be provided at their outlets and/or the terminal downstream end of disturbance until ground cover is implemented. 3. Stockpile and/or waste areas must be maintained within the limits of the areas protected b the proposed measures and otherwise temporarily seeded if to be left stockpiled over 15 calender dyays. 4. Construction shall be planned so that grading operations can begin and end as quickly as possible. 5. Silt Fences shall also be installed prior to or as a first step in construction. 6. The Contractor shall be responsible for the installation and maintenance of all erosion and sediment control practices. Vegetative Ground Cover Immediately following grading, all areas shall receive either permanent or temporary seeding, as applicable, as follows: Site Area Description: Stabilization Time Frame: Stabilization Time Frame Exceptions: Perimeter dikes, swales, 7 Days None ditches & slopes. High Quality Water (HQW) 7 Days None Zones. LdI- Slope steeper than 3:1 7 Days If slopes are 10' or less in length & are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter. 14 Days 7 Days for slopes greater than 50 feet in length. All other areas with slopes 14 Days None (Except for perimeters and How flatter than 4:1 Zones) PERMANENT SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES TALL FESCUE PREMIUM BERMUDA RATE (LB/ACRE) 200 60 NURSE PLANTS BETWEEN APR. 15 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 ADD 25 LB/ACRE RYE (GRAIN). SEEDING DATES BEST POSSIBLE EARLY SPRING: FEB. 15 -MAR. 20 FEB. 15 -APR. 30 FALL: SEPT. 1 -SEPT. 30 SEPT. 1 -OCT. 31 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST. IF SOIL TEST IS NOT AVAILIBLE APPLY 2 TONS/ACRE AGRICULTURAL GRADE LIMESTONE AND 1,000 LBS/ACRE OF 10-10-10 FERTILIZER, OR APPLY 3,000-5,000 LB/ACRE SEDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 25 LB/ACRE RYE (GRAIN). MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE THE SECOND YEAR. ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. Maintenance 1. Reseed and mulch bare spots lar er than 9 square feet limited to 5% maximum of site area. P q ) 2. Maintain all seeded areas until uniform stand is acceptable. 3. If growth is not established by final project inspection, continue specified attention until the stand is acceptable. 4. Correct and repair all undue settling and erosion within 1 year after final inspection. 5. Remove from the site, all erosion control structures after complete stabilization at end of construction period. 6. Remove silt from sediment pits and from behind check dams when silt is within half depth of the pit or spillway. Dispose of in an area where silt cannot re-enter pit / trap. Calculations The practice utilized for the proposed site did require formal calculations. Calculations have been provided. OWNER RIVERDELL COMPANY 4880 NC 42 EAST Clayton, NC 27520 919.553.3086 (v) CONSTRUCTION SEQUENCE: 1. Obtain erosion control plan approval prior to beginning land disturbance. Retain a copy of the approved erosion control plan and permit on site. Call Johnston County at 919.209.8333 to notify the Inspector of a start date prior to land disturbance. 2. Clear the area needed to construct the proposed construction entrance. 3. Construct the construction entrance as shown on the plans. Maintain the construction entrance daily to ensure that mud and silt will not be tracked onto the paved surface. If mud is tracked onto the road surface, it is to be removed immediately. 4. Construction entrance location may not vary without prior approval from Engineer and NCDENR. 5. Clear the area needed to access and construct sediment basins. 6. Construct sediment basins. Stabilize immediately. 7. Clear the area needed to construct the perimeter erosion control measures including temporary diversion ditches, silt fence. 8. Construct the temporary diversion and silt fence. Tie temporary diversions into sediment basins where applicable diversions & basins shall be seeded, mulched, & anchored upon installation. 9. Begin clearing, grubbing, and topsoil stripping. 10. Rough grade all roadways and lots. Adjust basins and temporary diversions as grades rise. 11. onstruct sanitary sewer system throughout project. 12. Construct the storm sewer system throughout the project. Install inlet protection devices. 13. Construct curb and gutter and CABC on roadway. 14. Seed, straw and tack areas behind the curb and gutter that are graded to their final disposition. 15. Complete the construction of storm sewer pipe. 16. Construct permanent outlet protection devices at pipe outlet. 17. Upon completion of the project, contact Johnston County to inspect prior to removing EC measures. 18. Seed, straw and tack any remaining exposed areas. INFLI STRI PVC END CAP PVC END CAP-/ PVC TEE SN//! NAFAR SED1NENT BAS/N NOT TO SCALE ARM ASSEMBLY "C" ENCLOSURE WATER ENTRY UNIT 1AMS)DWAYT MEW NOT TO SCALE PVC ELBOW PVC PIPE 1/2" HOLES IN UNDERSIDE END VIEW NOT TO SCALE PVC VENT PIPE SCHEDULE 40 PVC PIPE SCHEDULE 40 PVC PIPE �-ORIFICE PLATE FLEXIBLE HOSE \ y� PVC TEE 0 FRONT VIEW NOT TO SCALE NOT TO SCALE EMERGENCY SPILLWAY `INFLOW BAFFLES 1' FREEBOARD STRUCTURE EMBANKMENT DEWATERING 6" MIN. INVERT ELEVATION OF EMERGENCY ZONE EMERGENCY SPILLWAY SPILLWAY ALTER FABRIC SEDIMENT STORAGE ZONE CROSS-SECTION VIEW NOT TO SCALE PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL �La� I FILTER BLANKET Il OR (MIRAFI 140N) SECTION A -A PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL CONSTRUCTION SPECIFICA TIONS: 1. Clearrub and strip the area under the embankment of oll vegetation and root mat. Remove oll surface soil containing high amounts of organic matter and 9� P 9 9 9 9 stockpile or dispose of it properly. Haul oll objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed. 2. Ensure that till material for the embankment is free of roots woody vegetation, etation, or onic matter, and other objectionable material. Place the All in lifts not to exceed 9 9 inches, and machine compact it. Over All the embankment 6 inches to allow for settlement. J. Shope the basin to the specified dimensions. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing o low support under the skimmer of stone or timber. 4. Place the barrel (t)pica0y 4 -inch Schedule 40 PVC pipe) on o Arm, smooth foundation of impervious soil. Do not use pervious material such os sand, gravel, or crushed stone as backfill around the pipe. Place the fill material around the pipe spillway in 4 -inch layers and compact it under and around the pipe to at least the same density os the adjacent embankment. Care must be taken not to raise the pipe from the Arm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet Of compacted backfill over the pipe spillway before crossing it with construction equipment. In no case should the pipe conduit be installed by cutting o trench through the dam after the embankment is complete. 5. Assemble the skimmer following the manufacturers instructions, or as designed. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach O rope to the skimmer and anchor it to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 7. Earthen spillways - Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes ore critical to the successful operation of the spillway. The spillway should be lined with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8 -inch staples or pins. The fabric must be long enough to extend down the slope and exit onto stable ground. The width of the fabric must be one piece, not joined or spliced- otherwise water can get under the fabric. if the length of the fabric is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, moy be used. The upper sections) should overlop the lower section(s) so the water cannot flow under the fabric. Secure the upper edge and sides of the fabric in o trench with staples or pins. 8. Inlets - Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trop efficiency. 9. Erosion control - Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency soiNway embankment and oll other disturbed areas above the crest of the principal spillway immediately after construction. 10. Install porous baffles os specified. 11. After oll the sediment -producing areas have been permanently stabilized, remove the structure and oll the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. MAINTENANCE: Inspect skimmer sediment basins at least weekly and after each significant (one-half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to One-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re -anchor the baffles if water is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin usual/ jerking on the roe will make the skimmer bob u and down and dislodge the debris 99 � y l 9 P P 9 and restore flow, if this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged,- if so remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice con be removed and the obstruction cleared with o plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the soNwoy. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement Yoke all necessary repairs immediately. Remove oll trosh and other debris from the skimmer and pool areas. Freezing weather can result in ice forming in the basin. Some special precautions should be taken in the winter to prevent the skimmer from plugging with ice. Maintenance Notes: A I�La a FILTER BLANKET OR (MIRAFI 140N) SECTION A -A PIPE OUTLET TO WELL-DEFINED CHANNEL GENERAL NOTES: 1. La = THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". J. