Loading...
HomeMy WebLinkAboutU-5536_Permit_dwgs_Modification_Site_1_20240328EOI DUCT BANK 216 FO 216 FO 432 FO 432 FO DUCT BANK DUCT BANK DUCT BANK DUCT BANK DUCT BANK432 FO432 FO 432 FO 216 FO 216 FO 216 FO 216 FO 432 FO X2CAB. EOI DUCT BANK DUCT BANK DUCT BANK DUCT BANK DUCT BANK DUCT BANK DUCT BANK 432 FO 432 FO 432 FO 432 FO 432 FO 432 FO 432 FO 432 FO 216 FO 216 FO 216 FO 216 FO216 FO 216 FO 216 FO 6 FO 432 FO BEGIN JS Grapevine Rd. Shallowford Rd. Shallowford Rd. Lewisville-vienna Rd. Hauser Dr. Lasley Rd. Williams Rd. Church Rd. Shallowford Rd. Williams Rd. Grapevine Rd. Conrad Rd. Franklin Rd. Rd. Conrad-Sawmill Lewisville-Clemmons Rd. Lewisville-Clemmons ReynoldsRd. Reynolds Rd. Lasley Rd. Grapevine Rd. Shallowford Rd. .06 1.35 .38 .11 1.02 .21 .10 1.01 .49 1.31 .43 1.53 .31 1.20 1.11 .27 .39 1.83 .48 1.55 .33 .31 .64 .65 .66 .44 .94 1.57 1171 1171 1173 1173 1001 1001 1001 1305 1175 1156 1308 1307 1001 1307 1308 1156 1160 1160 1001 1310 1305 3701 1312 1161 421 421 BA BB i/p WETLAND AND SURFACE WATER IMPACTS PERMIT N:\NC Hydro\M 18013_U-5536_Forsyth Co\Roadway\Proj\U5536_Hyd_prm _tsh_2.dgn M I ENGINEERING 3/28/2024 PERMIT MODIFICATION (SITE 1) 3-28-24 APPROVED 10-30-23 -Y2- -Y3- -L- POC STA. 70+44.54 END TIP PROJECT U-5536 -L- -L- THIS PROJECT IS WITHIN THE TOWNSHIP OF LEWISVILLE. FORSYTH COUNTY GRADING, DRAINAGE, AND PAVING U -5536 U-5536 N/A DAVID Z. KEISER, P.E. 2018 STANDARD SPECIFICATIONS N/A 8,200 ADAM M. CONRAD, P.E. CONNIE K. JAMES, P.E. 40 MINOR COLLECTOR FUNC CLASS = LENGTH ROADWAY TIP PROJECT U-5536 TOTAL LENGTH TIP PROJECT U-5536 1.130 MILES 1.130 MILES 44108.1.2 2040 % 60 12 3 % %K %1TTST %2DUALS D T V = = = = = =MPH ADT ADT 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK: 09/08/99 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 0 See Sheet 1-A For Index of Sheets 28-MAR-2024 17:08 N:\NC Hydro\M18013_U-5536_Forsyth Co\Roadw ay\Proj\U5536_Hyd_prm _tsh_2.dgn ljohns AT LINDA092017-PC CONTRACT: TIP PROJECT: ARTMEN N A S O H DEP T OF TRA SPORT TION TATE OF N RT CAROLINA Prepared in the Office of: VICINITY MAP NCDOT CONTACT 50 25 50 100 50 25 50 100 10 20105 P.E. See Sheet 1-B For Conventional Symbols = = FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. N.T.S. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 421 421 == -L- POT STA. 10+77.76 BEGIN TIP PROJECT U-5536 DRIVE SUNNY ACRES GREAT WAGON ROAD -RABT1- -Y4- ROAD TOM VOSS STREET DAVID MCKEE -RABT2- -Y1A- -Y5- -RABT3- ROADGREAT WAGON STREET STYERS CIRCLE CONRAD -Y8- -Y1B- LANE ESSO -Y7- -RABT4- BRIAR CREEK MANOR LOWES FOODS DRIVE -Y9- -Y9- POC STA. 13+95.00 END CONSTRUCTION -Y9- POT STA. 12+15.00 BEGIN CONSTRUCTION PROPOSED GREAT WAGON ROAD FROM SR 1001 ROAD) (SHALLOWFORD SR 1001 ROAD) (SHALLOWFORD SR 1001 ROAD)(WILLIAMSSR 1171 ROAD) CLEMMONS (LEWISVILLE SR 1156 ROAD) (SHALLOWFORD SR 1001 ROAD) (SHALLOWFORD SR 1001 TO SR 1103 ROAD) VIENNA (LEWISVILLE SR 1308 (SHALLOWFORD ROAD) TO SR 1308 (LEWISVILLE- VIENNA ROAD) IN LEWISVILLE ROAD) (SHALLOWFORD SR 1001 TO HWY 421 -Y3- POT STA. 12+30.98 BEGIN PAVING -Y3- POT STA. 11+18.91 BEGIN CONSTRUCTION STREET NORTHDRIVE BELNETTE -Y1A- POT STA. 11+35.00 BEGIN CONSTRUCTION -Y4- POT STA. 10+17.67 BEGIN CONSTRUCTION -Y6- POT STA. 14+30.00 END CONSTRUCTION -Y5- POC STA. 11+37.35 BEGIN CONSTRUCTION -Y1A- POT STA. 16+00.00 END CONSTRUCTION -Y6- POT STA. 10+18.02 BEGIN CONSTRUCTION -Y7- POT STA. 10+18.12 BEGIN CONSTRUCTION -Y8- POT STA. 12+10.10 BEGIN CONSTRUCTION U-5536 PROJECT END TIP U-5536 PROJECT BEGIN TIP FERRY ROAD) (STYERS -Y10- POT STA. 11+95.00 BEGIN CONSTRUCTION -Y10- -Y6- -Y10- POT STA. 13+76.19 END CONSTRUCTION 9 2024 MARCH 18, 2022 JUNE 18, 2024 -Y9--Y10- -Y1A- -Y5- -Y6- -Y8- TO THE LIMITS ESTABLISHED BY METHOD II. CLEARING ON THIS PROJECT SHALL BE PERFORMED 44108.2.1 44108.2.2 R/W UTIL REID ACRES LANE -L- POC STA. 71+31.65 END CONSTRUCTION -Y8- POT STA. 18+33.32 END PAVING -Y8- POC STA. 24+26.81 END CONSTRUCTION -Y2- POC STA. 12+49.56 END PAVING -Y2- POT STA. 13+05.00 END CONSTRUCTION 75% ROW PLANS N/A N/A SITE 1 SITE 4 9 7 8 6 5 4 -L- SITE 2 SITE 3 NA 2011 NAD 83/ SHEET 1 OF 12 PERMIT DRAWING 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G S 8" VC 8" PVC 8" PVC 8" PVC 15" RCP CB CB CB CB CB DIDI12" PVC 12" PVC 15" RCP 18" RCP 18" RCP CB CB CB CB CB CB 18" RCP 18" RCP 18" RCP 24" RCP DI 24" HDPE 15" CMP 18" RCP 18" CMP DI DI 24" RCP 15" RCP 18" RCP 24" RCP CB CB CB CB 15" HDPE 15" HDPE 24" HDPE 18" RCP 18" RCP CB CB CB 24" RCP CB DI DI DIDI24" RCP 24" RCP 30" RCP 36" RCP 15" RCP JB 15" RCP JBJB W 12" RCP TOWN OF LEWISVILLE CHARLIES PLACE LLC TOWN OF LEWISVILLE MELVIN G SHEETS & JAQUELYN S HARRELL TOWN OF LEWISVILLE STEPHANIE SURRATT LANIER WILLIAMS REAL ESTATE LLC FORSYTH COUNTY RODNEY L MESSER EIP EIP EIP EIP EIP EIP EIP EIP EIP BILLIE GRIMES OLIVER J. GRIMES, SR & EIP EIP EIP EIP EIP EIP EIP EIP CANDYCE S BROWN JAMES E PLUMMER &DEVELOPMENT LLC SOLOMON TERESA STEELMAN PHILIP R. STEELMAN & GALE W. KEY BOBBY RAY & ASSOCIATES LLC GUARDIAN LT LT LT LT LT PAVED 1SBKBUS 2SBKBUS GR LT LT LT LT LT LT LT LT LT LTLT LT LT LTLTLT LT LT LT LT LT LT LTLT S BLDG WAGON COVERED 48" CONC LT S 96" CONC 96" CONC 96" CONC LT LT LT LT LT 1SFD PAVED PAVED LT PAVED 2SBKBUS 1SBKBUS LT S S 96" CONC S S 60" CONC 60" CONC 84" CONC 24" C&G 48" CONC CONC 60" S MB LT S GAZ WALL BK RET CONC 12" RCP CONC 1SBKD 36" CONC PAVED 12" CLAY GR 60" CONC PLAY GRD 24" C&G96" CONC 24" C&G DK 15" RCP CONC BK RET WALL WALL BK RET 1SBK&BLKBUS LT CONC 6" C&G PAVED LT LTLT LT 60" CONC 24" C&G 48"CONC CONC CONC 1SFBUS W 60" CONC 96" CONC LT PLAY GROUND S 15' BK 12' BK WALL BK 96" CONC 84" CONC LT 9' CONC 60" CONC LT LT LT S LT LT W/LT W/LT W/LT DITCH DITCH BRANCH BRANCH BRANCH BRANCH DITCH BM2 EXIST R/W CONC RAMP WD W/LT GR 54" WI CONC S 1SBKD DB 2498 PG 4079 EASE. FOR REMAINING UTILITIES DB 2498 PG 3294 BELNETTE RD CLOSED PER EIPEIP JAMES O WILSON, ET AL BETTIE WILSON & EASE(PB42 PG31) TEMPORARY CONST. EASE(PB42 PG31) PERM. DRAINAGE INV=955.87 TOP LID=960.95OUT=957.95 INV=955.34 TOP=962.25 IN=959.45 OUT=957.93 TOP=965.41 IN=961.36 OUT=961.01TOP=965.38 OUT=962.55 TOP=965.70 IN =961.41 OUT=961.41 TOP=963.88 OUT=959.28 TOP=965.57 IN=960.43 OUT=960.07 TOP=964.05 OUT=959.05 TOP=966.70 TOP=968.84 IN=963.37 OUT=963.29 IN=963.29 OUT=963.37 TOP=963.74 OUT=957.84 IN=957.84 TOP=951.68 OUT=945.01 TOP=951.33 IN=944.69 OUT=944.68 TOP=949.22 IN (18")=944.45 IN (24")=943.89 OUT=943.75 TOP=950.36 TOP LID=947.76 IN=947.58 TOP=949.15 OUT=947.50 IN=943.22 OUT=943.15 TOP LID=945.49 IN=941.49 OUT=941.49 TOP=950.41 INV=948.02 