Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8210312_Current Permit_20230301
ROY COOPER 4 1.. Governor ELIZABETH'S.BISER �. ,.w Secretary — !___ DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Qrurlily March 1,2023 Dry Pond Partners,LLC Attn:Mr.Bruce Cameron,IV,Manager PO Box 3649 Wilmington,NC 28406 Subject: Permit Correction Stormwater Permit No. SW82.10312 Barclay Place Phase 2—Lot 2 New Hanover County Dear Mr.Cameron: The Wilmington Regional Office issued the subject permit on November 5,2021 and recently discovered it contained an error. This permit correction is necessary to incorporate the requirements of Section 4(a)of Session Law 2021-158,which became effective on September 16,2021 and is now included in G.S. 143-214.7(b4). Please replace the previously issued permit with the enclosed correct permit. This corrected permit does not impose new or different design standards;it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. This project is subject to the conditions and limitations as specified in the corrected permit. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the project,procedures for changes of ownership,transferring the permit,and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system,to record deed restrictions,to transfer the permit,or to renew the permit,will result in future compliance problems. If any parts,requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee.(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. ff you have any questions,need additional copies of the permit or approved plans,please contact Aisia Freeman with DEMLR in the Wilmington Regional Office at(910)796-7215 or.Aisia.freeman@ncdenr.gov. Sincerely, crpl` - . 71 ,g .Douglas R.Ansel,Interim Director Division of Energy,Mineral and Land Resources Enclosures: Attachment C—Permitting History DES/af: \\\Stormwater\Permits&Project\2021\210312 HD\2023 03 permit_correction 210312 cc: Wilmington Regional Office Stormwater File E .,› North Caroltna•Departmera ofEnvirOnmen+tal Quality I Division of ar ergy,Mineral and Land Resources Wilmington Regional Office I I27 CariiinaI.Drive,clay I WtiminaTiln,North Caro}ina.284O5 =I wwamwa ,►" 410.796.7215. Post Construction Stormwater Management Permit No. SW8210312 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST- CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT SERVED BY AN OFF-SITE STORMWATER SYSTEM in compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Dry Pond Partners, LLC Barclay Place, Phase 2—Lot 2 2545 Croquet Drive, Wilmington, New Hanover County FOR THE construction, management, operation, and maintenance of built-upon area (BUA) draining to a permitted off-site stormwater system as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated, and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are an enforceable part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. MASTER PERMIT. Stormwater runoff from this site, Lot 2, has been approved to be discharged into and treated by the wet detention pond (the "off-site stormwater system", "off-site stormwater control measure", or"SCM") operated and maintained by IG Wilmington, LLC (the "Master Permittee") under the terms and conditions set forth in the latest version of Stormwater Management Permit No. SW8 960820 (the "Master Permit") and as subsequently modified, transferred, and renewed. 2. BUA REQUIREMENTS. The maximum amount of BUA approved for this project is 123,892 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. a. OFF-SITE SCM BUA LIMITS. The maximum amount of BUA allocated to this development by the Master Permit is 123,892 square feet. This permit covers the construction of a total of 123,892 square feet of BUA, which includes 110,722 square feet of future BUA allocation. Page 1 of 5 Post Construction Stormwater Management Permit No. SW8210312 3. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 4. OFF-SITE SCM REQUIREMENTS. This permit is issued contingent on the permitted off-site SCM(s) being constructed, operated, certified, and maintained in compliance with the latest version of the Master Permit, and as it may be subsequently modified, transferred or renewed. 5. VEGETATED BUFFERS. A 50-foot wide vegetative buffer must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The buffer is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and maintenance access located on property owned by other persons or entities must be located in permanent recorded easements or drainage easements as shown on the approved plans. b. MASTER PERMIT DEED RESTRICTIONS AND PROTECTIVE COVENANTS. This permit is issued contingent on the recordation of the restrictions and protective covenants, which are required under the Master Permit, prior to the sale of this lot and must be maintained in perpetuity. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the project will be repaired immediately. a. PROTECTION OF OFF-SITE SCM. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements to protect the downstream off- site SCM from sedimentation. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition, as approved in the Master Permit, prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. Page 2 of 5 Post Construction Stormwater Management Permit No. SW8210312 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease, or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications.. