HomeMy WebLinkAboutNCC240934_Site Plan or Location Map_20240402 sa-' CONSTRUCTION SCHEDULE // . / �\
PP I.Obtain all necessary permits and Dlan approvals.Erosion and Sediment Cwvol(EffiSC)Permit and a Certificate of Coverage / Jl 1
WNays (CDC)must be obtained before any land dismrbing activities«cur.A copy of the E&SC permit,the COC end a bard copy / \
of the plan must be kept on site,preferably in a permits box,end accessible during inspection. / -\\_
2 hV!es 1 oentraoces firat Men'1 f f ed mitt ce 1
EFh'p[yM9 3.4.Finl LBegin lot a Iand grubbing any n`cesery ar th 1 hyare started lq/) J�_ / `� �1 ( \ \
ROBtivities
'3,027 5.Begincontinueg with houaco ///JJJ I I / -9i� \� -.CZOa�.7 -� \_--_` , \/
6.Finish 11 %M1 grading and M1oue wtncmm on All erase not disturbed for]days needs to have temporary or permanent //In
J /jla %_-,�'/ ^-\E\ a 11rr1
cover
tO,gaP�. ].IrTES ROAD �mtalldriveweys�w�alka and plans. // / jg �ot areas _ _ iirallist - _� �` .p- •-_�
Cn- CO HARN E�T�T V"_e 9.FinalBeginS. grassing,dmulchinging of! d 61' B f lot In most cases.is 11' I the elallatian of sod on the lot The silt / / / �- -1 I tko."^__ � �1� �S' ` _
'PM COUNTY 1 fin will DI 1.I sodded or grassing is stabilized and takes hold. / �/ / weTel Gt' _ ,0 �
P 1.0 10.Theca contractor shall conduct xlf'ncp«'ons of,be erosion end sad'a on cannot measures end complete the following �/\//h � �� ,.............91a /�
combined self-inspection faun towd on theDEMLR websim / ///yyy / �' ' �I��'�"= T -1YR� -- -- \ v/
svy pe M1ttps//www.de9mc.8ov/boutldiiions/enemgy-mineralaland-resource✓smmmwater/stosmwa[er-PrograMmmPdesconswction-pro8nm. j / / '��Jk'�^ +•�'' '' 'a'\��JOp� \� �� � ��•�. J\ V
ma Twelve months of inspection forms shall be kept on site d available for inspection at all times.It is recommended
��� .. �� � /� Tq.� \ _= ___ I '-!� \\��\
copy be kept in a perm box. f G 5.113A 54.1 through G S. 3 S io SA NCAC 04A.0101 Though 1SA / r" i- �'-` " A' �� ` �\
SITE .: � /�� - _ _ -_ __ :. _
w&� rvcnc o4E.osg4 General eermiervcc Dl0000 NPDEsfor cnmo-netinn wceanmesnal - - _, oal - -_ e_ \\ \ \
toN+aaca Q 401 II.Self-inavalions for erosion and sedimentation control measures ma to be performed at least once eery even calendar days '�// - •`:WC. "-".'. -/o �� �J00_., 1\
tt \`a ram end within 24 hours of every rein event of greater thanlinch.Any needed repairs shell be made immediately to maintain � / -� " _�" '''- / 1� �_-i �- �_ v
UMgER,� m J asdesignN.Al1ESCmeesuresshallbemaintainedasspeciiiedinthecomime[iondemilsonMisPlan.Arein /- �.��- y �11b4.. ..�;..� JJJ��' /Jr \ \_ fy� -I68-13� ��`� \�\\
G gaugeshall be installeda[NeProj«t site for monitoring. / ✓._ .. ....... D88�- \\ ��
U gauge
®� /'_ '�' CONSTRUCT \\ p
COO 12.Inspection and final acceptance tenors.When the Project is complete,the Permittees shall contact DEMLR to close out the de /" 00 � �`�\ � /O_ .. rA00' ryQ LIMITS \V� �
EffiSC Man.v714CG DEMLR miorms t.leeronic taoe° project closee-NOT via A$120ianualgreport,the l permitfeettee will
visit i�� \
/' r
o "d<.n vMCG01"to submit an electronic Notice oftetmination e-NO .A$120 annual oral permit lac will be � �.�.�� �.%.�.�.�.�.�.-.�.�.��.�.-.�.-.�.�.�.-.�.-.�.�.�.�.�.-.�.�. I � °B�
O i7o., charged until the e-NOT h.been filled out ( 17 Ben P ..��. . :�.-r ............�........--.J �......... ... ..... 6 too-\ \ �-\\
4' jai .....: _ ti-.