TOP=950.43 IN (24")=947.05 IN (15")=946.91 OUT=946.89 TOP=953.68 OUT=948.78 TOP=954.13 OUT=951.53 TOP=961.60 OUT=954.10 IN=954.20 INV=940.91 INV=941.01 INV=941.10 TOP LID=945.02 IN=940.92 OUT=940.92 TOP=956.43 IN (15")=954.54 IN (18")=953.88 OUT=953.50 TOP=956.74 OUT=954.64TOP=955.54 OUT=945.54 IN (FROM SW)=945.64 IN (FROM NE)=945.54 TOP=954.67 IN=952.08 OUT=951.49 TOP=954.86 OUT=952.81 TOP=956.15 OUT=947.35 IN=947.35 TOP=955.47 IN (18")=951.42 IN (15")=951.31 OUT=951.13 INV=951.10 TOP=956.05 IN=953.80 OUT=953.60 TOP=954.67 OUT=952.56 TOP=956.56 OUT=948.74 IN=948.76 TOP=956.37 OUT=954.40 TOP=957.91 OUT=950.28 IN=950.28 EASE(PB42 PG31) TEMPORARY CONST. EASE(PB42 PG31) PERM. DRAINAGE EXIST R/W(PB42 PG31) EXIST RW(PB42 PG31) EXIST R/W(PB42 PG31) (PB42 PG31) EXIST R/W EXIST R/W(PB42 PG31) EXIST R/W(PB42 PG31) EXIST R/W(PB42 PG31) (PB42 PG31) EXIST R/W (PB42 PG31) EXIST R/W LAWSON TIMOTHY LEE EXIST R/W=PROP LINE 15" STL 15" STL 15" STL LLC SOLOMON DEV. BAPTIST MEDICAL CTR WAKE FOREST UNIV. 30.00' 30.0' (30.3') VAR EXIST R/W PROP LINE EXIST R/W= (31.9') VAR NORTH ST. (PAVED VARIES) BELNETTE DR. (18' PAVED) GREAT WAGON RD. (36' PAVED) DAVID McKEE ST. (PAVED VARIES) R/W EXIST EXIST R/W=PROP LINE 60.00' EXIST R/W EXIST R/W R/W EXIST EXIST R/W EXIST R/W 60.00' 58.7'(VAR) 60.0' 60.0' 60.0' EXIST R/W EXIST R/W EXIST R/W EXIST R/W 60.00' 8"DI 8"DI 8"DI 8"VC/DI EASEMENT UTILITY UTILITY EASEMENT EIP (BENT) EIP EIP 27.3'(VAR) EXIST R/W=PROP.LINE TO INV) (UNABLE l I 60"CONC BATH 1SBK W/BK WALK TRELLIS IN(18"CMP)=951.49 IN(18"RCP)=949.04 IN(15")=949.74 W/30"C&G PAVED RAP RIP- NO OUTLETTO SHALLOWFORD RD 24"RCP 36' PAVED W/30"C&G SHALLOWFORD RD. (SR 1001) 60" CONC 60" CONC W/6"CURB PAVED WALL BK RET WALL BK RET aaa I a CUT & EXPOSED (2) T LINES 4 III II H IIII I Iaaaaa a c c b bQ I I a Q a IN PNG HH PROTECTION CATHODIC UNDERGROUND EOI EOI EOI EOI EOI EOI 6" DI 6" DI 4" STEEL 4" STEEL 6" DI 6" DI 12" DI 2" STEEL 6" DI 6" DI 12" DI 8" DI 6" DI 6" DI EASE UTIL NORTH ST. (20' PAVED) 3" PLAS 4" STL 18"RCP 4"STL CONC 36" & GIFTS LLC TEXTURE SALON JAMES O WILSON, ET AL BETTIE WILSON & FORSYTH COUNTY LANIER WILLIAMS REAL ESTATE LLC JERRY O. SHEETS JACQUELYN S HARRELL & MELVIN G SHEETS JAQUELYN S HARRELL MELVIN G SHEETS & PAVED GR CONC 1SFBUS 72"CONC T EOI DUCT BANK 216 FO 216 FO 432 FO 432 FO DUCT BANK 432 FO 216 FO CB REMOVE CB REMOVE CB CB REMOVE REMOVE CB CB 15"15" 7 SY GEOTEXTILE 2 TONS CL B RIP RAP OUTLET PROTECTION MIN D CB MIN D CB MIN D CB REMOVE RETAIN RETAIN RETAIN RETAIN RETAIN MIN D CB 15" 15" RCP-V RCP-V 15" 18" REMOVE CB 4 LF PIPE REMOVE COLLAR AND EXTEND CB Adj. CB CB CB CB GRADE TO DRAIN DI SEE CROSS SECTIONS SPECIAL SHOULDER GRADING CB CBCB REMOVE 15" RCP-V 15" RCP-V 15" 18" RCP-III 15" RCP-V RETAIN 18" RCP-III 15"RCP-V DICB CB REMOVE RETAIN RETAIN GRADE TO DRAIN 15" RCP-V 15" RCP-V CB MIN D CB 15" RCP-IV 18" 18"15" RCP-V CB 2:1 2:1 D ( Not to Scale) STANDARD 'V' DITCH L=45', S=0.33%, DDE=6 CY TO STA. 12+65, 92' RT FROM Y4 STA. 12+59, 47' RT Min. D=1 Ft. DETAIL 5D Ground Natural Ground Natural SEE DETAIL 5D STANDARD 'V' DITCH COLLAR AND EXTEND 15" RCP-V GRADE TO DRAIN SEE DETAIL 5C SPECIAL LATERAL 2' BASE DITCH RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN 36" RCP-III 30" 15" FLOWABLE FILL SEE DETAIL 5A CURB CUT DITCH SPECIAL BACK OF 2:1 D B ( Not to Scale) Flatter2:1 or SPECIAL LATERAL BASE DITCH FROM L STA. 28+21 TO STA. 28+61 RT DETAIL 5C B=2 Ft. Min. D=1 Ft. Ground Natural Slope Fill SEE DETAIL 5B EST 73 TONS, EST 226 SY GF TOE PROTECTION CB 30" RCP-III 30" RCP-III DO NOT BURY BURY DO NOT 56 SY GEOTEXTILE 28 TONS CL I RIP RAP SEE DETAIL 5E BANK STABILIZATIOIN 24 SY GEOTEXTILE 9 TONS CL I RIP RAP SEE DETAIL 5E BANK STABILIZATIOIN FROM L STA. 27+60 TO STA. 30+50 LT. Fill Slope 2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner= B Rip-Rap b DETAIL 5B Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 30" RCP-III 36" RCP-III 30" RCP-III 30" 30" RCP-III RCP-III 18" ( Not to Scale) 2:12:1 D B b LATERAL BASE DITCH 1"/Ft. FROM L STA. 25+22 TO STA. 27+36 LT. DETAIL 5F b=3 Ft. B=2 Ft. Min. D=1.2 Ft. Ground Natural Slope Fill SEE DETAIL 5F LATERAL 2' BASE DITCH 10 SY GEOTEXTILE 3 TONS CL B RIP RAP OUTLET PROTECTION (Variable) Channel Bed (TYP) 2ft Bottom Until Refusal (Typ) Press Riprap into Channel 1.5:1 OR FLATTER d FLATTER 1.5:1 OR Minimum of 1ft (TYP) Tuck Geotextile a 28-M AR-2024 16:58 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_05_2.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. ENGINEER HYDRAULICS REVISIO NS M ATCH LIN E -L- PO T STA. 38+ 00.00 SEE SHEET 6 MATCH LINE -L- POT STA. 24+ 00.00 SEE SHEET 4 U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_05_2.dgn M I ENGINEERING 3/28/2024 5 SITE 1 PLAN VIEW 4 OF 12 FOR ENLARGEMENT SEE PERMIT DRAWING SHEET ( Not to Scale) Elevation Natural Bed Ground Natural Ground Natural Geotextile* 18" PIPE INLET/OUTLET BANK STABILIZATION DETAIL 5E Est.= See Below Tons of Class I Rip-Rap, Keyed-In d= See Below Length= See Below on Jurisdictional Streams 2ft Outside Top of Ditch Slopes *Rip-Rap to be Installed to 9 Tons RipRap, 24 SY Geotextile, DDE=9CY L STA. 28+21 RT, L=12', d=1.0' 28 Tons RipRap, 56 SY Geotextile, DDE=19CY L STA. 27+55 LT, L=30', d=2.8', C C C C F F F F F F F F F C F F C C F C F F FFF C C C C C C 5 8 9 10 15 12 13 14 16 16 7 11 6B 21A 11 PROP. R/W +67.00 30.00' RT +71.00 39.00' LT +37.00 52.00' LT EX. R/W +32.00 EX. EASEMENT +00.00 25 30 35 -Y4- POT STA. 10+17.67 BEGIN CONSTRUCTION -Y9- POT STA. 12+15.00 BEGIN CONSTRUCTION -Y9- POC STA. 13+95.00 END CONSTRUCTION 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 10' CONC. SIDEWALK 5' CONC. SIDEWALK 10' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. SIDEWALK 10' CONC. SIDEWALK CR CR CR CR CRCR CR CR CRCR CR CR SIDEWALK 5' CONC. SIDEWALK 10' CONC. 15 SIDEWALK 10' CONC. DRIVEWAY 6" CONC. 15 -Y10- POT STA. 11+95.00 BEGIN CONSTRUCTION -Y10- POT STA. 13+76.19 END CONSTRUCTION -L- POT STA. 32+71.93 BEGIN CONST. -L- POT STA. 33+12.26 END CONST. CR CR HISTORIC MARKER DO NOT DISTURB HISTORIC MARKER DO NOT DISTURB CR CR 18" RCP-IV 30" S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY GRAPHIC SCALE 0'50'100'150'50' NAD 83/NA 2011 SHEET 2 OF 12 PERMIT DRAWING 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G 24" C&G S 8" VC 8" PVC 8" PVC 8" PVC 15" RCP CB CB CB CB CB DIDI12" PVC 12" PVC 15" RCP 18" RCP 18" RCP CB CB CB CB CB CB 18" RCP 18" RCP 18" RCP 24" RCP DI 24" HDPE 15" CMP 18" RCP 18" CMP DI DI 24" RCP 15" RCP 18" RCP 24" RCP CB CB CB CB 15" HDPE 