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. FLARED END SECTION IS OPTIONAL. SEE PLANS FOR REQUIREMENT. 6. SEE PLAN AND PROFILES FOR ACTUAL DIMENSIONS. PIPE OUTLET PROTECTION SCALE: N.T.S. WOOD OR METAL POST STAKE 10 MIL LINING SILT FENCE I I= TEMPORARY PIPE I,!I INLET PROTECTION SCALE. N.T.S. 1 1 STAPLE (2 PER BALE) SILT FENCE 10 MIL PLASTIC LINING STRAW BALE METAL STAKE (2 PER BALE) PLYWOOD PAINTED WHITE BLACK LETTERS 6" TALL CONCRETE WASHOUT WOOD POST T GROUND LEVEL CONSTRUCTION SPECIFICATIONS: 1. CONCRETE WASHOUT SIGN SHALL BE INSTALLED NO FURTHER THAN 25' FROM THE FACILITY AND SHALL BE VISIBLE TO ALL CONSTRUCTION TRAFFIC. 2. POLYETHYLENE SHEETING SHALL BE 10 MILS FREE OF HOLES, TEARS, OR LEAKS. MAINTENANCE.• FACILITY SHALL NOT BE FILLED MORE THAN 12" FROM THE TOP BEFORE DISPOSING OF CONCRETE. CONCRETE SHALL BE DISPOSED OF IN THE SAME MANNER AS OTHER NON-HAZORDOUS MATERIALS FROM THE SITE OR MAY BE BROKEN UP AND USED AS FILL IN NON-STRUCTURAL AREAS. 1. Do not let any area remained exposed for more than 7 or 14 calendar days according to chart without applying temporary seeding. 2. Maintain all erosion control measures daily and reseed disturbed areas as needed. 3. Inspect all erosion control measures weekly and after each rainfall event. Repair as needed. 4. At the end of each day's storm drainage operation, construct a temporary pipe inlet protection device until the next day's operation continues. CONCAAETETA#4WA WASHOUT NOT TO SCALE SUPPORT ROPE TO SUPPORT POST, STAKE TO SEE EROSION CONTROL PLAN FOR ACTUAL PIT DIMENSIONS SET CLEAN-OUT STAKE AT 1/2 PI T VOLUME B DESIGN SETTLED TOP � �N \ \ \^ r \ STAPLEDW TRENCHED INTO BOTTOM OR SIDE SED BASIN BAFFLES SCALE: N.T.S. I-51 ---1 CLEAN-OUT MIN. STAKE 1 5' `L s`0�F U VII I'I =11V ;III FILTER FABRIC -J =III_=1i'=IIV„ Illi; I'' CROSS SECTION EMERGENCY BY-PASS 6" BELOW OVERFILL 6" SETTLED FOR SETTLEMENT --� TOP OF DAM SEE EROSION CONTROL PLAN FOR ACTUAL PIT DIMENSIONS 4' MIN. \ \ Y 2. 1 SIDE SLOPE MAX V/; -i 1 / i FILTER FABRIC : 1 SIDE �. III= SLOPE MAX... 1= 11- u1E I I- I =i I i=I I I- 3' MIN. ii=iiI. iVi=iii=iV1=411=1i1=YYFEIII I i iI I I°I II I I-1 I I- ' I=_1 I I -I I I i I 11- -1 I I_, I I IE' 1 1_I 111,;11 11-' '-III,;.I 1 :,III STONE SECTION NA TURAL GROUND GENERAL NOTES: 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and the soil. Place the filter fabric between the riprap and soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or Excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft. deep and 2 ft. wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft. and a maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. 8. Material used in the stone section should be a well -graded mixture of stone with a d size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection). 10. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 11. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References: Surface Stabilization). 12. Show the distance from the top of the spillway to the sediment cleanout level (one-half the design depth) on the plans and mark it in the field. SEDIMENT BASIN SCALE: N.T.S. CAR0 :Q l SEAL 19843 C'NV C�'�G.��` 4-15-15 EL S C° 00 0)I) MT A 00 1 100 �O '-d- 0) 0)LID 1_1 0) NqO-� 04 ( n .-. v %1 ZL;iZLo J H =XO CLAM W W Z (H V Z W VI O 00 Z r - i Q N U00 Z 0LLJLJ X QO Ld M 2 00Q �aZ V) 0 LdI- 0 Z In Q LJ LJ J J Q Q U C) 0 U) (f) Z 0 N O= > W o - C° 00 0)I) MT A 00 1 100 �O '-d- 0) 0)LID 1_1 0) NqO-� 04 ( n .-. v %1 ZL;iZLo J H =XO CLAM W W Z (H V Z W VI O 00 Z r - i Q N U00 Z 0LLJLJ X QO Ld M 2 00Q �aZ V) TOP DAM 288.50 e SLOPES TO RECEIVE �CEN77PEDE SOD W CEN77PEDE SOD GROWN ON SANDY SOILS WI7H AN INFILTRA 77ON RATE OF 2� INCH/ ` HR OR GREATER Irk V 12 MAX. �ONDING `/ \�� TOP OF BIORE7EN77ON 286.00 � - 4" C. 0. 4" C.O. ++ DEPTH I6f �If'� 24" FILL SOIL MEDIA v 85-88Yo WASHED SAND 8-12Z FINES (SILT & CLAY) 3-5% ORGANIC MATTER PHOSPHOROUS INDEX < 30 PERFORATED PVC SOCK DRAIN SLOPES TO RECEIVE CEN77PEDE SOD, CLASS B RIP RAP LINED FOREBAY 12" IN DEPTH 2" CHOKING STONE #8 OR #89 6" #57 STONE 4" WASHED SAND PROPOSED GRADE M 0 N N to N O � I 3 M < o O w Z � w < J o � 4"X4" SCOUR BIORETENTION AREA PROFILE O O. 7,437 \Sq Ft HOLE W/CLASS B NOT TO SCALE C O• 7,314 Sq Ft / RIP RAP 293 2 C. 0. / 44 LF 18" 16 86 X02 RCP © 10.0% \ 2g O TOW 278.00 < W 6' FES Conversion Procedure Sediment Basin to Bioretention Area 1 O / 1. After the site is completely stabilized, contact Stocks Engineering ®252-459-8196 for verification 289.00 TOW KEYSTONE OR EQUAL WALL. Q of completion and stabilization. \ O 2. Contact Thad Valentine of NCDENR-Land Quality Section ® 919-791-4200 for approval to remove 'Q TOW 278.00 CONTRACTOR TO PROVIDE all temporary erosion control measures. d' 289.00 3. Upon approval from NCDENR-Land Quality Section, begin the conversion of the bioretention area \ CAS CA STRUCTURAL DESIGN PRIOR from a temporary sediment trap to a permanent BMP as follows. 5 \ O\ TO INSTALLATION AND 4. Construct silt fence around the toe of the interior side slope of the bioretention area (BA) to Q �7 11 ' protect the BA from sediment contamination during the Conversion Procedure. Leave an opening at O 0 X'/CERTIFICATION ONCE COMPLETE Q the downstream end of the BA just wide enough for construction machinery to enter/exit. \ \ 5. Bring the side slopes surrounding the BA to proposed grade. ' TOP OF WALL 6. Seed/sod the side slopes as per specifications. (Contractor is responsible to maintain and \ 6l0 ��� CP VARIES: 278.0'-289.0' O protect seed/sod to promote successful establishment during Conversion Procedure. If damage or P"Q , death to seed/sod occurs, Contractor must replace affected area immediately.) /!v C) BOTTOM OF WALL. 276.33 7. Once seed/sod has been installed, Contractor shall excavate the bottom of the BA to a depth / equal to the greater of the following: O a. 1 foot below any evidence of sedimentation upon in situ soils; or, \ \� /P� O / 42 b. 4 feet below the proposed bottom of BA elevation. \ P P 2 5— 29 4 � O 8. Excavated material must be disposed of in an approved off-site location. � � 9. Care must be taken to prevent any sedimentation/re-sedimentation during this process, as \C contamination of the in situ soils or the designed soil media will compromise the functionality of the \ / BA. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering ® 252-459-8196 to inspect excavated BA before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing BA per details. Establish appropriate \ gT S1 CIO permanent vegetation in BA as soon as possible. \ N \ 12. Upon completion of BA construction, remove sediment from silt fence and dispose of at an approved off-site location. \ O 13. Contact Stocks Engineering ® 252-459-8196 to inspect completed BA before removing silt fence and placing the BA in service. 41 /i 24" FILL SOIL MEDIA I/� O 7 3 �,S F 85-88% WASHED SAND 8-12% FINES (SILT &CLAY) \ \ \ \ , \- / 0 1 Q 3-5% ORGANIC MATTER PHOSPHOROUS INDEX < 30 \� CENTIPEDE ELEV 286.00 \ 1 19 24 Aj- III= \ 4" WASHED SAND---- � l ELEy 282.00 2" CHOKING STONE #8 OR #89—I I V—III— —I I—III—VII—I I V—I V I—I 1= y II I -I I I -I I I -I I I -I I I -I I I-' ° III, , I I I- I 1=1 I I=I i COMPACTED 6" #57 STONE SUBGRADE 6" PERFORATED PVC BIORETENTION AREA PROFILE SOCK DRAIN O NOT TO SCALE Centipede Sod Notes: 1. Centipede Sod shall have been grown in sandy soils with an infiltration rate of 2 -inches per hour or greater. 2. Do not deliver more sod than can be installed in less than 24 hours. 3. Use a knife or sharp edged shovel to cut the sod to desired lengths. Do not tear sod. 4. Water sod immediatley upon installation to a depth of 1 inch. Water daily for a period of 2 weeks and then periodically until roots have been established. SCALE: 1 " = 30' 0 30 60 75 90 CA'1�� c�.o'EsS/ •Q, SEAL l 19843 Ile INV ­ S '. EL C coC O � r co 100 rJ ��I O '* (3)0) L0 1_1 N 04 r n LCJ .-. v `N-' U') 04 ZZ J = X O CLAM W W Z C7 Z W )W L0 Z i Q N U W0Z CE - 09 0 M II w w J J < U 0 U Z Ln > o' M 0 N N to N O � I 3 M < o O w Z � w < J o � 4"X4" SCOUR BIORETENTION AREA PROFILE O O. 7,437 \Sq Ft HOLE W/CLASS B NOT TO SCALE C O• 7,314 Sq Ft / RIP RAP 293 2 C. 0. / 44 LF 18" 16 86 X02 RCP © 10.0% \ 2g O TOW 278.00 < W 6' FES Conversion Procedure Sediment Basin to Bioretention Area 1 O / 1. After the site is completely stabilized, contact Stocks Engineering ®252-459-8196 for verification 289.00 TOW KEYSTONE OR EQUAL WALL. Q of completion and stabilization. \ O 2. Contact Thad Valentine of NCDENR-Land Quality Section ® 919-791-4200 for approval to remove 'Q TOW 278.00 CONTRACTOR TO PROVIDE all temporary erosion control measures. d' 289.00 3. Upon approval from NCDENR-Land Quality Section, begin the conversion of the bioretention area \ CAS CA STRUCTURAL DESIGN PRIOR from a temporary sediment trap to a permanent BMP as follows. 5 \ O\ TO INSTALLATION AND 4. Construct silt fence around the toe of the interior side slope of the bioretention area (BA) to Q �7 11 ' protect the BA from sediment contamination during the Conversion Procedure. Leave an opening at O 0 X'/CERTIFICATION ONCE COMPLETE Q the downstream end of the BA just wide enough for construction machinery to enter/exit. \ \ 5. Bring the side slopes surrounding the BA to proposed grade. ' TOP OF WALL 6. Seed/sod the side slopes as per specifications. (Contractor is responsible to maintain and \ 6l0 ��� CP VARIES: 278.0'-289.0' O protect seed/sod to promote successful establishment during Conversion Procedure. If damage or P"Q , death to seed/sod occurs, Contractor must replace affected area immediately.) /!v C) BOTTOM OF WALL. 276.33 7. Once seed/sod has been installed, Contractor shall excavate the bottom of the BA to a depth / equal to the greater of the following: O a. 1 foot below any evidence of sedimentation upon in situ soils; or, \ \� /P� O / 42 b. 4 feet below the proposed bottom of BA elevation. \ P P 2 5— 29 4 � O 8. Excavated material must be disposed of in an approved off-site location. � � 9. Care must be taken to prevent any sedimentation/re-sedimentation during this process, as \C contamination of the in situ soils or the designed soil media will compromise the functionality of the \ / BA. