HomeMy WebLinkAbout20240271 Ver 1_More Info Received_20240327From: dlutheran(c segi.us To: "Shaver. Brad E CIV USARMY CESAW (USA)" Cc: Snider, Hollev Subject: [External] RE: Alexandra Place Request for Additional Information Date: Thursday, March 28, 2024 4:30:49 PM Attachments: Alexandra Place Revised PCN Packet 3-27-24 Reduced.odf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello, Brad. Please see my responses to your RFAI below. I will also upload the attached revised PCN, with associated attachments, to the DWR's electronic submittal portal, which will be received in your office as a new submittal of previously submitted PCN. 1. In section 5 there is a statement that the JD was last verified in 2011, the Corps reverified this line in 2022. The PCN has been revised to reflect the correct reverification date (see attached). 2. 1 believe the profile view drawing shows a retaining wall but it is not consistently labeled through the site plan. The profile drawing has been revised to clearly identify the retaining walls across the site (see attached) 3. There are no cross-section drawings of the fill impacts. Cross-section drawings should be provided for each fill impact unless typical drawings can be used for similar impacts. Cross sections have been included with the updated site plans (see attached). 4. At impact PI-1, why are there wetland impacts behind what is presumed to be a retaining wall? The wetland impact shown behind the retaining wall is needed for outlet protection (rip rap) form Wet Pond #1's outfall pipe which discharges at that location. 5. The Corps would like to see a cross section behind all building that are platted right up to the wetland line such as A and A10. There are no retaining walls so it would seem reasonable the fill slope necessary for foundation construction would extend into the wetlands. A cross section has been provided for Lots A8-Al1 (see attached). 6. Will there be no temporary impacts for the construction of the retaining walls? Eric Damstrom (wall installer) confirmed no additional impacts are necessary to construct the retaining walls (see attached email chain). 7. The Corps sees that this project has shown up on the State's Reasonable Period of Time spreadsheet therefore it is assumed an Individual Certification (IC) is being processed. The Corps will not be able to issue the verification until the IC is issued and coordinated with the EPA. Noted. On another note, I also included the updated USFWS Official Species List as part of this submittal. It is my hope that the information found within and attached to this email will complete the application and processing of the request to utilize NWP 18 can commence. However, should you need additional information or have further questions, please do not hesitate to call. Dana Dana A. Lutheran Regulatory Specialist SEG01 =====MFr* Southern Environmental Group, Inc 5315 South College Rd, Suite E Wilmington, NC 28412 910.452.2711 Office 910.228.1841 Mobile (preferred) From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver(@usace.army.mil> Sent: Thursday, March 7, 2024 8:14 AM To: dlutheran(@segi.us Cc: lobos251(@aol.com; Snider, Holley <holle)t.snider(@deq.nc.gov> Subject: RE: Alexandra Place Request for Additional Information Again I failed to provide a suspense date for this request. In this case it would be April 5, 2024. Brad Brad Shaver Project Manager US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4611 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https://regu latory.ops. usace.a rmy. m i I/customer-service-su rvey/ From: Shaver, Brad E CIV USARMY CESAW (USA) Sent: Tuesday, March 5, 2024 8:34 AM To: dlutheran(@segi.us Cc: lobos251(@aol.com; Snider, Holley <holley.snider(@c1eq.nc.gov> Subject: Alexandra Place Request for Additional Information Dana, After a review of the package received March 1, 2024 the following items are needed for the application to be considered complete and ready for processing: 8. In section 5 there is a statement that the JD was last verified in 2011, the Corps re verified this line in 2022. 9. I believe the profile view drawing shows a retaining wall but it is not consistently labeled through the site plan. 10. There are no cross-section drawings of the fill impacts. Cross-section drawings should be provided for each fill impact unless typical drawings can be used for similar impacts. 11. At impact PI-1, why are there wetland impacts behind what is presumed to be a retaining wall? 12. The Corps would like to see a cross section behind all building that are platted right up to the wetland line such as A9 and A10. There are no retaining walls so it would seem reasonable the fill slope necessary for foundation construction would extend into the wetlands. 13. Will there be no temporary impacts for the construction of the retaining walls? 14. The Corps sees that this project has shown up on the State's Reasonable Period of Time spreadsheet therefore it is assumed an Individual Certification (IC) is being processed. The Corps will not be able to issue the verification until the IC is issued and coordinated with the E PA. If you need anything clarified, please advise. Brad Brad Shaver Project Manager US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4611 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https://re ulg atory.ops.usace.army.mil/customer-service-survey(