15" HDPE 24" HDPE 18" RCP 18" RCP CB CB CB 24" RCP CB DI DI DIDI24" RCP 24" RCP 30" RCP 36" RCP 15" RCP JB 15" RCP JBJB W 12" RCP TOWN OF LEWISVILLE CHARLIES PLACE LLC TOWN OF LEWISVILLE MELVIN G SHEETS & JAQUELYN S HARRELL TOWN OF LEWISVILLE STEPHANIE SURRATT LANIER WILLIAMS REAL ESTATE LLC FORSYTH COUNTY RODNEY L MESSER EIP EIP EIP EIP EIP EIP EIP EIP EIP BILLIE GRIMES OLIVER J. GRIMES, SR & EIP EIP EIP EIP EIP EIP EIP EIP CANDYCE S BROWN JAMES E PLUMMER &DEVELOPMENT LLC SOLOMON TERESA STEELMAN PHILIP R. STEELMAN & GALE W. KEY BOBBY RAY & ASSOCIATES LLC GUARDIAN LT LT LT LT LT PAVED 1SBKBUS 2SBKBUS GR LT LT LT LT LT LT LT LT LT LTLT LT LT LTLTLT LT LT LT LT LT LT LTLT S BLDG WAGON COVERED 48" CONC LT S 96" CONC 96" CONC 96" CONC LT LT LT LT LT 1SFD PAVED PAVED LT PAVED 2SBKBUS 1SBKBUS LT S S 96" CONC S S 60" CONC 60" CONC 84" CONC 24" C&G 48" CONC CONC 60" S MB LT S GAZ WALL BK RET CONC 12" RCP CONC 1SBKD 36" CONC PAVED 12" CLAY GR 60" CONC PLAY GRD 24" C&G96" CONC 24" C&G DK 15" RCP CONC BK RET WALL WALL BK RET 1SBK&BLKBUS LT CONC 6" C&G PAVED LT LTLT LT 60" CONC 24" C&G 48"CONC CONC CONC 1SFBUS W 60" CONC 96" CONC LT PLAY GROUND S 15' BK 12' BK WALL BK 96" CONC 84" CONC LT 9' CONC 60" CONC LT LT LT S LT LT W/LT W/LT W/LT DITCH DITCH BRANCH BRANCH BRANCH BRANCH DITCH BM2 EXIST R/W CONC RAMP WD W/LT GR 54" WI CONC S 1SBKD DB 2498 PG 4079 EASE. FOR REMAINING UTILITIES DB 2498 PG 3294 BELNETTE RD CLOSED PER EIPEIP JAMES O WILSON, ET AL BETTIE WILSON & EASE(PB42 PG31) TEMPORARY CONST. EASE(PB42 PG31) PERM. DRAINAGE INV=955.87 TOP LID=960.95OUT=957.95 INV=955.34 TOP=962.25 IN=959.45 OUT=957.93 TOP=965.41 IN=961.36 OUT=961.01TOP=965.38 OUT=962.55 TOP=965.70 IN =961.41 OUT=961.41 TOP=963.88 OUT=959.28 TOP=965.57 IN=960.43 OUT=960.07 TOP=964.05 OUT=959.05 TOP=966.70 TOP=968.84 IN=963.37 OUT=963.29 IN=963.29 OUT=963.37 TOP=963.74 OUT=957.84 IN=957.84 TOP=951.68 OUT=945.01 TOP=951.33 IN=944.69 OUT=944.68 TOP=949.22 IN (18")=944.45 IN (24")=943.89 OUT=943.75 TOP=950.36 TOP LID=947.76 IN=947.58 TOP=949.15 OUT=947.50 IN=943.22 OUT=943.15 TOP LID=945.49 IN=941.49 OUT=941.49 TOP=950.41 INV=948.02 TOP=950.43 IN (24")=947.05 IN (15")=946.91 OUT=946.89 TOP=953.68 OUT=948.78 TOP=954.13 OUT=951.53 TOP=961.60 OUT=954.10 IN=954.20 INV=940.91 INV=941.01 INV=941.10 TOP LID=945.02 IN=940.92 OUT=940.92 TOP=956.43 IN (15")=954.54 IN (18")=953.88 OUT=953.50 TOP=956.74 OUT=954.64TOP=955.54 OUT=945.54 IN (FROM SW)=945.64 IN (FROM NE)=945.54 TOP=954.67 IN=952.08 OUT=951.49 TOP=954.86 OUT=952.81 TOP=956.15 OUT=947.35 IN=947.35 TOP=955.47 IN (18")=951.42 IN (15")=951.31 OUT=951.13 INV=951.10 TOP=956.05 IN=953.80 OUT=953.60 TOP=954.67 OUT=952.56 TOP=956.56 OUT=948.74 IN=948.76 TOP=956.37 OUT=954.40 TOP=957.91 OUT=950.28 IN=950.28 EASE(PB42 PG31) TEMPORARY CONST. EASE(PB42 PG31) PERM. DRAINAGE EXIST R/W(PB42 PG31) EXIST RW(PB42 PG31) EXIST R/W(PB42 PG31) (PB42 PG31) EXIST R/W EXIST R/W(PB42 PG31) EXIST R/W(PB42 PG31) EXIST R/W(PB42 PG31) (PB42 PG31) EXIST R/W (PB42 PG31) EXIST R/W LAWSON TIMOTHY LEE EXIST R/W=PROP LINE 15" STL 15" STL 15" STL LLC SOLOMON DEV. BAPTIST MEDICAL CTR WAKE FOREST UNIV. 30.00' 30.0' (30.3') VAR EXIST R/W PROP LINE EXIST R/W= (31.9') VAR NORTH ST. (PAVED VARIES) BELNETTE DR. (18' PAVED) GREAT WAGON RD. (36' PAVED) DAVID McKEE ST. (PAVED VARIES) R/W EXIST EXIST R/W=PROP LINE 60.00' EXIST R/W EXIST R/W R/W EXIST EXIST R/W EXIST R/W 60.00' 58.7'(VAR) 60.0' 60.0' 60.0' EXIST R/W EXIST R/W EXIST R/W EXIST R/W 60.00' 8"DI 8"DI 8"DI 8"VC/DI EASEMENT UTILITY UTILITY EASEMENT EIP (BENT) EIP EIP 27.3'(VAR) EXIST R/W=PROP.LINE TO INV) (UNABLE l I 60"CONC BATH 1SBK W/BK WALK TRELLIS IN(18"CMP)=951.49 IN(18"RCP)=949.04 IN(15")=949.74 W/30"C&G PAVED RAP RIP- NO OUTLETTO SHALLOWFORD RD 24"RCP 36' PAVED W/30"C&G SHALLOWFORD RD. (SR 1001) 60" CONC 60" CONC W/6"CURB PAVED WALL BK RET WALL BK RET aaa I a CUT & EXPOSED (2) T LINES 4 III II H IIII I Iaaaaa a c c b bQ I I a Q a IN PNG HH PROTECTION CATHODIC UNDERGROUND EOI EOI EOI EOI EOI EOI 6" DI 6" DI 4" STEEL 4" STEEL 6" DI 6" DI 12" DI 2" STEEL 6" DI 6" DI 12" DI 8" DI 6" DI 6" DI EASE UTIL NORTH ST. (20' PAVED) 3" PLAS 4" STL 18"RCP 4"STL CONC 36" & GIFTS LLC TEXTURE SALON JAMES O WILSON, ET AL BETTIE WILSON & FORSYTH COUNTY LANIER WILLIAMS REAL ESTATE LLC JERRY O. SHEETS JACQUELYN S HARRELL & MELVIN G SHEETS JAQUELYN S HARRELL MELVIN G SHEETS & PAVED GR CONC 1SFBUS 72"CONC T EOI DUCT BANK 216 FO 216 FO 432 FO 432 FO DUCT BANK 432 FO 216 FO CB REMOVE CB REMOVE CB CB REMOVE REMOVE CB CB 15"15" 7 SY GEOTEXTILE 2 TONS CL B RIP RAP OUTLET PROTECTION MIN D CB MIN D CB MIN D CB REMOVE RETAIN RETAIN RETAIN RETAIN RETAIN MIN D CB 15" 15" RCP-V RCP-V 15" 18" REMOVE CB 4 LF PIPE REMOVE COLLAR AND EXTEND CB Adj. CB CB CB CB GRADE TO DRAIN DI SEE CROSS SECTIONS SPECIAL SHOULDER GRADING CB CBCB REMOVE 15" RCP-V 15" RCP-V 15" 18" RCP-III 15" RCP-V RETAIN 18" RCP-III 15"RCP-V DICB CB REMOVE RETAIN RETAIN GRADE TO DRAIN 15" RCP-V 15" RCP-V CB MIN D CB 15" RCP-IV 18" 18"15" RCP-V CB 2:1 2:1 D ( Not to Scale) STANDARD 'V' DITCH L=45', S=0.33%, DDE=6 CY TO STA. 12+65, 92' RT FROM Y4 STA. 12+59, 47' RT Min. D=1 Ft. DETAIL 5D Ground Natural Ground Natural SEE DETAIL 5D STANDARD 'V' DITCH COLLAR AND EXTEND 15" RCP-V GRADE TO DRAIN SEE DETAIL 5C SPECIAL LATERAL 2' BASE DITCH RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN 36" RCP-III 30" 15" FLOWABLE FILL SEE DETAIL 5A CURB CUT DITCH SPECIAL BACK OF 2:1 D B ( Not to Scale) Flatter2:1 or SPECIAL LATERAL BASE DITCH FROM L STA. 28+21 TO STA. 28+61 RT DETAIL 5C B=2 Ft. Min. D=1 Ft. Ground Natural Slope Fill SEE DETAIL 5B EST 73 TONS, EST 226 SY GF TOE PROTECTION CB 30" RCP-III 30" RCP-III DO NOT BURY BURY DO NOT 56 SY GEOTEXTILE 28 TONS CL I RIP RAP SEE DETAIL 5E BANK STABILIZATIOIN 24 SY GEOTEXTILE 9 TONS CL I RIP RAP SEE DETAIL 5E BANK STABILIZATIOIN FROM L STA. 27+60 TO STA. 30+50 LT. Fill Slope 2:1 or Flatter b=3 Ft. d=1 Ft. Type of Liner= B Rip-Rap b DETAIL 5B Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 30" RCP-III 36" RCP-III 30" RCP-III 30" 30" RCP-III RCP-III 18" ( Not to Scale) 2:12:1 D B b LATERAL BASE DITCH 1"/Ft. FROM L STA. 25+22 TO STA. 27+36 LT. DETAIL 5F b=3 Ft. B=2 Ft. Min. D=1.2 Ft. Ground Natural Slope Fill SEE DETAIL 5F LATERAL 2' BASE DITCH 10 SY GEOTEXTILE 3 TONS CL B RIP RAP OUTLET PROTECTION (Variable) Channel Bed (TYP) 2ft Bottom Until Refusal (Typ) Press Riprap into Channel 1.5:1 OR FLATTER d FLATTER 1.5:1 OR Minimum of 1ft (TYP) Tuck Geotextile a 930 935 935 935 940 940 940 940 940 940 940 940 940 940 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 955 955 955 955 955955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 960 960 960 960960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 965 970 970 970 970 970 970 28-M AR-2024 16:58 N:\NC Hydro\M18013_U-5536_Forsyth Co\Hydraulics\PERMITS_Environmental\Drawings\U5536_Hyd_prm_psh_05_3_con.