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 1n OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed Operation and Maintenance Agreement titled Stormwater Collection System Maintenance Requirements, a part of the Off-site Supplement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. The permittee shall keep records of maintenance activities and make them available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. Page 3 of 5 Post Construction Stormwater Management Permit No. SW8210312 12. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; v. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves of a formal request to transfer the permit. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated conveyances must be accessible for inspection, operation, maintenance and repair as shown on the approved plans. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. a. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions. Page 4 of 5 Post Construction Stormwater Management Permit No. SW8210312 f OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. g. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit corrected, updated and reissued this the 1 day of March 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Douglas R. Ansel, Interim Director 9 Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C- Permitting History Dry Pond Partners, LLC Permit No. SW8210312 Approval Permit BIMS Date Action Version Description of the Changes construction, management, operation, and maintenance of built-upon area (BUA) draining to a permitted off-site stormwater system as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting 11/5/2021 Original 1 0 data (the "approved plans and specifications") as attached Approval and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated, and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are an enforceable part of this permit. This permit correction is necessary to incorporate the 3/1/2023 Correction 1.0 requirements of Section 4(a) of Session Law 2021-158, which became effective on September 16, 2021 and is now included in G.S. 143-214.7(b4). Governor "'•9,11al 1 COOPER Y,rs ELIZABETH S.RISER S BRIM.WRENN NORTH CAROUNA November 5,2021 Dry Pond Partners,LLC Attn:Mr.Bruce Cameron,IV,Manager PO Box 3649 Wilmington,NC 28406 Subject: State Stormwater Permit No.SW8 210312 Barclay Place Phase 2—Lot 2 High Density Project served by an Oftsfte SCM New Hanover County Dear Mr.Cameron: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for the subject project on October 26,2021. Staff review of the plans and specifications has determined that the project, as proposed,complies with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 amended on January 1,2017(2017 Rules). We are hereby forwarding Permit No.SW8 210312 dated November 5,2021,for the construction,operation,and maintenance of the built-upon areas(BUA)associated with the subject project. This permit shall be effective from the date of issuance until rescinded and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems.Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter,attachments,and all documents on file with DEMLR shall be considered part of this permit and are herein incorporated by reference. If any parts,requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 154E of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail.Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. Eroli, North Carolina Department of Environmental Quality I Division of Energy,fi ineral and Land&esources ' Wilmington Regional Office 1 127 Cardinal Drive extension I Wilinington,North Carolina.2&405 per: a 91a79E47215 State Stormwater Permit No.SW8 210312 Page 2 of 2 If you have any questions concerning this permit,please contact Kelly Johnson in the Wilmington Regional. Office,at(910)796-7215 or kelly.p.johnson@ncclenr.gov. Sincerely, CAILUTier -... 9- 0 Brian Wrenn,Director Division of Energy,Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Forms Application Documents Attachment B for SW8 960820—Built-Upon Area Allocation DES/kpj: \11Stormwater&Permits&Prajects12021\210212 Offsite12021 11 permit 210212 cc: Mr.Jason Clark,PE,Norris&Tunstall 2602 Iron Gate Drive,Suite 102,Wilmington,NC 28412 Mr.Bruce B.Cameron Trustee,Master Permittee P.O.Box 3649,Wilmington,NC 28406 New Hanover County Building Safety Department New Hanover County Engineering NCDOT District Engineer Wilmington Regional Office Stormwater File C -. North Carolina Department of Environmental Quality I Division of Energy sera[and Land Resources ✓ Wilmington ertaa Regional Office 11Zi Cardinal Drive Extension I Eton North caroltna.2S4OS claim '1' e...0 towel mwtomoil°°toroo 910:79b.72IS State Stormwater Management Permit No. SW8 210312 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT SERVED BY AN OFF-SITE STORMWATER SYSTEM In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Dry Pond Partners, LLC Barclay Place, Phase 2— Lot 2 2545 Croquet Drive, Wilmington, New Hanover County FOR THE construction, management, operation, and maintenance of built-upon area (BUA) draining to a permitted off-site stormwater system as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated, and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are an enforceable part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. MASTER PERMIT. Stormwater runoff from this site, Lot 2, has been approved to be discharged into and treated by the wet detention pond (the "off-site stormwater system", "off-site stormwater control measure", or"SCM") operated and maintained by IG Wilmington, LLC (the "Master Permittee") under the terms and conditions set forth in the latest version of Stormwater Management Permit No. SW8 960820 (the "Master Permit") and as subsequently modified, transferred, and renewed. 