HomeMy WebLinkAboutSW8200705_Historical File_20200820 r ROY COOPER Governor 4 MICHAEL S.REGAN .-� Secretorjt *44`�"""^"'�- BRIAN WRENN NORTH CAROLINA Director Environmental Quality August 20,2020 D.R.Horton,Inc.(developer) Attn: Thomas B.Montano,Vice President c/o Ian Flannery,Assistant Secretary 131 Racine Drive, Suite 201 Wilmington,NC 28403 and RMP Sidbury Road,LLC(property owner) Attn:John Rudolph,Manager 172 Huntley Place Charlotte,NC 28207 Subject: State Stormwater Management Permit No.SW8 200705 Sidbury Farms High Density Subdivision Project New Hanover County Dear Mr.Flannery and Mr.Rudolph: The Wilmington Regional Office received a complete, State Stormwater Management Permit Application for the subject project on August 5th,2020. Staff review of the plans and specifications has determined that the project, as proposed,complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 amended on January 1,2017(2017 Rules). We are hereby forwarding Permit No. SW8 200705 dated August 20th,2020, for the construction of the built-upon areas(BUA)and stormwater control measures(SCMs)associated with the subject project. This permit shall be effective from the date of issuance until August 20th,2028 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems.Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter,attachments,and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. Please be aware that it is the responsibility of the permit holders,D.R.Horton,Inc.("Developer")and RMP Sidbury Road,LLC("Property Owner"),to notify the Division of any changes in ownership and request an ownership/name change for the stormwater permit. However, if the development agreement between the Developer and the Property Owner is dissolved, cancelled or defaults, and the Division is not notified by the Developer to transfer the permit,then the responsibility for permit compliance reverts back to the Property Owner. A complete transfer request must be submitted to the Division within 30 days as described below otherwise the Developer and Property Owner will be operating a stormwater treatment facility without a valid permit which is a violation of NC General Statue 143-215.1. Failure to transfer the permit may result in appropriate enforcement action in accordance with North Carolina General Statute§143-215.6A through§143- 215.6C being taken against the Property Owner. If any parts,requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. —p North Carolina Department of Environmental Quality I Division of Energy.Mineral and Iand Resources D E `� Wilmington Regional.Office 1127 Carolinal Drive Extension I Wilmington North Carolina 28405 NORTH CAROLINA . 0spi°°°"°` 0n's� f 910.7%.7215 State Stormwater Permit No. SW8 200705 Page 2 of 2 If you have any questions concerning this permit, please contact Kellie Beth Norris in the Wilmington Regional Office, at(910) 796-7215 or kellie.norris@ncdenr.gov. Sincerely, j7 . Brian Wrenn, D1fC for Division of Energy, Mineral and Land Resources Enclosures: Attachment A -Designer's Certification Form Application Documents DES/kbn: \\\Stormwater\Permits&Projects\2020\200705 HD\2020 08 permit 200705 cc: Richard A.Moore,PE,McKim&Creed New Hanover County Building Safety Department. New Hanover County Engineering Wilmington Regional Office Stormwater File State Stormwater Management Permit No. SW8 200705 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO D.R. Horton, Inc. and RMP Sidbury Road, LLC Sidbury Farms Sidbury Road, Castle Hayne, New Hanover County FOR THE construction, management, operation and maintenance of built-upon area (BUA) draining to four(4) wet ponds ("stormwater control measures" or"SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until August 20th, 2028 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 5,325,989 square feet. The runoff from all BUA within the permitted drainage areas of this project must be directed into the permitted SCMs. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCMs labeled Pond #1, Pond #2, Pond #3, and Pond #4 have been designed using the runoff treatment method to handle the runoff from 563,354, 325,115, 555,912 and 334,158 square feet of BUA, respectively, within the delineated drainage areas. The BUA for future development within the drainage areas to the SCMs labeled Pond #1, Pond #2, Pond #3, and Pond #4 is limited to 25,000, 45,500, 155,000, and 109,400 square feet, respectively. b. BUA FOR INDIVIDUAL LOTS. Each of the 258 lots are limited to a maximum of 4,000 square feet of BUA, as indicated in the approved plans and specifications. The maximum BUA assigned to each lot via this permit and the recorded deed restrictions and protective covenants may not be increased or decreased by either the individual lot owner or the permittee unless and until the permittee notifies the Division and obtains written approval from the Division. Page 1 of 6 State Stormwater Management Permit No. SW8 200705 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. c. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. d. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans or in the following instances where the BUA has been minimized and channelizing runoff from the BUA is avoided: i. Water dependent structures; and ii. Minimal footprint uses such as poles, signs, utility appurtenances, and security lights that cannot practically be located elsewhere. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds prior to the sale of individual lots or groups of lots: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights-of-way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. Page 2 of 6 State Stormwater Management Permit No. SW8 200705 d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. Recorded deed restrictions and protective covenants must include, at a minimum, the following statements related to stormwater management: i. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 200705, as issued by the Division of Energy, Mineral and Land Resources (the "Division") under 15A NCAC 02H.1000, effective January 1, 2017. ii. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. iii. These covenants are to run with the land and be binding on all persons and parties claiming under them. iv. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. v. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. vi. The maximum built-upon area (BUA) per lot is 4,000 square feet. This allotted amount includes any BUA constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement not shown on the approved plans. BUA has the same meaning as G.S. 143-214.7, as amended. vii. The maximum allowable BUA shall not be exceeded on any lot until the permit is modified to ensure compliance with the stormwater rules, permit, and the approved plans and specifications. viii. All runoff from the BUA on the lot must drain into the permitted system. This may be accomplished via grading, a stormwater collection system and/or a vegetated conveyance. ix. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters in accordance with 15A NCAC 02H.1003(4) and the approved plans. x. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143, Article 21. e. DEEDS FOR INDIVIDUAL LOTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. Page 3 of 6 State Stormwater Management Permit No. SW8 200705 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. Adding the option to use permeable pavement or#57 stone within the lots as a permeable surface. The request may require a proposed amendment to the deed restrictions and protective covenants for the subdivision to be submitted and recorded. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material within the common areas to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11 PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). Page 4 of 6 State Stomiwater Management Permit No. SW8 200705 12. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. DEVELOPER AGREEMENT. It is the responsibility of the permit holders, D.R. Horton, Inc. ("Developer") and RMP Sidbury Road, LLC ("Property Owner"), to notify the Division of any changes in ownership and request an ownership/name change for the stormwater permit. However, if the development agreement between the Developer and Property Owner is dissolved, cancelled or defaults, and the Division is not notified by the Developer to transfer the permit, then the responsibility for permit compliance reverts back to the Property Owner. A complete transfer request must be submitted to the Division within 30 days as described below otherwise the Developer and Property Owner will be operating a stormwater treatment facility without a valid permit which is a violation of NC General Statue 143-215.1. Failure to transfer the permit may result in appropriate enforcement action in accordance with North Carolina General Statute §143-215.6A through §143-215.6C being taken against the Property Owner. b. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; ii. The assignment of declarant rights to another individual or entity; iii. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); iv. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; v. Bankruptcy; vi. Foreclosure, subject to the requirements of Session Law 2013-121, b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14 COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. Page 5 of 6 State Stormwater Management Permit No. SW8 200705 a. REVIEWING AND MONITORING EACH LOT FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA on each individual lot, within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review all individual lot plans for new construction and all subsequent modifications and additions for compliance. The plans reviewed must include all proposed BUA, grading, and driveway pipe placement. The permittee shall not approve any lot plans where the maximum allowed BUA limit has been exceeded or where modifications are proposed to the grading and/or to the stormwater collection system and/or to the vegetated conveyance unless and until a permit modification has been approved by the Division. The permittee shall review and routinely monitor the project and each lot to ensure continued compliance with the conditions of the permit, the approved plans and specifications, and the recorded deed restrictions and protective covenants. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing and shall require timely resolution. b. ARCHITECTURAL REVIEW BOARD (ARB) OR COMMITTEE (ARC). The permittee may establish an ARB or ARC to conduct individual lot reviews. However, any approval given by the ARB or ARC on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the conditions of the permit and the approved plans and specifications. c. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. g. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 20th day of August 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION . Brian Wrenn, +ire •f Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 200705 Page 6 of 6 State Stormwater Management Permit No. SW8 200705 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • • As-Built Permittee Certification • As-Built Designer's Certification General MDC • As-Built Designer's Certification for Wet Detention Pond Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 200705 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature , a Notary Public in the State of County of , do hereby certify that personally appeared before me this day of , 20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Completed/ Permittee's Certification NCAC .1042(4) Provided N/A A. DEED RESTRICTIONS/BUA RECORDS 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1) B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection /conveyance Y or N system are located in recorded drainage easements. 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y or N have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y or N NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y or N appears in the chain of title. F. OPERATION AND MAINTENANCE PLAN—maintenance records are being kept in a known set location for each SCM and are available for Y or N review. G. DESIGNER'S CERTIFICATION FORM—has been provided to the Y or N Division. Page 1 of 6 State Stormwater Management Permit No. SW8 200705 Note 1-Acceptable records include ARC approvals, as-built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 2 of 6 State Stormwater Management Permit No. SW8 200705 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules H and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. ©N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this SCM or project. Consultant's Certification NCAC 1003((3) & General MDC ; As-built ©N/E ON/A .1050 A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build-out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. B. VEGETATED SETBACKS / BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N (b2)(2) is located in the setback. Page 3 of 6 State Stormwater Management Permit No. SW8 200705 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water-dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. OAs-built ON/E ©N/A C. STORMWATER OUTLETS—the outlet handles the peak Y or N flow from the 10 year storm with no downslope erosion. D. VARIATIONS 1. A variation (alternative)from the stormwater rule Y or N provisions has been implemented. 2. The variation provides equal or better stormwater control Y or N and equal or better protection of surface waters. E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS Y or N has been met. F. SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required Y or N storm depth. G. CONTAMINATED SOILS— infiltrating SCM's are not Y or N located in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1V. 3. Vegetated side slopes are steeper than 3H:1 V(provide Y or N supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 10 year storm. J. EXCESS FLOWS—An overflow/bypass has been Y or N provided. K. DEWATERING—A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION—the SCM has been Y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >3:1. N. DESIGNER QUALIFICATIONS (FAST-TRACK PERMIT)— The designer is licensed under Chapters 89A, 89C, 89E, or Y or N 89F of the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E", below. Attach additional pages as needed: Page 4 of 6 State Stormwater Management Permit No. SW8 200705 AS-BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT' drawings, such that the intent of the stormwater rules and the general H statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: 0 Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 ON/E = not evaluated (provide explanation on page 2) ON/A= not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1053) jOAs-built ON/E ©N/A A. Forebay/ Depths/Fountain 1. The available Sediment storage is consistent with the Y or N approved plan and is a minimum of 6 in. 2. Water flow over the forebay berm into the main pond Y or N occurs at a non-erosive velocity. 3. The provided Forebay Volume is 15%-20% of the main Y or N pool volume. 4. The Forebay entrance elevation is deeper than the exit Y or N elevation into the pond. 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted Y or N value? 6. Fountain documentation is provided. Y or N B. Side slopes/ Banks/Vegetated Shelf 1. The width of the Vegetated Shelf is consistent with the Y or N approved plans and is a minimum of 6 feet. 2. The slope of the Vegetated Shelf is consistent with the Y or N approved plans and is no steeper than 6:1. C. As-built Main Pool I Areas/Volumes I Elevations 1. The permanent pool surface area provided is consistent Y or N with the permitted value. 2. The Temporary Pool Volume provided is consistent with Y or N the permitted value. Page 5 of 6 State Stormwater Management Permit No. SW8 200705 3. The permanent pool elevation is consistent with the Y or N permitted value. 4. The temporary pool elevation is consistent with the Y or N permitted value. OAs-built OO N/E OO N/A D. Inlets/Outlet/Drawdown 1. The design volume draws down in 2-5 days. Y or N 2. The size of the Orifice is consistent with the permitted Y or N value. 3. A trash rack is provided on the outlet structure. Y or N 4. Hydrologic impacts to the receiving channel are minimized Y or N from the 1 yr 24 hr storm discharge? 5. The inlets and the outlet location are situated per the Y or N approved plan and avoid short-circuiting. E. Vegetation 1. The vegetated shelf has been planted with a minimum of 3 Y or N diverse species. 