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. ENGINEER HYDRAULICS REVISIO NS M ATCH LIN E -L- PO T STA. 38+ 00.00 SEE SHEET 6 MATCH LINE -L- POT STA. 24+ 00.00 SEE SHEET 4 U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_05_3_con.dgn M I ENGINEERING 3/28/2024 5 4 OF 12 FOR ENLARGEMENT SEE PERMIT DRAWING SHEET SITE 1 PLAN VIEW ( Not to Scale) Elevation Natural Bed Ground Natural Ground Natural Geotextile* 18" PIPE INLET/OUTLET BANK STABILIZATION DETAIL 5E Est.= See Below Tons of Class I Rip-Rap, Keyed-In d= See Below Length= See Below on Jurisdictional Streams 2ft Outside Top of Ditch Slopes *Rip-Rap to be Installed to 9 Tons RipRap, 24 SY Geotextile, DDE=9CY L STA. 28+21 RT, L=12', d=1.0' 28 Tons RipRap, 56 SY Geotextile, DDE=19CY L STA. 27+55 LT, L=30', d=2.8', C C C C F F F F F F F F F C F F C C F C F F FFF C C C C C C 5 8 9 10 15 12 13 14 16 16 7 11 6B 21A 11 PROP. R/W +67.00 30.00' RT +71.00 39.00' LT +37.00 52.00' LT EX. R/W +32.00 EX. EASEMENT +00.00 25 30 35 -Y4- POT STA. 10+17.67 BEGIN CONSTRUCTION -Y9- POT STA. 12+15.00 BEGIN CONSTRUCTION -Y9- POC STA. 13+95.00 END CONSTRUCTION 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 10' CONC. SIDEWALK 5' CONC. SIDEWALK 10' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. SIDEWALK 10' CONC. SIDEWALK CR CR CR CR CRCR CR CR CRCR CR CR SIDEWALK 5' CONC. SIDEWALK 10' CONC. 15 SIDEWALK 10' CONC. DRIVEWAY 6" CONC. 15 -Y10- POT STA. 11+95.00 BEGIN CONSTRUCTION -Y10- POT STA. 13+76.19 END CONSTRUCTION -L- POT STA. 32+71.93 BEGIN CONST. -L- POT STA. 33+12.26 END CONST. CR CR HISTORIC MARKER DO NOT DISTURB HISTORIC MARKER DO NOT DISTURB CR CR 18" RCP-IV 30" S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY GRAPHIC SCALE 0'50'100'150'50' NAD 83/NA 2011 SHEET 3 OF 12 PERMIT DRAWING DI 24" RCP 30" RCP 36" RCP MELVIN G SHEETS & JAQUELYN S HARRELL ASSOCIATES LLC GUARDIAN BRANCH BRANCH DITCH EASE(PB42 PG31) PERM. DRAINAGE TOP LID=945.49 OUT=941.49 INV=940.91 INV=941.01 INV=941.10 TOP LID=945.02 IN=940.92 OUT=940.92 EASE(PB42 PG31) TEMPORARY CONST. EASE(PB42 PG31) PERM. DRAINAGE EXIST R/W(PB42 PG31) EXIST RW(PB42 PG31) JAQUELYN S HARRELL MELVIN G SHEETS & REMOVE CB REMOVE REMOVE CBCB GRADE TO DRAIN 36" FLOWABLE FILL 30" RCP-III DO NOT BURY BURY DO NOT 36" RCP-III 30" RCP-III 30" 30" RCP-III 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC ENGINEER HYDRAULICS REVISIO NS U-5536 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_05_4_enlarge.dgn M I ENGINEERING 3/28/2024 55 SITE 1 ENLARGEMENT PLAN 29 -L- 030 15 30 SCALE: 1"= 30' HORIZ. 28 27 NAD 83/NA 2011 F F F C C 9 11 2'-6" C&G 2'-6" C&G 10' CONC. SIDEWALK 5' CONC. SIDEWALK TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES PERMANENTSS LEGEND SHEET 4 OF 12 PERMIT DRAWING ESSO LN. (15' GR) 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 36" CMP 30" CMP 24" CMP 18" CMP 15" RCPCB CB CB CB CB DI DI 15" RCP 15" RCP 12" HDPE CB CB CB DI DI DI DI 15" RCP 18" RCP 15"HDPE 15"HDPE 15" CMP 8" VC 8" DI 8" VC 8" VC 8" VC 8" VC 8" VC 8" DI 8" VC 8" DI 24" RCP CB CB CB CB DI 15" RCP 8" HDPE 8" HDPE 18" HDPE U5536-5 UNKNOWN END 15" HDPE ANDREW P BOBOTSIARES ANDREW P BOBOTSIARES LDG 434AF&AM WEST BEND MASONIC MICHAEL R & JULIE COLLINS JOHN W OWEN JARVIS E & NAN JOHNSON LEWISVILLE UNITED METHODIST CHURCH JASON J CASERTANO LDG #434 TRST WESTBEND MASONIC REX D & MARTHA B JENNINGS THOMAS H FOWLER FAMILY LLC THOMAS H FOWLER FAMILY LLC LILLIE C HICKS RALPH M HICKS SHARON C WARREN WHITE DENVER OIL CO INC EIP EIP EIP EIPEIP EIP REX D & MARTHA B JENNINGS EIP EIP EIP EIP EIPNAIL EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP COMPANY SONOMA BUILDING TOWN OF LEWISVILLE NAILP/K LT LT PAVED LT 42" CONC LT PAVED LT LT S LT LT 2SBKBUS 1SFD GR PAVED 1SFD PAVED 1SFD 42" CONC LT LT LT LT 60" CONC PAVED 48" CONC LT LTLT LT LT LT LT LT PAVED LT LT LT LT LT LT LT S PAVED PAVED GR GR 1SFD 24" CONC 1SFD 1SBKBUS 48" CONC PAVED 1SBKBUS LT LT GR LT GR 1SBK&BLKBUS 2SBK&BLKBUS LT PAVED CONC WALLBLK RET CONC48" PAVED DK GR CONC CONC LT MTW TANK SEPTIC 1SBKBUS 48" CHL 48" CHL S 1SFD 1SFD 48" CHL CONC 60" CHL CONC S 48" CHL CONC 1S CHL S DKB 48"CHL G 2SBK CHURCH LT PLAY GROUND CONC LT 60" CONC 48" BK W/WI BK S PAVED S DK DK DK 1SFD CONC PAVED S GR CONC 60" CONC LT LT LT CONC 1SFBUS 1SFBUS 1SFBUS 1SFBUS 72" WD WD GATE GZCONC 24" C&G 60" CONC 2SFBUS 1SFBUS 84" CONC S LT 1SBKD 12" HDPE 60" CONC MTL S S PAVED 48" CONC CAN METAL DK 84" CONC CONC 84" CONC CONC RUINS GR LT BRANCH DITCH DITCH DITCH EIP 48" CHL EIP NAIL P/K NAIL P/K 1SBKBUS PAVED BST CURB SIGNHISTORICAL LT LT LT 36" SR CONC 60" CHL S S MTL 60" CHL 48" CHL 48"CONC MTW CAN 60.00' 60.00' (SEE PB 46 PG 162) EXIST R/W (SEE PB 46 PG 162) EXIST R/W 60.00' TOP=945.05 OUT=941.65 TOP=943.75OUT=937.40 TOP=949.74IN=946.84OUT=946.74 TOP=943.73OUT=938.43 TOP=949.95 TOP=944.20 OUT=947.35 OUT=940.40 TOP=945.87IN=941.57OUT=941.17 TOP=953.38OUT=946.58 TOP=954.80IN=951.95OUT=951.70OUT=949.98 TOP=955.46 TOP=947.09 OUT=943.75 TOP=947.80OUT=942.96 IN=942.96 TOP=943.16 OUT=939.77 TOP=947.53 OUT=945.23 TOP=947.52 IN=943.94 OUT=943.67 TOP=947.20 OUT=944.50 TOP=951.08OUT=944.62 IN=944.68 TOP=946.40 IN=944.85 OUT=944.85 TOP=947.66 IN=946.06 OUT=946.06 TOP=957.30 OUT=948.06 IN=948.09 TOP=952.79 OUT=944.69IN=944.69 TOP=947.85 OUT=946.83 INV=943.74 INV=944.55 TOP=951.72 OUT=949.42 TOP=951.47 OUT=948.07 TOP=951.42 OUT=947.52 TOP=951.89 TOP LID=950.22 IN=947.07 OUT=945.52 TOP=951.50 IN=947.92 OUT=947.78 GREAT WAGON RD. (36' PAVED) GREAT WAGON RD. (36' PAVED)T/A LEW AUTO SER REICH W S INC RICHARD STIMSON FOWLER FAMILY LLC THOMAS H TAYLOR DAVID E 60.00' 60.00' R/W EXIST R/W EXIST EXIST R/W EXIST R/W EXIST R/W(PB 19 PG 100) EXIST R/W EXIST R/W SANDRA M SPACH TANYA M TISE & MNGMNT LLC J&K PROPERTY MNGMNT LLC J&K PROPERTY MNGMNT LLC J&K PRPRTY QUIRANTE D. A. DOSDOS RYAN L REEDY & EXIST R/W EXIST R/W45.00' 935.47 INV= (DB 1726 PG 2080)ACCESS EASE MTW UTIL.EASE 10'UTIL EASEMENT 10'UTIL EASEMENT MAG MB (BENT) EIP END UNK IN (24")=937.63 IN (30")=937.40 (SEE PB 46 PG 162) EXIST R/W (PB 46 PG 162) EXIST R/W 30"CMP 12"PVC DI TOP=944.45' (DATUR) INV=937.5' OUT=943.05IN(SW)=943.07IN(NE)=943.13 24" RCP BASE CONC W/24"C&GPAVED W/24"C&GPAVED