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering ® 252-459-8196 to inspect excavated BA before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing BA per details. Establish appropriate \ gT S1 CIO permanent vegetation in BA as soon as possible. \ N \ 12. Upon completion of BA construction, remove sediment from silt fence and dispose of at an approved off-site location. \ O 13. Contact Stocks Engineering ® 252-459-8196 to inspect completed BA before removing silt fence and placing the BA in service. 41 /i 24" FILL SOIL MEDIA I/� O 7 3 �,S F 85-88% WASHED SAND 8-12% FINES (SILT &CLAY) \ \ \ \ , \- / 0 1 Q 3-5% ORGANIC MATTER PHOSPHOROUS INDEX < 30 \� CENTIPEDE ELEV 286.00 \ 1 19 24 Aj- III= \ 4" WASHED SAND---- � l ELEy 282.00 2" CHOKING STONE #8 OR #89—I I V—III— —I I—III—VII—I I V—I V I—I 1= y II I -I I I -I I I -I I I -I I I -I I I-' ° III, , I I I- I 1=1 I I=I i COMPACTED 6" #57 STONE SUBGRADE 6" PERFORATED PVC BIORETENTION AREA PROFILE SOCK DRAIN O NOT TO SCALE Centipede Sod Notes: 1. Centipede Sod shall have been grown in sandy soils with an infiltration rate of 2 -inches per hour or greater. 2. Do not deliver more sod than can be installed in less than 24 hours. 3. Use a knife or sharp edged shovel to cut the sod to desired lengths. Do not tear sod. 4. Water sod immediatley upon installation to a depth of 1 inch. Water daily for a period of 2 weeks and then periodically until roots have been established. SCALE: 1 " = 30' 0 30 60 75 90 CA'1�� c�.o'EsS/ •Q, SEAL l 19843 Ile INV ­ S '. EL C coC O � r co 100 rJ ��I O '* (3)0) L0 1_1 N 04 r n LCJ .-. v `N-' U') 04 ZZ J = X O CLAM W W Z C7 Z W )W L0 Z i Q N U W0Z CE - 09 BEFORE YOU DIG, CALL 0 Q I NORTH CAROLINA ONE CALL CENTER www.ncocc.org /0, WIDE CLASS BSPILLWAY 0 288.25 RIP RAP EMERGENCY / OVER MIRAFI 140N ►NI , / � D. 1. #,D \ \ I I r IE- TOP 287.00 alC . \ — — / / SSW// / � ft -ft` INV. OUT 281.00 I \ / / TlaP=285�64-BEEBE 9 \ \ \ , \ / I I ) I I I I \ o � egg• \\ I 2 6 CO.Ft c 7,437 \Sq w ..,RCA 15 ago II c \ 17 \ o215 \ \\» I cv )300x' \ \ l �14 \ p —295— 29 24,343 SF\ I \ \29? \ 0.5 \AC. n tie \ \18 h 8" HEADWALAI AT INVERT OF 18T'Oic 1(, \\ \ \ i INVERT ELEV.jW2k'\T-.g \ \ \ \ \ 19 J i 3 29 \ \ \ 45,1\70 5 05\ Ac 10 3\ \ r, 20 LO \ N } 21 I / 2\1 Act a I - 10 \ 22 18,98 SF/ I Pin e via -e -`E a s t 23 \ \ 9 s \\ --2 6.1 a c. Al \ IN / TOPS 58 \ \ \ O \\ \ \ -305- — — - \ \ ° /' - \\ \ • \, \ 310 \\< \\ \ \\ \�° 2 \ \\ \ \ \ \ \ \ \ \\\ O N / \ A � RrVER DELL J // / (� 1`_� J^_�—'� �` \✓/ // /���' ELEMENTARY OSCHOOL S0.1 KETCH N NNOT TO SCALE --45— �' 14,140Sr u Ole i - INV. FES— w #11 276.00 / •� / / / / / Jc `,� / ✓ / I � — ,� � 275— -- CUR POND Ld � /4'X4' SCOUR � � i / / / / // � / / �/ / / / ' �� w = > /HOLE W/CLASS B / , `Z RIP RAP �/ 44 LF 18" /�� `� / / ' / / / ♦ 42 078 00 RCP ® 10.0% jam\ \ ///� / / / /� W/6' FES / / / / / ��3 / /, / / ♦ ERCY FlAWERS V 2Lo 078.00 KEYSTONE OR EQUAL WALL. - 1��\ / /'/ / /, / / 42 STORE CONTRACTOR TO PROVIDE / / ✓ / i.00 I STRUCTURAL DESIGN PRIOR ' �' / / POND L O � TO INSTALLATION AND / �/ / / / / �� o CERTIFICATION ONCE COMPLETE / / / / / / /�� �� //,510 SF— CERTIFICATION J TOP OF WALL / / / ,� / / �\ �\ Of 0.7/Ac. 0 - BOTTOM o VARIES: 278.0'- 289.0' BOTTOM OF WALL: 276.33' / // / / / // �/ �� / / 04 42,/ // / // / �!, / 93_ \ / z HcF// \� Ld X510 SF \i�x\� �NM��(O 1-- J / / �. / / / / / / / `/�/ j/ / / /i�•`� \ 0.17 Ac/ / \> o L� --112 ' 11,013 SSF– 0.25 Ac. / t /113 i ,.27 Ac \ I -c \\ 114 \ I \ I \ / 72 SF \� / .1 Ac. �/ 87F <\ / 0.17/Ac. //' / V 28 3 \ `\ `\ 7,5,93 SF \ I I \\\\(0/1 7 Ac/ ` KD 0 0 'If(_j' i �o \\ \\\ 7,29 AS F �\ \\\ / / /% / ♦ / / / / / 0. 36 29 ///\/ � // /$62/ 1` 10.1K Ac. `mss JL ♦ / ��� \ �/ / // // �v \ / / x,561 SF / 0�4 Ad o _ `807/SF / SF / 0. 26– / / JF 80 ` Ac.\MEN BE �J soh/ 82 000 / 81 /ti /� 1000, _I v` I \ SCALE: 1 " = 60' \\�V ` f 0 60 120 150 180 o) Crn 00 00 � '0 0. I 0)� O � I � rn LO 04 'd- (nLO.4 v �0v Z w�J H =X0 CLAM W W Z H V Z W LLI (0 0 00 VI Z r - j N ``01i111fill/," Q U CAR p� %,,�., U W O z LLI 0V)x Q SEAL - N 0 J Q 0 J 19843 wo m z cl 00< NciNEE. C�' 4-15-15 � a z EL S� CE -10 PAVEMENT OR go' BEND FINISHED GRADE 22 1/2' BEND 11 1/4• BEND GATE VALVE TO BE SAME SEE VALVE BOX DIAMETER AS MAIN LINE INSTALLATION "MIN. 11 VALVE SIZ TAMPED BACKFILL BOX TAMPED THREADED COUPLING BACKFILL B 2" THREADED BRASS PIPE i•�: �•',';' D.I. PIPE ,,.4. •j'�`' CONCRETE BLOCKING B MIN. 1/3 C.Y. AT 3000 P.S.. B C D 5/8" TYPE 304 STAINLES 8" CONCRETE THRUST THREADED RODS (MIN. 4 EA) a' COLLAR 2" THREADED W LENGTH) 5' MIN. MJ CAP W/ 2" TAP PIPE (12 -PAY REM 6" INCLUDES ALL ITEMS EXCEPT g' 10' MAIN LINE VALVE 8' TEMPORARY BLOW -OFF ASSEMBLY NOT TO SCALE 10' Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL Temporary Blow Off Assembly PAGE of 47 Drawn By: Checked By: Approved By: scale: 15" Rev. I Description 1 Date Inil. NOTES: 1. CONCRETE SHALL BE 3,000 PSI MIN 2. CONCRETE FOR THRUST BLOCKING SHALL BE KEPT FAIRLY DRY, THUS MAKING THE CONCRETE WEDGE SHAP MORE EASILY FORMED WITH THE WIDEST PART (BLOCKING AREA) AGAINST UNDISTURBED SOIL. 3. NO CONCRETE SHALL COVER ANY BOLTS OR GLANDS. 4. ALL FITTING AND ACCESSORIES TO B WRAPPED WITH 10 MIL POLYETHYLEN PRIOR TO POURING BLOCKING. 5. VOLUME OF THRUST BLOCKING SHAL BE AS SHOWN ON THE THRUST BLOCKING SCHEDULE. SOIL (TYP.) PLAN BENDS 18" MIN. – 10" 0 24" MIN. – 12" 0 703 •,r• \r DO SECTION X -X BENDS & TEES PLAN TEES PLAN & ELEV. PLUGS PIEPE go' BEND 45• BEND 22 1/2' BEND 11 1/4• BEND TEE PIM SIZ A B A B A B A B A B C D 4" 8" 12" a' 8" 6" 8' 8' 6" a' g' 10' 16" 8' 10' 12" B" 10' 8" B' B" 8" 10" 10" 12' 18" a' 15" 13" 10" 1o" 8" 8' a' 8" 1o" 12" 12" 24" 10" 16' 14" 10" 12' 6" 10" 8' 10' 11" 14" 14' 23' 12' 20' 16" 12" 14' 8" 12' a" 12' 14" 16" 18' 30' 14" 2Y 1B" 14" 16" 10" 14' 10" 14" 16" 18' 18' 34" 16" 26" 20' 16' 18' 12' 16" 12" 16' 18' 20" 36" 26' 24" 18' 18' 1 13" 1 12' 1 B' 1g" 24" 48" 33" 30" 21" 1B" 1 18" 1 15' 1 11" 21' 1 21" 1 28' 1 56" N M THRUST BLOCK DETAIL NOT TO SCALE Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL Thrust Block PAGE 8 Of 47 Drawn By: Checked By: Approved By: Scale: THREADED COUPLING Rev I Description I Date Init, PAVEMENT OR FINISHED GRADE TAMPED BACKFILL 5/8" TYPE 304 STAINLESS STEEL THREADED RODS (MIN. 4 EA.) • ''' I D.I. P SEE VALVE BOX 5" INSTALLATION 2 NOTES: M 1 1. VALVE MARKERS SHALL l!\N 0 BOX BE PLACED AT R/W. M TAMPED THREADED COUPLING 2. LETTERS "MV" SHALL V BREAK RING TO BE SET WITHIN 2"-4" 6",B",12" FACE TOWARDS VALVE. CAST IN CONC. & •1'ti.:y: 3. MARKER SHALL HAVE BRASS OR BRONZE FINISHED GRAD 0 PAINTED BLACK 2- T EMBED ON TOP OR SIDE. I - 20" V-4" 1-0" 4. CONTRACTOR SHALL I 1 4 EA. – #3 REBAR 24" STAMP DISTANCE TO m (1 EA. CORNER) TWO CENTER OF VALVE INTO V-4" V-2" 4" EMBED. 36" V-4' 1'-4" 5. BLOW–OFF ASSEMBLY SQUARE MARKER OF 6 SQ. FT. (4 C.F. MIN.) SHALL INCLUDE 1 EA. WITH BEVELED CORNERS TYPE 304 S.S. THREADED RODS MARKER W/ "BO" OR LEG TO DIP MIN. 2 EA. PER SEGMENT REQ'D.). "MV" CAST. 3. DRAIN HOLES AND PAY ITEM Aqua–Grip" RINGS OR ROMAC VALVE MARKER DETAIL CLEAR OF CONC. ALL ITEMS EXCEPT MAIN LINE TEE JOINTS IN LIEU OF THREADED RODS NOT TO SCALE SELECTED BACKFILL _ _ NOTE ALL PAVEMENT SHALL BARRELSHALL BE Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 24" 69,252 WATER STANDARD DETAIL Valve Marker PAGE 15 of 47 Drawn By: Checked By: Approved By: Scale: Drawn By: Rev. I Description jDate Init. PAVEMENT OR FINISHED GRADE TAMPED BACKFILL 5/8" TYPE 304 STAINLESS STEEL THREADED RODS (MIN. 4 EA.) • ''' I D.I. P SEE VALVE BOX 4" MIN. INSTALLATION 2 VALVE CONCRETE THRUST COLLAR BOX of 47 TAMPED THREADED COUPLING BACKFILL BREAK RING TO BE SET WITHIN 2"-4" 6",B",12" 2" BRASS NIPPLE 2' •1'ti.:y: 16" %'.