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or Y or N no less than 24 inches on center. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E" below. Attach additional pages as needed: Page 6 of 6 DFMLR USE ONLY Date ece ved Fee Paid Permit Number `] /4/c 9O o /5 SQS=' Su)S boo `76..5 Applicable Ru s: ❑Coastal SW-1995 ❑Coastal SW-2008 ❑Ph II-Post Construction (select all that apply) El Non-Coastal SW-HQW/ORW Waters ❑Universal Stormwater Management Plan ❑Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy,Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Sidbury Farms-Phase 1 2. Location of Project(street address): 6010 Sidbury Rd City:Castle Hayne County:New Hanover Zip:28429 3. Directions to project(from nearest major intersection): From the Intersection of Blue Clay Road(SR 1318)and Sidbury Road(SR 1336),travel North East approximately 1.80 miles.The project will be on the right. 4. Latitude:34°19'52.92"N Longitude:77°51'11.43"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): New ❑Modification ❑Renewal w/ Modificationt tRenewals with modifications also requires SWU-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project(check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned,N/A and the previous name of the project,if different than currently proposed,N/A 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by,contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control:86.01 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? No ❑Yes ' If yes, see S.L.2012-200, Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulations ii flJUL162020 ij BY: Form SWU-101 Version Oct.31,2013 Page 1 of 6 III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:D.R.Horton,Inc. Signing Official&Title:Libby Shelton,Assistant Vice President signing for Thomas B.Montano(Vice President) b.Contact information for person listed in item la above: Street Address:131 Racine Drive,Suite 201 City:Wilmington State:NC _ Zip:28403 Mailing Address(if applicable): City: State: Zip: Phone: (843 ) 709-0752 Fax: ( ) Email:LShelton@DRHorton.com c.Please check the appropriate box.The applicant listed above is: ❑The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ®Developer*(Complete Contact Information,item 2a and 2b below.) �......' " ' "I,,, A 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or d. , s�Ai person who owns the property that the project is located on): _ 9<; _ AL Property Owner/Organization:RMP Sidbury Road.LLC = 025503 _ Signing Official&Title:john Rudolph.Manager =13,'ti Vciwc���s b.Contact information for person listed in item 2a above: '�,,.„41i'0 A 1"O Street Address:172 Huntley Place �`""' "'�+� City:Charlotte State:NC Zip:28207 Mailing Address(if applicable):172 Huntley Place City:Charlotte State:NC Zip:28207 Phone: (704 ) 372-8000 Fax: ( Email:JRudolph57@gmail.com 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: f ) Fax: ( ) Email: 4. Local jurisdiction for building permits:New Hanover County Point of Contact:Nicholas Gadzekpo Phone#: (910 ) 798-7308 Form SWU-101 Version Oct.31,2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Stormwater will be collected with pipe collection systems and treated with wet detention basins. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:122.27 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area(4)-Total Coastal Wetlands Area(5)-Total Surface Water Area(6)=Total Project Area+:118.68 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded�� structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water (MHW)line, and coastal wetlands landward from the NHW(or MHI line. The resultant project area is used to calculate overall percent built upon area(BLIA). Non-coastal wetlands landward of the NHW(orMHW)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/Total Project Area)X 100 =36.6 9. How many drainage areas does the project have?4(For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area_ Drainage Area_, Drainage Area Drainage Area_ Receiving Stream Name J ► . A • a aEV°Pri Stream Class * Stream Index Number* Total Drainage Area(sf) On-site Drainage Area(sf) Off-site Drainage Area(sf) Proposed Impervious Area(sf) % Impervious Area(total) Impervious'Surface Area Drainage Area_ Drainage Area_ Drainage Area_ Drainage Area_ On-site Buildings/Lots(sf) On-site Streets (sf) On-site Parking (sf) On-site Sidewalks (sf) Other on-site (sf) ' . : Imo;; Future(sf) f JUL 1 6 2020 i Off-site (sf) Existing BUA=- (sf) LiY•_ Total (sf): * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not Iimited to, buildings,roads,parking areas, sidewalks,gravel areas,etc. Form SWU-101 Version Oct.31,2013 Page 3 of 7 Y 0.1 N U CO o m 3 `. 0 o tmn ae R $ to o 0 v « r4 m o W U. 0 N O N m to 0 m N O c 00 s-1 O com iLn 12 C7 00 m m 00 m I- o to in O a 00 al •-1 t/7 V1 - ,..j M '-1 M ti u O c N O o. Ml Pn t1 Y N 0) 0l m el 'i 'O to 0 t0 al tom a-. a.) O V31 ^ CO1 ea O of O O ` O O O O O O O O C (Su U Ob n n D u ''1 N N 0 u •c ti Y W 01 U m LO COCO a e`o l^O a,up 004 U * a 00 to m in 2 0 to ^ P. o O r' v 2 0 0 0 oo m o 0 '•' 44 l7 U O O Tr- ' N-' U d tD 0. m Kr- m m oe-I 01 m to to ,. N .-1 ° m w U c t Y Ol E U m m m t^ v CO 'N-' * t^ as 0 0 0 CLI 2 O to ^ rl O r vi Id 2 O f` O N O O co Ol tr) C7 U 00 Kr tao Lo m an M to - Ini a, U •c a Y Ol W U` '-1 N m 3 t0'] M rNl �^ N O '�-' 2 O to V '-1 O '-' 'y N a O m O tV 0 to 0 .-' c0 sr; Lri to U U co a V m m N N . c rq m L w - C In - E d f0 LL Y N U -O_ rt m m a LIO N O rl �� g Ol to N 2 o ?Pi N m O co 00 00 o0 o m O O O - O m LA U U 00 00 10 M r' N t0 u c rz a d c m U > '0�' aa, 7 m E m N a ra t. ¢ I m " a N co N .fir a O w N F E d a m o_ m u G= V '�j' < E O W 01 a Z .O N ;� - N Z Oo m y 01 .J C t70 N m .-. w ` L.N x f0 A Oo C N v7i al C y c c C E O v a[ U m to tL in c m m 54....„. +,.,a.O > E E m Uw O o c 2 7. " Y +°1. o a c +,.,.,,a al `l d 7 to m a E al m to N N d = , JUfn ° • fl 1A HOOI--' 1 O OOOOlLW �� .. By: ***Report only that amount of existing BLIA that will remain after development.Do not report any existing BLIA that is to be removed and which will be replaced by new BLIA. 11. How was the off-site impervious area listed above determined?Provide documentation.N/A P�•jects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600 V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources(DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. itials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s)(sealed,signed and dated)and O&M agreement(s)for each BMP. ,pp+ 4. Permit application processing fee of ai able to NCDENR. (For an Express review,refer to 720161A http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailednarrative(one to o pages) escribing the stormwater treatment/management for lf�1 1 the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the 13101 receiving stream drains to class SA waters within 1/2 mile of the site boundary,include the'/z mile radius on the map. 7. Sealed,signed and dated calculations(one copy). 8. Two sets of plans folded to 8.5"x 14" (sealed,signed,&dated),including: I a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impoun. =--- •. structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. " "" -•- !` ' i. Dimensioned property/project boundary with bearings&distances. c j. Site Layout with all BUA identified and dimensioned. f JUL1 8 2020 k. Existing contours,proposed contours,spot elevations,finished floor elevations. + / 1. Details of roads,drainage features,collection systems,and stormwater control measuresBY.• 1 Form SWU-101 Version Oct.31,2013 Page 4 of 7 m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify i elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed.Deed book:5617 Page No:442-445 IV" 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC ..._ Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state stormwater-forms does.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Richard A.Moore,P.E. Consulting Firm:McKim&Creed Mailing Address:243 North Front Street City:Wilmington State:NC Zip:28401 Phone: (910 ) 343-1048 Fax: (910 ) 251-8282 ✓oz @a Email:RAmoore mckimcreed.com IX. PROPERTY OWN' ' AU ► ORIZATION(if Contact Information,item 2 has been filled out, complete ,h section) Uor ��I,r A_te W I, (print or type name of person fed in Contact Information,item 2a) ,certify that I own the property identified• •s permit application,and thus give permission to(print or type name o f person listed in Contact Information,i • 'a) with(print or type name of organization listed in Contact Information,item 1a) to develop the project as currently proposed. A copy of the lease agreement or pen ing pr.