GR W/24"C&G PAVED AXLE CONRAD CIR. (19' PAVED) TO SHALLOWFORD RD SHALLOWFORD RD. (SR 1001) 36' PAVED w/30"C&G UNKEND 60" CONC 60" CONC IN(24")=947.62 IN(15")=947.62 24"RCP 15"RCP DI 60"CONC 15"RCP RAP RIP- END UNK INV=943.21 INV=943.36 IN(30")=938.73 IN(15")=939.73 HDPE 15" 15"RCP CHRISTIE B SEVERINO PHILIP F & CRYSTAL R LILLY AARON L & ca a I I a H I a I a a a } Ha I I H a a a a aaa a a a a a I IH I c nnn}| Q d a a a I I a a b I I I I II a nn } EORI EORI EORI GM (2) a END EOI T |T (PNG) NO INFO SANITARY- PRIVATE 6" STEEL 6" STEEL 6" STEEL 8" DI 8" DI 8" DI 8" DI 12" DI 12" DI12" DI 12" DI 6" DI 12 " 8" DI 4" STEEL 2" PLASTIC 4" STEEL 4" STL END UNK LT LT BEROTH OIL COMPANY SHARON C WARREN (38' PAVED SR 1308) LEWISVILLE VIENNA RD. FAMILY LLC THOMAS H FOWLER GLORIA C LUCAS WILLIAM W & ASSOCIATION TRUSTEE US BANK NATIONAL 15" HDPE 2"PVC 6PVC REX D & MARTHA B JENNINGS GR GR TOP=948.94'IN=941.94'OUT=941.94' IN=942.19' T HH HH HH HH T EOI EOI EOI DUCT BANK DUCT BANK DUCT BANK DUCT BANK DUCT BANK 432 FO 432 FO 432 FO 432 FO 432 FO 216 FO 216 FO 216 FO 216 FO216 FO 216 FO 216 FO 25 PR 432 FO IN=940.55 TOP=945.10OUT=940.43 MAPLE TREE INVESTMENTS LLC MAPLE TREE INVESTMENTS LLC POND RETENTION CONCCONC CONC CONC PAVED PAVED 1SBKBUS DI EORI a CONC GTD GTD GTD GTD GTD PLUG PLUG PLUG P P P P 15" RCP-III 15" RCP-III CB CB CB 18" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III FLOWABLE FILL REMOVE REMOVEREMOVE REMOVE SEE DETAIL 7A SPEC. LAT 'V' DITCH CB DI CB CB DI CB CB CB CB REMOVEREMOVEREMOVEREMOVEREMOVE RETAIN REMOVEREMOVEREMOVEREMOVEREMOVEREMOVE REMOVE REMOVEREMOVEREMOVE REMOVE 24" 18" 18" 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III CB CB CB DI CB DI CB CB CB CB DI DI CB DI 30 SY GEOTEXTILE 15 TONS CL I RIP RAP OUTLET PROTECTION RETAIN RETAIN RETAIN 36" RCP-IV 36" JB w/MH 15" RCP-III CB 15" RCP-IV 2GI-D CB CB CB CB REMOVE DI CB 15" RCP-IV 15" RCP-IV CB CB CB CB CB 948.1993 15" RCP-IV 15" RCP-IV 15" 15" RCP-IV 15" 15" DIMIN D CB JB w/MH CB CB d 2:1 B D ( Not to Scale) Flatter2:1 or SPECIAL LATERAL BASE DITCH FROM L STA. 54+34 TO STA. 56+50 RT Slope Fill DETAIL 7C B=2 Ft. Max. d=1 Ft. Min. D=1 Ft. Type of Liner= CL B Rip-Rap Ground Natural Geotextile 15" RCP-IV 15" RCP-IV CB CB CB 15" RCP-IV 15" RCP-IV 15" RCP-IV RETAIN RETAIN RETAIN REMOVE REMOVE FROM L STA. 54+00 TO STA. 54+34 RT. Fill Slope 2:1 or Flatter b= 3.0 Ft. d= 1.0 Ft. Type of Liner= B Rip-Rap b DETAIL 7B Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 30" 30" 30" RCP-IV CB RCP-III 30" CB 18" REMOVE CB GRADE TO DRAIN 15" RCP-III 15" 12 SY GEOTEXTILE 8 TONS CL I RIP RAP SEE DETAIL 7E BANK STABILIZATION (Variable) Channel Bed (TYP) 2ft Bottom Until Refusal (Typ) Press Riprap into Channel 2:1 OR FLATTER d FLATTER 2:1 OR Minimum of 1ft (TYP) Tuck Geotextile a SEE DETAIL 7D CHANNEL STABILIZATION PIPE OUTLET (TYP) 2ft FLATTER 2:1 OR 2:1 OR FLATTER d Minimum of 1ft (TYP) Tuck Geotextile a BBottom Until Refusal (Typ) Press Riprap into Channel 15" RCP-IV 15" RCP-III 15" RCP-IV 28-M AR-2024 16:58 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_07_4.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. ENGINEER HYDRAULICS REVISIO NS MATCH LINE -L- POT STA. 51+ 50.00 SEE SHEET 6 SEE SHEET 8 MATCH LINE -L- POC STA. 67+75.00 U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC MATCH LINE -Y8- POT STA. 18+50.00 SEE SHEET 9 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_07_4.dgn M I ENGINEERING 3/28/2024 7 TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND TEMPORARY SURFACE WATER IMPACTS PERMANENT SURFACE WATER IMPACTS SITE 2 AND SITE 3 PLAN VIEW 8 OF 12 FOR ENLARGEMENT SITE 3 - SEE PERMIT DRAWING SHEET 7 OF 12 FOR ENLARGEMENT SITE 2 - SEE PERMIT DRAWING SHEET ( Not to Scale) Elevation Natural Bed Ground Natural Ground Natural Geotextile* 18" PIPE OUTLET BANK STABILIZATION DETAIL 7E Est.= See Below Tons of Class I Rip-Rap, Keyed-In d= See Below Length= See Below on Jurisdictional Streams 2ft Outside Top of Ditch Slopes *Rip-Rap to be Installed to 8 Tons RipRap, 12 SY Geotextile L STA. 67+05 RT, L=8', d=2.0', ( Not to Scale) Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION Geotextile* DETAIL 7D on Jurisdictional Streams 2ft Outside Top of Ditch Slopes *Rip-Rap to be Installed to Excavated channel 18" Est.=See Below Tons of Class I Rip-Rap, Keyed-In Max. d=1.8 Ft. B=2 Ft. 17 Tons RipRap, 26 SY Geotextile L=15', S=1.7%, DDE=14 CY L STA. 53+50, 115' LT TO STA. 53+51, 128' LT F C C C C F F F F F F F F F F F F F F F F F F F F F F F F F F F F F C C F C C C F 35 33 36 39 37 42 43 44 45 48 59 49 49 49 53 54 55 56 57 58 40 49 38 41 34 66 46 34A 46 57A 48 60 15 65 55 15 -Y8- POT STA. 12+10.10 BEGIN CONSTRUCTION -Y7- POT STA. 10+18.12 BEGIN CONSTRUCTION 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G2'-6" C&G 2'-6" C&G2'-6" C&G CURB8"X18" G&C "6-'1 5' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. SIDEWALK SIDEWALK 5' CONC. 5' CONC. SIDEWALK 10' CONC. SIDEWALK 5' CONC. SIDEWALK 10' CONC. SIDEWALK CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR SIDEWALK 5' CONC. 2'-6" C&G SIDEWALK 10' CONC. SIDEWALK5' CONC. SIDEWALK10' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. TAPER 8:1 CR CR CR CR -Y8- POT STA. 18+33.32 END PAVING 12" PCC 1'-6" C&G 1'-6" C&G 12" PCC12" PCC 1'-6" C&G 1'-6" C&G 1'-6" C&G 1'-6" C&G -Y8- STA. 15+30.00, 27.60' RT. -WL4- STA. 10+00.00 = BEG. RETAINING WALL #4 -L- STA. 60+10.08, 22.13' RT. -WL4- STA. 11+66.67 END RETAINING WALL #4 -Y1B- STA. 11+98.21, 24.00' RT. -WL6- STA. 10+00.00 = BEG. RETAINING WALL #6 -Y1B- STA. 12+44.23, 24.00' RT. -WL6- STA. 10+46.02 END RETAINING WALL #6 DO NOT DISTURB SEE DETAIL 6B LATERAL 2' BASE DITCH SEE DETAIL 7C SPECIAL LATERAL 2' BASE DITCH 18" RCP-IV SEE DETAIL 7A 'V' DITCH SPEC. LAT. SEE DETAIL 7B EST 9 TONS, EST 27 SY GF TOE PROTECTION SEE DETAIL 7B EST 5 TONS, EST 14 SY GF TOE PROTECTION TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN GRAPHIC SCALE 0'50'100'150'50' WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * *** ** * * NAD 83/NA 2011 SHEET 5 OF 12 PERMIT DRAWING ESSO LN. (15' GR) 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 30" C&G 36" CMP 30" CMP 24" CMP 18" CMP 15" RCPCB CB CB CB CB DI DI 15" RCP 15" RCP 12" HDPE CB CB CB DI DI DI DI 15" RCP 18" RCP 15"HDPE 15"HDPE 15" CMP 8" VC 8" DI 8" VC 8" VC 8" VC 8" VC 8" VC 8" DI 8" VC 8" DI 24" RCP CB CB CB CB DI 15" RCP 8" HDPE 8" HDPE 18" HDPE U5536-5 UNKNOWN END 15" HDPE ANDREW P BOBOTSIARES ANDREW P BOBOTSIARES LDG 434AF&AM WEST BEND MASONIC MICHAEL R & JULIE COLLINS