�•`•;; CONCRETE BLOCKING CONCRETE THRUST L— 2" BRASS NIPPLE MIN. 1/3 C.Y. AT 3000 COLLAR (MIN. 6" IN LENGTH) M.J. CAP W/ 5' MIN. L 2" THREADED TAP 2" BRASS PIPE (MIN. 12" IN LENGTH) PAY ITEM INCLUDES ALL ITEMS PERMANENT BLOW -OFF ASSEMBLY JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 NOT TO SCALE WATER PAGE O 2 Permanent Blow Off CONCRETE THRUST COLLAR Assembly NOT TO SCALE WATER PAGE STANDARD DETAIL 2 Permanent Blow Off CONCRETE THRUST COLLAR Assembly of 47 r — 4'-0"1: B CONCRETE THRUST T I COLLAR (3,000 P.S.I.) A 1' ANCHOR C • ° D.I.P. . MAIN • y Q• SECTION REINFORCING NOTE: 6' TO 16" MAINS = 12–N0. UNDISTURBED 7 BARS SOIL — — – 20" TO 36" MAINS = 12–N0. CONCRETE THRUST 8 BARS _COLLAR (3,000 P.S.I.) BARS PLACED AS SHOWN -III—III—III—. , —I 11=1 11=1 11=1 11= ................... • , ANCHOR .I a MA.N TRENCH WALL RING TRENCH a° :': TAMPED BACKFILL WALL = I I I_ICI_ I I=1 I I PLAN UNDISTURBED SOIL THRUST COLLARINSTALLATION SCALENOT TO Name. Date Drawn By: PAGE Checked By: JOHNSTON COUNTY WATER Approved By: Department of Public Utilities STANDARD DETAIL 9 scale: P.O. Box 2263 Thrust Collar Smithfield, NC 27577 Installation of47 Rev.Descri lion jDate linit. NOTE: PIPE SHALL BE BEDDED UP TO SPRING LINE AND MINIMUM 4" BELOW BOTTOM OF PIPE WHEN WET AREAS ARE ENCOUNTERED. HAND PLACED DENSELY COMPACTED BACKFILL TO 1 – ___ ABOVE TOP OF PIFT. PE _ _ _– � I _ __ UNDISTURBED EARTH '%;-_7_7_7_ – ELECTRONIC MARKER BALLS AT 100' ON =-PIPE _– CENTER & AT BENDS. MARKER BALLS SHALL BEDDED PIPE _– _O.D._.:__, BE INSTALLED AT 1 1/2 TO 2' DEEP. –_ – – –_ NOTE: MARKER BALLS SHALL BE SHAPED SUBGRADE – – INSTALLED CONCURRENTLY WITH PIPE. – – MARKER BALLS SHALL NOT BE SHALL PROVIDE BEARING – – — INSTALLED AFTER TRENCH HAS BEEN ALONG ENTIRE LENGTH OF PIPE BARREL COMPLETELY BACKFILLED. /2 PIPE O.D. 24" + O.D. MAX. 12" + O.D. MIN. NOTE: WATER MAINS 8"0 AND SMALLER SHALL HAVE MINIMUM OF 3' COVER. WATER MAINS LARGER THAN 8"0 SHALL HAVE A MINIMUM OF 3'-6" COVER. PIPE LAYING CONDITION NOT TO ALE Name ate Drawn By: Checked By: JOHNSTON COUNTY WATER PAGE Approved By: Departmentof Public Utilities STANDARD DETAIL 16 Scale: P.O. Box 2263 Pipe Laying Smithfield, NC 27577 Condition of 47 Rev. I Description I Date Init. COAT HYDRANT BONNET AND NOZZLE CAPS SCHEDULE "ALERT" REFLECTIVE FIRE HYDRANT PAINT EXIST. WATER MAIN PIPE DIAMETER CONCRETE THRUST COLLAR ANCHOR COLLAR RINGS REQUIRED 1 IN UNPAVED AREA A B C BREAK RING TO BE SET WITHIN 2"-4" 6",B",12" 1'-0' V-0' 2' ONE 16" V-4' V -O' 2- ONE 20" V-4" 1-0" 3" ONE 24" V-4" 1'-O" 3' TWO 30" V-4" V-2" 4" TWO 36" V-4' 1'-4" 4" TWO THRUST COLLARINSTALLATION SCALENOT TO Name. Date Drawn By: PAGE Checked By: JOHNSTON COUNTY WATER Approved By: Department of Public Utilities STANDARD DETAIL 9 scale: P.O. Box 2263 Thrust Collar Smithfield, NC 27577 Installation of47 Rev.Descri lion jDate linit. NOTE: PIPE SHALL BE BEDDED UP TO SPRING LINE AND MINIMUM 4" BELOW BOTTOM OF PIPE WHEN WET AREAS ARE ENCOUNTERED. HAND PLACED DENSELY COMPACTED BACKFILL TO 1 – ___ ABOVE TOP OF PIFT. PE _ _ _– � I _ __ UNDISTURBED EARTH '%;-_7_7_7_ – ELECTRONIC MARKER BALLS AT 100' ON =-PIPE _– CENTER & AT BENDS. MARKER BALLS SHALL BEDDED PIPE _– _O.D._.:__, BE INSTALLED AT 1 1/2 TO 2' DEEP. –_ – – –_ NOTE: MARKER BALLS SHALL BE SHAPED SUBGRADE – – INSTALLED CONCURRENTLY WITH PIPE. – – MARKER BALLS SHALL NOT BE SHALL PROVIDE BEARING – – — INSTALLED AFTER TRENCH HAS BEEN ALONG ENTIRE LENGTH OF PIPE BARREL COMPLETELY BACKFILLED. /2 PIPE O.D. 24" + O.D. MAX. 12" + O.D. MIN. NOTE: WATER MAINS 8"0 AND SMALLER SHALL HAVE MINIMUM OF 3' COVER. WATER MAINS LARGER THAN 8"0 SHALL HAVE A MINIMUM OF 3'-6" COVER. PIPE LAYING CONDITION NOT TO ALE Name ate Drawn By: Checked By: JOHNSTON COUNTY WATER PAGE Approved By: Departmentof Public Utilities STANDARD DETAIL 16 Scale: P.O. Box 2263 Pipe Laying Smithfield, NC 27577 Condition of 47 Rev. I Description I Date Init. COAT HYDRANT BONNET AND NOZZLE CAPS 2' ASPHALTIC CUT TO "ALERT" REFLECTIVE FIRE HYDRANT PAINT EXIST. WATER MAIN SILVER MODEL #1440 AT 45' BEND. IN PAVED AREA 1Y2" �1 1" FINISHED GRADE PUMPING & HOSE CONNECTIONS 1 IN UNPAVED AREA EQUAL TO COUNTY STANDARD m 8" COMPACTED CRUSHER BREAK RING TO BE SET WITHIN 2"-4" FINISHED GRADE OF FINISHED GRADE – t – – ENCASEMENT • VALVE BOX ISI I -I I I -I I -I I I -I I -III HYDRANT TEE BURY IAS I I I I I I I I I I I I I I I I I I I III' ' I I I WATERLINESIZE VARIES I SPECIFIED SEE NS CONCRETE THRUST BLOCK FABRICATED OF TYPE 304 S.S. AND NOTE: _ LINE IN LAYERS 1. MIN. OF 4 CU. FT. CONCRETE THRUST BLOCK STONE (MORE IF CIRCUMFERENTIAL GASKET. REQ'D). GATE VALVE 2. CONC. THRUST VALVE SHALL BE PLACED ON THE BLOCK TO HAVE M1467 STONE FILL WATER MAIN SIDE OF ROAD DITCH OF 6 SQ. FT. (4 C.F. MIN.) 04 LONGITUDINAL BEARING ON SOLID TYPE 304 S.S. THREADED RODS BANK (MORE IF HYDRANT LEG TO DIP MIN. 2 EA. PER SEGMENT REQ'D.). OR 3. DRAIN HOLES AND PAY ITEM Aqua–Grip" RINGS OR ROMAC FLANGES SHALL BE FIRE HYDRANT ASSEMBLY INCLUDES GRIP RINGS MAY BE USED AT CLEAR OF CONC. ALL ITEMS EXCEPT MAIN LINE TEE JOINTS IN LIEU OF THREADED RODS 4. FIRE HYDRANT SELECTED BACKFILL _ _ NOTE ALL PAVEMENT SHALL BARRELSHALL BE 6 PLUMB. FIRE HYDRANT ASSEMBLY 24" 69,252 NOT TO SCALE Name Date JOHNSTON COUNTY Departmentof Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL Fire Hydrant Assembly PAGE 4 Of 47 Drawn By: Checked By: Approved By: Scale: PRIMARY HIGHWAYS Rev.1 Description Date Inil. RESTRAINED FLANGE ADAPTER "UNIFLANGE" OR EQUAL kP(P ESSORY KIT "FIELD LOK" GASKET OR EQUAL DIP (BELL 3/4" THREADED TYPE 304 OR TYPE 316 S.S. RODS MIN. 4 EA. HARNESS RESTRAINT DETAIL NOT TO SCALE Name Date Drawn By: PAGE Checked By: JOHNSTON COUNTY WATER Approved By: I Department of Public Utilities STANDARD DETAIL 10 Scale: I P.O. Box 2263 Restraint Harness Smithfield, NC 27577 of 47 Rev. I Description Date Init. FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS 2' ASPHALTIC CUT TO VALVE BOX COVER EXIST. WATER MAIN CONC. OR AS IN NEAT EDGE AT 45' BEND. IN PAVED AREA 1Y2" �1 1" FINISHED GRADE PLACE 1 IN UNPAVED AREA TAPPING SLEEVE m 8" COMPACTED CRUSHER TAPWITH 6" MIIJ, CONCRETE RUN STABILIZED WITH – t – – ENCASEMENT • NEW WATER MAIN - - - 5% PORTLAND CEMENT TAPPING SLEEVE & ASSEMBLY VALVE BOX •' BURIED - - SELECTED –_ NOTE: TAPPING SLEEVE SHALL BE _ PIPE BACKFILL TAMPED FABRICATED OF TYPE 304 S.S. AND TAMPED _ LINE IN LAYERS BACKFILL EXISTING PIPE WITH FULL SECONDARY HIGHWAYS & CITY STREET CIRCUMFERENTIAL GASKET. Name 2' PLANT MIx A'PHAL JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 STANDARD DETAIL Tapping Sleeve and Valve Assembly OR CONCRETE MIx SAW TO NEAT EDGE Drawn By:WATER Checked By: 04 LONGITUDINAL Scale: 2 TIE OARS EXISTING PAVEMENT m 8" 7,694 EXTENSIONS. CONCRETE 12 -_ -_ 12" 2. VALVE BOX SHOULD 2 - - 6' HB 16" 30,779 MAIN OR VALVE. SELECTED BACKFILL _ _ NOTE ALL PAVEMENT SHALL 3. CONCRETE PROTECTOR 6 TAMPED IN 8' - - BE REPAIRED WITHIN 24" 69,252 LIEU OF ENCASEMENT LAYERS - THE SAME WEEK R IS CUT. IN UNPAVED AREAS. BURIED INSTALLATION NOT TO SCALE PIPE UNE Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 PRIMARY HIGHWAYS WATER STANDARD DETAIL Valve and Valve Box Installation PAGE 13 of 47 TRANSVERSE AND LONGITUDINAL CUTS Checked By: Approved By: DETAILS FOR CUTTING AND VERTICAL BEND Rev. I Description IDate Imt. REPLACING PAVEMENT AND BLOCKING DETAIL NOT TO SCALE NOT TO SCALE Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL Cutting and Replacing Pavement PAGE 17 of 47 Drawn By: Y Checked B Y Approved By: Scale: Approved By: Rev.1 Description jDate linit. FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS CJBOX VALVE BOX COVER EXIST. WATER MAIN FINISHED GRADE _TV2 MIN. AT 45' BEND. IN PAVED AREA 1Y2" �1 1" FINISHED GRADE �;. 1 IN UNPAVED AREA TAPPING SLEEVE BASE COURSE– = I�2'-0"� TAPWITH 6" MIIJ, CONCRETE – t – – ENCASEMENT • NEW WATER MAIN TAMPED BACKFILL_ ___ _—_= AT 3,000 P.S.I. °•° TAPPING SLEEVE & ASSEMBLY VALVE BOX •' N SCALE –_ NOTE: TAPPING SLEEVE SHALL BE 2'-0" FABRICATED OF TYPE 304 S.S. AND TAMPED PROVIDE A 360' SEAL AROUND BACKFILL EXISTING PIPE WITH FULL WATER MAIN –_ –_ _ _– CIRCUMFERENTIAL GASKET. Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 STANDARD DETAIL Tapping Sleeve and Valve Assembly PAGE 5 Of 47 Drawn By:WATER Checked By: Approved By: I I Scale: 2 Rev.1 Description jDate Init. FOR USE IN PAVED AREAS FOR USE IN UNPAVED AREAS PAGE VALVE BOX COVER SERVICE DETAIL FINISHED GRADE _TV2 MIN. AT 45' BEND. IN PAVED AREA 1Y2" �1 1" FINISHED GRADE �;. 1 IN UNPAVED AREA of 47 BASE COURSE– = I�2'-0"� FOR DIMENSIONS OF BLOCK. 6" MIIJ, CONCRETE 10' MAX. – t – – ENCASEMENT • •• TAMPED BACKFILL_ ___ _—_= AT 3,000 P.S.I. °•° ' `�° 4 •Q•a; • ' VALVE BOX •' . •• : = –_ • 2'-0" n TAMPED AT 90' BEND. BACKFILL a WATER MAIN –_ –_ _ _– VALVE VALVE BOX COVER TAMPED BACKFILL BLOCKING CONCRETE ENCASEMENT SECTION PLAN AT 3,000 P.S.I. NOTES: 1. D.I.P. MAY BE USED 2 FOR VALVE BOX 8" 7,694 EXTENSIONS. 2. VALVE BOX SHOULD 2 NOT CONTACT WATER 16" 30,779 MAIN OR VALVE. 3. CONCRETE PROTECTOR 6 RING MAY BE USED IN 24" 69,252 LIEU OF ENCASEMENT IN UNPAVED AREAS. VALVE AND VALVE BOX INSTALLATION NOT TO SCALE Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL Valve and Valve Box Installation PAGE 13 of 47 Drawn By: Checked By: Approved By: Scale: VERTICAL BEND Rev. I Description IDate Imt. NOTE: ALL TAPS 2" AND SMALLER SHALL BE MADE WITH TAPPING SADDLE. ALL TAPS LARGER THAN 2" SHALL BE MADE WITH TAPPING SLEEVE AND VALVE. NO DIRECT TAPS SHALL BE MADE. TAPPING SADDLE SHALL BE BRASS OR BRONZE FOR "CC" THREADS WITH DOUBLE STRAPS, FORD S-90, MUELLER BR213 OR APPROVED EQUAL. TAPPING SLEEVE SHALL BE BRASS OR BRONZE FOR "CC" THREADS, FORD S-70, MUELLER H-134, JCM 403 OR APPROVED EQUAL FOR SDR -21 PVC. CLASS 20 POLYETHYLENE CORPORATION STOP SHALL BRONZE WITH "CC" THREADS, MUELLER B-25000, FORD FB600, JCM 403 OR APPROVED EQUAL DUCTILE IRON PIPE P.V.C. PIPE (CLASS 50 CEMENT LINED) (CLASS 200) NOTE: ALL TAPS TO BE MADE ON TOP QUARTER OF MAIN. STANDARD WATER TAP DETAIL NOT TO SCALE Name Date Drawn By: PAGE Checked B Y JOHNSTON COUNTY WATER Approved By: Department of Public Utilities STANDARD DETAIL 19 Scale: I P.O. Box 2263 smithfield, NC 27577 Standard Water Tap of 47 Rev. Descri tion Date Inf #3 REBAR 10" 2 EA " • �I I.I 4- 2- 24" NOTE: PROTECTOR RING SHALL U BE 3,000 P.S.I. CONCRETE. CONCRETE PROTECTOR RING NOT TO SCALE JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 PAGE CONCRETE THRUST BLOCK SERVICE DETAIL STANDARD DETAIL AT 45' BEND. Concrete Protector Ring �;. SEE THRUST BLOCK DETAIL of 47 JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 FOR DIMENSIONS OF BLOCK. 