Loading...
HomeMy WebLinkAboutU-5536 stormwater revision and bank stabilizationRyan and Steve, At the beginning of February, we reached out concerning a stormwater revision on U-5536 in Forsyth. We met with Ryan and Susan to discuss the changes. Based on our discussions, the plans have been revised. The stormwater revision resulted in an additional 17’ of bank stabilization at permit site 1. Previous emails and the revised permit plans are attached. Can we permit the additional 17’ under a non-reporting NW 13, or should we resubmit the permit application? In the past when we were below USACE IP thresholds, we have handled additional bank stabilization in this way. Ryan and Susan, Please advise if you have any further comment on the stormwater revisions. Thanks. Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov <mailto:aeuliss@ncdot.gov> 375 Silas Creek Parkway Winston Salem, NC 27127-7167 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.