Loading...
HomeMy WebLinkAboutSW5231101_Supplement-EZ Form_20240329 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name E.Jewett Avenue Subdivision-Phase 1 2 Project Area(ac) 2.63(Phase 1 Only) 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0.01 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 1 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Fiiterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: J.Michael Stocks,PE 28 Organization: Stocks Engineering 29 Street address: 801 E Washington St. 30 City,State,Zip: Nashville,NC 27856 31 Phone number(s): 252-459-8196 32 Email: mstocks@stocksengineering.com Certification Statement I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 011.1111(.fil,', d,e •• Y ,v SEAL w M f Designer 19313• -lifii114st,:�° • v/2 /7/ Sea! Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? Yes 4 If so,number of low density drainage areas 1 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 LD 1 4 Type of SCM Wetland None 5 Total drainage area(sq ft) 114796 sf 50088 sf 64708 sf 6 Onsite drainage area(sq ft) 114796 sf 50088 sf 64708 sf 7 Offsite drainage area(sq ft) 0 0 0 8 Total BUA in project(sq ft) 33633 sf 28357 sf 5276 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) 22096 sf 16863 sf 5233 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 11537 sf 11494 sf 43 sf 11 Offsite BUA(sq ft) sf sf sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) sf sf sf -Sidewalk(sq ft) 1604 sf 1561 sf 43 sf -Roof(sq ft) sf sf sf -Roadway(sq ft) 9933 sf 9933 sf sf -Future(sq ft) sf sf sf -Other,please specify in the comment box below(sq ft) sf sf sf New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf sf sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf sf sf 16 Existing BUA that is already permitted(sq ft) sf sf sf 17 Existing BUA that will be removed(sq ft) sf sf sf 18 Percent BUA 34% 57% 8% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(cu ft) 2724 cf 21 Calculation method for design volume Simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): STORMWATER WETLAND 1 Drainage area number 1 2 Minimumr-.ukedtreatmentvolrme cif 2980cf GENERAL MDC FROM 0214.1050 3 is the SCM sized to treat the SW from all surfaces at buad-out? •Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining wags,gablon watts or other engineered side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion(10- • year storm)? Yes 8 Is there an overflow or bypass for Inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does OW)the plat comply with NIA General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? •Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes _ 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desIgned by an NC licensed professional? Yes STORMWATER WETLAND MDC FROM 0211.1654 18 Design volume of SCM(cm ft) 3372 Are the inlel(s)and outlet located in a manner that avoids short- 19 circuiting? Yes . 20 Are berms or baffles provided to Improve the flow path? No • 21 Does the orifice drawdown from below the top surface of the Yes • permanent pool? 22 Does the wetland minimize impacts to the receiving channel from the 1- yr,24-hr storm? Yes 23 Is a trash rack or other device provided to protect the outlet system? Yes Elevations 24 Elevation,peak attenuation above temporary pool(if applicable)((nisi) 255.f2 25 Elevation,temporary pool(top of the temporary Inundation zone)(fmsi) 253.25 26 Elevation,permanent pool(top of the shallow water zone)(fmst) 252.00 27 Elevation,bottom of shallow water zone(frost) 251.25 28 Elevation,bottom of forebay deep pool at deepest point(at forebay 249,00 entrance)(frost) 29 Elevation,bottom of forebay deep pool at shallowest point(at forebay exit)(fmsl) 250,00 30 Elevation,bottom of non-forebay deep pool at deepest point(fmsl) 250.00 Planting Zones __ 31 Area,total surface area of the SW wetland at temporary pool elev.(sq 3,450.00 ft) 32 Area,temporary Inundation zone al temporary pool elev.(sq ft) 1,589.00 33 Area,shallow water zone at temporary pool elev.(sq ft) 1,277.00 34 Area,forebay at temporary pool elev.(sq ft) 348.00 35 Area,non-forebay deep pool at temporary pool day.(sq ft) 255.00 • 36 Percent area provided,temporary inundation zone(should be 30.45%) •.:::.45%. 37 Percent area provided,shallow water zone(should be 35-45%) 37% 38 Percent area provided,deep pool(forebay)(should be 10-15%), 10% 39 Percent area provided,deep pool(non-forebay)(should be 5-15%) 7% :` Depths end Outlet 40 Peak attenuation depth above temporary inundation zone(inches) 22 In 41 Temporary inundation zone depth(temporary pool to permanent pool) 15 in (inches)._ 42 Shallow water zone depth(permanent pool to bottom of wetland) 9 in (inches) 43 Depth,forebay at entrance(permanent pool to bottom of forebay entrance)(inches) 38 in 44 Depth,forebay at exit(permanent pool to bottom of forebay exit) 24 in (inches) 45 Depth,non-forebay deep pools(permanent pool to deep pool bottom) 24 in ench 46 If there is an orifice,diameter(inches) 1 in 47 If there is a weir,weir height(inches) WA 48 if there is a weir,weir length(inches) N/A 49 Drewdown time for the temporary pool(days) 2.3 Wetland 1 2:24 PM 3/29/2024 STORMWATER WETLAND Sol!and Plan is 50 Soil amendment depth(inches) 12 In 51 Has a soil amendment specification been provided? Yes 52 Has a landscaping plan that meets SW Wetland MDC(12)been Yes provided? _ 53 Number of plants per 200 square feet(b)in the shallow water zone: Does the temporary Inundation zone planting comply with SW Wetland Yes MDC(14)? 55 Are the dam structure end temporary fig slopes planted in non- Yes clomping turfgrass? 56 Wi#I cattails be planted in the wetland? No ADDITIONA.t.INFORMATION 57 Please use this space to provide any additional information about the stormwater wetland(s): • Wetland 2 2;24 PM 3/29/2024