HomeMy WebLinkAboutNCC240952_ESC Approval Submitted_20240402 Engineering Department
Wake Forest Town Hall—3rd Floor
301 S Brooks Street
TOWN of Wake Forest, NC 27587
WAKE FOREST P:919-435-9510
www.wakeforestnc.gov
EROSION AND SEDIMENT CONTROL
LAND DISTURBING PERMIT
LETTER OF APPROVAL
March 27,2024
Hawthorne at Wakefield
ATTN:Scott Fields
806 Green Valley Road Suite 311
Greensboro, NC 27408
RE:
Project Name: Hawthorne at the Forest Apartments Phase 2
Permit Number: 2024-00000807
Location: 0 Star Rd
Acres Approved:3.66
Submitted By: Michael Allen
Date Approved: March 27,2024
Dear Scott Fields:
This office has reviewed the subject erosion and sedimentation control plan.We find the plan to be acceptable and hereby issue this
Letter of Approval.The land disturbance permit will be issued after you have obtained a Certificate of Coverage,as outlined below,
and provided a copy to this office.The land disturbance permit shall expire two(2)years from the date of issuance and can be
renewed in one-year increments.
Per Section 12.3.2 of the Unified Development Ordinance(UDO),a copy of the approved erosion control plan shall be on file at the job
site.Also,this letter provides you notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as
outlined in the UDO.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and
adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973,this office may require revisions to the plans
and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal,State,and Local water quality laws,
regulations,and rules.This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form.You
are requested to file an amended form if there are any changes in the information.
Created with idtPlans Review Hawthorne at the Forest Apartments Phase 2 Page 1 of 2
3/27/24
Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities).The Town does
not distribute the NCG01 permit; instead,you will have to obtain the permit from NC DEMLR.To receive a Certificate of Coverage,you
must submit an electronic Notice of Intent with this approval letter.The NCGO1 permit requires that the following documentation be kept
on file at the job site:
• The approved E&SC plans as well as any approved deviations
• The NCG01 permit and the Certificate of Coverage
• Records of inspections made during the previous 12 months
Sincerely,
GI9a46is4-
Jessica Watkins
Engineering Technician
Created with idtPlans Review Hawthorne at the Forest Apartments Phase 2 Page 2 of 2
3/27/24