oci,
•
m- : �r K s....: / -�10 Pi GROUND STABILIZATION - ... .. �: _ Lot Plan 10 N.
m Oe\ J.'....\ OyR........ •
................. ..... ............'`fir.....'�.�1g, o „A. Lot Plan
401 SITE AREA STABILIZATION EXCEPTIONS pq=YR.........Aro.- - - .-a: '::: ^: .:.:.:...:.:.:.:.:...:.:.:.:.:...:...:.....:...r.:._ ' .1.�.. ....... ......T.�..-- 11 ��� \\
VICINITY MAP DESCRIPTION TIME FRAME - -GM-win-Gate ��
yL (}y
(N.T.S.) PERIMETER DIKES, 7 DAYS NONE e •
""' """ """ > / - e'."_eat Plan
CONSTRUCTION ���,
SWALES. DITCHES �° �f ��f ���� � \ Lot an ' LIMITS \`e,
IIVUWl \
&SLOPES I T° „ ..'::-6p0� ... -::- 'Ro-H# ,,a �'� _.....:3,��. �� 1 . ,-1. -� �_ CA2 \ y
HIGH QUALITY 7 DAYS NONE ,�.....':.".'. :. :. r;.:�......... / \\\
CONSTRUCTION
1 \
WATER ZONES o LIMITS i
HOW �'l Y?' ".. .. ..... yo. ........ t1y \
y.......... 57 0
59 ,.
SLOPES STEEPER 7 DAYS IF SLOPES AREi. .ftg0_YRII�.:..��.:.�::.:.:..:.:.:.:.:..:.: SH
61 of Plan Lot Plan 56 I0 0B \THAN 3:1 10'LENGTHOR LESS IN CQ //,','// CA2 LotPlan J \ ` \
...........
A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY //I "G" h
AND ARE / r/j / G CONLIMITS IO / `r-� \ \
NCGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR Plan V \// 100_
COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER / 1� LIT „B„ -� �� .� ` )'RJ
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 / ''112�-J ,�'Y GONSTRUCTI. [. ___. �1� \
EROSION AND DAYS ARE / ••ram • , J7 LIMITS 'x/
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED �fU ''" "'"""/ / II CONSTRUCTION CONSTRUCTION 544.C� ` ��
NCAC 046.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY W ��114 1 LIMITS / LIMITS 49 ' e� �_ __ tee
INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR '
-....... X 44 46 47 48
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER B) /" CONSTRUCTION /Lot Plan Lot Plan 3 Lot Plan 45 1 / 11• 1,§� \\
DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN '.'.',;y LIMITS/ E E. nE„ I \\
PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION "...".":........ /
CONTROL PLAN." LENGTH W3 ... ........1-..'..'.'�% CAY I ' �53 _1? ��
ALL OTHER AREAS 14 DAYS NONE(EXCEPT j/�/`/ �16/ _ /
WITH SLOPES FOR PERIMETERS 'YdERfW "' CONSTRUCTION /51 /
FLATTER THAN 4:1 12
AND HOW ZONES) Vega Lane / Y -24
/ Vega Lane EN RANCE ' /
ii. ...'. w ego Lane -- 1 „B - • 13
' � if +' CONSTRUCTION `� - O2 r,�'v9
DATE: PAGE: �- �8\ _LIMITS / i 126 /0 126 ///
`.:..."'- jam
sat Sock/wattle Sat Swk/Wattle N ..�\:............................... _�43 �24_ i / �
a�l Dw� ra,tnb D ;p a ...Muted for - - - LDtPlan _ _ 41 in 40 39, �zz_3$ - �0 ,�
NOTE:
t«ann
42
_- -.- g- - -� I ".'.'..'.'.'.WEl.r4gg'..'.'.'.'.'.'.'.'.'.'.' .'.WErfnrl4' A � 1
,rMtn "` ,:ran wde.