10' MAX. 3 Y: BY- NOTE: ALL PIPE SEGMENTS LESS S.S. THREADED RODS THAN 10' SHALL REQUIRE CONCREFLOWIN&ST BLOCK AT 90' BEND. '• SEE THRUST BLOCK DETAIL O FOR DIMENSIONS OF BLOCK. ROD REQUIREMENTS SIZE OF 45' BEND STATIC THRUST IN POUNDS NUMBER OF RODS REQUIRED 6" 4,328 2 8" 7,694 2 12" 17,312 2 U) 16" 30,779 4 20" 48,091 6 24" 69,252 8 GENERAL NOTES 1. RODS AND NUTS SHALL BE OF TYPE 304 OR TYPE 316 STAINLESS STEEL. lyj 2. CONCRETE SHALL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT BENDS. J VERTICAL BEND RODDING AND BLOCKING DETAIL NOT TO SCALE Q Q Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL Critical Bend Rodding and Blocking Details PAGE 7 Of 47 Drawn By: Checked By: Approved By: Scale: N Rev. Desai lion Date Inf. #3 REBAR 10" 2 EA " • �I I.I 4- 2- 24" NOTE: PROTECTOR RING SHALL U BE 3,000 P.S.I. CONCRETE. CONCRETE PROTECTOR RING NOT TO SCALE JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 LID SHALL BE LABELED "WATER METER" AND FINISHED GRADE SHALL BE "AMR" TYPE WITH METAL FLIP–UP LID AND 2" HOL METER (US GAL.) %" X �4" 7" MIN. I I- 3" MIN. CLEARANCE MIN. 4" WASHED STONE 20" MIN. LOCK TYPE METER ANGLE CL STOP CHECK BLOCK SUPPORT OR VALVE STONE AS NEEDED 7" WATER POLYETHYLENE .. .. SERVICE LINE WIDE BODY OR DOUBLE STRAP SADDLE METER YOKE SHALL BE COPPERSETTER MUELLER NO. H-1404-2, FORD NO. VH -72-7W OR APPROVED EQUAL FOR METER YOKE COMPLETE WITH SERVICE DUAL PURPOSE FITTINGS CORP. STOP WATER MAIN NOTE: 1. CONTRACTOR SHALL PLACE METER BOX IN NON TRAFFIC AREA ONLY. 2. PLASTIC METER BOX SHALL BE CENTURY #1015, NDS D1200, OR APPROVED EQUAL 3. CONTRACTOR SHALL CENTER METER YOKE IN METER BOX. 4. METER YOKE TO MUELLER No. H-1404-2, FORD No. VH -72-7W OR APPROVED EQUAL. 5. METER TO MEET AWWA C-700-71 STDS. AND SPECS. 3/4" PAGE WATER SERVICE DETAIL STANDARD DETAIL 14 Concrete Protector Ring Name of 47 LID SHALL BE LABELED "WATER METER" AND FINISHED GRADE SHALL BE "AMR" TYPE WITH METAL FLIP–UP LID AND 2" HOL METER (US GAL.) %" X �4" 7" MIN. I I- 3" MIN. CLEARANCE MIN. 4" WASHED STONE 20" MIN. LOCK TYPE METER ANGLE CL STOP CHECK BLOCK SUPPORT OR VALVE STONE AS NEEDED 7" WATER POLYETHYLENE .. .. SERVICE LINE WIDE BODY OR DOUBLE STRAP SADDLE METER YOKE SHALL BE COPPERSETTER MUELLER NO. H-1404-2, FORD NO. VH -72-7W OR APPROVED EQUAL FOR METER YOKE COMPLETE WITH SERVICE DUAL PURPOSE FITTINGS CORP. STOP WATER MAIN NOTE: 1. CONTRACTOR SHALL PLACE METER BOX IN NON TRAFFIC AREA ONLY. 2. PLASTIC METER BOX SHALL BE CENTURY #1015, NDS D1200, OR APPROVED EQUAL 3. CONTRACTOR SHALL CENTER METER YOKE IN METER BOX. 4. METER YOKE TO MUELLER No. H-1404-2, FORD No. VH -72-7W OR APPROVED EQUAL. 5. METER TO MEET AWWA C-700-71 STDS. AND SPECS. 3/4" & 1" WATER METER SERVICE DETAIL NOT TO SCALE Name Date JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 WATER STANDARD DETAIL 3q" and 1" Water Meter Service 3 Y: BY- ,escri tion IDate Init, PAGE 20 of 47 CA �'E04 SSR' ON9•' �'9 Q SEAL = 19843 �j/ NGINVO... 4-15-15 � EL 5 1 1 1 1 1 11 /!� Q V� (oC 0 0 A n W 1 1� 471 00 '^I 00 � U-) 0 to t7: Nto 04 4 Cq Z w�J H =X0 CLLL_M W W uz v z W LILI L0 V / 0Z 00 r - i Q N UWLLI O Z 0Ljr X Q 0 LLI M = Ul00Q /n JIn az D-0 1 Ld W O Z U) Q LJ lyj J J Q Q U O N to (n Z 0 IV 02 >of W (oC 0 0 A n W 1 1� 471 00 '^I 00 � U-) 0 to t7: Nto 04 4 Cq Z w�J H =X0 CLLL_M W W uz v z W LILI L0 V / 0Z 00 r - i Q N UWLLI O Z 0Ljr X Q 0 LLI M = Ul00Q /n JIn az D-0 1 WATER SERVICE FROM WATERMAIN . FINISHED FORD VBH77-15B X 10 YOKE FOR METER PLAN RPZ WATER SERVICE INSULATED ENCLOSURE -HOT BOX-, "HYDROCOWL", OR EQUAL ENCLOSURE SHALL HAVE A HINGED, LOCKABLE UD AND MINIMUM 9" CLEARANCE ON EACH END & EACH SIDE OF THE RPZ Y. FLANGED COUPLING ADAPTER SUPPORT (EYP) CONCRETE METER BOX, RPZ BACKFLOW PREVENTER FINISHED GRADE FEBCO - RPZ MODEL 825 FORD VBH77-158 X UD WITH HINGED 10 YOKE FOR METER READ' UD WITH DOUBLE CHECK JOINT VALVE NATURAL GROUND -ECKI_ r I I I , THICKNESS (THICKER ANGLE Ra - VALVE RPZ WATER SERVICE INSULATED ENCLOSURE -HOT BOX-, "HYDROCOWL", OR EQUAL ENCLOSURE SHALL HAVE A HINGED, LOCKABLE UD AND MINIMUM 9" CLEARANCE ON EACH END & EACH SIDE OF THE RPZ Y. FLANGED COUPLING ADAPTER SUPPORT (EYP) CONCRETE METER BOX, 8.5" MINIMUM. FINISHED GRADE SLAB THICKNESS (MAX) W/ GRADE COME IN CONTACT WITH ANY PART OF A - sY UP TO 12' SEE NOTE 11 JOINT BROOKS, No. 38-H WITH 12" EXTENSION 6 THICKNESS (THICKER SEALANT WALLS SHALL BE USED 60" + FINISHED GRADE STRUCTURAL STRENGTH) Q WALL REINFORCEMENT POTABLE WATER MAIN PER ASTM C478 4000 PSI ® 28 DAY 6 CONCTETE TYPE II F_ 11LOCK suPPORr OR (OVER 6'-9" LINK SEAL GASKET MAIN OR STORM SEWER WATER SERVICE FROM WATER 2. A MINIMUM HORIZONTAL SEPARATION OF WATER MAIN 18" MIN FINISHED GRADE a Z THREE (3) FEET OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAINS AND SrarE AS f✓tEOm F' SHALL BE USED IF THE ABOVE CONDITIONS WATER SERVICE MAIN" SHALL BE CLEAN - OUT (SHOWN DASHED) SHALL BE 3' MIN '...... ':. I \\ `e0' BEND ! CLASS 200 POLYETHELYNE ':....':. ...... SERVICE LINE """""" ..BYPASS ....�.# 18" MIN 90' BEND ..':::::.':: LASS 2a0 POLYETHELYNE SERVICE LINE DUPLEX OUTLET SHALL BE PROVIDED FOR POWER INTERSECTIONS OR VALVE TO MH. WITH STAINLESS STEEL PWC PROJECT COORDINATOR. MAINTAIN THE REQUIRED SEPARATION, THE WATER TO HEAT BOX MAXIMUM. 10. MAIN MUST BE LAID IN A SEPARATE TRENCH OR 57 WASHED STONE SEWER MAIN BELOW PRING LINE. 11. 1Y." PVC DRAIN WATER LINE AND SECTION 4" CONCRETE SLAB. MIN. 8" WIDER THAN BOX ONE SIDE OF THE SANITARY GRAVITY SEWER, To DAYLIGHT - 12. ON ALL SIDES 1 1 /2" and 2" SERVICE W/ RPZ Bc BEP GROUT SEALED NDWATER TO SCALE JOHNSTON COUNTY Department of Public Utilities P.O. Box 2263 Smithfield, NC 27577 US FOUNDRY MODEL 170-E C.I. FRAME & COVER (SEE DETAIL) ADJUST TO 8.5" MINIMUM. FINISHED GRADE SLAB THICKNESS (MAX) W/ GRADE COME IN CONTACT WITH ANY PART OF A RINGS UP TO 12' SEE NOTE 11 JOINT 5" MINIMUM WALL 6 THICKNESS (THICKER SEALANT WALLS SHALL BE USED 60" IF REQUIRED FOR FINISHED GRADE STRUCTURAL STRENGTH) Q WALL REINFORCEMENT POTABLE WATER MAIN PER ASTM C478 4000 PSI ® 28 DAY 6 CONCTETE TYPE II F_ TYPICAL BASE REINFORCEMENT SHALL BE: NO. 4 BARS ® 12" O,C, FOR DEPTHS UNDER 6' NO. 4 BARS ® 9" O,C, FOR GREATER DEPTHS WATER STANDARD DETAIL and 2" Meter & Backflow Assembly 2-6 BRICK & MORTAR r- INVERT CHANNEL 8" MINIMUM BASE THICKNESS 8" AASHTO NO. 57 STONE - COMPACTED PAGE 21 AQUA a North Carolina, Inc. RAISED 1-j" LEITERS FLUSHED WITH TOP OF COVER LABELED SANITARY NOTES: 1. ARTERIAL ROADWAYS - USF RING AND COVER SERIES 170 -BJ. HEAVY DUTY LOAD RATING. COVER WEIGHT 217# TOTAL WEIGHT 372#. 2. ALL OTHER APPLICATIONS - USF RING AND COVER SERIES 170-J. HEAVY DUTY LOAD RATING. COVER WEIGHT 150#, TOTAL WEIGHT 305#. 3. CITY IDENTIFIER SHALL BE USED FOR CITY OWNED STRUCTURES ONLY. PRIVATE FACILITIES SHALL ONLY BE IDENTIFIED AS TO USE. 4. AQUA NORTH CAROLINA MAY REQUIRE LOCKING MANHOLES AT CERTAIN LOCATIONS. �23 F14. r MANHOLE COVER TYPE BJ I~23"�I r14" r MANHOLE COVER TYPE J 224" 6. J- 1244" �I 30}" USF 170 MANHOLE RING 23 AQUA E MANHOLE FRAME AND COVER DETAILS 05/2012 Aqua North Carolina, Inc. HEAT SHRINK MANHOLE CAST IRON FRAME AND ENCAPSULATION SYSTEM COVER. SEE NOTE #1 - SEE NOTE #2 CONCRETE ADJUSTING RINGS (AS REQ'D) 2'-6" 4" MIN. ;,•; • d CONICAL MANHOLE TOP HEAT SHRINK MANHOLE ENCAPSULATION SYSTEM CAST IRON FRAME AND - SEE NOTE #2 COVER. SEE NOTE #1 2'-6" CONCRETE ADJUSTING RINGS (AS REQ'D) 4" MIN AQUA Aqua North Carolina, Inc. SANITARY GRAVITY, FORCE MAIN, REUSE MAIN, 8.5" MINIMUM. FINISHED GRADE SLAB THICKNESS (MAX) STORM SEWER, & POTABLE WATER MAIN COME IN CONTACT WITH ANY PART OF A STRIP UP TO 12' SEPARATION NOTES & SOLUTIONS JOINT MIN 6 AS REQ'D SEALANT - 4'-0" IIINIMUM 60" I. A MINIMUM HORIZONTAL SEPARATION OF TEN FINISHED GRADE INSIDE I IAMETER Q (10) FEET OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAINS AND POTABLE WATER MAIN 2 � o 0 SANITARY GRAVITY SEWER OR STORM SEWER 6'-9" (MAX) A-LOK OR E (OVER 6'-9" LINK SEAL GASKET MAIN OR STORM SEWER USE STD. M.H.) BRICK & MORTAR r- INVERT CHANNEL 8" MINIMUM BASE THICKNESS 8" AASHTO NO. 57 STONE - COMPACTED PAGE 21 AQUA a North Carolina, Inc. RAISED 1-j" LEITERS FLUSHED WITH TOP OF COVER LABELED SANITARY NOTES: 1. ARTERIAL ROADWAYS - USF RING AND COVER SERIES 170 -BJ. HEAVY DUTY LOAD RATING. COVER WEIGHT 217# TOTAL WEIGHT 372#. 2. ALL OTHER APPLICATIONS - USF RING AND COVER SERIES 170-J. HEAVY DUTY LOAD RATING. COVER WEIGHT 150#, TOTAL WEIGHT 305#. 3. CITY IDENTIFIER SHALL BE USED FOR CITY OWNED STRUCTURES ONLY. PRIVATE FACILITIES SHALL ONLY BE IDENTIFIED AS TO USE. 4. AQUA NORTH CAROLINA MAY REQUIRE LOCKING MANHOLES AT CERTAIN LOCATIONS. �23 F14. r MANHOLE COVER TYPE BJ I~23"�I r14" r MANHOLE COVER TYPE J 224" 6. J- 1244" �I 30}" USF 170 MANHOLE RING 23 AQUA E MANHOLE FRAME AND COVER DETAILS 05/2012 Aqua North Carolina, Inc. HEAT SHRINK MANHOLE CAST IRON FRAME AND ENCAPSULATION SYSTEM COVER. SEE NOTE #1 - SEE NOTE #2 CONCRETE ADJUSTING RINGS (AS REQ'D) 2'-6" 4" MIN. ;,•; • d CONICAL MANHOLE TOP HEAT SHRINK MANHOLE ENCAPSULATION SYSTEM CAST IRON FRAME AND - SEE NOTE #2 COVER. SEE NOTE #1 2'-6" CONCRETE ADJUSTING RINGS (AS REQ'D) 4" MIN AQUA Aqua North Carolina, Inc. SANITARY GRAVITY, FORCE MAIN, REUSE MAIN, 9. NO WATER PIPE SHALL PASS THROUGH OR FINISHED GRADE _ STORM SEWER, & POTABLE WATER MAIN COME IN CONTACT WITH ANY PART OF A RUBBER UP TO 12' SEPARATION NOTES & SOLUTIONS SANITARY SEWER MANHOLE OR STORM SEWER MIN 6 AS REQ'D STRUCTURE. - 10.00' MIN 60" I. A MINIMUM HORIZONTAL SEPARATION OF TEN FINISHED GRADE &3' Q (10) FEET OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAINS AND POTABLE WATER MAIN 2 � o 0 SANITARY GRAVITY SEWER OR STORM SEWER 24.5" SANITARY GRAVITY E LINES. A-LOK OR LINK SEAL GASKET MAIN OR STORM SEWER t 2. A MINIMUM HORIZONTAL SEPARATION OF WATER MAIN 18" MIN FINISHED GRADE a Z THREE (3) FEET OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAINS AND "REUSE WATER F' SHALL BE USED IF THE ABOVE CONDITIONS RECLAIMED WATER LINES CARRYING UNRESTRICTED MAIN" SHALL BE CLEAN - OUT (SHOWN DASHED) SHALL BE 3' MIN INSTALLED BY THE UTIUTY CONTRACTOR TO PUBLIC ACCESS REUSE WATER. BURIED TO 6' AT ROSSI G HAZARD 18" MIN 9. 