2. BUA REQUIREMENTS. The maximum amount of BUA approved for this project is 123,892 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. a. OFF-SITE SCM BUA LIMITS. The maximum amount of BUA allocated to this development by the Master Permit is 123,892 square feet. This permit covers the construction of a total of 123,892 square feet of BUA, which includes 110,722 square feet of future BUA allocation. Page 1 of 5 State Stormwater Management • Permit No. SW8 210312 3. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 4. OFF-SITE SCM REQUIREMENTS. This permit is issued contingent on the permitted off-site SCM(s) being constructed, operated, certified, and maintained in compliance with the latest version of the Master Permit, and as it may be subsequently modified, transferred or renewed. 5. VEGETATED BUFFERS. A 50-foot wide vegetative buffer must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The buffer is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater collection and conveyance system on the lot, and any maintenance accesses, must be located in public rights-of-way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. MASTER PERMIT DEED RESTRICTIONS AND PROTECTIVE COVENANTS. This permit is issued contingent on the recordation of the restrictions and protective covenants, which are required under the Master Permit, prior to the sale of this lot and must be maintained in perpetuity. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the project will be repaired immediately. a. PROTECTION OF OFF-SITE SCM. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements to protect the downstream off- site SCM from sedimentation. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition, as approved in the Master Permit, prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. Page 2 of 5 State Stormwater Management Permit No. SW8 210312 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease, or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed Operation and Maintenance Agreement titled Stormwater Collection System Maintenance Requirements, a part of the Off-site Supplement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. The permittee shall keep records of maintenance activities and make them available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11 CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. Page 3 of 5 State Stormwater Management Permit No. SW8 210312 12. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part, ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and (8); iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves of a formal request to transfer the permit. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Page 4 of 5 State Stormwater Management Permit No. SW8 210312 Permit issued this the 5th day of November 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION cRublvv:_4 ()lc rian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 210312 Page 5 of 5 State Stormwater Management Permit No. SW8 210312 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As-Built Permittee Certification • As-Built Designer's Certification General MDC/Off-site A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 210312 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. ❑ Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature , a Notary Public in the State of County of , do hereby certify that personally appeared before me this day of , 20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Permittee's Certification NCAC .1042(4) C°mple# I N/A 1 Provided A. DEED RESTRICTIONS I BUA RECORDS 1. The deed restrictions and protective covenants have been recorded —Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. The built-upon area does not exceed the maximum permitted amount. B. EASEMENTS 1. The components of the runoff collection/conveyance system are Y or N located in recorded drainage easements. 