JOHN W OWEN JARVIS E & NAN JOHNSON LEWISVILLE UNITED METHODIST CHURCH JASON J CASERTANO LDG #434 TRST WESTBEND MASONIC REX D & MARTHA B JENNINGS THOMAS H FOWLER FAMILY LLC THOMAS H FOWLER FAMILY LLC LILLIE C HICKS RALPH M HICKS SHARON C WARREN WHITE DENVER OIL CO INC EIP EIP EIP EIP EIP EIP REX D & MARTHA B JENNINGS EIP EIP EIP EIP EIPNAIL EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP COMPANY SONOMA BUILDING TOWN OF LEWISVILLE NAILP/K LT LT PAVED LT 42" CONC LT PAVED LT LT S LT LT 2SBKBUS 1SFD GR PAVED 1SFD PAVED 1SFD 42" CONC LT LT LT LT 60" CONC PAVED 48" CONC LT LTLT LT LT LT LT LT PAVED LT LT LT LT LT LT LT S PAVED PAVED GR GR 1SFD 24" CONC 1SFD 1SBKBUS 48" CONC PAVED 1SBKBUS LT LT GR LT GR 1SBK&BLKBUS 2SBK&BLKBUS LT PAVED CONC WALLBLK RET CONC48" PAVED DK GR CONC CONC LT MTW TANK SEPTIC 1SBKBUS 48" CHL 48" CHL S 1SFD 1SFD 48" CHL CONC 60" CHL CONC S 48" CHL CONC 1S CHL S DKB 48"CHL G 2SBK CHURCH LT PLAY GROUND CONC LT 60" CONC 48" BK W/WI BK S PAVED S DK DK DK 1SFD CONC PAVED S GR CONC 60" CONC LT LT LT CONC 1SFBUS 1SFBUS 1SFBUS 1SFBUS 72" WD WD GATE GZCONC 24" C&G 60" CONC 2SFBUS 1SFBUS 84" CONC S LT 1SBKD 12" HDPE 60" CONC MTL S S PAVED 48" CONC CAN METAL DK 84" CONC CONC 84" CONC CONC RUINS GR LT BRANCH DITCH DITCH DITCH EIP 48" CHL EIP NAIL P/K NAIL P/K 1SBKBUS PAVED BST CURB SIGNHISTORICAL LT LT LT 36" SR CONC 60" CHL S S MTL 60" CHL 48" CHL 48"CONC MTW CAN 60.00' 60.00' (SEE PB 46 PG 162) EXIST R/W (SEE PB 46 PG 162) EXIST R/W 60.00' TOP=945.05 OUT=941.65 TOP=943.75OUT=937.40 TOP=949.74IN=946.84OUT=946.74 TOP=943.73OUT=938.43 TOP=949.95 TOP=944.20 OUT=947.35 OUT=940.40 TOP=945.87IN=941.57OUT=941.17 TOP=953.38OUT=946.58 TOP=954.80IN=951.95OUT=951.70OUT=949.98 TOP=955.46 TOP=947.09 OUT=943.75 TOP=947.80OUT=942.96 IN=942.96 TOP=943.16 OUT=939.77 TOP=947.53 OUT=945.23 TOP=947.52 IN=943.94 OUT=943.67 TOP=947.20 OUT=944.50 TOP=951.08OUT=944.62 IN=944.68 TOP=946.40 IN=944.85 OUT=944.85 TOP=947.66 IN=946.06 OUT=946.06 TOP=957.30 OUT=948.06 IN=948.09 TOP=952.79 OUT=944.69IN=944.69 TOP=947.85 OUT=946.83 INV=943.74 INV=944.55 TOP=951.72 OUT=949.42 TOP=951.47 OUT=948.07 TOP=951.42 OUT=947.52 TOP=951.89 TOP LID=950.22 IN=947.07 OUT=945.52 TOP=951.50 IN=947.92 OUT=947.78 GREAT WAGON RD. (36' PAVED) GREAT WAGON RD. (36' PAVED)T/A LEW AUTO SER REICH W S INC RICHARD STIMSON FOWLER FAMILY LLC THOMAS H TAYLOR DAVID E 60.00' 60.00' R/W EXIST R/W EXIST EXIST R/W EXIST R/W EXIST R/W(PB 19 PG 100) EXIST R/W EXIST R/W SANDRA M SPACH TANYA M TISE & MNGMNT LLC J&K PROPERTY MNGMNT LLC J&K PROPERTY MNGMNT LLC J&K PRPRTY QUIRANTE D. A. DOSDOS RYAN L REEDY & EXIST R/W EXIST R/W45.00' 935.47 INV= (DB 1726 PG 2080)ACCESS EASE MTW UTIL.EASE 10'UTIL EASEMENT 10'UTIL EASEMENT MAG MB (BENT) EIP END UNK IN (24")=937.63 IN (30")=937.40 (SEE PB 46 PG 162) EXIST R/W (PB 46 PG 162) EXIST R/W 30"CMP 12"PVC DI TOP=944.45' (DATUR) INV=937.5' OUT=943.05IN(SW)=943.07IN(NE)=943.13 24" RCP BASE CONC W/24"C&GPAVED W/24"C&GPAVED GR W/24"C&G PAVED AXLE CONRAD CIR. (19' PAVED) TO SHALLOWFORD RD SHALLOWFORD RD. (SR 1001) 36' PAVED w/30"C&G UNKEND 60" CONC 60" CONC IN(24")=947.62 IN(15")=947.62 24"RCP 15"RCP DI 60"CONC 15"RCP RAP RIP- END UNK INV=943.21 INV=943.36 IN(30")=938.73 IN(15")=939.73 HDPE 15" 15"RCP CHRISTIE B SEVERINO PHILIP F & CRYSTAL R LILLY AARON L & ca a I I a H I a I a a a } Ha I I H a a a a aaa a a a a a I IH I c nnn}| Q d a a a I I a a b I I I I II a nn } EORI EORI EORI GM (2) a END EOI T |T (PNG) NO INFO SANITARY- PRIVATE 6" STEEL 6" STEEL 6" STEEL 8" DI 8" DI 8" DI 8" DI 12" DI 12" DI12" DI 12" DI 6" DI 12 " 8" DI 4" STEEL 2" PLASTIC 4" STEEL 4" STL END UNK LT LT BEROTH OIL COMPANY SHARON C WARREN (38' PAVED SR 1308) LEWISVILLE VIENNA RD. FAMILY LLC THOMAS H FOWLER GLORIA C LUCAS WILLIAM W & ASSOCIATION TRUSTEE US BANK NATIONAL 15" HDPE 2"PVC 6PVC REX D & MARTHA B JENNINGS GR GR TOP=948.94'IN=941.94'OUT=941.94' IN=942.19' T HH HH HH HH T EOI EOI EOI DUCT BANK DUCT BANK DUCT BANK DUCT BANK DUCT BANK 432 FO 432 FO 432 FO 432 FO 432 FO 216 FO 216 FO 216 FO 216 FO216 FO 216 FO 216 FO 25 PR 432 FO IN=940.55 TOP=945.10OUT=940.43 MAPLE TREE INVESTMENTS LLC MAPLE TREE INVESTMENTS LLC POND RETENTION CONCCONC CONC CONC PAVED PAVED 1SBKBUS DI EORI a CONC 910 910 915 915 915 915 920 920 920 920 920 920 925 925 925 925 925 925 925 925 925 930 930 930 930 930 930 930 930 930 930 930 930 930 935 935 935 935 935 935 935 935 935 935 935 935 935 935 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 940 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 945 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 955 955 955 955 955 955 955 955 955 955 955 955 955955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 955 960 960 960 960 960 960 960 960 960 960 960 960 960 960 GTD GTD GTD GTD GTD PLUG PLUG PLUG P P P P 15" RCP-III 15" RCP-III CB CB CB 18" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III FLOWABLE FILL REMOVE REMOVEREMOVE REMOVE SEE DETAIL 7A SPEC. LAT 'V' DITCH CB DI CB CB DI CB CB CB CB REMOVEREMOVEREMOVEREMOVEREMOVE RETAIN REMOVEREMOVEREMOVEREMOVEREMOVEREMOVE REMOVE REMOVEREMOVEREMOVE REMOVE 24" 18" 18" 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III 15" RCP-III CB CB CB DI CB DI CB CB CB CB DI DI CB DI 30 SY GEOTEXTILE 15 TONS CL I RIP RAP OUTLET PROTECTION RETAIN RETAIN RETAIN 36" RCP-IV 36" JB w/MH 15" RCP-III CB 15" RCP-IV 2GI-D CB CB CB CB REMOVE DI CB 15" RCP-IV 15" RCP-IV CB CB CB CB CB 948.1993 15" RCP-IV 15" RCP-IV 15" 15" RCP-IV 15" 15" DIMIN D CB JB w/MH CB CB d 2:1 B D ( Not to Scale) Flatter2:1 or SPECIAL LATERAL BASE DITCH FROM L STA. 54+34 TO STA. 56+50 RT Slope Fill DETAIL 7C B=2 Ft. Max. d=1 Ft. Min. D=1 Ft. Type of Liner= CL B Rip-Rap Ground Natural Geotextile 15" RCP-IV 15" RCP-IV CB CB CB 15" RCP-IV 15" RCP-IV 15" RCP-IV RETAIN RETAIN RETAIN REMOVE REMOVE FROM L STA. 54+00 TO STA. 54+34 RT. Fill Slope 2:1 or Flatter b= 3.0 Ft. d= 1.0 Ft. Type of Liner= B Rip-Rap b DETAIL 7B Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile 30" 30" 30" RCP-IV CB RCP-III 30" CB 18" REMOVE CB GRADE TO DRAIN 15" RCP-III 15" 12 SY GEOTEXTILE 8 TONS CL I RIP RAP SEE DETAIL 7E BANK STABILIZATION (Variable) Channel Bed (TYP) 2ft Bottom Until Refusal (Typ) Press Riprap into Channel 2:1 OR FLATTER d FLATTER 2:1 OR Minimum of 1ft (TYP) Tuck Geotextile a SEE DETAIL 7D CHANNEL STABILIZATION PIPE OUTLET (TYP) 2ft FLATTER 2:1 OR 2:1 OR FLATTER d Minimum of 1ft (TYP) Tuck Geotextile a BBottom Until Refusal (Typ) Press Riprap into Channel 15" RCP-IV 15" RCP-III 15" RCP-IV 28-MAR-2024 17:25 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm_psh_07_5_con.