2 2 m i• }+
...............
Stokes parallel - _ .
SECTION Stokes andami mumo;,ot«toenndthetoeofa L� - l
SECTION
9mded,tap.BtttBne am.I,iMaaMdb.M
Pat ouMbel�wadat.eedgeofte - -
�L aland �h,,;,n The ends to :�---:.. _ � �
<L ram 9 ewdn,a -r. . /2� i 30 31 Alp ti
t..
""' N. sit °ea)9 :...:.:.: 26 27 ^O 29 /- 32 33 34 35
ill I -W T 0 / i
0 maximum interval of 4 f.t era /
: d(//1//
of 0 feet if a,ia,aaw.ama Owed tna4lnnh �� r
q) ki/ vertically plumb,through the center.the silt
or Corn g rid 4 Mn.
placed
1 ��
io 1,2 hei ht of Io / l9 9a
:� I at a
Jment,b�:�wM lli r to Street �UN REN RED INaTAL ADDN Co e Ga /erew���e.�.m.,e�...ee..en��,�e.�w,, ::
_
geig���rcatwm, / ��i /
IaoMan,ILVIE.v ,. o«t` afar � ._...... CA1 �/ ( \ C qc
\wMulchorasP «xNmAL�WRA 9�enN.=g Ta _ _wamnnncraplllow for adanwpadnrocks
roMcteae N« rim) (ono.era)(�.so.m)(eon.m) am) .. _ .. ...........- 12 'a �\ .'.WET.LltNDS'. 0k to ax ,all m z m ^_ tb _ \ 22 20Prasllto Sock Bumfaw� �o reej]so re) ��"���"����������wattle /M (>a'"1 ci°"> (ego) : :-: :.:.:.:.:.:.:.:.:.:.::::_... \ 24 23 �-
wwkAma ,um kdam aor dduiode a.`a I' - - ��128_ /28 \einpawcm: T t t z x s l \ �-•;: �....._._ 1 0 -'M s%fit s tin r n�a non n Jiff maa,nre nil,wm�e aWsmbai:aa. / �_ �� - - - - � 73�� �11100111krigl
---
SILT \ _
/m/m) /rat/m) /Ira/m) /RI TE 4. a IN E PROTECTION a \ -�� _ _ �- -_�- -� /_----
3 \\��\
L SOCK/WATTLE FOR PERIMETER AND INLET 7?