•erty sales contract has been provided with the submittal,which indicates the party responsible for the o eration . d maintenance of the stormwater system. Form SWU-101 Version Oct.31,2013 Page 5 of 7 IX. PROPERTY OWNER AUTHORIZATION(if Contact Information,item 2 has been filled out,complete this section) I I, (print or type name of person listed in Contact Information,item 2a) iO�w �u4v 1,ok ,certify that I own the property identified in this permit a lication,and thus give permission to(print or type name of person listed in Contact Information,item la) ( OET2 4 with(print or type name of organization listed in Contact Information,item 1a) b.a.NtaTwJ IS/ QC . to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DEMLR Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the asses ment of civ' ties f up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: (It . 4197,44! Date: 7 • 1 •z 0 Z.e I, 1 1 ►+ck L1 •es ,a Notary Public for the State of Ni'C- ,County of Av '1 ,do hereby certify that J OItiM C.,. R,IAetD I p L.. personally appeared before me this lay of,.] ,im ,ada0,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, D. tskto 14issian. +� !.- SEAL My commission expires 1 l'd%11-ALI flECEIVEfl JUL 17 2020 Form SWU-101 Version Oct.31,2013 Page 6 of 7 ` X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information,item 1a)Libby Shelton certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions • and protective'covenants-will be recorded,and that the proposed project complies with the requirements of the applicable stormwater iv_Iesander 15A NCAC2H.1000 and,any other applicable state stormw ter requirements. Signature: �� Bate: 7 �7/ I, I A&,1 PI PtN/J ARK ,a Notary Public for the State of .)oLrl CA16 LNA',County of NE,i.J lik ve,k ,do hereby certify that ELM milt s 4El TM%) personally appeared before me this,,today of Tvi ( ,jet30 ,and acknowle ge the due execution of the application for a stormwater permit. Witness my hand and official seal, out o t i 40.? FLANA,S, it NOT,4 =a v' 40 00 ‘11\:::BLIC 41 unsatio SEAL My commission expires 05/7/.2 68)-S Form SWU-101 Version Oct.31,2013 Page 7 of 7 Burd, Tina J From: Burd,Tina J Sent: Thursday,August 27, 2020 10:41 AM To: Ishelton@DRHorton.com: Richard (Rick)A. Moore Subject: SW8 200705 - Sidbury Farms Attachments: SW8 200705 - Sidbury Farms.pdf The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources(Stormwater Section)completed their review of the Express Stormwater Permit Application for the subject project.Attached is the cover letter and permit issued on May 6, 2020 that will be mailed separately,along with any other supporting documents. Please direct any questions to your reviewer. DO NOLRESPON4 TQ THIS EMAIL. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance&Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Eill""Nagift , A-P'°'°11.-11Clii-1-"Z Iiiii ,-,—) aoL„,LY...„,,li iSYH[YY!1(reu:i}iofa y Er;pair corresp 'ric?e"ce ;r}and from this address is subject to the Noilh Cal Wine sc),bf c Records Law and may be disclosed to third patties. 1 Burd, Tina J From: Burd,Tina J Sent: Thursday,August 27,2020 10:43 AM To: 'JRudolph57@gmail.com' Subject: FW: SW8 200705 - Sidbury Farms Attachments: SW8 200705 - Sidbury Farms.pdf From: Burd,Tina J Sent:Thursday,August 27, 2020 10:41 AM To: Ishelton@DRHorton.com;JRoudolph57@gmail.com; Richard (Rick)A. Moore<RAMoore@mckimcreed.com> Subject:SW8 200705-Sidbury Farms The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources(Stormwater Section)completed their review of the Express Stormwater Permit Application for the subject project.Attached is the cover letter and permit issued on May 6,2020 that will be mailed separately,along with any other supporting documents. Please direct any questions to your reviewer. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance &Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 ,..A. 4 "'3V.,..It-ea.,„,,,li --\000...- Email correspondence to arid from flies address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 MCKIM&CREED E I E E R S SuR;' EEYCRS L•4NNERS August 13, 2020 M&C 04245-0012(40) Kellie Norris, Environmental Engineer DEMLR—State Stormwater Program Department of Environmental Quality 127 Cardinal Drive Wilmington, North Carolina 28405 RE: Request for Additional Information Stormwater Project No. SW8 200705 Sidbury Farms New Hanover County Dear Ms. Norris: In response to the Request for Additional Information Received (August 10, 2020) regarding Sidbury Farms Stormwater Project No. SW8 200705, we offer the following responses: 1. 15A NCAC 02H.1053(2):Based on the provided variables,the reported average depth is not consistent with the use of Equation 3.Please provide additional calculations to support the average depth reported,3.01 ft,or reconsider the provided average depth. -Response: The average depth for Pond 1 has been updated. The same spreadsheet calculation error was also found in the Pond 2 calculations. Both revised pond calculations have been submitted with this submittal.Ponds 3 and 4 were correct as previously submitted. 2. 15A NCAC 02H.1053(1):Using the average depth determined from the provided pond design,it appears that the surface area of Pond #1 does no meet the minimum required surface area.Please review and resolve, as a.j ,,�, ,o f s+, �, necessary.One possible solution is to lessen the future allotment of BUA for Pond#1. ny,c,, N : 28401 -Response:After revising the average depth used for Ponds 1 and 2, the provided permanent pool surface area exceeds the minimum required surface area. We do not propose any changes to the proposed or future BUA allocations. '?10 343 04_ Fax ?i• 25' 828? r ::•a , �� r �read.:.om Ms.Kellie Norris August 11,2020 3. 15A NCAC 02H.1042(2):Please email the updated and revised supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements. -Response: The updated and revised supplement form has been emailed to kellie.norris@ncdenr.gov 4. Due to the relatively minor nature of these comments,the express additional information review fee has been waived. -Response:Noted. Thank you. If you have any questions,please do not hesitate to contact me at our office 910- 343-1048. Sincerely, • &Creed,INC. RIchard A.Moore, PE Regional Manager Cc: Ian Flannery,DR Horton File(with attachments) MCKIVI&CREED SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 1 Site Data Total DA I 839,746 SF Value from CAD On-Site Drainage Area I 839,746 I SF Value from CAD Off-Site Drainage Area I 0.00 I SF Value from CAD Impervious 563,354 SF Value from CAD Buildings 392,000 SF Value from CAD Sidewalks 20,963 SF Value from CAD Streets 125,391 SF Value from CAD Parking 0 Sr Value from CAD Other(Amenity Center) 0 SF Value from CAD Future 25,000 SF Value from CAD Offsite I SF Impervious Cover=(impervious Drainage Impervious Cover 67.09% Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.654 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 68,626 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 81,593 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation Main Bay 1 23.0 FT Value selected by designer Bottom of Pond Elevation Forebay 23.5 FT Sediment Storage Elevation-Main Bay 24.0 FT Value selected by designer Sediment Storage Elevation-Forebay 24.0 FT Sediment Storage Volume _ 33,277 CF Pond volume below sediment storage elev. Permanent Pool Elevation 27.50 FT Value selected by designer Temporary Pool Elevation I 29.00 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 I FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 840 I FT Main Bay only Average Depth Provided 3.23 FT See formula below Required SA/DA Ratio for 90%TSS Removal L 4.695 % Value from 90%TSS removal chart Required Permanent Pool Surface Area 39,387 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 41,744 SF Value from stage-storage calculations Forebay Permanent Pool Volume 126,409 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 25,282 CF 20%of permanent pool volume Provided Volume-Forebay 23,425 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 18.53% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice I 3.50 ]IN Value selected by designer Weir Elevation of Outlet Structure I 29.00 I FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.35 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.45 FT 1/3 of total elevation head Cd,Coefficient of Discharge 0.60 Value selected by designer - Q,Flowrate Through Low-flow Orifice 0.22 CFS Q=Cd*Weir Area*sgrt(2*32. *Avg Hea. • Drawdown Time 3.68 DAYS 1.5"Runoff Volume/Flowra th 00 'Pt i r° egdaf.rn t Awry..depfh+Moo Oho meet fuhwd m .. rm ♦• r '. ✓ IP too fhN>f bQll•.excluded Nan the *ph eeKWNlar Average Depth formula: ii 0 "os °" ADuttouwfs tetf (st, SEib L �` tplap v.:nrm tt�, • a..r.0ea•4thn4t: QGJsJQw� i 1v.. -• A40.0...dgennenw.p.olfeef, , .A. ....