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. ENGINEER HYDRAULICS REVISIO NS MATCH LINE -L- POT STA. 51+ 50.00 SEE SHEET 6 SEE SHEET 8 MATCH LINE -L- POC STA. 67+75.00 U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC MATCH LINE -Y8- POT STA. 18+50.00 SEE SHEET 9 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERMITS_Environm ental\Drawings\U5536_Hyd_prm _psh_07_5_con.dgn M I ENGINEERING 3/28/2024 7 TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND TEMPORARY SURFACE WATER IMPACTS PERMANENT SURFACE WATER IMPACTS SITE 2 AND SITE 3 PLAN VIEW 8 OF 12 FOR ENLARGEMENT SITE 3 - SEE PERMIT DRAWING SHEET 7 OF 12 FOR ENLARGEMENT SITE 2 - SEE PERMIT DRAWING SHEET 28-MAR-2024 17:25 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm_psh_07_5_con.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. ENGINEER HYDRAULICS REVISIO NS MATCH LINE -L- POT STA. 51+ 50.00 SEE SHEET 6 SEE SHEET 8 MATCH LINE -L- POC STA. 67+75.00 U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC MATCH LINE -Y8- POT STA. 18+50.00 SEE SHEET 9 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERMITS_Environm ental\Drawings\U5536_Hyd_prm _psh_07_5_con.dgn M I ENGINEERING 3/28/2024 7 ( Not to Scale) Elevation Natural Bed Ground Natural Ground Natural Geotextile* 18" PIPE OUTLET BANK STABILIZATION DETAIL 7E Est.= See Below Tons of Class I Rip-Rap, Keyed-In d= See Below Length= See Below on Jurisdictional Streams 2ft Outside Top of Ditch Slopes *Rip-Rap to be Installed to 8 Tons RipRap, 12 SY Geotextile L STA. 67+05 RT, L=8', d=2.0', ( Not to Scale) Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION Geotextile* DETAIL 7D on Jurisdictional Streams 2ft Outside Top of Ditch Slopes *Rip-Rap to be Installed to Excavated channel 18" Est.=See Below Tons of Class I Rip-Rap, Keyed-In Max. d=1.8 Ft. B=2 Ft. 17 Tons RipRap, 26 SY Geotextile L=15', S=1.7%, DDE=14 CY L STA. 53+50, 115' LT TO STA. 53+51, 128' LT F C C C C F F F F F F F F F F F F F F F F F F F F F F F F F F F F F C C F C C C F 35 33 36 39 37 42 43 44 45 48 59 49 49 49 53 54 55 56 57 58 40 49 38 41 34 66 46 34A 46 57A 48 60 15 65 55 15 -Y8- POT STA. 12+10.10 BEGIN CONSTRUCTION -Y7- POT STA. 10+18.12 BEGIN CONSTRUCTION 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G 2'-6" C&G2'-6" C&G 2'-6" C&G2'-6" C&G CURB8"X18" G&C "6-'1 5' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. SIDEWALK SIDEWALK 5' CONC. 5' CONC. SIDEWALK 10' CONC. SIDEWALK 5' CONC. SIDEWALK 10' CONC. SIDEWALK CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR SIDEWALK 5' CONC. 2'-6" C&G SIDEWALK 10' CONC. SIDEWALK5' CONC. SIDEWALK10' CONC. SIDEWALK 5' CONC. SIDEWALK 5' CONC. TAPER 8:1 CR CR CR CR -Y8- POT STA. 18+33.32 END PAVING 12" PCC 1'-6" C&G 1'-6" C&G 12" PCC12" PCC 1'-6" C&G 1'-6" C&G 1'-6" C&G 1'-6" C&G -Y8- STA. 15+30.00, 27.60' RT. -WL4- STA. 10+00.00 = BEG. RETAINING WALL #4 -L- STA. 60+10.08, 22.13' RT. -WL4- STA. 11+66.67 END RETAINING WALL #4 -Y1B- STA. 11+98.21, 24.00' RT. -WL6- STA. 10+00.00 = BEG. RETAINING WALL #6 -Y1B- STA. 12+44.23, 24.00' RT. -WL6- STA. 10+46.02 END RETAINING WALL #6 DO NOT DISTURB SEE DETAIL 6B LATERAL 2' BASE DITCH SEE DETAIL 7C SPECIAL LATERAL 2' BASE DITCH 18" RCP-IV SEE DETAIL 7A 'V' DITCH SPEC. LAT. SEE DETAIL 7B EST 9 TONS, EST 27 SY GF TOE PROTECTION SEE DETAIL 7B EST 5 TONS, EST 14 SY GF TOE PROTECTION TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN GRAPHIC SCALE 0'50'100'150'50' WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED** * * ** * ** * * NAD 83/NA 2011 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED** * * ** * ** * * SHEET 6 OF 12 PERMIT DRAWING 8" HDPE 18" HDPE UNKNOWN END ANDREW P BOBOTSIARES EIP EIP TOWN OF LEWISVILLE BRANCH DITCH AXLEBEROTH OIL COMPANY CB REMOVE JB w/MH 15" RCP-IV 15" RCP-IV CB CB CB 30" 30" 30" RCP-IV RCP-III 30" CB SEE DETAIL 7D CHANNEL STABILIZATION PIPE OUTLET O TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC ENGINEER HYDRAULICS REVISIO NS U-5536 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_07_7_enlarge.dgn M I ENGINEERING 3/28/2024 SITE 2 ENLARGEMENT PLAN -L- 030 15 30 SCALE: 1"= 30' HORIZ. 35 33 WETLAND DENOTES FILL IN NAD 83/NA 2011 F F **** 7U-5536 F F C 33 34A 2'-6" C&G 2'-6" C&G 2'-6" C&G 5' CONC. SIDEWALK CR CR SIDEWALK10' CONC. SEE DETAIL 7C SPECIAL LATERAL 2' BASE DITCH 18" RCP-IV SEE DETAIL 7B EST 9 TONS, EST 27 SY GF TOE PROTECTION TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES PERMANENTSS LEGEND SHEET 7 OF 12 PERMIT DRAWING CLEARING (GRUBBING) DENOTES MECHANIZED 30" C&G 12" HDPE CB DI DI 15" RCP 15"HDPE 15"HDPE 15" CMP 8" DI 8" DI SHARON C WARREN EIP EIP PVT IN HOLE COMPANY SONOMA BUILDING PAVED LT LT DK 1SFD CONC 1SFBUS GZ BK CONC 24" C&G 60" CONC GR DITCH SHALLOWFORD DR. (34' PAVED SR 1001) PAVED15"RCP SEWER EASEMENT MAG I a a H b I I I I II a EORI EORI EORI a 12" DI LT LT GR T EOI EOI DUCT BANK 100 PR GTD GTD GTD GTD SEE DETAIL 7A SPEC. LAT 'V' DITCH REMOVEREMOVEREMOVEREMOVEREMOVEREMOVE 24" 18" 18" DI DI CB CB REMOVE 15" CB 15" RCP-IV 2GI-D 15" 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC ENGINEER HYDRAULICS REVISIO NS U-5536 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Hydraulics\PERM ITS_Environm ental\Drawings\U5536_Hyd_prm _psh_07_8_enlarge.dgn M I ENGINEERING 3/28/2024 SITE 3 ENLARGEMENT PLAN 030 15 30 SCALE: 1"= 30' HORIZ. -L- 68 67 WATER IMPACTS TEMPORARY SURFACE WATER IMPACTS PERMANENT SURFACE 7 NAD 83/NA 2011 F F F C C C 58 66 2'-6" C&G2'-6" C&G 2'-6" C&G 5' CONC. SIDEWALK 5' CONC. SIDEWALK SIDEWALK 5' CONC. TAPER 8:1 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES PERMANENTSS LEGEND SHEET 8 OF 12 PERMIT DRAWING WETLAND SITE 2 00 00 1010 1010 2020 2020 3030 3030 4040 4040 5050 5050 6060 6060 7070 7070 8080 8080 9090 9090 100100 100100 110110 110110 120120 120120 130130 130130 140140 140140 150150 150150 26-OCT-2023 09:39 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Roadway\XSC\U5536_Hyd_XPL_L.dgn $$$$USERNAME$$$$ PROJ. REFERENCE NO.SHEET NO.0 6/23/16 940 940 950 950 960 960 970 970 52+50.00 930 930 940 940 950 950 960 960 970 970 53+00.00 920 920 930 930 940 940 950 950 960 960 53+50.00 X-18U-5536 -L- 5 10 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Roadway\XSC\U5536_Hyd_XPL_L.dgn ljohns 10/26/2023 SHEET 9 OF 12 PERMIT DRAWING 946.01 0.0200.020 2:1 950.41 -Y7- M ATCHLINE 945.10 0.0200.020 2:1 949.01 -Y7- M ATCHLINE 944.41 0.0200.020 2:1 2:1 947.96 947.96 30" C&G 30" C&G 15" RCP 12" RCP 15" RCP 15" RCP CB CB CBDI DI DI 