Loading...
HomeMy WebLinkAboutNCC240905_Site Plan or Location Map_20240402 itI '`'",� �+ r YL F aF 1, wrrv, 1 " 7�, -4 tir. ,,0'• ', .i a +n N� wx1 � e + w -A v ea t' ' v` r' .,. 1• 71) 1 52 us vcLnuoe r.aaemrrvore nL Hmv PF G* F 2 P r� — *4.P Air 4 ,GAyo :''' . lik. u a ice, s sdisi.sa v PROJECT OVERVIEW SCALE:1":600' WETLAND CROSSING • RESTORE PRE-CONSTRUCTION WETLAND CONTOURS TO MAINTAIN THE WETLAND HYDROLOGY. ADDITIONAL NOTES TOTAL LIMITS OF • REVEGETATION AND PERMANENT ROW MAINTENANCE PROCEDURES AS WELL AS THE USE OF LIME OR MULCH IN AREAS IS ADDRESSED IN THE FERC RESTORATION AND REHABILITATION PLAN. m 1. ALL EROSION CONTROL MEASURES SHALL BE IN STRICT ACCORDANCE WITH LOCAL AND STATE i • DUKE ENERGY AND ITS CONTRACTORS WILL NOT USE HERBICIDES OR PESTICIDES IN OR WITHIN 100 12 STANDARDS-SPECIFICALLY THE NC EROSION&SEDIMENT CONTROL MANUAL AND ORDINANCES. DISTURBANCE = .2 ACRES • FEET OF A REMOVE PROJECT-RELATEDEFEDERAL MATERIAL A USED TO SUPPORT EQUIPMENT THE CONSTRUCTION N ROW,Y. al2. ALL DISTURBED AREAS SHALL BE STABILIZED AT THE END OF EACH WORKDAY. INCLUDING COMPOSITE MATTING AND PREFABRICATED EQUIPMENT MATS UPON COMPLETION OF 3. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL BMPs AND W STRUCTURES TO ENSURE DEVICES ARE FUNCTIONING PROPERLY TO MINIMIZE EROSION AND SEDIMENT CONSTRUCTION. TRANSFER. • REMOVE TEMPORARY PERIMETER BMPS LOCATED AT THE BOUNDARY BETWEEN WETLAND AND Z 4. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED DUE TO FIELD CONDITIONS INCLUDING THE USE OF ADJACENT UPLAND AREAS AFTER UPLAND REVEGETATION AND STABILIZATION OF ADJACENT UPLAND 1O AREAS ARE SUCCESSFUL. 0 O MATTING ON ALL DISTURBED AREAS. J 0 5 ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AT ANY TIME IF DUKE Oi ENVIRONMENTAL OVERSIGHT OR NCDEQ DEEMS IT APPROPRIATE TO MAINTAIN COMPLIANCE AND GOOD COMPOSITE MATS = STEWARDSHIP. DUKE ENERGY UTILIZES CONSTRUCTION COMPOSITE MATS TO PROVIDE ACCESS THROUGH AREAS 6. ANY STREAMS OR WETLANDS IMPACTS PROPOSED THAT ARE NOT INCLUDED IN THIS PLAN MUST BE APPROVED SUCH AS WETLANDS AND WATERBODIES,AGRICULTURAL FIELDS,AND OTHER AREAS AS DETERMINED PRIOR TO LAND DISTURBANCE. BY THE CONSTRUCTION SUPERVISOR.THIS PRACTICE REDUCES SOIL COMPACTION AND PROVIDES A 7. NO WASTE,SPOIL,SOLIDS,OR FILL OR ANY KIND SHALL OCCUR IN WETLANDS OR WATERS BEYOND THE STABLE TRAVEL LANE FOR CONTRACTORS ALONG THE PROJECT ROW,THUS MINIMIZING LAND PERMITTED PLANS(INCLUDING TEMPORARY IMPACTS). DISTURBANCE.THE MATERIALS USED TO CONSTRUCT THE COMPOSITE MATTING WILL BE ABLE TO 8 NO REMOVAL OF VEGETATION OR OTHER IMPACTS OF ANY KIND SHALL OCCUR TO COUNTY REGULATED WITHSTAND THE ANTICIPATED LOADING OF THE CONSTRUCTION TRAFFIC.THE COMPOSITE MATS OVER RIPARIAN BUFFERS BEYOND THE PERMITTED PLANS. WATERBODY CROSSINGS WILL BE CLEANED AT THE END OF EACH DAY AND WHERE EXCESS 9. ALL WETLANDS,STREAMS,SURFACE WATERS,AND RIPARIAN BUFFERS LOCATED WITHIN 50 FEET OF THE ACCUMULATION OF SEDIMENT THE COMPOSITE MATS WILL BE CLEANED OFF THROUGHOUT EACH DAY. CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED PRIOR TO ANY LAND DISTURBING THE USE OF COMPOSITE MATS MAY GENERALLY NOT CONSTITUTE SOIL DISTURBANCE OR A CHANGE IN ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT IS COMPLETED. HYDROLOGY.THEREFORE,THE INSTALLATION OF COMPOSITE MATS ACCESS ROADS AND WORK AREAS 10. ALL MECHANIZED EQUIPMENT OPERATED NEAR SURFACE WATERS OR WETLANDS SHALL BE REGULARLY IS NOT CONSIDERED A REGULATED LAND-DISTURBING ACTIVITY. INSPECTED AND MAINTAINED TO PREVENT CONTAMINATION OF WATERS AND WETLANDS FROM FUELS, Li LUBRICANTS,HYDRAULIC FLUIDS OR OTHER POTENTIAL TOXIC CHEMICALS.CONSTRUCTION SHALL BE STAGED IN ORDER TO MINIMIZE THE EXPOSURE OF EQUIPMENT TO SURFACE WATERS TO THE MAXIMUM EXTENT Li PRACTICABLE.FUELING,LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHALL NOT TAKE PLACE II\UIIHIII/y WITHIN 100 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION BY FUELS AND OILS.FUEL �p�P'�N CAgOlp�i ® DUKE TITLE HE-0006 NEW ELAM SHALL NOT BE STORED WITHIN 100 FEET OF A WATERBODY OR WETLAND. .. .,FES�/a-7. : Deil_rIerIjr® c, D MX5059186 02/06/24 100%FOR PERMITTING-NCDEQ COMMENT RESPONSE UPDATES ARB JA ZAE = • 055132 SELf: LT. Dewberry Engineers Inc. ENERGY® 2610100/6 FOR PERMITTING WYCLIFF ROAD C MX5059186 01/16/24 100%FOR PERMITTING ARB JA ZAE it fiN . 'o SUITE 410 PROGRESS B MX5059186 01/08/24 100%DRAFT DESIGN FOR DEP REVIEW ARB JA ZAE ggiP GI � PHONIER 919?88109939 OVERALL PROJECT LAYOUT A MX5059186 12/12/23 50%DRAFT DESIGN FOR DEP REVIEW ARB JA ZAE DO NOT USE FOR CONSTRUCTION FAX 919.881.9923 411 FAYETTBILLE STREET I/2S/Zy NCBELS#F-0929 RALEIGH N.C. . 27601 SIZE D DRAWINGMX5059186 SHEET OF 15 REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50169208 wwdewberry.com TELEPHONE NO.(919)546-2090