Loading...
HomeMy WebLinkAboutSW8150211_Compliance Evaluation Inspection_20210914 STATE OF NORTH CAROLINA,Department of Environmental Quality, 127 Cardinal Drive Extension,Wilmington,North Carolina 28405 (910)796-7215 FILRACCESS RECORD "IREVIM W TIMEDA T E DEQ SECTION: V EMAIL: REPRESENUN6: PHONE: Guidelines for Access: The staff of Wilmington Regional Office is dedicated to making public records in our custody readily C, 1� available to the public for review and copying. We also have the responsibility to the public to safeguard these records and to carry out our day-to-day program obligations: Please read carefully the following guidelines signingC,the form: I Due to the large public demand for file access, werequest that you call at least a day in advance to schedule an appointment to review the files. Appointments will be scheduled between 9:00arn and 3:00pm. Viewing time ends at 4:45pm. Anyone arriving without an appointment may view the files to the extent that time and staff supervision is available. 2. You must specify files you want to review by facility name. The number of files that you may review at one time will be limited to five. oil Pets issued out of the.Morehead'.City:,Dlstri-t-t 0-15de; The COMPLETE file is in the Morehead Office: and may.coniajn.-ddAit nal information-'-a'jia/br .comments-which-,T'na"v not hd in th-eRl"k6file. 4. You may make copies of a file when the copier is not in use by the staff and if time permits. Cost per copy is$.05 cents. Payment may be made by check,money order,or cash at the reception desk. 5 FILES MUST BE INEPT IN ORDER YOU FOUND THEM. Files may not be taken from the office. To remove, alter, deface,mutilate,or destroy material in one of these files is a misdemeanor for which you can be fined up to S500.00. No briefcases,lame totes,etc are permitted in the file review area. Necessary large plan copies can be scheduled with Ca-ilieroLi.Weave..r(('z:..i3cden.r.!zo, 919-796-7475 for a laterdate/time at an offshe location at your expense.Large plan copies needed should be attached on top of the file. Allways Graphics 'C� rm and. aff can be contacted to set up payment options. Written-questio yibe-16- 4copta t:j wh ere ereiifdi'�gtdd-above. m �aiber'.ai(l be in contact with:�q V'yK&o*ide Y. !il - :­ - - .% -w-, ;-.. �Rt­-.1-....- o.A 7. In accordance with General Statue 2 5-3-51.2, a S25.00 processing fee will be charged and collected for checks on which payment has been refused. FACILITY NAME COUNTY 1. C)5 14 2. 0) 4. 5. h Si,V, a q an Nar�e_of_T�irm/B asiness Date MM/DD/YY Time in Time Out COD S t7K) -, I S MADE PAID INVOICE GJADM/Shared/File Review Access Form rev 2018 3 a► Cr 1' LU !'I W 00 3 4�A��- � cn 0 N ei Ln Ln ao 44 NI V3HIM3=1 E 7 N n N qj coN o Ln C p u � Y a Q G. u u �f z In 1n N N 1-10 Do N N LA DP,E OOM RI GE y Cta Go Wto k L J II C DRIVE O }v ..' ; nitre■ ,,•;Wita. cre 1 I ! 1 r ul LLJ 2 to J VLLY Mr- O 1 �` 'tea'r� y��{{►• "1" ` MA •i, 1. "$tag 4Lt*®R 4 N si Ln s•i �•y V u 0� PA%C — �� d Z � Lu 2 4. e r r5AlD%f- � 1 12Ln a L? a NI H3H.LV3:A 00 N co o 3 E � 1y{y v rn -1 H rY1 LA Ln { rl e--i cl. 00 Do 00 y d N N N I L DEE ; Ck y RI URGE T-1 . 0 Ln d N c w 10 IS u C L" ho C c y C 9 33 L V � w a .c u O CL C al -a Q Ti1t �� rJW .1 It l 1� to 1 c 0! fa N e.90, y N of 1 es m w 1 1 CL CL ' ., - y co 30 LM ao c cu LA 1 1 E- O1 d a.� 1 .•."''� r r 'a Oki Ln -WIN 3 � A � L, ! .... in S MU GO M 1 z E a "� w Ln N N - Y LO 41 eMi c�-1 .�-I 1 00 00 OO tJ 0130 II DEEPIPOOM _n I� O a+ � a r M � P _ P 7 vad4 73 Ln Go d 4 �Lm C 7 O a c m O eY -0CD `° g G�ovv w f 1 N n T wn v Ri 40 C M $ F V FA Cie d ns � t � _ d a _ pIS c L6 IA Ln a LI) Ln N co Ln C TURKEY CREEK m THE KNOLLS a { 1 ei MAP BOOK 56 PAGE 46 1, 00 °3 •� ;, Ln A%� Lp Ln N r4 tj 3 00 co 3: t..., lLOA1K�N ANE.n y � L CA Ln V1 t` 557n-W �~ 1 'ram 5l4p if °'!1 m a ii ' 1 1 a r In In 1331I�t�lM��.' 00Ya'sts 00 c ., a .; I m 'o d d +� nif a �. Mft In d Go a NA VAI• l%9:J 0 of E In 3 � 4 o � w N Imp In N N IA M In Ln CA c-i a I m W 00 w V N N N N L DE.E DS w ICl.. GE o � . Y T-1 OW 3: iiFktl799"'' •p;4 u r r. 04 7 , I• �.��. yiK. T 4 •r s � - Y: CL ik Ln cn _Ln N . 1 Ln eq 4. �. r � ! w � r r is y .fW �• rip a YTX .j 16 • 1' T� R ZJ l 04 a a aI a 3 Iv 15 'y�I pj 9S� - .roa harm. .y 0 H 3 a _ EV-1 ��3 • Doi�� r jF Y ! - ----------- AV; �n k ------------ �� Vic:•-'�"' _ _ !._.. Nk jE sfla fil Ti a :: tea I� H � �,�.-�'.� .s � .{``-SFr.- ff ,�y■�{ Ln 4 �"•� �� �r; S,J~ yyr f tg+• � r• �+ii C'. r� r �.... i .a w....• -- V k ■■ •f;f T E Y F A V * rf'•� ,,f,,//'•' / a�a!