12" RCP 12" RCP(1) 12" RCP(2) EIP EIP EIP EIP EIP EIP EIP EIP 1SBKD GR 1SFD 48"CHL GR 1SFD 48" CHL 1SFD DK 60"WD G 48" CHL W/LT EIP EXIST R/W EXIST R/W 45.00' CB LT W/ 48"CHL TO YADKINVILLE RD a a a 8" DI 4" STEEL (38' PAVED SR 1308) LEWISVILLE VIENNA RD. T JB 30" RCP 927.32' INV= GR EIP R/W LT LT LT LT LT LT LT LT CB 20' PAVED JENNINGS RD 24" RCP W/LT TO YADKINVILLE RD SR 1307 GRAPEVINE RD EXISTING R/W EXISTING R/W 60' EXISTING R/W 30' PAVED CB 15" RCP TO CONRAD RD TO LOWES FOODS GUY EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EXIST R/W 12" RCP DI INV=908.59 JB? LOG G S 15" HDPE(APPROX.LOC.) 15" HDPE(APPROX.LOC.) 919.20 INV= EIP INV=908.59 15" HDPE(APPROX.LOC.) CB 18" RCP-III 18" RCP-III REMOVE REMOVE 29 SY GEOTEXTILE 10 TONS CL B RIP RAP APRON LENGTH=16' OUTLET PROTECTION RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN 307.7' LT -L- STA. 49+75 INV=918.50 458.6' LT -L- STA. 50+04 INV=908.59 6.50% REMOVEREMOVEREMOVE 458.6' LT -L- STA. 50+04 INV=908.59 6.50% REMOVEREMOVEREMOVE 28-M AR-2024 16:59 N:\NC Hydro\M 18013_U-5536_Forsyth Co\Roadway\Proj\U5536_Hyd_prm_psh_09_.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. 9 ENGINEER HYDRAULICS REVISIO NS U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC MATCH LINE -Y8- POT STA. 18+50.00 SEE SHEET 7 SEE SHEET 6 DITCH MATCH LINE N:\NC Hydro\M 18013_U-5536_Forsyth Co\Roadway\Proj\U5536_Hyd_prm _psh_09_.dgn M I ENGINEERING 3/28/2024 SITE 4 3:13:1 D ( Not to Scale) STANDARD BASE TAIL DITCH B d L=152'@S=6.50%, 149 TONS CL I RIP RAP, 273 SY GEOTEXTILE -L- STA 49+75 TO 50+04 L=60'@S=1.07%, 59 TONS CL I RIP RAP, 108 SY GEOTEXTILE -L- STA 49+65 TO 49+75 L=87'@S=3.87%, 86 TONS CL I RIP RAP, 156 SY GEOTEXTILE -L- STA 49+51 TO 49+65 L=50'@S=8.58%, 49 TONS CL I RIP RAP, 90 SY GEOTEXTILE -L- STA 49+44 TO 49+51 Total L=349', DDE=126CY (APPROX) TO STA. 50+04, 458.6' LT FROM -L- STA. 49+44, 109.5' LT DETAIL 6G B= 2.0 Ft. Max. d= 1.3 Ft. Min. D= 1.5 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= SEE BELOW Geotextile PLAN VIEW SITE 4 46 47A 47B 47C 20 25 -Y8- POT STA. 18+33.32 END PAVING -Y8- POC STA. 24+26.81 END CONSTRUCTION & DORSEY D STIMSON TESTAMENTARY TRUST DORSEY D STIMSON JR 31A 31 32 & DORSEY D STIMSON TESTAMENTARY TRUST DORSEY D STIMSON JR SEE DETAIL 6G 2' BASE TAIL DITCH SEE DETAIL 6G 2' BASE TAIL DITCH TS TS TEMPORARY SURFACE WATER IMPACTS GRAPHIC SCALE 0'50'100'150'50' NAD 83/NA 2011 NAD 83/NA 2011 SHEET 10 OF 12 PERMIT DRAWING SITE 4 ENLARGEMENT PLAN WATER IMPACT TEMPORARY SURFACE 30" C&G 30" C&G 15" RCP 12" RCP 15" RCP 15" RCP CB CB CBDI DI DI 12" RCP 12" RCP(1) 12" RCP(2) BY-21 EIP EIP EIP EIP EIP EIP EIP EIP 1SBKD GR 1SFD 48"CHL GR 1SFD 48" CHL 1SFD DK 60"WD G 48" CHL W/LT EIP EXIST R/W EXIST R/W 45.00' CB LT W/ 48"CHL TO YADKINVILLE RD a a a 8" DI 4" STEEL (38' PAVED SR 1308) LEWISVILLE VIENNA RD. T JB 30" RCP 927.32' INV= GR EIP R/W LT LT LT LT LT LT LT LT CB 20' PAVED JENNINGS RD 24" RCP W/LT TO YADKINVILLE RD SR 1307 GRAPEVINE RD EXISTING R/W EXISTING R/W 60' EXISTING R/W 30' PAVED CB 15" RCP TO CONRAD RD TO LOWES FOODS GUY EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP EXIST R/W 12" RCP DI INV=908.59 JB? LOG G S 15" HDPE(APPROX.LOC.) 15" HDPE(APPROX.LOC.) 919.20 INV= EIP INV=908.59 15" HDPE(APPROX.LOC.) CB 18" RCP-III 18" RCP-III REMOVE REMOVE 29 SY GEOTEXTILE 10 TONS CL B RIP RAP APRON LENGTH=16' OUTLET PROTECTION RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN 0719 900 900 905 905 905 905 905 910 910 910 910 910 910 910 915 915 915 915 915 915 915 915 915 915 915 915 920 920 920 920 920 920 920 920 920 920 920 920 920 920 920 920 920 925 925 925 925 925 925 925 925 925 925 925 925 925 925 925 925 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 930 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 935 940 940 940 940 940 940 940 940 940 940 945 945 945 945 945 945 945 945 945 945 950 950 950 950 307.7' LT -L- STA. 49+75 INV=918.50 458.6' LT -L- STA. 50+04 INV=908.59 6.50% REMOVEREMOVEREMOVE 890 895 895 895900 900 900 900 900 900 905 905 905 905 905 905 910 910 910 910 910 910 910 915 915 915 915 915 915 915 915 920 920 920 920 920 920 920 920 920 925 925925 925 925 925 925 930 930 930 930 930 930 935 935 935 935 935 935 935 940 940 945 945 950 458.6' LT -L- STA. 50+04 INV=908.59 6.50% REMOVEREMOVEREMOVE 28-M AR-2024 16:59 N:\NC Hydro\M18013_U-5536_Forsyth Co\Roadway\Proj\U5536_Hyd_prm _psh_09_9_con.dgn ljohns AT LINDA092017-PC 5/14/99 SHEET NO.PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W SHEET NO. 9 ENGINEER HYDRAULICS REVISIO NS U-5536 1011 Schaub Drive Raleigh, NC 27606 NC COA No. P-0671 Suite 100 MI Engineering, PLLC MATCH LINE -Y8- POT STA. 18+50.00 SEE SHEET 7 SEE SHEET 6 DITCH MATCH LINE N:\NC Hydro\M 18013_U-5536_Forsyth Co\Roadway\Proj\U5536_Hyd_prm _psh_09_9_con.dgn M I ENGINEERING 3/28/2024 SITE 4 3:13:1 D ( Not to Scale) STANDARD BASE TAIL DITCH B d L=152'@S=6.50%, 149 TONS CL I RIP RAP, 273 SY GEOTEXTILE -L- STA 49+75 TO 50+04 L=60'@S=1.07%, 59 TONS CL I RIP RAP, 108 SY GEOTEXTILE -L- STA 49+65 TO 49+75 L=87'@S=3.87%, 86 TONS CL I RIP RAP, 156 SY GEOTEXTILE -L- STA 49+51 TO 49+65 L=50'@S=8.58%, 49 TONS CL I RIP RAP, 90 SY GEOTEXTILE -L- STA 49+44 TO 49+51 Total L=349', DDE=126CY (APPROX) TO STA. 50+04, 458.6' LT FROM -L- STA. 49+44, 109.5' LT DETAIL 6G B= 2.0 Ft. Max. d= 1.3 Ft. Min. D= 1.5 Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= SEE BELOW Geotextile PLAN VIEW SITE 4 46 47A 47B 47C 20 25 -Y8- POT STA. 18+33.32 END PAVING -Y8- POC STA. 24+26.81 END CONSTRUCTION & DORSEY D STIMSON TESTAMENTARY TRUST DORSEY D STIMSON JR 31A 31 32 & DORSEY D STIMSON TESTAMENTARY TRUST DORSEY D STIMSON JR SEE DETAIL 6G 2' BASE TAIL DITCH SEE DETAIL 6G 2' BASE TAIL DITCH SITE 4 ENLARGEMENT PLAN TS TS TEMPORARY SURFACE WATER IMPACTS GRAPHIC SCALE 0'50'100'150'50' NAD 83/NA 2011 NAD 83/NA 2011 SHEET 11 OF 12 PERMIT DRAWING Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 L Sta. 28+02 LT & RT 30" dia. to 36" dia. pipe 0.01 < 0.01 92 21 1 L Sta. 27+55 LT Bank Stabilization < 0.01 29 1 L Sta. 28+21 RT Bank Stabilization < 0.01 12 2 L Sta. 54+08 LT 30" dia. pipe 0.01 < 0.01 0.02 < 0.01 141 10 3 L Sta. 67+06 RT 24" dia. pipe < 0.01 12 3 L Sta. 67+06 RT Bank Stabilization < 0.01 8 4 L Sta. 50+04 LT Std 2' Base Tail Ditch < 0.01 13 TOTALS*: 0.01 < 0.01 0.04 < 0.01 282 56 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 12 OF 12 WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Forsyth County U-5536 44108.1.2 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3-28-24