3. IN AREAS WHERE IT IS NOT PRACTICAL TO INTERSECTIONS OR WHENEVER POSSIBLE. LOCATE DOUBLE LATERAL TO MH. WITH STAINLESS STEEL PWC PROJECT COORDINATOR. MAINTAIN THE REQUIRED SEPARATION, THE WATER WHERE CROSSING MAXIMUM. 10. MAIN MUST BE LAID IN A SEPARATE TRENCH OR WITH POTABLE SEWER MAIN BELOW PRING LINE. 11. ON AN UNDISTURBED EARTH SHELF LOCATED ON WATER LINE AND POTABLE PORTION OF TEE TO NORTH CAROLINA STANDARDS. ONE SIDE OF THE SANITARY GRAVITY SEWER, WILL MAINTAIN - 12. STORM SEWER OR RECLAIMED WATER LINE AT EIGHTEEN (18) INCH WATER MIN. SUCH AN ELEVATION THAT THE BOTTOM OF THE CLEARANCE MAIN GROUT SEALED WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES LOCATION OF CLEANOUT(s) AT THE PROPERTY ABOVE THE TOP OF THE OTHER LINE. 14. SANITARY GRAVITY MAIN "MIN. BACK OF CURB OR 2 -FT BACK OF SIDEWALK. 10. A MINIMUM OF VERTICAL SEPARATION OF OR STORM SEWER C900 BELL X SDR 26 4. IF THE MINIMUM ALLOWABLE TEN 10 FOOT EIGHTEEN(18 INCHES OUTSIDE TO OUTSIDE AQUA NORTH CAROLINA, INC. -5' MI HORIZONTAL SEPARATION OR EIGHTEEN (18) INCH SHALL BE MANTAINED BETWEEN WATER MAIN, SANITARY LATERALS IS FROM THE MAINLINE TO In VERTICAL SEPARATION IN A SEPARATE TRENCH SANITARY GRAVITY SEWER, STORM SEWER OR 16. DEVIATIONS AND OTHER ALTERNATIVES SHALL J a CANNOT BE MAINTAINED, UPGRADE THE WATER RECLAIMED WATER ONES. BE CONSIDERED ON CASE-BY-CASE BASIS AND MAIN TO DUCTILE IRON, IF THE OTHER LINE ISA SDR 26 PVC i MUST RECEIVE SPECIFIC APPROVAL BY NCDENR o STORM SEWER. 11. WHEN THERE IS LESS THAN TWENTY FOUR PRIOR TO IMPLEMENTATION (24) INCHES VERTICAL CLEARANCE BETWEEN THE O 5. IF THE NON -CONFORMING LINE IS A GRAVITY WATER MAIN AND STORM SEWER, THE WATER 17. THERE SHALL BE AN EIGHTEEN (18) INCH F SANITARY SEWER, AND TEN (10) FEET OF MAIN SHALL BE UPGRADED TO DUCTILE IRON. VERTICAL SEPARATION BETWEEN WATER MAINS 4� HORIZONTAL SEPARATION OR EIGHTEEN (18) ONE FULL LENGTH OF PIPE SHALL BE CENTERED AND SANITARY SEWER FORCE MAINS AT a D_ INCHES VERTICAL SEPARATION IN A SEPARATE AT THE POINT OF CROSSING. CROSSINGS WITHOUT EXCEPTION. CONFLICTS WITH w TRENCH CANNOT BE MAINTAINED. UPGRADE THE EXISTING LINES, WHERE IT IS NOT POSSIBLE TO GRAVITY SANITARY SEWER (IF BEING NEWLY 12. IF THE NON -CONFORMING IS A SANITARY MAINTAIN THE REQUIRED SEPARATION, IT SHALL INSTALLED) TO AWWA C-900, D.R. 18 PVC AND GRAVITY SEWER WHERE THERE IS LESS THAN BE REPORTED TO AQUA NORTH CAROLINA, INC./ENGINEER. SPECIAL SOLUTIONS MUST BE J F HYDROSTATICALLY TEST IT TO 150psi. EIGHTEEN (18) INCHES VERTICAL CLEARANCE ACCEPTED BY NCDENR PRIOR TO => 6. IF THE OTHER UNE IS A RECLAIMED WATER FROM THE WATER MAIN, UPGRADE THE SANITARY GRAVITY SEWER TO DIP PVC AND IMPLEMENTATION. LINE AND THE ABOVE SEPARATION REQUIREMENTS HYDROSTATICALLY TEST IT TO WATER MAIN ARE NOT MET, UPGRADE THE RECLAIMED WATER STANDARDS. PIPES SHALL BE LOCATED SO THAT LINE MATERIAL TO DUCTILE IRON. JOINTS ARE AS FAR AS POSSIBLE FROM EACH OTHER. 7. DEVIATIONS AND OTHER ALTERNATIVES SHALL BE CONSIDERED ON CASE-BY-CASE BASIS AND 13. IF THE OTHER LINE IS A RECLAIMED WATER MUST RECEIVE SPECIFIC APPROVAL BY AQUA LINE AND THE ABOVE MINIMUM SEPARATION IS NORTH CAROLINA, INC. AND NCDENR PRIOR TO NOT MET, UPGRADE THE RECLAIMED WATER LINE IMPLEMENTATION. MATERIAL TO DUCTILE IRON. 8. THERE SHALL BE AT LEAST A TEN (10) FOOT 14. SPECIAL STRUCTURAL SUPPORT OR SEPARATION BETWEEN WATER MAINS AND CONCRETE SADDLES MAY BE NECESSARY AT THE N SANITARY SEWER FORCE MAINS WITHOUT CROSSING LOCATION. EXCEPTION. FIELD PROBLEMS SHALL BE 15. IT IS PREFERABLE TO LAY THE WATER MAIN 00 N k0 REPORTED TO NCDENR/ENGINEER. SPECIAL ABOVE THE CROSSING HAZARD. $ 3 SOLUTIONS MUST BE ACCEPTED BY NCDENR O PRIOR TO IMPLEMENTATION. LOT LINE 5' MIN w REMOVABLE STOPPER SET IN JOINT COMPOUND BY PLUMBER J 6" PVC RISER 3 (SINGLE PIECE)Of TERMINAL DEPTH AS REQUIRED FOR HOUSE SERVICE (18" MIN, 5'-0" MAX) COMBINATION WYE AS REQUIRED - CLEANOUT "Y" FITTING 30' BEND SEWER MAIN SIZE VARIES - ELDER VALVE PLAN AQUA NORTH CAROLINA RESPONSIBILITY PROVIDE BRASS RING & PLUG IN TRAFFIC AREAS BY LICENSED UNDERGROUND 7 UTILITY CONTRACTOR ELDER VALVE 2% MIN. 45' BEND 6" MINIMUM ITE 30" (TYP) 2 MAIN ' MAX VARIES PROFILE FRAME AND COVER A "SANITARY" _ D E RUBBER UP TO 12' CHIMNEY 8" SEAL 15" AS REQ'D 2 COATS (8 MIL 12' TO 18' 60" EA) COAL TAR 24.5" 15" EPDXY, INTERIOR 10" ;p & JOINTS 8" 24.5" 15" E 14" A-LOK OR LINK SEAL GASKET LATERALS SHALL HAVE 4" CLEANOUTS. 6. CONC. FILL SHALL ENTER ALL OTHER 4' DIAMETER ALL PLANTINGS & STRUCTURES AROUND BENCHING z f$. 7. F' SHALL BE USED IF THE ABOVE CONDITIONS #89 CRUSHED STONE FINISH GRADE -CONC. ADJUSTING RUNGS (5 MAX) B ECCENTRIC CONICAL SECTION STRIP JOINT SEALANT PRE -CAST CONC. 9" MIN MH DEPTH A B I C I D E F UP TO 12' 48" 8" 24.5" 15" AS REQ'D 8" 12' TO 18' 60" 8" 24.5" 15" AS REQ'D 10" 18' AND DEEPER 72" 8" 24.5" 15" AS REQ'D 14" MANHOLE SIZE UP TO 24" PIPE: 48" MANHOLE UP TO 36" PIPE: 60" MANHOLE OVER 36" PIPE: 72" MANHOLE NOTES: 1. PRE -CAST CONCRETE SHALL BE TYPE 2 CEMENT (4,000 PSI). 2. LIFT HOLES NOT PERMITTED THROUGH PRE -CAST SECTIONS. 3. ALL OPENINGS SHALL BE SEALED WITH NON -SHRINK GROUT. 4. INSTALL FLOW CHANNEL INSIDE MANHOLES. 5. SERVICE LATERALS SHALL GENERALLY NOT BE PERMITTED DIRECTLY INTO MANHOLES. 6. PLACE TWO HALF-MOON SHAPED PLYWOOD (3/8" TH. MIN.) IN BOTTOM OF MANHOLE AFTER PIPES HAVE BEEN CONNECTED TO KEEP DEBRIS FROM ENTERING SEWER. 7. REINFORCING STEEL PER ASTM C478 -88A. 8. PROVIDE 5' X 5' X 12" CONCRETE COLLAR AROUND COVER FRAME, WITH 4 - #4 REBAR E.W. IN UNPAVED AREAS. 9. PROVIDE PIPE TO MANHOLE SEAL: A-LOK GASKET PER ASTM C-433 SPECIFICATION CAST INTEGRALLY IN MANHOLE WALL AND LOCATED AS DIRECTED. GASKET DESIGNED TO MEET TEST AND PERFORMANCE REQUIREMENT OF ASTM C-425 SPECIFICATION. JOINT SHALL ALLOW 10' OMNIDIRECTIONAL DIRECTION. 10. JOINT SEALANT SHALL BE BUTYL RUBBER OR BITUMINOUS MASTIC GASKET PER ASTM C-990 SPECIFICATION. PROVIDE BUM-LOK BY A-LOK PRODUCTS, INC. 11. MANHOLE STEPS SHALL BE 4 INCH GRADE 60 STEEL ENCAPSULATED IN POLYPROPYLENE CONFORMING TO ASTM C478. 12. MANHOLE FRAME AND GASKETED COVER SHALL BE NEENAH MODEL R-1743 OR AN APPROVED EQUAL. 13. SEAL MANHOLE FRAME AND GRADE RINGS WITH WRAPIDSEAL HEAT SHRINK ENCAPSULATION SYSTEM BY CANUSA-CPS, INC. 14. MANHOLES GREATER THAN 15' SHALL HAVE AN INTERMEDIATE LANDING CONSTRUCTED OF PRECAST CONCRETE. 15. MANHOLE UPSTREAM OF WW PLANT SHALL BE A GRIT TRAP TYPE WITH 2" SUMP. w.E STANDARD MANHOLE DETAIL 16 AQUA 05/2012 Aqua North Carolina, Inc. NON-SKID SURFACE THE SITE DEVELOPER SHALL LEAVE THE FOR PERSONNEL SAFETY CLEANOUT RISER 3'-4' ABOVE GRADE AND IT ti DIAMETER SHALL REMAIN SO UNTIL LOT BUILD OUT. THE OF PIPE RISER SHALL THEN BE CUT AND CAPPED AT SLOPE FINISHED GRADE WITH A CONCRETE PAD. 3" MIN ALL CLEANOUTS TO BE FLUSH WITH FINISH CONCRETE BONDING AGENT GRADE. SEE NOTE UTILITY CONTRACTOR TO INSTALL & PRESSURE MANHOLE CHUTE IS TO BE USED=AASHTO TEST WYE AND INSTALL PLUG. PLUMBER TO WHERE DIFFERENCE IN INVERT AQUA ELEVATIONS BETWEEN INCOMING PIPEAND CONCRETE PAD. 4. Aqua North Carolina, Inc. NOTE: 1. THE SITE DEVELOPER SHALL LEAVE THE NOTES OF 5' DIAMETER TO 12" ABOVE TEE. DROP CLEANOUT RISER 3'-4' ABOVE GRADE AND IT A I SHALL REMAIN SO UNTIL LOT BUILD OUT. THE B 4/ RISER SHALL THEN BE CUT AND CAPPED AT SLOPE FINISHED GRADE WITH A CONCRETE PAD. 2. ALL CLEANOUTS TO BE FLUSH WITH FINISH JOINT J M GRADE. 3. UTILITY CONTRACTOR TO INSTALL & PRESSURE MANHOLE CHUTE IS TO BE USED=AASHTO TEST WYE AND INSTALL PLUG. PLUMBER TO WHERE DIFFERENCE IN INVERT REMOVE PLUG, INSTALL CLEANOUT AND ELEVATIONS BETWEEN INCOMING PIPEAND CONCRETE PAD. 4. MARK CURB WITH "S" WHERE LATERAL CROSSES IF THE DIFFERENCE IS 24" OR UNDER CURB. 5. ALL COMMERCIAL AND RESIDENTIAL SINGLE SHALL BE USED. LATERALS SHALL HAVE 4" CLEANOUTS. 6. MAINTAIN A MINIMUM OF 3CLEARANCE FREE OF SHALL ENTER ALL OTHER 4' DIAMETER ALL PLANTINGS & STRUCTURES AROUND MANHOLES. ALL LATERALS SHALL HAVE AN CLEANOUT. 7. CLEANOUT CAPS SHALL BE SLOTTED OR HAVE A SHALL BE USED IF THE ABOVE CONDITIONS RECESSED NUT. 8. CLEAN - OUT (SHOWN DASHED) SHALL BE BE AT THE TOP OF THE SHELF. INSTALLED BY THE UTIUTY CONTRACTOR TO 1� 8. NO MORE THAN 5 LATERALS SHALL 10. CONNECTIONS TO EXISTING FINAL CONFIGURATION IN ACCORDANCE WITH ENTER A 5' DIAMETER TERMINAL MANHOLES SHALL HAVE COREI STANDARD PLUMBING CODE. 9. DOUBLE LATERALS ARE TO BE AVOIDED 9. FLEX. BOOT SHALL BE CONNECTED APPROVED OTHERWISE BY WHENEVER POSSIBLE. LOCATE DOUBLE LATERAL TO MH. WITH STAINLESS STEEL PWC PROJECT COORDINATOR. AS CLOSE TO LOT LINE AS POSSIBLE, 5' [ MAXIMUM. 10. INVERT OF SERVICE LATERAL SHALL NOT ENTER CONNECTORS SHALL CONFORM TO VACUUM TESTED IN SEWER MAIN BELOW PRING LINE. 11. DOUBLE SERVICE LATERAL TO BE USED ONLY p WHEN WHEN BOTH BUILDING SLABS ARE NOT PORTION OF TEE TO NORTH CAROLINA STANDARDS. GREATER THAN 4" -INCHES ELEVATION DIFFERENCE. 12. SERVICE LATERAL, PIPING AND FITTINGS TO BE MAINTENANCE PURPOSES 6" SDR35 PVC UNLESS OTHERWISE NOTED. MIN. (GASKETED ONLY) 13. INSTALL 4"X4" (TOP ONE -FOOT PAINTED GREEN) GROUT SEALED AND 3M MAGNETIC MARKER TO IDENTIFY LOCATION OF CLEANOUT(s) AT THE PROPERTY UNE 14. ALL LATERALS SHALL HAVE C.O. SET ® 2 -FT "MIN. BACK OF CURB OR 2 -FT BACK OF SIDEWALK. o IF SIDEWALK IS IMMEDIATELY ADJACENT TO C900 BELL X SDR 26 CURB, DO NOT PLACE C.O. IN SIDEWALK. 