• ua..t*MP.0i..e0oemrdC.....0.0,, . 1y A. Kw,• 0.6'Dipa....r'Pennwrr...•,' ..".wn,..•. • ��//����yy4/:-� �'�l' o; Men t1,e,..... • aepesgNaier attodeep e.iedae Metal -. i "•u V PM•M1Aet.•+•enw * pMnetln p. nt NW MOM lm oi tl•e JJJJJ L A A. ��b ! �� 4gt•640i9;:g4 I Wor.11. . r• Width.ar he.eN Oda*ft*Ode der vra QswYtw a RalilVel 0.10.4 SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE I -POND I Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.50 50,977 0 0 ••Permanent Pool 28.00 53,891 26,217 26,217 +-Top of Shelf 28.50 55,376 27,317 53,534 29.00 56,862 28,060 81,593 Temporary Pool 30.00 59,889 58,376 139,969 31.00 62,973 61,431 201,400 32.00 66,114 64,544 265,943 +-Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 +-Pond Bottom 24.00 31,902 30,780 30,780 +-Sed.Storage 25.00 34,206 33,054 63,834 26.00 36,570 35,388 99,222 27.00 38,994 37,782 137,004 +-Bottom of Shelf 27.50 41,744 20,185 157,189 +-Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.50 4,577 0 0 +-Bottom of Forebay 24.00 4,993 2,393 2,393 +-Sed.Storage 25.00 5,880 5,437 7,829 26.00 6,839 6,360 14,189 27.00 7,868 7.354 71 542 27.50 9,233 4,275 25,817 *Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 +-Pond Bottom 24.00 36,895 33,277 33,277 +-Sed.Storage 25.00 40,086 38,491 71,767 26.00 43,409 41,748 113,515 27.00 46,862 45,136 158,650 +Bottom of Shelf 27.50 50,977 24,460 183,110 +-Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 2 Site Data Total DA 405,130 ISF Value from CAD On-Site Drainage Area 405,130 ISF Value from CAD Off-Site Drainage Area I 0.00 ISF Value from CAD Impervious 325,115 SF Value from CAD Buildings I 212,000 ISF Value from CAD Sidewalks I 10,248 ISF Value from CAD Streets 57,367 SF Value from CAD Parking 0 ISF Value from CAD Other(Amenity Center) I 0 SF Value from CAD Future I 45,500 SF Value from CAD Offsite I 0 SF Impervious Cover 80.25% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.772 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 39,108 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 39,195 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay I 26.0 FT Value selected by designer Bottom of Pond Elevation-Forebay 27.0 FT Sediment Storage Elevation-Main Ray 27.0 FT Value selected by designer Sediment Storage Elevation-Forebay 28.0 I FT Sediment Storage Volume 11,617 CF Pond volume below sediment storage elev. Permanent Pool Elevation I 32.50 FT Value selected by designer Temporary Pool Elevation 33.75 I FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 f FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool I 677 FT Main Bay only Average Depth Provided I 4.37 FT See formula below Required SA/DA Ratio for 90%TSS Removal 4.21% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 17,044 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 22,640 SF Value from stage-storage calculations Forebay Permanent Pool Volume 90,175 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 18,035 CF 20%of permanent pool volume Provided Volume Forebay 17,263 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 19.14% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 2.50 I,IN Value selected by designer Weir Elevation of Outlet Structure 33.75 I FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.15 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.38 FT 1/3 of total elevation head Cd,Coefficient of Discharge 0.60 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.10 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 4.45 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 Spun..l A.:miss*path'Wulff.me if h...*..de.i A.! Average Depth formula: ""'bi""`""""°_En1tlq°'t°oOwrve°"°then"""" f.'P-Vaitelf — ` a'y Abattomoffhelf .m... a,., o.rdop"o 4.;1 i ' Viv - Tel.'amt:dpam x4+29D13 Oak; Vwala.P,MbONarnoeMNg fee xwt k.u...« ` Att.1eat warn we Wiatame ow:lkt:1 t Mora: D.....r • Done/waw al evdeep ea ardor WO es a.ee..rle xpan.souppet II* Prtaefte,...rw ' Qpkaalt.*WM:11R'MPI al Ml lbetla a le HapLa.,.a,aa+ 41111Itehel.e'aegede bind*etdeabhc eneiftl nakri al Apinaamtpcat Reen SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1-POND 2 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 32.50 28,778 0 0 •Permanent Pool 33.00 31,280 15,015 15,015 +Top of Shelf 33.75 33,200 24,180 39,195 •Temporary Pool 34.00 33,840 8,380 47,575 35.00 36,456 35,148 82,723 36.00 39,128 37,792 120,515 +Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.00 9,983 0 0 •Pond Bottom 27.00 11,524 10,754 10,754 +Sed.Storage 28.00 13,182 12,353 23,107 29.00 14,915 14,049 37,155 30.00 16,712 15,814 52,969 31.00 18,572 17,642 70,611 32.00 20,496 19,534 90,145 'Bottom of Shelf 32.50 22,640 10,784 100,929 Permanent Pool rspiker Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.00 1,726 0 0 •Bottom of Forebay 28.00 2,274 2,000 2,000 *Bed.Storage 29.00 2,887 2,581 4,581 30.00 3,564 3,226 7,806 31.00 4,306 3,935 11,741 32.00 5,113 4,710 16,451 32.50 6,137 2,813 19,263 +Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.0U 9,983 0 0 •Pond Bottom 27.00 13,250 11,617 11,617 •Sed.Storage 28.00 15,456 14,353 25,970 29.00 17,802 16,629 42,599 30.00 20,276 19,039 61,638 31.00 22,878 21,577 83,215 32.00 25,609 24,244 107,458 +Bottom of Shelf 32.50 28,777 13,597 121,055 +Permanent Pool SUPPLEMENT-EZ COVER PAGE I FORMS LOADED I ,PROJECT INFORMATION . . . ..._. .... . , — [._ 1 Project Name l,..._ SIDBURY FARMS-PHASE 1 2 Project Area(ac) I 118.68 ----1 --1 1 3 Coastal Wetland Area(ac) 0 1 i 1 4 Surface Water Area(ac) 1.04 __ 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? i No ' i COMPLIANCE WITH 02H 1003(4) —: . . . . —•----- , 7 11Mdth of vegetated setbacks provided(feet) >50 1 1 8 Will the vegetated setback remain vegetated? I Yes , 9 Ils BUA other that as listed in.1003(4)(c-d)out of the setback?- T— Yes 101.1.Estreambank stabilization proposed on this project? ; No ;NUMBER AND TYPE OF SCMs: ....... , _. 11 !Infiltration System 0 „ 12 iBioretention Cell 0 ,_. 13 iWet Pond 4 .I : 1 14 Stormwater Wetland 0 1 F" i 15 IPerrneable Pavement I 0 16 tSand Filter ' 0 -r- 1 17 Rainwater Harvestirig_LRWH) • • 0 .1 18 !Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 I 204Disconnected Impervious Surface(DIS1 • •0 1 21 !Treatment Swale 0 I 22 iDriPond „ 0 1_ ,23 iStormFilter 0 1 1_24 iSilva Cell 0 -I. 25 Ifilayfilter 0 I ' 26 iFilterra • 0 I I FORMS LOADED I DESIGNER CERTIFICATION • -----a . . ' 27 ;Name and Title: Richard A.Moore,PE I---1 28 lganization: : Mckim&Creed --1— 29 Street address: ' 243 N Front St 30 tCity_LState,Zip: VVilmington,NC 28401 ,_ __.„...,-- .--I- 31 !Phone number(s): 19101143-1048 --4- 32 i Email: ramoore@mckimcreed.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Desir net Allfairb. ,,,t skoloi4ow., „;.. ''''1 1;tii•/1.17-: i.itticli„,..:1% , • .4,-- .z. t. Signat Designer 025503 .,L iTasas ,..,...z,... saNnt,,,,„,... • ,_4.," 4-iiimmitivoRs ch 7/0610 Seal Date { • r , ' ifii I _ t i tttk i i tj ? t { 1 IC[2 co ....r:Li �i N4 eW { tiflW; pqV c � O' ill 1 'M� 10iol t ! I j 30 r c{�.J i U�, co el. G`.,i { ijpp !1pf petji I Imo• :r• li p(_!!tt i 1 1 i I E ` ivr ! I I i { ' i �i ( I i t I I i ,,,Ira N Oi Ni If 'W' tl;- 1� ° �;� of I o°• 01 " c �i-J M oSQ,{ of rni 1 i o 0 00 i i { 11 of co d�•; 0), Mj : I I0; fN:�, t ! i rapt 1�'.� t ro w, 010 9.oL N NI j'-1 1C1,`-: • :(ptfn. j j t ! i ' I �; y t iw.1 iw'-: N�i 0 4[f N r oat M�, t C UeJr DI i a o II�'o j 'N C� o �catF :O O• i� Wi.. t1jN! �iMI O" 4E4; ! ! 1 .pf�. yIM1 Ni �' ���' 1 I I ,M1U1 1±H".".4."'