�a�at wood, 040 ��1r1{yrlrltl.'1_'{al!"tau. �� y-� ri � aaaaaarrr�rg!}fin ullaa h 3 h O .O a i d v Compliance Inspection Report Permit: SW8130514 Effective: 07/11/13 Expiration: Project: The Knolls at Turkey Creek Section I Owner: Tioga LLC County: Pender Adress: Carver Dr Region: Wilmington City/State/Zip: Rocky Point NC 28457 Contact Person:Scott Gerow Title: Member Phone:910-279-1589 Directions to Project: From int.of NC 117 and NC 210,take NC210 west one mile left onto Carver,go 0.75 miles site on right, opposite Pine Hollow Drive. Type of Project: State Stormwater-Low Density Drain Areas: 1 -(Turkey Creek) (03-06-23)(C;Sw) On-Site Representative(s): Related Permits: SW8151209 Tioga LLC-The Knolls at Turkey Creek Section II SW8150211 Tioga LLC-The Knolls at Turkey Creek Section I Phase 2 Inspection Date: 06/03/2021 Entry Time 10:OOAM Exit Time:12:OOPM Primary Inspector: Trentt James Phone: Secondary Inspector(s): Kelly Johnson Reason for Inspection: Routine Inspection Type: Transfer Renewal Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant Not Compliant Question Areas: State Stormwater (See attachment summary) page 1 permit: SW8130514 Owner-Project: Tioga LLC Inspection Date: 06/03/2021 Inspection Type Transfer Renewal Reason for Visit: Routine File Review Yes No NA NE Is the permit active? E ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ 0 ❑ ❑ Signed copy of the Operation&Maintenance Agreement is in the file? ❑ N ❑ ❑ Copy of the recorded deed restrictions is in the file? N ❑ ❑ ❑ Comment: Certification is needed. O&M Form is needed from incoming party when they apply for a transfer. Deed restrictions are recorded BK4453/PG310. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ❑ ❑ ❑ 0 Is the drainage area as per the permit and approved plans? ❑ ❑ ❑ 0 Is the BUA(as permitted)graded such that the runoff drains to the system? ❑ ❑ ❑ N Comment: Certification needed. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? z ❑ ❑ Are the inlets located per the approved plans? ❑ ❑ ❑ Are the outlet structures located per the approved plans? ❑ ❑ ❑ ❑ Comment: The outfall for Swale 9 needs to be revised on the plans The engineer needs to justify it as an alternative design. Other outlets may also need to be modified to match the plans. See the inspectior pictures. All atypical desings need to be justified by the engineer in writing that the proposed design Provides equal or better treatment than the typical design Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Modification is needed to make this assessment. page 2 Compliance Inspection Report Permit: SW8150211 Effective:05/18/15 Expiration: Project: The Knolls at Turkey Creek Section I Phase 2 Owner: Tioga LLC County: Pender Adress: Carver Dr Region: Wilmington City/State/Zip: Rocky Point NC 28457 Contact Person:Scott Gerow Title: Member Phone:910-279-1589 Directions to Project: From int. of NC 117 and NC 210,take NC 210 west one mile left onto Carver Drive continue for 0.75 miles proposed entrance to site on right,opposite Pine Hollow Drive. Type of Project: State Stormwater-Low Density Drain Areas: 1 -(Turkey Creek) (03-06-23)(C;Sw) On-Site Representative(s): Related Permits: SW8130514 Tioga LLC-The Knolls at Turkey Creek Section I SW8150209 Reserve Development Co LLC-St James Plantation Seaside West Inspection Date: 06/03/2021 Entry Time 10:OOAM Exit Time:12:OOPM Primary Inspector: Trentt James Phone: Secondary Inspector(s): Kelly Johnson Reason for Inspection: Routine Inspection Type: Transfer Renewal Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant Not Compliant Question Areas: State Stormwater (See attachment summary) page 1 Permit: SW8150211 Owner Project: Tioga LLC Inspection Date: 06/03/2021 Inspection Type Transfer Renewal Reason for Visit: Routine File Review Yes No NA NE Is the permit active? M F-1 ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ ❑ ❑ Signed copy of the Operation&Maintenance Agreement is in the file? ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ 0 ❑ ❑ Comment: Certification is needed. O&M Form is needed from incoming party when they aPDly for a transfer. Deed restrictions are needed. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ❑ ❑ ❑ Is the BUA(as permitted)graded such that the runoff drains to the system? ❑ ❑ ❑ Comment: Certification needed. SW Measures Yes No NA NE Are the GW measures constructed as per the approved pians Are the inlets located per the approved plans? ❑ ❑ ❑ Are the outlet structures located per the approved plans? ❑ ❑ ❑ Comment: The lot listed at Lot 115 on County GIS needs to be added to the plan Lot 115 needs to be accounted for in the impervious accounting Lot 115 needs to be accounted for at full build out if not already deed restricted Modification is needed to ensure the constructed condition matches the permitted condition All atypical designs need to be iustified by the engineer in writing that the proposed design provides egua or better treatment than the typical design. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ❑ E Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Modification is needed to make this assessment. page 2 Compliance Inspection Report Permit: SW8151209 Effective:03/17/16 Expiration: Project: The Knolls at Turkey Creek Section II Owner: Tioga LLC County: Pender Adress: Carver Dr Region: Wilmington City/State/Zip: Rocky Point NC 28457 Contact Person:Scott Gerow Title: Member Phone:910-279-1589 Directions to Project: From int. of NC 117 and NC 210,take NC 210 west one mile left onto Carver Drive,go 0.75 miles entrance to project is on right opposite Pine Hollow Drive. Type of Project: State Stormwater-Low Density Drain Areas: On-Site Representative(s): Related Permits: Inspection Date: 06/03/2021 Entry Time 10:OOAM Exit Time:12:00PM Primary Inspector: Trentt James Phone: Secondary Inspector(s): Kelly Johnson Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant Not Compliant Question Areas: 0 State Stormwater (See attachment summary) page 1 Permit: SW8151209 Owner-Project: Tioga LLC Inspection Date: 06/03/2021 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? 0 ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ 0 ❑ ❑ Signed copy of the Operation&Maintenance Agreement is in the file? ❑ e ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ Comment: Certification is needed. O&M Form is needed from incoming party when they apply for a transfer. Deed restrictions are needed. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ❑ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ❑ ❑ ❑ ❑ Is the BUA(as permitted)graded such that the runoff drains to the system? ❑ ❑ ❑ ❑ Comment: There are two lots on Clutch Drive that are shown as future development on the plans but have been subdivided. One is constructed and needs to be accounted for at full build out if it is not already deed restricted. A Darking area has been added to the end of Clutch Drive which may or not be in the 50ft buffer. A cul-de-sac is constructed for Clutch Drive but a dead end road is shown on the plan Please ensure the cul-de-san is accounted for in the impervious accounting. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ❑ ❑ ❑ E Are the inlets located per the approved plans? ❑ ❑ ❑ 0 Are the outlet structures located per the approved plans? ❑ ❑ ❑ Comment: A modification is needed to ensure the constructed condition matches the Permitted condition All atypical designs need to be justified by the engineer in writing that the Droposed design provides egua or better treatment than the typical design. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ❑ E Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Modification is needed to make this assessment. page 2 North Carolina Department of Environmental Quality Land Quality Section: 127 Cardinal Dr Extension Wilmington, NC 28405, Phone:910-796-7215 COUNTY: Pender PROJECT: THE KNOLLS AT TURKEY CREEK PHASE 2 RIVER BASIN: CAPE FEAR PERSON FINANCIALLY RESPONSIBLE: Scott Gerow, Tioga, LLC PROJECT# PENDE-2015-020 ADDRESS: PO Box 789 Castle Hay ne, NC 28429 CASE# Skj / O?_/j 1. PROJECT LOCATION: Carver Dr. Rocky Point NC Pictures: Video: Digital: 2. Weather and Soil Conditions: SUNNY AND DRY First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last inpections? Lake/natural watercourse on the tract: Lake/natural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): NONE Title: Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: SEP 08, 2017 9. Corrective Actions Needed: 10. COMMENTS: This portion of the project appears complete and stabilized. File will be closed. Permanent ground cover sufficignt td restrain erosion has been established. No additional self-monitoring or self-inspections are required. P;roje/fi'`is=r an coverage under NPDES General Stormwater Permit for Construction Activities is tervinat�1 :� Report By: Trentt James ,e° Others Present: Date of Inspection: AUG 31, 20'17 Time Arriving on Site: 11:15 Time Leaving Site: 11:30 cc; Revision Date 10/16/2015 Page 1 of 1