15. AQUA NORTH CAROLINA, INC. -5' MI REPAIR/MAINTENANCE RESPONSIBILITY FOR SANITARY LATERALS IS FROM THE MAINLINE TO z THE C.O. DESCRIBED IN THE NOT ABOVE. THE PROPERTY OWNER IS RESPONSIBLE UPSTREAM OF C.O. 16. PVC SDR -26 SHALL BE USED FROM THE C.O. TO THE MAINLINE WHERE AQUA NORTH SDR 26 PVC i CAROLINA, INC. IS RESPONSIBLE FOR REPAIR/MAINTANCE. N 0 N 10 '�j NEW • SANITARY 1 SEWER � A 1'"' rKfi;t 1.. . C11 -X1/8- STAINLESS ::rte 1., .., STEEL STRAP �' PLAN SDR 35 PVC SW TEE WITH OPEN END ON SPIGOT SIDE FLEXIBLE BOOT CONNECTED TO MH WITH SS EXP. RING NON -SHRINK GROUT SEAL SDR 26 PVC 6" MIN 12" MAX FOR TRANSITION FROM D.I. TO PVC. USE A C900 BELL X SDRk,l COMPACTEAF99TOVA�OTO♦ . STONE FROM UNDISTURBED SOIL TO SPRING -LINE OF PIPE AS DIRECTED BY PWC PROJECT COORDINATOR. 1"x 1/8" STAINLESS STEEL STRAPS CONFORMING TO THE PIPE ANCHORED WITH STAINLESS STEEL ANCHOR BOLTS AND WEDGE ANCHORS. 2 STRAPS MINIMUM, STRAPS SHALL BE 3' O.C. MAX. PLACE STRAPS WITHIN 1' OF TEE AND WITHIN 1' OF } BEND. ALL OTHER STRAPS SHALL BE 3' O.C. SDR 35 SW PVC 1/4 BEND TOWARD INVERT OUT. BEND SHALL BE PLACED ON TOP OF SHELF. CONSTRUCT TROUGH ON TOP OF SHELF TO DIRECT DISCHARGE IN THE DIRECTION OF FLOW. 1 "/FT - MIN. SLOPE 4,000 PSI CONCRETE BENCH & CHANNEL BENCH PIPE & MANHOLE 2'-0" MIN J_ 1"/FT • MIN. SLOPE L PIPE & MANHOLE :� 4 MANHOLE RADIUS TO BE MAXIMUM POSSIBLE & CHANNEL TO BE TROWEL FINISH 2. -0" MAX NOTES OF 5' DIAMETER TO 12" ABOVE TEE. DROP '• Ta.. • '. A I B 4/ 1 }" SLEEVING I SLOPE FOR SINGLE e SERVICES JOINT J M a NOTE: C A MANHOLE CHUTE IS TO BE USED=AASHTO WHERE DIFFERENCE IN INVERT WATER MAIN ELEVATIONS BETWEEN INCOMING PIPEAND 3' FROM EDGE OF PAVEMENT I OUTGOING PIPE IS LESS THAN 24. COMPACTED STONE IF THE DIFFERENCE IS 24" OR GREATER, THEN DROP CONNECTION SHALL BE USED. JOINT SLOPE 6" MIN 2, AQU A aR wiE MANHOLE CHUTE 05/2012 Aqua North Carolina, Inc. I / / SLEEVING 1 }' OR GREATER \ FOR SINGLE SERVICE AQUA a North Carolina, 5. DROP STRUCTURE MH. SHALL BE A MIN. NOTES OF 5' DIAMETER TO 12" ABOVE TEE. DROP A I B 4/ 1 }" SLEEVING I C FOR SINGLE MANHOLE DETAIL FOR ADDITIONAL TO WALL AS POSSIBLE. SERVICES INFORMATION 2. ALL PVC FITTINGS FOR DROP 6. DROP STRUCTURES REQUIRED FOR ALL a STRUCTURE SHALL BE SDR 35 DROPS 6" AND GREATER IN DIAMETER, AND C A 1 }' SLEEVING OR GREATER FOR DOUBLE slxvlcFs WATER MAIN IN DEPTH SHALL HAVE MIN. 6" MORE THAN FOUR 4" INTERIOR DROPS ARE 3' FROM EDGE OF PAVEMENT I WATER MAIN AQUA a North Carolina, 5. DROP STRUCTURE MH. SHALL BE A MIN. NOTES OF 5' DIAMETER TO 12" ABOVE TEE. DROP 1. MANHOLE SHALL BE IN STRUCTURE SHALL BE INSTALLED AGAINST ACCORDANCE WITH AQUA NORTH WALL OF MANHOLE AS SHOWN. IF THE GRADE S CAROLINA STANDARDS, SEE DOES NOT ALLOW, THEN INSTALL AS CLOSE MANHOLE DETAIL FOR ADDITIONAL TO WALL AS POSSIBLE. INFORMATION 2. ALL PVC FITTINGS FOR DROP 6. DROP STRUCTURES REQUIRED FOR ALL o STRUCTURE SHALL BE SDR 35 DROPS 6" AND GREATER IN DIAMETER, AND 1 0 PVC WITH SOLVENT WELD JOINTS WHEN 3 OR MORE 4" LATERALS ENTER- 3. MANHOLES GREATER THAN 12' MANHOLES WITH 4" INTERIOR DROPS. NO 3. 0 IN DEPTH SHALL HAVE MIN. 6" MORE THAN FOUR 4" INTERIOR DROPS ARE Z. EXTENDED BASE. ALLOWED IN A 5' MANHOLE. 4. DROP STRUCTURE SHALL BE 7. NO MORE THAN 4, FOUR INCH LATERALS OR PLACED WHERE SEWER MAIN OR 3, SIX INCH LATERALS SHALL ENTER A 4' LATERAL VERTICAL DROP BETWEEN DIAMETER TERMINAL MANHOLE. NO MORE INVERTS EXCEEDS 2.00'. THAN 2 LATERALS (REGARDLESS OF SIZE) SHALL ENTER ALL OTHER 4' DIAMETER MANHOLES. ALL LATERALS SHALL HAVE AN INDIVIDUAL TROUGH. 5' DIAMETER MANHOLES SHALL BE USED IF THE ABOVE CONDITIONS lyj ARE NOT MET. THE LATERAL INVERT SHALL BE AT THE TOP OF THE SHELF. 1� 8. NO MORE THAN 5 LATERALS SHALL 10. CONNECTIONS TO EXISTING ENTER A 5' DIAMETER TERMINAL MANHOLES SHALL HAVE COREI U MANHOLE. AND "BOOT" ONLY UNLESS 9. FLEX. BOOT SHALL BE CONNECTED APPROVED OTHERWISE BY rn a TO MH. WITH STAINLESS STEEL PWC PROJECT COORDINATOR. [ EXPANSION RING. FLEXIBLE BOOT 11• ALL MANHOLES SHALL BE o j CONNECTORS SHALL CONFORM TO VACUUM TESTED IN ASTM C-923 SPEC.ACCORDANCE W/ AQUA p PORTION OF TEE TO NORTH CAROLINA STANDARDS. z BE REMOVED FOR MAINTENANCE PURPOSES MIN. SW TEE SDR 35 0 - GROUT SEALED 0 FOR TRANSITION FROM D.I. TO PVC USE A 1 "MIN. o C900 BELL X SDR 26 -5' MI SPIGOT ADAPTOR. z - SDR 26 PV t FLEXIBLE BOOT SDR 26 PVC i i SS STRAPS SW } BEND SDR 35 `� CO IIII �`,��` , CA p`'' Q`•o �Ss , Q� SEAL � 19843 v 4-15-15 yyEL C t 00 CO 0) 1� I 0)1 0 0) N� � LC)(n r4 V N LN Z 04 wJ H =x0 11 LL M W W z W LIjZ Z 00 i Q N UZ 00 O Z LLI Lj 0_jao M V1 00< vl �aZ 17 W O Z U) Q F- LLi JJ lyj Z LLI O U O nj > L) O= 0 Q t 00 CO 0) 1� I 0)1 0 0) N� � LC)(n r4 V N LN Z 04 wJ H =x0 11 LL M W W z W LIjZ Z 00 i Q N UZ 00 O Z LLI Lj 0_jao M V1 00< vl �aZ STREET 1; " 0 LO II ww J J Q Q O O Irl � Ld O ; 0 N M O O J_ � O Q N O Z WMA 12+00 Q J L. 1 -1o �O 1 Oil o� 11 1 Op Q O V O V MT A W 1 I.L I rn "' ,°n'°°0 ��CD N�CN (n N'R V env Z w�J z H =Qo W W Z H Z W Z) LO `' z 00 V Q N U Boz 0 X ao> m= n 0o< vl Jaz CS -01 40� 00 30� 00 20� 00 10.100 10.100 20� 00 30� 00 40� 00 50� 00 50� 00 40� 00 30� 00 20� 00 10.100 10.100 20� 00 30� 00 40� 00 50� 00 50� 00 40� 00 30� 00 20� 00 10.100 10.100 20� 00 30� 00 40� 00 I I_ I I I I I_ I I I I I I_ I I I I I I I I I L_ I I I I [_ I I I I I L_ I I 310.01 I I I I I 1310.00 1 315.00 I I I I T121 305. 0 - 1 1305.00 1 T12 ��OLC Op - 10 31 ----_ 10.00 10 300. 0 0 IGINAL L =306. 0 DESIGN EL. =306.44 U011 I --I--- p DIESIGN E RTHWORIK 1 it � 4A�=10+-�� I I I FILL AREA =7.151 1 305.00 _ 3 5.00 - DESIGN E =308.25 UT ARE =40.3 1 I I I VF 4.54 DIESIGN E RTH WORIK 1 VC = 5.34 1 UT ARE =188.0 1 VF 2.04 1 VC =130.44 I 1 315.00 1 1 315.00 1 1 310.01 I I I I 310.00 I I 111 315.00 1 I 115.00310.00 1 + 1 305. 101305.00 + --- I I Q25 �IlJ�A =11+.010.0025305.00305� 1 300. 10 013 I GI N AL L = 307. �2 1 1300.00 1 ORIGINAL L =309.131 25 MUT A[RFA P5 I I =307. I I DESIGN E RTH WORIK A =10+��C�ESIGN E 1 1 (FILL AREA =2.661 305.001 ORIGINAL L =310.40 3P5.00 =57,54 DIESIGN E=308.317 I I I I I IFILL AR A =1.831 I I I I VF 0.48 UT ARE =102.0 1 1 VC =13.22 DIESIGN E RTHWORIK FILL AR A =2.15 VF 1.70 UT ARE =93.71 1 VF o.07 VC 3.16 315.00 � 1 315.00 1 310.0 I I 1310.00 3 310.00 + 305. 0 � 305.00 + 1 _ 00 00 1 - 0 IGINAL L =307. 0 10.00 - 110.00 - 305.001 1 � 1 ;�A =1 1 +00 1 1305.00 - 1 300. 10 DESIGN E =307.11 + --- - + 0 IGINAL L =309. 5 24.06 I I I _ ., ---I - 2.06 I I I DIESIGN E=308.00 1 1 DESIGN E RTHWORTo LO 1-1 pp ()-uu 'K � S� 6 FILL AR A =1.58 305.00 ORIGINAL L =310.2-5 31 5.00 I I I I I I I I I UT ARE =58.41 - DIESIGN EL. =308.318 I I I FILL AREA =1.84LL 1 VF 1.07 �UT ARE=125.5i/ 1 VC = 4.73 DIESIGN E RTHWORIK � 1 1 VF 1.63 FILL ARHA =2.01 - UT ARE =88.1 VF 0.89 VC =39.27 315.00 1 1 315.00 1 315.01 315.00 1 315.001 115.00 1 10 1 31 0�-------- 1 1310.00 1 (To 1 310.0 I I I 1310.00 75 10 I I I 11 p + I+ I I I I s1J�A =10+JAI 305.00 305.00 5 305. 0 - 50 -rJA = �! 1 + 5 ORIGINAL L=311.0 I I I I DIESIGN E=308.112 I I I I I I J �'�' J �' DIESIIGNLE L=30084185 305.00 DESIGN E RTH WORK 3 5.00 DESIGN EARTHWORK - ICUT AREA =0.001 I I I I I I I I qUT ARE =175.616 I I I I I I I I DIESIGN E RTHWORIK I I I_ VF o.00 I I I I I I I I I I VF 1.83 I I I I I I I I I IFILL ARA =1.491 I I I I = I I I I I I I I I �uT ARE =69.6 VC 0.00 VC 168.38 I I I I I I I I I I I I I I vc = 9.50 40100 30100 20100 10.100 1000 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 STREET IV " 0 Lo II w w J J << O O V) Irl � O > M O N M O O J_ O Q N O Z Q J 3 5.00 Q 11 Q o Q �O 1 o� OQ Q O O MT A W 1 I.L I rn "' ,°n'°°o ��CD N�CN (n N'R V env Z w�J Z H =Qo W W Z H Z W z 00 Z r, V Q N Uof O Z 0 X (n J w m 2 n ooQ vl Jaz CS�OZ 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 I I I I I 310.0 I I 1310.00 I I I I I I I I 121 1 12 315.00 + 305. 0 - - - 305.00 + 310.00 10.00 315.00 315.00 300. 0 0 IGINAL L - 306. 5 300.00 10110 DIESIGN E RTHWORIK + 5 I I I 1310.00 1 IFI LL ARA =1.871 75 305.001 1 3 5.00 1r�A ��JJ �J � I+ + I I I I ORIGINAL L =308.0 150 1 1 1 I I V� =:I.// DIESIGN El 1 � I L, ►- - 1 - 501 i VC = 18.27 DESIGN E =305.43 305.001 "�4 4- 1 305.00 DIESIGN E RTHWORIK I I I J�A =1 1 +� � IFILL AR A_ 1.951 I I I ORIGINAL L =309.8 UT ARE 166.419 DESIGN E =305.05 310.0 310.00 1 VC =130.57 I I I I DIESIGN E RTHWORIK (FILL ARA =1.901 121 I _ I I 12 UT ARE =241.4 + 305. 0 -- 3-e + VC = 18.7_ 1 � � j1J�A =12 I I I o IGINAL L =307.8 310.00 10.00 300. 0 - 300.00 1011 p DIESIGN E RTHWORIK + + IFI LL AR A =1.851 50 305.001 1 -per p 1 315.00 I I I 1315.00 1 =153.81 VF 1.69 1J�A =10+ vi 11 1 1 w ) co Lo 1-1 cq 9 I I I I I I VC =167.02 j 0 IGINAL L =307.9 300.001 DIESIGN E=305.516 1 31 0.00 I I I I 1310.00 1 DIESIGN E RTHWORIK _ -� I I I (FILL AR A =1.861 CUT ARE =115.5 25 25 I 1 305.001 1 305.00 310.0 310.00 VC = 5.76 �1 r�A =1 1 +-�J=�1 I I - 0 IGINAL L =309. 8 +I + 10.00 DESIGN E -305.1 p 305. 0 305.00 00 10 I DIESIGN E RTHWORiK i + I I FILL AR A- 1.941 I I �l 0 IGINAL L=308.0 25 305.00 5 UT ARE -231.11 300. 0 DESIGN EL. =304.80 300.00 O +�; � 0 IGINAL L =306. VC = 05.77 i DIESIGN E RTHWORIK DIESIGN EL. I I I I I I FILL AR A =1.81 300.00 3 0.00 CUT ARE =206.95 DIESIGN E RTHWORIK I I I VF 1.71 1 (FILL AREA =2.901 I I VC = 03.53 AUT ARE =69.6 315.00 1 1 315.00 1 1 VC =32.26 310.00 I I I 110.00 I I I 1310.00 I I I 1310.00 pp 001 + 10 305.00 3 5.00 110 - - 1 305.001 1 305.00 1 7 1 30 1 1 305.00 75 _\ -•I 1 j 00 1 1 OT _\+I---f--0�AA+-A -• � I I I I I oI�IGINAL L-309.111 ORIGINAL L=305.170 I I I I I I - I I I � ORIGINAL L-309.4 300.00 - 3 0.00 ESIGN E -305. 1 - - 300. 