Loading...
HomeMy WebLinkAboutNC0038377_Comments_20240105 (2)From: Chernikov, Seroei To: Tollie, Lori White; McDaniel, Kim Spence Subject: RE: [External] RE: Duke Energy Mayo NPDES NCO038377 Date: Wednesday, November 29, 2023 8:52:33 AM Lori, Your understanding is correct. Thank you! Sergei Sergei Chernikov, Ph.D. Environmental Engineer III Industrial NPDES Permitting Unit NEW Tel. 919-707-3606 1617 Mail Service Center, Raleigh, NC 27699-1617 Express Mail: 512 N. Salisbury St., Raleigh, NC 27604 NEW E-MAIL:sergei.chernikov@deq.nc.gov From: Tollie, Lori White <Lori.Tollie@duke-energy.com> Sent: Wednesday, November 29, 2023 7:52 AM To: Chernikov, Sergei <sergei.chernikov@deq.nc.gov>; McDaniel, Kim Spence <Kim.MCDaniel@duke- energy.com> Subject: [External] RE: Duke Energy Mayo NPDES NCO038377 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sergei, Another question/comment came up after further review of the draft permit. Permit condition A(4). is associated with internal Outfall 002A the lined retention basin, now has a toxicity sampling requirement after ash basin dewatering is complete. Internal Outfall 002A comingles with other low volume waterwater before final discharge into Mayo reservoir via Outfall 002. Outfall 002 will continue to be the final discharge even after basin closure activities are complete. It's my understanding that Outfall 002 would be the location for sampling to account for all wasterwater flow leaving the Mayo Station. Please let me know if you have any questions about this or if you would like to discuss further. Thankyou Lori W. Tollie Duke Energy Permitting & Compliance 500 Utility Drive Lewisville, NC 27012 Cell: (336) 408-2591 Office: (336) 854-4916 From: Tollie, Lori White Sent: Monday, November 27, 2023 1:16 PM To: Chernikov, Sergei <sergei.chernikov(@deq.nc.gov>; McDaniel, Kim Spence <Kim.McDaniel (cDduke- energy.com> Subject: Duke Energy Mayo NPDES NC0038377 Sergei, I wanted to send you the following comments on the Mayo NPDES draft permit and fact sheet. The fact sheet incorrectly lists that ash basin dewatering began in October of 2023. Dewatering begin on May 24, 2021. 1 have attached the email correspondence notifying the Division of commencement. There is ample effluent data to support the reduction of sampling at Outfall 002 from weekly to monthly and to return toxicity sampling to quarterly at Outfall 002. Permit condition A(3). Also still has the nonstandard permit language concerning notification of any exceedance of 85% of the allowable level of certain constituents. The supplement to the permit cover sheet should not contain the language "upon completion of construction" for the Lined Retention Basin. The LRB is complete. Please let me know if you have additional questions or need additional information. Thankyou Lori W. Tollie Duke Energy Permitting & Compliance 500 Utility Drive Lewisville, NC 27012 Cell: (336) 408-2591 Office: (336) 854-4916 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.