• = _ '/- _� �- _ �� _ o
_____ -7
DATE: PAGE: / _ // /�� _ _ �� -�� �� �� \ \ I J
s
2 /? / /
Ba ..A.. ..B" ..C.. .D.. ..E.. ..F. .G. "H.. '*'7
/ / �� --) `1/11
i f ' 'I I- � I % % % % I Ise s, s d \ V )/)))) l
if R O doh ll nouor �. \ \ , ( --- i
( r ic
m I sous Q ❑
RO,-054rA4�1Fim.•„ -OApWAY 1..;P�RbS$� Y� H(a,�.• 6
__ / ' \ l / ///
CURB INLET OE or CURB Notes: . 1/11-"'
/ (/((//0/
// / ��
1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland / /
boundary and/or around protected trees,providing a radius of at least 1,25 feet for each / / I // / / 1 I I \ / /FLOWLEGE DI inchm Wnkaraman \ / 1 ' / / / (ie
\SILT FENCE --- 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on ) / / J /I \\ I / /\N scntiguo s and ha and fee adustew f necessary,for placement at low points.If lots are / / / / \ / / /contiguous antl have dMerent land owners or builders,each lot should have indivitlual Sitt l (` (II/ 11 /) / \SILT FENCE OUTLET ® 3ENE .Instalseptilrequired Silt Fence within iitfethe propertyensuretheistall isnOfConflict meM 1 \ / I ,
ENTRANCECONSTRUCTION septic system.el doe responsibility impact
of sap builder toand repair instal). Msetllment / / ` \\ I / / \� //fl/ \
CURB INLET control measures does not impact the septic system and repair area(sI. J I// C C
/ I/ I I /
d.Al least one Construction Enlance/Exit is b be installed per lot. / \ J \ / I f ) // \
5.Waste bins and other areas dedicated ee for managing building material waste shall be at \ \ \\ \ \ \ / `/\ /I//
lees[50 feet away from storm drain inlets or drainage dkches unless it can be shown that \ / /
no other alternative exists.If this separation cannot be achieved,these areas must be /
nails for
behind Sett Fence. \ \ \ \ ♦ ` \ \ \ /// /
6.Inlets downstream of disturbances should be protected;streets should be swept when \ 1 1 1 / /�//
sediment from the construction activity is present. //
..\NC-Environmenlel.jpeq ].Details for Silt Fence,Silt Fence Outlets,ConOUT WITH Entrances GUTTnd ER
other measures are Th
/ \ / \ \ \ \ \ t , I I / 1 \ 1 �/ ///�//// / I// �\
provided on additional sheets.Erosion and sediment control details are not drawn to scale. J 1I / 1 /7
------------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER
DATE: PAGE:
/ PAGE of
/ . ° MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION TOTAL DISTURBED ACREAGE: 4.67 ACRES
GQo) ,�y�yy{ LOT EROSION CONTROL PLAN
� �, General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be
Jam\` / ivil ii''i•''ii i• ..a relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. LOTS 1, 2, 9-1 1, 43, 44, cJ 55, rJ 7 & 5J 8
op
'~~~~~~~ �fnr COLLIER GATE
i�yy+y+y+y+y+y+yy+y+y'tii. , Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all
/-...- - - - - - - - - - -,10;,710;,A21 PAPA KM PAPV,PV,�-.yy, objectionable materials spilled,washed,or tracked onto public roadways.
�' _ ~Y�� �������ti Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.An sediment deposits that build u against the fence should be removed and disposed of/ _ Mn p y. y p p g p properly to insure ESTATES
�y" 1�Y•''ii'7•''i•'77'"i���•''��-. that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations.
ii 011/11011 FOR
e4�� :`�1i1i1i1i.i. 'e,o Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth
/ e3 5'. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. BENJAMIN STOUT REAL ESTATE SERVICES, INC.
-•• Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be CARVERS CREEK TOWNSHIP CUMBERLAND COUNTY
Construction: Maintenance: repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
I.Clear the entrance and exit area of all vegetation,roots.and other objectionable 1.Per NCG-01 Inspect at least once a week and after each 1 Inch or SCALE:111=120' FE B RUARY 2024
material and properly grade lt greater rainfall;make any required repairs immediately. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed GRAPHIC SCALE
2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment sediment shall be deposited within the project in such a waythat the sediment is not subject to erosion bwind or water.
smooth It. from leaving the construction site.This may require periodic j 120 0 60 120 240 480
3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone, 11
4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all
subject to seepage or high water table. tracked onto public roadways, fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET )
CONSTRUCTION ENTRANCE/EXIT m I
MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
PHONE(910)484-5191 FAX(910)484-0388 LICENSE MF-0106
LAST SAVED:2/21/2024 B:39 AM LAST PLOTTED:3/25/2024 10:52 AM PLOTTED BY.Dennis Gilbert nunvvur:G.\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-20 COLLIER GATE-EC\PLANS\COLDER GATE EC-LOTS 1.2,9-11.43,44,55.57&58.OWG