0 DESIGN EL. =304.93 300.00 DIESIGN E RTHWORIK I I I I I I I I DIESIGN E RTHWORIK I I I I I I I I DIESIGN EARTHWORK IFI LL AREA =0.001 I I I I I I I I I FI LL ARA =1.911 I I I FILL AREA =1.89 ICUT AREA =0.001 I I I I I I I I UT ARE =213.3 I I I I I I I I c1UT ARE =232.617 VC 0.00 VF 1.75 I I I I vC =175.85 I I I I I I I I I I vC = 19.51 40100 30100 20100 10.100 1000 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 STREET IV " 0 Lo II w w J J Q Q O O V) Irl � Of O > 0 N 0 0 J_ O � O Q N 0 Z w �NM�McO � o �O 1 o� S*4 N%-% Op Q O V O V MT A W 1 I.L I rn "' ,°n'°°o ��� 04 04 (n c ., V env Z w�J Z H =Qo W W Z rH V Z W Z V Q N U Boz X ao> m= oC3a �a_Z CS -03 401 00 301 00 201 00 10.100 10.100 201 00 301 00 401 00 501 00 501 00 401 00 301 00 201 00 10.100 10.100 201 00 301 00 401 00 501 00 501 00 401 00 301 00 201 00 10.100 10.100 201 00 301 00 40Ld F4 1 00 1 305.001 31 5.00 13 310.00 113 1 300.001 300.00 1 1 305. 0 I I I 305.00 50 p �'-��A =13+501 ORIGINAL L =300.7 I I I+ + 295.00 2 5.00 295.00 300. 0 300.00 1��A=14�+5o 151 I 15 DIESIGN E RTHWORIK I I I ORIGINAL L=297.101 I I I BILL ARE =48.1 1 290.00 1 1 DIESIGN E =297.816 1 1290.00 I _ _ 5 295, Ip - 50 1 VF = 8.56 I I I I DIESIGN E RTHWORIK I I ORIGINAL L=297.3 VC = 8.40 I I I I RILL ARE _68.5 I i DiESIGN E=297.810 1 UT ARE -33.7fi VC =31.02 DILL ARE =36.08 1 �UT ARE =33.1 305.00 3 5.00 VF = 3.15 13 113 + 300.001 1 1 0.00 1+ 1 300.001 1 I I 1300.00 1 1 300. Ip I I I I 1300.00 1�,�A=13+25� I I I 14_ _ ORIGINAL L=301.9 I I I+ I 1-----E--- - I I + 151 --1--- 15 295.001 DIESIGN E =301.71 21 5.00 1 125 1 295.00 25 I +1 295 Ip p + 1 r A� _ 1 �+�- � 1�<Ab JA =15 +25 1 DIESIGN E RTHWORIK 0 IGINAL L=297.5 I I I I �-�I 1 DILL ARE =35.1 Cp I I I � I I I I I I ORIGINAL L=297.p7 1 UT ARE =30.3 I I I DIESIGN EL. I I I I I DIESIGN E=297.610 290.00 290.00 290. 0 290.00 VC = 4.55 I I I I DESIGN E RTHWORK I I I I DIESIGN E RTHWORIK ILL ARE -65.8 1 1 DILL ARE =57.1 13 13 14 14 1 �UT ARE =33.3 I I = VF = 7.09 UT ARE 32.8 _ VC = 0.37 VC =31.15 310.00 1 10.001 1 1 1 305.001 1305.00 305.00 I I I 3 5.00 1 1 300.001 1 300.00 1 1 300. 10 I I 1300.00 4-- --------- 4- vr 0 151 ----�- 15 00 1 300.001 1 � 1 r� _\ _ � � 1 c � 0 00 1 295.001 I I' 1 r�A=14�+©©1 295.00 - Op +1 295. Ip 00 + TA 13 +00 � �� � � J _ 1 0 IGINAL L =303. 0 I I I I 0 IGINAL L =298. 4 1 - �1r�A =15+001 1 DIESIGN E=302.616 I I I I DIESIGN E=298.918 I I J �� I I -1 o IGINAL L =296.6 DESIGN E RTHWORK 290. 0 DESIGN EL. =297.50 290.00 ILL ARE =17.6 ILL ARE =57.4 �UT ARE =44.2 � 1 �UT ARE =32.2 � DIESIGN E RTHWORIK 1 VF =10.21 VF = 2.89 1 1 ILL ARE =64.9 1 =.5i ng VC = 9.72 UT ARE =34.4 - VF = 5.14 VC =32.15 1 1 310.00 110.00 305.001 1305.00 1 - 1 31 5.00 1 00.001 1300.00 1 1 300. 0 I I 1300.00 75 1 s_ 75 I I I -1-- ----I---- 75 1 ;A-12+7%� I I I I I �-r;0 �uj;:: "A =13+7/51 I I I 141 14 300.00 0 IGINAL L = 304. 3 3 0.00 295.00 295.00 + 295. 0 2 00 + DESIGN E =303.50 DESIGN EL. -299.83 � I I I 1 DIESIGN E RTHWORIK I I I I I DIESIGN E RTHWORIK I I I I I 0 IGINAL L=296.181 FILL AR A =4.45 - 290. 0 DESIGN EL. =297.58 290.00 UT ARE =66.0 I I I I l I I I UT ARE =31.9 I I I l VF 2.93 DESIGN E RTHWORK I I I I VF = 8.58 I I VC = 7.64 I I I I I I I I I I VC =29.12 I I I I I I I I I ILL ARE =75.7 UT AREA =35.0 I I I I I I I I I I I I I I VF = 6.82 I I I I I I I I I I I I I I vC =31.82 40100 30100 20100 10.100 1000 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 0 II w w J J STREET IV LO Q Q O O V) Irl � Ld O ; N �� 0 0 J_ cq � O Q N 0 Z Q J �NM�McO F o W4 IRS 1 o� 11 �, S Op Q O V 1 1-711 O DIE -SIGN EAR`-IHWUKIK co r- I.L I rn ,LO 0 � I rn VC 9,5.9 2rn N�CN (n N 'R v � � �N. Z wJ z H =Q0 W 1-71 W Z rH V 1 Z W � Z 00 ` ' z r - V Q N U O z 1 1 1 0 �uj ;:: X ao> m= n ooQ vl Jaz CSS 0� 40� 00 30� 00 20� 00 10.100 10.100 20� 00 30� 00 40� 00 50� 00 50� 00 40� 00 30� 00 20� 00 10.100 10.100 20� 00 30� 00 40� 00 50� 00 50� 00 40� 00 30� 00 20� 00 10.100 10.100 20� 00 30� 00 40� 00 I I_ I I I I I I I I I I I I I I I I I I I I 305.001 L_ I I I I 31 5.00 1 1 305.001 I I 1305.00 1 1 300. Ip I I I I I 1300.00 1 181---I--� I I I I 18 31 0.00 - X300.0 -II - 300.00 I � 295 Ip I I I �2g5.00 00 + I+ I I + 25 5 25 25 1 ORIGINAL L =298. 3 TMA =16�+2�I _ � f 295.00 _ 2 5.00 295.00 � 1��A =1 J+�- 295.00 290. 0 DESIGN E -295.09 290, DESIGN E =298.33 0 IGINAL L =300. 3 1 I I I I DIESIGN E=297.316 I DIESIGN E RTHWORiK DIESIGN EARTHWORK I I I I I FILL AREA 1.69 DESIGN E RTHWORK dUT ARE =147.2 UT ARE =69.0 FILL AREA =1.84 VF 9.68 UT ARE =142. 11 I VC =146.92 1 VC = 55.13 VF 1.72 VC =126.06 -305.001 I I I 31 5.00 1 1 305.001 1305.00 1 1 305. Ip I I 1305.00- ----------- 3 05.00 00.00 I I I I 31 0.00 1 - �300�1300.00 I I �p 0---- 16 _ _ I I 1300.00 16 - I W1'6++1717000000�751r�A 295.00 � 1��A=16�'+O© 2 5�0- 295.00 �J 295.00 295. 0 295.00 01 IGINAL L =298.171 I I I DIESIGN E =297.812 � 1�,�A=17j+jJ- DIESIGN E=298.210 I I I I I I ORIGINAL L=299.7 DIESIGN EARTHWORK DIESIGN E =295.919 1 ILL ARE =18.2 I I I QUT ARE =130.0 I I I DIESIGN EARTHWORK 1 UT ARE =50.0 I I I I VF 1.73 I I FILL AREA =1.741 VF 0.98 I I I I I I I dUT ARE =170.05 1 VC = 10.02 VF 0.62 - I VC = 9.38 1 305:0 I I I 31 5.00 1 1 305.001 1305.00 1 305. 0 1 1 305.0 300.00 3 0.00 16 300: -- 1300.00 16 300. 0 - --- 300.00 15 -------I-- I I 115 75 + + + + 65.6 65.56 98.58 9.58 j 1 � 1J�A=1s�+-�=� 295.00 � �A =1 -'+9 � ,- � 2 -5.� 295.00 _ 295.00 295. 0 295.00 1 ORIGINAL L =298. 7 DIESIGN E=298.114 I I ORIGINAL L=299.b9 1 DESIGN E =298.19 II I DIESIGN E RTHWORIK I I DIESIGN E =296.219 ILL ARE =18.8 UT ARE =107.5 �UT ARE =49.2 I I I VF 1.72 _I IFILL AREA =1.801 i 1 VF = 9.82 VC = 8.86 UT ARE =169.64 VF 1.05 1 305.00 31 5.00 305.001 1305.00 1 305. 10 305.00 1 1300.00 1 300. 0300.00 1 300.00 3 0.00 15 I I 115 I+ + 1 + + + I I L+ 50 ., 57-54 50 50 I I I I -►-- 50 1 295.001 _ _ - - - -2 :09-- 1 - 1 295.00295.00 1 2 1 ( 1 1295.00 1 � I ORIGINAL EL=298.p8 I I I I I I ESIGN E =298. 1 I I I I I I 0 IGINAL L =300. 2 DIESIGN E=298.010 I I I I I I I I I I I DIESIGN E=296.715 DIESIGN E RTHWORIK ILL ARE =26.5 I I I I I I I I TUT ARE =84.3 I I I I I I I I IFILL AREA =1.851 UT ARE =38.7 I I I I I I I I I VF 2.09 I I I I I I I I I C$UT ARE =156.219 - vc =71.02 I I I I I I I I I I VF 1.71 VF - 8.97 - I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 40100 30100 20100 10.100 1000 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 STREET IV " 0 Lo II w w J J << III11IIII - c5 � IIII11IIII 9 � - __II11IIIII1I1IIIII ---------- - lI11111II1IIII 00 � -ll�11I _ OOQVv�VoIHH.AL/1 NJ oOopO��Q rn �NQC) 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 V�Z��0O ) _ O 1 I I I I 1 I I 1 I I I I I I 1 I I I I I > 300.00 _ 30.00 295.00 295.00 300.0 300.00 21919 211 �0 1 00 1 0 295.00 25.00 75 2900 290.00 7 0 295.0 295.00 8 18 N T I - I I JA SWEIA�+o Ld 0 -21+75 �J87'80 I 8.80 0 IGINALL=292.161 ORIGINAL L=297.6 Q rA�I I I I I I I I 0 �+$7oo290.00 20.00 285.00 285.00 290. 0 =295.290.UG EL. 1 DIESIGN EL. I I I DIESIGN ERTHWORK DESIGN EARTHWORK DIESIGN EARTHWORK I FILL AREA =7.331 FILL AREA =1.87 UT AREA =29.5 �UT ARE =87.3 VF =2.54 VF3.54 AUT AREA =54.3$ VC 28.54 VC =136.99 VF =:1.83 VC =62.54 30.00 295.00 295.00 300.00 I I - I19 1 19 2 20 -2 �+ 290.00 290.00 295.0 9+295.00 60.79 + I 5 -4 I I 50 60.7�A 1J�A_PA J+S=20 +5+sJ93I 0 290.001 n4lc�I�IAI El _ 20.00 285.00 _ 290. 0 ORIGINAL EL =295.5 290.00 DESIGN E=293.22 DESIGN EL. DESIGN E-293.96 �,20 1 DIESIGN ERTHWORIK I I DIESIGN ERTHWORIK I I DIESIGN ERTHWORIK _ = FILL AREA =1.95 UT AREA 70.7 UT AREA =32.1 TUT AREA =60.6 I I I IvF2.67vF0.74 I VF =11.09 I I VC =29.14 I VC =32.13 1 1 VC 84.30 300.00 30.00 295.00 295.00 300.00 1 I19 I I 1 I I 19I I I I+ + 1 295.00 0 25 290.0 290.00 25 295. 0 o-*-q2r-JA 4----r =19+250 I 0 #+ +I rA1S+5 1 0IGINALL=293.101 02.6 02.66 290.00 ORIGINALL =295.7 20.00 285.00 DESIGN E=292.36 -29� 290.0 11 0 DESIGN E=293.8 rrs I10IGINALL =293. 5 DIESIGN E RTHWORIK DIESIGN E=292.815 DIESIGN ERTHWORIK I I FILL AREA =4.191 FILL AREA =1.85 UT AREA =37.2$ UT AREA =75.10 VF =2.78 VC =40.10 (FILL AREA =1.101VF1.65 UT AREA =35.5$ T CO VC =4.68 M"VF0.12 0CD0- CN Lo 1-1 Lo Lo00 wJ300.03 0.00 300.00 300.00 . Z =X0 W 18 0295. W18 295.00 295.00 29500 5 5 19 19 2 - 20Z1 I OVrJA + + + ++-2_2= I - 00 00 Od 00I 0IGINALL -2964290.00 20.00 290.001 1 A 290.00 290.00 0 IGINAL EL =293.7 Z I DIESIGN E=292.516 I I I ORIGINAL L=293.6 W DIESIGN ERTHWORIK I I I I I I I I I DIESIGN EL. IFILL AREA =1.721 I I I I I �Z 00 zDESIGN ERTHWORK Q VF 1.58 FILL AREA =1.81 i UT ARE =49.3 I I I l I I I I FILL AREA =1.341 I UVC18.10 0 �uj;:: co of Z VF =0.82 UT AREA =34.5 VF4.02 aXo>VC =3.43 m o= o0 az 40100 30100 20100 10.100 1000 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100 50100 50100 40100 30100 20100 10.100 10.100 20100 30100 40100CS-05 STREET IV " 0 LO II w w J J << O O V) I�1 � Ld O > M O N M O O � O Q N O Z Q J �NM�McO o W4 IRS 1 o� 00 �Q 0 PizO V MT A CO W 1 I.L I rn "' ,00 1 ��� CD LO N-04 (n N 'R v � � �N.. Z cq w�J Z H =Qo W W 21 12-1 Z rH 50 50 V Z W Z 00 `' Z I I I I I I I I I I + I I I I I I I 1 1 V Q N U Boz 0 T- T T X Q p v k-11 M= oC3a La-Z cs-vs 4000 3000 2000 10.00 10.00 2000 3000 4000 5000 5000 4000 3000 2000 10.00 10.00 2000 3000 4000 5000 5000 4000 3000 2000 10.00 10.00 2000 3000 4000 I- I I I I - I I I I I I- 305-0 I I 3 5.00 300.00 78.90 7.90 295.00 r � �. _� +'��., � 2 5.00 ORIGINAL L =298. 7 � I�ESIGN E =298.1 DESIGN E RTHWOR FILL AREA =1.85 UT ARE =39.30 � VF 1.89 � VC = 4.63 305.00 3 5.00 300.00 I I 3 i�5:T70 - 2 5.00 � 0 IGINAL L=298.6 I I I DIESIGN E =297.214 I I I (FILL AREA =1.681 I I I I I I I I I I AUT ARE =62.8 I I I I I I I I I I I I I VF 3.29 I I I I I I I I I I I I I I 4000 3000 2000 10.100 10.100 2000 3000 4000 5000 5000 4000 3000 2000 10.100 10.100 2000 3000 4000 5000 5000 4000 3000 2000 10.100 10.100 2000 3000 4000