2. A copy of the recorded plat(s) is provided. Y or N C. OPERATION AND MAINTENANCE AGREEMENT —_--_— --- — Y .or N --_- 1. The O&M Agreement is referenced on the final recorded plat. Y or N -2. The O&M Agreement is recorded with the Register of Deeds and Y or N appears in the chain of title. D. OPERATION AND MAINTENANCE PLAN-maintenance records are ,f or N being kept in a known set location and are available for review. _ E. DESIGNER'S CERTIFICATION FORM-has been provided to the Y or N Division. - - Provide an explanation for every requirement that was not met, and for every"N/A". Attach additional sheets as needed. Page 1 of 3 State Stormwater Management Permit No. SW8 210312 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC /OFF-SITE I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 and the Off-site MDC as defined in NCAC 02H.1002(29) and the requirements of NCAC 02H.1003(3)(c) in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/#? _ Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3). _ Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the Off-site SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. ©N/E = not evaluated (provide explanation on page 2) OO N/A= not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) &General MDC ©As-buiff ©NIE ®NIA .1050 I- THE OFF-WE SCM 1. The project controls runoff through an off-site permitted Y or N SCM that meets the requirements of the MDC. 2. The Off-site SCM has been certified by an appropriately Y or N licensed design professional as meeting the General MDC found in NCAC 02H.1050. 3. The Off-site SCM has been certified by an appropriately Y or N licensed design professional as meeting the specific MDC for the type of SCM that treats the runoff from this project. 4. The off-site SCM is currently permitted under permit No. Y or N SW B. VEGETATED SETBACKS/ BUA 1. The width of the vegetated setback for this project is 50' Y�or N and has been measured from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N (b2)(2) is located in the setback. Page 2 of 3 State Stormwater Management Permit No. SW8 210312 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water-dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Runoff from the as-built BUA for the project is collected and directed into the off-site SCM. -- - _ — — — DAs-built ®N/E a N/A C. COMPLIANCE W?TH OTHER REGULATORY PROGRAMS Y or N has been met. D. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V(provide Y or N su orting documents for soils and vegetationL_ E. EROSION PROTECTION -- - 1- The inlets from the project into the off-site SCM do not Y or N cause erosion in the SCM. P. DESIGNER QUALIFICATIONS (FAST-TRACK PERMIT)- The designer is licensed under Chapters 89A, 89C, 89E, or Y or N 89F of the General Statutes. — Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E", below. Attach additional pages as needed: Page 3 of 3 _ - DEMLR USE ONLY Date Received Fee Paid Permit Number 315140IA (oc‘cinatLM) -►3L1s 45as 6-d/3 d% �31� Applicable Rules: Coast-SW-1995 El Coastal SW-2008 ❑Ph II-Post Construction (select all that apply) ❑Non-Coastal SW-HQW/ORW Waters ❑Universal Stormwater Management Plan ❑Other WQ Mgmt Plan: • State of North Carolina Department of Environment and Natural Resources � it 10 c Division of Energy,Mineral and Land Resources (41( `iC 43) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 6-bl- D sAL) This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Barclay Place Phase 2-Lot 2 2. Location of Project(street address): 2545 Croquet Drive(Lot 2)-Note: Address Has Not Yet Been Assigned City:Wilmington County:New Hanover Zip:28412 3. Directions to project(from nearest major intersection): From the intersection of Independence Blvd.&US 117(Shipyard Blvd.),turn East on Shipyard Blvd. Travel-380 FT,then turn right on Southhall Dr. Project is-720 FT on the left. 4. Latitude:34°11'42.8"N Longitude:-77°54'24.8"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): New :Modification ❑Renewal w/Modificationt tRenewals with modifications also requires SWU 102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ['Not Started ['Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ['Low Density ['High Density ®Drains to an Offsite Stormwater System Daher 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): [LAMA Major NSedimentation/Erosion Control:0.43(within Lot 2) ac of Disturbed Area ❑NPDES Industrial Stormwater D404/401 Permit:Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit:All required permits are under review. ECEIVE 5. Is the project located within 5 miles of a public airport? ❑No ®Yes 2 O Zazi If yes,see S.L.2012-200,Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulations AUG Form SWU-101 Version Oct.31,2013 Page 1 of 6 III. CONTACT INFORMATION 1.a.Print Applicant/Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Dry Pond Partners,LLC Signing Official&Title:Bruce B.Cameron,IV,Managing Member b.Contact information for person listed in item la above: Street Address:1201 Glen Meade Road City:Wilmington State:NC Zip:28401 Mailing Address(if applicable):P.O.Box 3649 City:Wilmington State:NC Zip:28406 Phone: (910 ) 762-2676 Fax: (910 ) 762-2680 Email:hill@cameronco.com c.Please check the appropriate box.The applicant listed above is: The property owner(Skip to Contact Information,item 3a) Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer's(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City:_ State: Zip: Phone: ( ) Fax: ( ) Email: ECEIVE 4. Local jurisdiction for building permits:New Hanover CountyBuildingSafe S 2 O Point of Contact:Nicholas Gadzekpo,Director Phone#: (910 ) 79 6 BY: Form SWU-101 Version Oct.31,2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Treated in permitted stormwater pond(offsite)in Permit SW8 960820. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: El Coastal SW—1995 ❑Ph II—Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:3.56 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area(4)—Total Coastal Wetlands Area(5)—Total Surface Water Area(6)=Total Project Area+: 3.56 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures,the area between the banks of streams and rivers,the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHW)line.The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area:(Total Impervious Area /Total Project Area)X 100 =80 9. How many drainage areas does the project have?1 (For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area Receiving Stream Name Hewletts Creek Stream Class * SA Stream Index Number* 18-87-26 Total Drainage Area(sf) 154,865 On-site Drainage Area(sf) 154,865 Off-site Drainage Area(sf) 0 Proposed Impervious Area**(sf) 123,892 %Impervious Area**(total) 80% Impervious**Surface Area Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ On-site Buildings/Lots(sf) 0 On-site Streets (sf) 0 On-site Parking (sf) 7,355 On-site Sidewalks (sf) 410 Other on-site (sf) 0 Future(sf) 110,722 Off-site (sf) 0 Existing BUA***(sf) 5,405 Total (sf): 123,892 * Stream Class and Index Number can be determined at: http://portaI.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, siaewalks,gravel areas,etc. ***Report only that amount of existing BUA that will remain after development.Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct.31,2013 Page 3 of 6 11. How was the off-site impervious area listed above determined?Provide documentation.N/A Protects in Union County; Contact DEMLR Central Office staff to check if the project is located within a Threatened a Endangered Species watershed that may be subject to more stringent stormwater requirements as per I5A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMF specified for this project. The latest versions of the forms can be downloaded from http://portal.nctlen eon/i 'elb/it4/ rshit/Imp-manual. VL SUBMITTAL REQUfItErvIENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources(DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from bttp://portajimientorg/web/wq/ws/suistatesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/weblwq/ws/sulmap .) Please iindicate#hat the€allowing ram+ +i ihave beers provided bar init'aling in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from ht .•/I__ rtal.npocdenr.or web/wq/ws/sulstatesw/forms docs. i 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants Form.of required as per Part VII below) 3. Original of the applicable Supplement Form(s)(sealed.signed and dated)and O&M -� agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCD£NR.(For an Express review,refer to http://yvww.ertvhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) { i . 5, A detailed narrative(one to two pages)describing the stormwater treatment/management fo . 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1 mile of the site boundary,include the/ mile radius on the map. 7. Sealed,signed and dated calculations(one copy). "-eel 8. Two sets of plans folded t0$.5" IA"(sealed,signed,&dated),including: r _ --'' a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. a Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MIiW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. E G E 1�E j. Site Layout with all BUA identified and dimensioned. k. Existing contours,proposed contours,spot elevations,finished floor elevations. AJGI) O Zia 1. Details of roads,drainage features,collection systems,and stormwater control measures, m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who BY: made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations, o. Drainage areas delineated(included in the main set of plans,not as a separate document). p. Vegetated buffers(where required). �n ,V t1 Forms SWU-101 Version Oct.31,2013 Page 4 of 6 mA 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify �y elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils snap with the project area dearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit Jbr DEMLR to verifij the SHWT prior to submittal,(9W)796-7378.) 10. A copy of the most current property deed.Deed book: Page No: i1. For corporations and limited liability corporations(LLC):Provide documentation from the NC Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item Ia,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/ orporations/CSeearch.aspp VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.nedenr.org/webAristate- stormwater-frirrns dots.