HomeMy WebLinkAboutNC0021644_La Grange Inspection_20240325United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO021644 111 121 24/03/25 I17 18 I C I 19 Ls_] 20I � I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I n,J I I I 71 I 74 79 I I I I I I I80
701� I 711 L
LJ L
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:45AM 24/03/25
19/04/01
La Grange WWTP
700 E King St
Exit Time/Date
Permit Expiration Date
La Grange NC 285510368
11:45AM 24/03/25
24/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
James Wesley Sutton/ORC/252-566-3295/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Shawn M Condon,PO Box 368 La Grange NC 28551/Town Manager/252-566-3186/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Sara Selby 15'aA� DWR/WARD WQ/252-946-6481/ 3/26/24
Robert E Bullock (/ DWR/WARD WQ/252-948-3843/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
vm-� " DWR/waRO WQROS / 252-948-3939 3/28/2024
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO021644 I11 12I 24/03/25 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On March 25, 2024, Sara Selby and Robbie Bullock with Division of Water Resources from the
Washington Regional Office conducted a compliance evaluation at La Grange WWTP operating
under NPDES permit NC0021644. The review period for this inspection was January 2022 through
July 2023. Over this review period, there were numerous total phosphorus limit violations.
The current permit is set to expire March 31, 2024. A renewal application has been submitted and the
current permit will remain effective until the new permit is issued. James Sutton is the ORC with Carl
Foster as the backup ORC.
Page#
Permit: NCO021644
Inspection Date: 03/25/2024
Owner - Facility: La Grange WWTP
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The facility appeared to be maintained.
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The current permit is set to expire March 31, 2024. A renewal application has been
submitted and the current permit will remain effective until the new
permit is issued.
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
0
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
0
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
❑
❑
operator on each shift?
Is the ORC visitation log available and current?
0
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
0
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility
0
❑
❑
❑
classification?
Page# 3
Permit: NCO021644 Owner -Facility: La Grange WWTP
Inspection Date: 03/25/2024 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑
Facility has copy of previous year's Annual Report on file for review? 0 ❑ ❑ ❑
Comment: James Sutton is the ORC with Carl Foster as the backup ORC. The November 2023
DMR was spot-checked for accuracy.
Laboratory
Yes
No
NA
NE
Are field parameters performed by certified personnel or laboratory?
■
❑
❑
❑
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
❑
❑
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
■
❑
❑
❑
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
❑
❑
❑
■
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
❑
❑
❑
Comment:
Flow Measurement - Influent
Yes
No
NA
NE
# Is flow meter used for reporting?
❑
0
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The influent flowmeter was calibrated on Mav 23, 2023 by Chadwick Instrument Service
Co, Inc.
Lagoons Yes No NA NE
Type of lagoons?
# Number of lagoons in operation at time of visit? 2
Are lagoons operated in?
# Is a re -circulation line present?
❑
❑
0
❑
Is lagoon free of excessive floating materials?
0
❑
❑
❑
# Are baffles between ponds or effluent baffles adjustable?
❑
❑
0
❑
Are dike slopes clear of woody vegetation?
0
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
❑
❑
❑
■
Are dikes free of seepage?
❑
❑
❑
Are dikes free of erosion?
❑
❑
❑
Page# 4
Permit: NCO021644 Owner -Facility: La Grange WWTP
Inspection Date: 03/25/2024 Inspection Type: Compliance Evaluation
Lagoons
Yes
No
NA
NE
Are dikes free of burrowing animals?
❑
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
❑
❑
❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
❑
Is the lagoon surface free of weeds?
0
❑
❑
❑
Is the lagoon free of short circuiting?
❑
❑
❑
Comment: The lagoons are used for flow equalization.
Grit Removal
Yes
No
NA
NE
Type of grit removal
a.Manual
❑
b.Mechanical
Is the grit free of excessive organic matter?
■
❑
❑
❑
Is the grit free of excessive odor?
0
❑
❑
❑
# Is disposal of grit in compliance?
0
❑
❑
❑
Comment:
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
■
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Influent Sampling
Yes
No
NA
NE
# Is composite sampling flow proportional?
❑
■
❑
❑
Is sample collected above side streams?
0
❑
❑
❑
Is proper volume collected?
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
■
❑
❑
❑
degrees Celsius)?
Page# 5
Permit: NCO021644
Inspection Date: 03/25/2024
Influent Sampling
Is sampling performed according to the permit?
Owner -Facility: La Grange WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
■ ❑ ❑ ❑
Comment: The influent sampler temperature measured at two degrees Celsius and is sampled
once every hour.
Pump Station - Influent
Yes
No
NA
NE
Is the pump wet well free of bypass lines or structures?
■
❑
❑
❑
Is the wet well free of excessive grease?
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
■
❑
❑
❑
Is SCADA telemetry available and operational?
❑
❑
❑
Is audible and visual alarm available and operational?
❑
❑
❑
Comment:
Oxidation Ditches
Yes
No
NA
NE
Are the aerators operational?
0
❑
❑
❑
Are the aerators free of excessive solids build up?
0
❑
❑
❑
# Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
0
❑
❑
❑
Are settleometer results acceptable (> 30 minutes)?
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/I)
■
❑
❑
❑
Are settelometer results acceptable?(400 to 800 ml/I in 30 minutes)
❑
❑
❑
■
Comment:
Nutrient Removal
Yes
No
NA
NE
# Is total nitrogen removal required?
■
❑
❑
❑
# Is total phosphorous removal required?
0
❑
❑
❑
Type
Biological
# Is chemical feed required to sustain process?
0
❑
❑
❑
Is nutrient removal process operating properly?
0
❑
❑
❑
Comment:
Page# 6
Permit: NC0021644 Owner -Facility: La Grange WWTP
Inspection Date: 03/25/2024 Inspection Type: Compliance Evaluation
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
■
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
■
❑
❑
❑
Are weirs level?
■
❑
❑
❑
Is the site free of weir blockage?
■
❑
❑
❑
Is the site free of evidence of short-circuiting?
■
❑
❑
❑
Is scum removal adequate?
■
❑
❑
❑
Is the site free of excessive floating sludge?
■
❑
❑
❑
Is the drive unit operational?
■
❑
❑
❑
Is the return rate acceptable (low turbulence)?
■
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
■
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
■
❑
❑
❑
Comment: The sludge blankets are approximately eight feet.
Aerobic Digester
Yes
No
NA
NE
Is the capacity adequate?
■
❑
❑
❑
Is the mixing adequate?
■
❑
❑
❑
Is the site free of excessive foaming in the tank?
■
❑
❑
❑
# Is the odor acceptable?
■
❑
❑
❑
# Is tankage available for properly waste sludge?
■
❑
❑
❑
Comment:
Filtration (High Rate Tertiary)
Yes
No
NA NE
Type of operation:
Down flow
Is the filter media present?
■
❑
❑
❑
Is the filter surface free of clogging?
■
❑
❑
❑
Is the filter free of growth?
■
❑
❑
❑
Is the air scour operational?
❑
❑
❑
■
Is the scouring acceptable?
❑
❑
❑
■
Is the clear well free of excessive solids and filter media?
■
❑
❑
❑
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting? ■ ❑ ❑ ❑
Page# 7
Permit: NCO021644 Owner -Facility:
Inspection Date: 03/25/2024 Inspection Type:
La Grange WWTP
Compliance Evaluation
Flow Measurement - Effluent
Yes
No
NA
NE
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
❑
Comment: The effluent flowmeter was calibrated on May 23, 2023 bV Chadwick Instrument Service
Co, Inc.
Disinfection -Gas
Are cylinders secured adequately?
Are cylinders protected from direct sunlight?
Is there adequate reserve supply of disinfectant?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de -chlorination?
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No.
7782-50-5)?
If yes, then is there a Risk Management Plan on site?
If yes, then what is the EPA twelve digit ID Number? (1000- - )
If yes, then when was the RMP last updated?
Comment:
De -chlorination
Type of system ?
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de -chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de -chlorinators operational?
Number of tubes in use?
Comment:
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Yes No NA NE
Gas
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Yes No NA NE
❑ ■ ❑ ❑
■ ❑ ❑ ❑
Page# 8
Permit: NCO021644 Owner -Facility: La Grange WWTP
Inspection Date: 03/25/2024 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
■
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
0
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: The sampler temperature was three deqrees Celsius. The sampler uses constant time
and volume and samples every hour.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
■
❑
Comment:
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
Comment: Traveler's Service Station supplies the generator fuel.
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 9