Loading...
HomeMy WebLinkAbout20130223 Ver 4_Workbridge_TempImpact-R1_031914_20151203GREENSBORO WESTERN LOOP PROJECT AREA OF WETLAND IMPACT FOR WORK BRIDGE PROPO� ELIMINATION OF PROPOSED WORK BRIDGE AREA WITHIN THE WETLAND BOUNDARIES TOTAL AREA 0.39 ACRES PROPOSED ADDITIONAL WORK BRIDGE AREA WITHIN THE WETLAND BOUNDARIES TOTAL AREA 0.20 ACRES RESULTING IN A TOTAL REDUCTION OF 0.19 ACRES ORIGINAL DESIGN INDICATES 7,000 LF OF WORK BR CONTRACTORS PROPOSAL SUGGESTS 5,927 LF OF REVISION01 - ILLUSTRATING THE CORRECT WETLAND BOUNDRY TEMPORARY IMPACTS 0 100 200 SCALE: 1 "=100'