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot he changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your,behalf for this project(such as addressing requests for additional information). Consulting Engineer:T.Tason Clark.P.E. Consulting Firm:Norris&Tunstall Consulting Engineejrs.P.C. Mailing Address:202 Iron Gate Drive.Suite 102 City:Wilmington State:NC Zip:28412 Phone: (91Q ) 343-9653 Fax: (910 ) 343-9604 Email:jclarkerttengineers.com & annzris@ntengineers.com I.X. PROPERTY OWNER AUTHORIZATION(if Contact Information,item 2 has been filled out,complete this section) I,(print or type name of person listed in Contact Information,item 2a) .certify that I own the property identified in this permit application,and thus give permission to(print or type name of person listed in Contact information,item le) with(print or type name of organization listed in Contact 'in rmmation,item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. reive Form SWU-IQ1 Version Oct.31,2013 Page S of 6 cAnY\ „,„., ,,,, `, As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated / agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their (9 lease agreement,or pending sale,responsibility for compliance with the DEMLR Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater * treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: L-40, Date: it I, L'L•ice-r u• i e rrr,I),a Notary Public for the State of 4'1 (4-- unty of do hereby certify that �sSnally appeared before me this i day of ,•°zi and ackno ledgethe du execution oft a lication for a stormwater permit. Witness my and and official seal, ..k/ 3 WI ��1j04 4D. 4f0 SEAL NOTARY a� PUBLIC I III,f, �V My commission expires 5-- 3( a 10 couN ,” X. APPLICANT'S CERTIFICATION I,(print or type name of person listed in Contact Information,item la)Bruce B.Cameron,IV,Managing Member certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable stowater s under 15A NCAC 2H.1000 and any other applicable state stormwater requirements. Signature: , .4 f 1$ Zl ��-- Date: I I, `�u.. .- �, Me)h ,a Not ry Public for the State of P • unty of fe- 6,...,.—, ,do hereby certify that • rsonally appeared before me this, day of -�4,and ackn ledge the d e execution of pplication for a stormwater permit. Witness myVand and official seal,,--- • ,5�M • SEAL F I 113 A�r�R) z a n 4 crJ 3 1.P My commission expires -- , .\,$, Gad Form SWU-10l Version Oct. 31,2013 Page 6 of 6 0. r • Permit No. ` ,08 a lt>2jl 1 to be provided by DEMLR) State of North Carolina Department of Environment and Natural Resources Division of Energy,Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM OFF-SITE SYSTEM SUPPLEMENT 0�5�FOR DEVELOPMENT DRAINING TO PERMITTED OFF-SITE TREATMENT SYSTEMS NT This form may be photocopied for use as an original (Rev , O$ t -�rl (tb DEMLR Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an off-site system supplement for each off-site stormwater treatment system, appropriate supplement forms for any on-site stormwater treatment systems, and plans and specifications showing all stormwater conveyances and drainage details for the project. I. PROJECT INFORMATION Project Name : Barclay Place Phase 2 -Lot 2 Contact Person: T. Jason Clark,P.E. Phone Number: (910)343-9653 Is all drainage from the project directed to the off-site system? (check one): /1 Yes ❑No II. OFF-SITE SYSTEM INFORMATION(please complete the following information for the off-site system that will treat runoff from your project): Permit No. SW8 960820 Project Name:Barclay Place Type of System(wet pond, infiltration basin, etc.):Wet Detention Pond Lot No. (if part of a subdivision):Lot 2 How much built upon area draining to the permitted treatment system has been allocated to this project?123,892 ECE1VE 1) III. REQUIRED ITEMS CHECKLIST PAZ O Hi BY: Prior to issuing an off-site permit, verification of the following information must be provided. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SW401-Off-Site System-Rev.! Page 1 of 2 Applic. 1 Initials l ; a. Deed restrictions limiting the built-upon area on the site have been recorded. ,I'�1 y�;! b. Engineers certification for the existing off-site system has been submitted to DEMLR. ( i I_ ' "c. There are no outstanding Notices of Violation for the off-site system. y � IAA1, .a' d. Off-site system is in compliant with the issued permit. \IJ/6 AkkiL 4,0i-' bi' NW 66\6 IV. STORMWATER COLLECTION SYSTEM MAINTENANCE REQUI MENTS 1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time. 2. Accumulated sediment and trash will be removed from the collection system as necessary. Swales and ditches will be reseeded or sodded following sediment removal. 3. Eroded areas of swales and ditches will be repaired and reseeded. Swales and ditches will be revegetated as needed based on monthly inspections. 4. The collection system, including catch basins,curb cuts, velocity reduction devices, and piping, will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices, and piping. 5. The collection system may not be altered in any way without prior approval from NCDENR Division of Energy, Mineral and Land Resources. I acknowledge and agree by my signature below that I am responsible for maintaining the stormwater collection system in accordance with the five maintenance procedures listed above. I agree to notify DEMLR of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title:Bruce B. Cameron,IV, Managing Member/Dry Pond Partners, LLC Address:P.O. Box 3649 Wilmington, NC 28406 Phone:910-762 676 Date: t k I z i Signature: 24_ 1, 4,..,a_Ar Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. lt,tr) ,a Notary Public for the tate of aunty of do hereby certify that pally appeared before me this day of d4a.el , a�Z7�f ,and acknowledge the due execution of the forgoing document including the stormwater collection systmaintenance requirements. Witness my hand and official seal, 66�� I►lltp NoTq o = Z/L2ECEIVE Y y ublic 2 E L/Q My commission expires Pc j [(� AU6 2 0 ZUZi ,,pp V Form Ni1/44.440601N4-03:410.7©� a ` g Page 2 of 2 BY: