Loading...
HomeMy WebLinkAbout_External_ SAW-2019-00697 - Provisional NWP14 (Bethabara Road Culvert Replacement_Winston-Salem - Forsyth County)Carpenter, Kristi From: Lawrence, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Lawrence@usace.army.mil> Sent: Thursday, March 21, 2024 2:28 PM To: toddml@cityofws.org Cc: jessica.tisdale@hdrinc.com; Conchilla, Ryan; Wanucha, Dave Subject: [External] SAW-2019-00697 - Provisional NWP14 (Bethabara Road Culvert Replacement/Winston-Salem - Forsyth County) You don't often get email from jennifer.l.lawrence@usace.army.mil. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear Mr. Love, This is in response to a Pre -Construction Notification (PCN) SAW-2019-00697 received on February 27, 2024, and considered complete on February 27, 2024. In submitting the PCN, you requested verification that the proposed project is authorized by a Department of the Army (DA) Nationwide Permit 14 (Linear transportation). The work affecting waters of the United States is part of an overall project known as Bethabara Road Culvert Replacement Project. The activities in waters of the United States include the replacement of a failing road crossing. The project proposes 206 LF (0.044 acres) of permanent stream impacts for bank stabilization and riprap apron installation, 72 LF (0.025 acres) of permanent loss stream impacts for a bottomed culvert installation, and 137 LF (0.047 acres) of temporary stream impacts for dewatering in order to replace a failing bottomless culvert. The project is located at Latitude 36.150376 and Longitude-80.150376; in Winston-Salem, Forsyth County, North Carolina. Conditions of the Individual Section 401 WQC, will generally become conditions of any final Nationwide Permit 14 verification letter. Should state action on the required WQC approve a project different from that shown on the current application, a modification to the PCN will be required. You should notify our office of any such changes as substantial changes may require further evaluation. As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP/RGP verification letter) prior to commencing the work. In all future correspondence, please refer to file number SAW-2019-00697. A copy of this letter is forwarded to State and/or Federal agencies for their information. If you have any questions, please contact Jennifer Lawrence, at (980)392- 9980 or by email at Jennifer.L.Lawrence@usace.army.mil. Thank you, Jennifer Lawrence, PWS (she/her) Regulatory Specialist, Charlotte Regulatory Field Office U.S. Army Corps of Engineers, Wilmington District 8430 University Executive Park Drive, Suite 615 Charlotte, NC 28262 Email: Jennifer.L.Lawrence@usace.army.mil Cell: (980)392-9980