+'+"+"..1 1 { I �'T" I I ! I i i 4 a• j w, H w I ml wi . j j �vr of I c`tpw M O. Ms i 1 f0! -Mi0' �1Off • lcol N( m, : 1 omico 01 jun;ol le°0-;r-._. n Ai p; ° jN? N,�. i I • t0� M N` I !�1�1 �aat," " 1 } I " 1 i i ;� 1 • • i a .o; I fle I 14-tal! "-WI o WI i mr m I • is fa o r,' - uil 0, ! �1 .;o �7 e!c -t o r•>_, 1 ; x•t Mi 0 i # V.�! Off �'V'i j �0- U�. °ci.to • 4. Ii U I t 0 j j 1 rA 1 , ! t i i~�1 i w 1 I 3 ;1 c t + .. of ;o . f m '- i sN I i i '� I I a ! 10 1D o i� r j i i i ci I 101 i t 1 1 1 I E f.. __i-DIN I • ,n'.o ' i t^ Io 1 I w, i I 1 o I n j=�� jm; M r I io I U E E to E,,3 ! o to i Et w iv is E N I t o m 1 s I o 7; a I io- � m I o f a j I w > > o c MI I� la ; I- . ! ! a !a IaE1 .� 1 I I t I 7` 1 I C Q,`7 j IX f� 4 ly i� j� ? Q1 t j� Ic' I� I51,2' t ,ilt3 • 2'2 1 �, �'�:m 1 I-�g im Ql j �' I :a5i 1 -,Im ,•a- Imi 1—18 Ojai I I•yt o,E o 7®, i 0,.E I o I",, ' mI 1 .- 0 I E E o{'. 1.0s1 `riN"- E= m j ui c c: '.�crlm ..7 m a`f ili I �)o Q n Ni tN Z �E'= =.� �'a3 c�=l� .oi a; {n...ta..-Im �nmlm. cot:a=y s n 'o a`f t I w m co, i ai m �" i co col o f t t t; oil- �'w Si F� t1�i n c w 7 up c y �� c c Y3IQ oi<Cicti l Ei t L m' a c r �,an d o ._ 01 w E E O Ct Es,o w U o o d m Q1 c �c;tf{ml..t n=" f.. tD �min.D E =1 of t;� � �` U Q ¢ PQ g ot1i 3 c tisi 3 a!�° 5, di,,m m'm=mf of o'o Z �°! I m• ,m �; 11 `1- ••D •••-•D c1 '1m: 01-w �! la;�'y tl;W .v_:, . 151°3 �Di D s yt>1=7-t= col ® rnt of�of �y o;m,m _jm o+of -f pia o o1-§{r 3 c ,>t c Ei : c c.cl c.c�iJ'd r �Q ii! '_; �:. O4 p0p�iTs:; E 3 E •��-q m aim;ixIce.o_•o o•3 �'3 v..m Ei mi ;c0 ° - a—w S• s `i ,co; i w N� O,N N-N y e'S: N ; i : '1 i N,-- j N jS.D ,U fCi_'N N w'l0 Z .ci' e < t_ -+-'; 41t-'�-jz z oao 0 0°! -;— ._ a;z y;z ,n wow_ a a a!y a -o, I u I�IN' M � �+ 01 n Oi0); co;f ; ' �,,.�.�.: st��il tOtf�fa0 Of.O. N:I N i C�; I. ,., � ..i.--..,1.-..y.. ' i I _',i I. .,.,, ! I i , W a^.....:samerm.....P. — _ �P T L''ND -_1++Drainage area number Pond 1 Pond 2 Pond 3 1 Pond 4 zlueaign volume of SCM(cu ft) 81593 cf I 39195 cf 68585 cf 1.• 42057 cf M ENERAL OC FROM 02H.1050 31Is the SCM sized to treat the SW from all surfaces et build-out? + Yes _i______ i Yes__..... Yes Yes 41s the SCM located awayfrom contaminated soils? Yes Yes Yes Yes 51What are the side slopes of the SCM(H:V)? j-_, 3 1 3 1 3:1 - - 3:1 (Does the SCM have retaining walls,gabion walls or other fl! f- - 6iengineered side slopes? No I -No No No ----..._ 1 -.._ ---, Are the inlets,outlets,and receiving stream protected from erosion i P i 7j(10-year storm)? I Yes Yes Yes s Ye- -- 1..._ __.-__."--es mama_' Is there an over-flow or bypass for inflow volume in excess of the 1 1 .1 i 8 design volume? Yes Yes 1 Yes Yes 9;What is the method for dewatering the SCM for maintenance? Pump(preferred) 1 Pump(preferred)Pump(preferred) Pump(preferred) 1011f applicable,will the SCM be cleaned out after construction? "" Yes Yes '� Yes Yes - 11 Daes the maintenance access comply with General MDC(8)? i Yes -71 , _ Yes 1 Yes Yes j 12(Does the drainage easement comply with General MDC(9)? i Yes i Yes ••4 Yes Yes IIf the SCM is on a single family lot,does(will?)the plat comply with a ! --- - -) 13lGeneral MDC(10)? I 1 14;Is there an O&M Agreement that complies with General MDC 11( ). Yes Yes Yas Yes ___ i- complies with 15 Is there an O&M Plan that General MDC(12)? Yes j Yes a Yes Yes 16,Does the SCM follow the device specific MDC? + - - - , 17 Was the SCM designed by an NC licensed professional? 1 - Yes 1 _... Yes -- Yes - Yes i Yes Yes IET POND MDC FROM 02H 1053 181Method used 1 SNDA A I- SA/DA SAIDA 1 SAIDA • 19;Has a stage/storage table beenprovided in the calculations? -' .,_ _ Yes Yes _ -Yes _ _ -- ----- ---_ .- Yes _._ Elevation of the excavated main pool depth(bottom of sediment i - ' ` - ""- j --" - 1 20 removal)(fmsl) 23.00 i 26.00 28.00 ' 25.00 `...____-_-__._-_.mama- 21{Elevation of the main pool bottom-(top of sediment removal)(fmsl) , 24.00 i 27.00 29.00 26.00 ;-._4__..___.._ . _.__.._..__.._ ,'_ 22-Elevation of the bottom of the vegetated shelf(fmsl) 27.00 32.00 34.00 ti 34.00 - -_�---`23I Elevation of the permanent pool frmsl) 27 50 32,50 34.50 34.50 24 Elevation of the to of the vegetated she fmsl - i33.0035.00 _.... _-,- P 9 ( ) 28 00 + 35 00 35 00 25"Elevation of the temporary pool(fmsl) 29 00 3 33.75 I 36.15 36.20 _ . - - 26; urface area of the main permanent pool(square feet) 41744 sf 22640 sf s 28985 f • 17318 sf 27 Volume of the main permanent pool(cubic feet) _ 126409 cf 90175 Cf 121150 cf ! 79792 cf 28 Average depth of the main pool(feet) s 3.23 ft t 4.37 ft i 4 54 ft 5.21 ft 29,Avera a depth equation used o - 9 P q Equation 3 Equation 3 I Equation 3 Equation 3 ; 30' If using equation 3,main pool perimeter feet840.0 _r --_ P P (feet) ft ft 738,0 ft 640 0 ft , 31; If using equation 3,width of submerged veg.shelf(feet) 3.0 ft i 3.0 ft 3.0 ft 3.0 ft^ _ 321Volume of the forebay(cubic feet) 23425 cf 1 17263 cf 23632 cf 12077 cf -33+Is this 15-20%of the volume in the main pool? _._ mama._ main pool? i Yes r _..__ Yes Yes Yes_._ - 34 Clean-out depth for forebay inches I __� Y ) 6in � 12m t � 12in 6in r"_._---- _..-mama----.---- -- 35 Desi n volume of SCM(Cuft _._.,_ g - ( ) 81593 cf 39195 cf 68585 cf 42057 cf 36;Is the outlet an orifice or a weir? Orifice Orifice Orifice Orifice 37; If orifice,orifice diameter(inches) --" _---- 3.50 in 2.50 in- -i_.__- 3.00 in _.-. .__ .•2.75 in "_ .i 38 Ifweir,weir height(inches) 39 If weir,weir length(inches) i ore 40 Drawdown time for the temporary pool(days) - • 3 68 4 45 -� 4 56 3.33 ..----mama_ ,.-__ ..__... ___ ._.mama-_._ ;Are the inlet(s)and outlet located in a manner that avoids short- �. , 4licircuiting? 1Yes Yes Yes 1 Yes . ___.. ... 42 Are berms or baffles provided to improve the flow path? No • No No No 43 Depth of forebay at entrance(inches) 54 in I 78 in 66 in 102 in 7 4 epth of forebay at exit(inches) f 48 in 66 in 54 in f 96 in I _ �._ __ .mama ... + 45i Does water flow out of the forebay in a non-erosive manner? --t Yes Yes Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 6 ft 6 ft -47;Slope of vegetated shelf(H:V) 6 1 6 1 6 1 • - "- 'I 6:1 , i Does the orifice drawdown from below the tap surface of the i 48perrnanent pool? Yes Yes Yes Yes # Does the pond minimize impacts to the receiving channel from the 1- "._..."-.- ;. 49;yr,24-hr storm? I Yes Yes Yes ' Yes (Are fountains proposed?(If Y,please provide documentation that 1 i- - -( 50 MDC(9)is met) No No No No • 5111s a trash rack or other device provided to protect the outlet system? Yes Yes Yes Yes 1 521Are the dam and embankment planted in non-clumping turf grass? r Yes + Yes Yes Yes 53+Species of turf that will be used on the dam and embankment Bermuda t Bermuda Bermuda Bermuda 54,1-5 a granting plan beeennprovided for the vegetated shelf? 'Yes 'Ye Yes Yes DDITIONAL INFORMATION i --- 1 Please use this space to provide any additional information about 55ithe wet pond(s): MCKiM&C �-I }-r D ENGINEERS V 1�LtL.�l.J St' RVEYORS '!A N N E R S July 28,2020 M&C 04245-0012(40) Kellie Norris, Environmental Engineer DEMLR—State Stormwater Program Department of Environmental Quality 127 Cardinal Drive Wilmington,North Carolina 28405 RE: Request for Additional Information Stormwater Project No.SW8 200705 Sidbury Farms New Hanover County Dear Ms.Norris: In response to the Request for Additional Information Received (July 22,2020) regarding Sidbury Farms Stormwater Project No. SW8 200705, we offer the following responses: 1. 15A NCAC 02H.1040(1)and.1042(2)(b):In the case of a corporation,the application must be signed by a principal executive officer of at least the level of vice-president.The signature by other agents shall be accepted on the application only if accompanied by a letter of authorization signed by the appropriate authority.The letter of authorization provided is signed by an assistant secretary.Please provide another letter of authorization or an appropriate signature on the application documents from a documented president or vice president of the corporation. -Response:A Letter of Authorization signed by Thomas B.Montano (Vice President) has been provided giving Libby Shelton (Assistant Vice President)signature authorization. The original Letter of Authorization is being overnighted from Texas and will be here tomorrow (29 July 2020),and we will deliver that under a separate cover ASAP. 243 North Fr nt S:ree.` ;J c 28 4 c; 2. 15A NCAC 02H.1042(2)(a)(vii): A. Please identify the vice president or president granting signature authority in Section III.1.a of the application.For instance,this section of 10 3.3 1C 4 8 the application could read"Ian Flannery,Assistant Secretary signing for...".. Fax 910 25' .8287 eed.corn Ms.Kellie Norris July 28,2020 -Response:Libby Shelton (Assistant Vice President)signing for Thomas B. Montano(Vice President)has been added in Section III.1.a of the application. B. The mailing address for the applicant listed in Section III.2.a of the application is not consistent with the office mailing address on file with the Secretary of State.Please confirm the mailing address for property owner listed in Section III.2.a of the application is consistent with the information on file with the Secretary of State.Other addresses may be added to section III.3.a of the application. -Response: The mailing address listed in Section III.2.a of the application for John Rudolph has been updated with the address on file with the Secretary of State. 3. 15A NCAC 02H.1003(7)and .1042(2)(k):The original deed restrictions were provided in the submittal;however,the name was left blank on the first page. Please provide this page completed. -Response:Libby Shelton has been added to the first page of the Deed Restrictions and original signature page has been included with this resubmittal. 4. 15A NCAC 02H.1042(2)(g)(ii):As discussed in the submittal meeting,please provide a complete, dimensioned project or project phase boundary with bearings and distances. -Response:Bearings and distances have been added for the project phase boundary. See plan sheet CS-100. 5. 15A NCAC 02H.1042(2)(f) and.1050(4):As discussed in the submittal meeting, please provide rip rap calculations to show that the stormwater discharge does not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event. -Response:Riprap calculations have been provided for Ponds 1-4 showing that stormwater discharge does not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event. 6. 15A NCAC 02H.1042(2)(g)(iv): A. And .1042(2)(a)(iv):In reviewing the delineated drainage areas compared to Section IV.10 of the application,there is a turnaround near Pond 1 that is not included in the drainage area to Pond 1.However, Section IV.10 of the application does not include any built-upon area in the MCKIM&CREED Ms.Kellie Norris July 28, 2020 untreated drainage area.Please confirm the information is presented consistently. -Response: The drainage area square footage in Section IV.10 of the application was listed correcttly,however the limits of Drainage Area 1 (Pond 1)were not updated. The Drainage area exhibit is now up to date. B. Please provide proposed contours and drainage patterns along the drainage divides including at the entrance roads and the road connection with future phases to support that all of the proposed built-upon area is being collected and treated.Recommendation:In the case where the contour interval on a "topographic"map is too large to adequately reflect the existing and proposed drainage patterns of a relatively flat property,spot elevations and/or a site specific elevation survey may be needed. - Response:Proposed contours have been added to the Drainage Area Exhibit. The offsite roadway improvements will be permitted separately once the design has been approved by NCDOT. 7. 15A NCAC 02H.1042(2)(g)(v):As discussed in the submittal meeting,the plans show that a walking trail is proposed.Please provide additional details on the plans to demonstrate if this feature has been designed per GS 143- 214.7(b2)to be a permeable surface or if it has been considered part of the builtupon area. -Response:We will submit the amenity center as a minor modification once the trail details have been worked out. We will permit it now as an allocation of future BLIA. 8. 15A NCAC)2H.1042(2)(g):As discussed in the submittal meeting,if the amenity center and walking trail is a conceptual site plan,please identify on your application submittal that this is a future development and that the final site layout and grading plan will be submitted once the design is set. -Response: The plan and permit application/supplements have been updated to show the amenity center BLIA as a future allocation. We will submit a minor modification in the future. 9. 15A NCAC 02H.1003(3)(a):In Row 19 of the drainage area section of the supplement,please identify the calculation method used to determine the design volume.It appears that you are using the Simple Method. -Response:Row 19 of the drainage area section of the supplement has been revised to indicate using the Simple Method. MCKJM&CREED Ms. Kellie Norris July 28,2020 10. 15A NCAC 02H.1003(4):The response to row 9 of the supplement cover page indicates that BUA will be proposed in the setback.Please reconsider this response. - Response:Row 9 of the supplement cover page has been revised to indicate no BUA is proposed in the setback. 11. 15A NCAC 02H.1042(2):Please email the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements. Response: The supplement form has been emailed to kellie.norris@ncdener.gov 12. 15A NCAC 02H.1053(2):It appears the average pond depths for Ponds 1 and 3 have been calculated using the entire permanent pool.Please update the calculations to use the main permanent pool only.Refer to Chapter C-3 of the Stormwater Design Manual,Equation 3. -Response:Pond 1 and Pond 3 calculations for average depth have been revised to only use the main permenant pool. 13. 15A NCAC 02H.1042(2)(h)(ii): A. The inlets of three of the four ponds appear to be set at an elevation which would be located within this sediment removal elevation.Please confirm the intended design and ensure that any sediment accumulation will not impede the water from entering the system and that the system can still be operated and maintained as outlined in the signed operation and maintenance agreement. -Response:Pond 2 was revised by increasing the forebay depth to get the outfall pipe above the sediment removal elevation. Ponds 3 and 4 were kept as designed. With pipe sizes of 42"and 60", and sediment depths of only 12"and 6"above the invert,pipe capacity will not be negatively impacted and the flow velocity will be sufficient to keep the sediment from accumulating immediately in front of the pipes. B. In the plans,the outlet details for Pond 3 and 4 appears to set orifice invert elevation below the identified permanent pool elevation.Please confirm the outlet structure details for Pond 3 and 4 are correct and consistent with the intended design. 0,4 MCK IM&CREED Ms.Kellie Norris July 28,2020 -Response: The outlet details for Pond 3 and Pond 4 have been revised and set at the permanent pool elevation. See revised sheets CN-503 and CN-504. 14. The express additional information review fee has been waived.If an extensive second request is needed,a fee may be assessed at that time. If you have any questions,please do not hesitate to contact me at our office 910- 343-1048. Sincerely, McKim&Creed,INC. Richard A.Moore,PE Regional Manager Cc: Ian Flannery,DR Horton File(with attachments) McI1[&CREED SIDBURY FARMS PHASE 1 (LOTS 1 -258) NEW HANOVER COUNTY, NC STORMWATER NARRATIVE Prepared for: D. R. Horton, Inc. 131 Racine Drive,Suite 201 Wilmington,NC 28403 Prepared by: 4MCKIM&CREED 243 North Front Street Wilmington, NC 28401 (910)343-1048 Project#04245-0012(40) July 2020 ++,%% III %,,ii i 9 • -AL 1 025503 . ° >%<VCINEV .,,..."RD A V .. ....9 Design Narrative I. Existing Site The proposed 314.3 acre development,known as Sidbury Farms,is located in New Hanover County, 1.80 miles North East of the intersection of Blue Clay Road (SR 1318)and Sidbury Road (SR 1336).This development will consist of single family residential,multifamily residential, open space, an amenity center and private streets. This phase(Phase 1) of the development consists of approximately 122 acres of single family residential development. The existing site is undeveloped farmland and woods with vegetation that is primarily row crops with crop residue,woods,wetlands and understory growth.A copy of the USGS quadrangle map is attached indicating project vicinity and general drainage patterns in the area.The New Hanover County SCS Soil Survey(copy attached)indicates the underlying soils within the project area predominantly Johnston Soils(JO),Leon Sand (Le),Murville Fine Sand (Mu), and Seagate Fine Sand (Se).The Hydraulic Soil Group Classifications are A/D,A/D,A/D, and B respectively. The project site is in the Cape Fear River Basin and drains to Prince George Creek. According to the latest surface water classifications published by NCDEQ Prince George Creek is classified as C;Sw.Prince George Creek Drains to the North East Cape Fear River(B;Sw,Index-No. 18-74- (47.5)) as illustrated on the attached USGS Topo Map.Wetlands do exist within the site boundary but will not be disturbed.The wetlands have been flagged and we are awaiting USACE approval. Because the Corps has not been making routine site visits since the beginning of the Covid-19 Pandemic, and our reviewer is still not able to schedule site visits, our wetland consultant is working with the Corps towards issuance of a delineation concurrence letter. The site does not drain to ORW designated waters, is not within 1-mile of and draining to SA classified waters, and is not within 1-mile and draining to HWQ designated waters. II.Proposed Improvements The proposed improvements are consistent with any residential subdivision.The basic improvements proposed at this time consist of the construction of roadways with standard curb and gutter,water and sewer utilities, and storm drainage collection and treatment systems (consisting of four wet detention ponds)to allow for the construction of 258 single family residential homes.The systems ultimately drain to the North East Cape Fear River via wetlands and Prince George Creek. CERTIFICATE OF OFFICER The undersigned hereby certifies as follows: 1. He is a duly elected, qualified and acting Vice President and Secretary of D.R. Horton,Inc.,a Delaware corporation(the "Company'),is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy ofresolutions related to the subject matter as adopted by the Consent of Executive Committee of the Board of Directors of the Company dated April 1, 2019 (the "Resolutions"). The Resolutions have not been amended, rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Vice President and City Manager WHEREAS,effective October 31,2017,Elizabeth Shelton was duly elected to the office of Assistant Secretary of the Company in the Company's Central Carolina Division; and WHEREAS, Elizabeth Shelton transferred to the Company's Coastal Carolina Division and has been promoted to the position of Assistant Vice President of the Company,and it is now desirable to grant her additional duties and authority for that division. NOW, THEREFORE, BE IT RESOLVED, that Elizabeth Shelton is hereby elected to the office of Assistant Vice President of the Company (the "Assistant Vice President') in the Company's Coastal Carolina Division (the "Division'), to serve until the next annual meeting of the directors of the Company and until her successor is duly elected and qualified or until her earlier death, resignation or removal. RESOLVED FURTHER, that the Assistant Vice President is hereby authorized and empowered,in the Wilmington area(the "Area")of the Division and in the name and on behalf of(A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities'), (i)subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President,(d)Executive Vice President or(e)the Region President of the Division (the "Approving Officers'), to execute and deliver contracts,agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement,leasehold or other tangible or intangible property,right or interest,and any personal property relating or incident thereto,(ii)subject to written approval by any one of the Approving Officers,to execute and deliver contracts,agreements,deeds, conveyances or other obligations of the Entities, closing statements and other documents and instruments for the sale of improved or unimproved real property,or any interest or right therein, owned, leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER, that in connection with the management of the Entities'business,the Assistant Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property,(ii)contracts,agreements,deeds, closing statements and other documents and instruments for the sale,transfer and/or conveyance of mineral rights, groundwater and other water rights owned,leased or controlled by any of the Entities to DRH Energy,Inc.,an affiliate of the Entities,(iii) home sales contracts,sales person employment agreements and similar or equivalent agreements,documents or instruments and(iv)personal property leases for,among other things, office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities' business in the Area, the Assistant Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family and multi-family homes. RESOLVED FURTHER, that effective as of the date hereof, Elizabeth Shelton is hereby removed from the office of Assistant Secretary of the Company. RESOLVED FURTHER,that effective as of the date hereof,the authority hereby granted to the Assistant Vice President supersedes authority previously granted by Written Consent of Executive Committee of the Board of Directors to the Assistant Vice President. IN WITNESS WHEREOF,the undersigned has signed on the 27th day of July, 2020. g. Thomas B. Montano Vice President and Secretary u:UTEWALT\MJn\ Ifl2o1u127-cos.wpd 2 III. CONTACT INFORMATION 1.a.Print Applicant/Signing Official's name and title(specifically the developer,property owner,Iessee, designated government official,individual,etc.who owns the project): Applicant/Organization:D.R.Horton,Inc, Signing Official&Title:Libby Shelton.Assistant Vice President signing for Thomas B.Montano(Vice President) b.Contact information for person Iisted in item la above: Street Address:131 Racine Drive,Suite 201 City:Wilmington State:NC - Zip:28403 Mailing Address(if applicable): City: State: Zip: Phone: f843 ) 709-0752 Fax: ( ) Email:LShelton@DRHorton,com c.Please check the appropriate box.The applicant listed above is: ❑The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ®Developer'"(Complete Contact Information,item 2a and 2b below.) otto, 'A' '"",,, •`s , 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or d% .•, r , e person who owns the property that the project is located on): s S-AL Property Owner/Organization:RMP Sidbury Road.LLC = 025503 Signing Official&Title:john Rudolph,Manager b.Contact information for person listed in item 2a above: Street Address:172 Huntley Place 1`""' "`9`�� City:Charlotte State:NC Zip:28207 Mailing Address(if applicable):172 Huntley Place City:Charlotte State:NC Zip:28207 Phone: (704 ) 372-8000 Fax: j ) Email:JRudolph57@gmaiI.com 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits:New.Hanover County Point of Contact:Nicholas Gadzekpo Phone#: (910 ) 798-7308 Form SWU-101 Version Oct.31,2013 Page 2 of 7 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information,item 1a)Libby Shelton certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants`willbbe recorded,and that the proposed project complies with-WO requirements of the applicable sto mwater rules ender 15A NCAC2H.1000 and,any other applicable state,stormw ter requirements. Signature: �'4SJ6 11711 7 � . Gate: I, 1 A1J ki AA)AJ SaC( ,a Notary Public for the State of Jstrrf CAI 6 UNA,County of 10GA.1 iko4,40 c,1.. ,do hereby certify that ELakiEt14 S I+EI TM%) personally appeared before me this day of 'Svc.K ,4410 ,and acknowle ge the due execution of the application for a stormwater permit. Witness my hand and official seal, ..o t1111N1II4g ik felz? FLAA/4/N t. i N�TAq j, '`S __z A \teliUBLIC �v 14, iii OfrER CO� SI'1Innl IM SEAL My commission expires 05/7/26s S • Form SWU-101 Version Oct.31,2013 Page 7 of 7 ` Sat 1 1 rg .~ a, Tot ; ' 5 & ae § L9 0 N o O, -• N N O N mm1 III 0 N N O Q O o co 00 Ob M M W M F p v, M n an ~ Y7 LA' .- ...1 m m s-1 Cs C 0 o_ IN 00 Ps E U-12 III rl ri -0 Y M aW 2 V, ^ O1 0 C O O 0�`I O 0 O O O O O O C 0 U, a5 P n O C O 8 r' N N 7 C 0_ Y 0I as U m ao a ,-I 3 v, eh asm vs ae R G m III pa v0°i W H ^ c a c v . O IO 0 0 o o a "i U o o M ~ Ip N of v ut W ..4 IO ID M V, .My f� .� O� en e a Y OI OJ U al M- m ED ; in co a .-I m 8 foi N M pO N 1 M o v, 4 N a N 01 1. Q 0 O C��. in to au()' U O^�P Q U ON1 N O IO O v1 O u1 .y ID N N N al "'� s-a aan n C a 01 al U N •a N O O vI Op M M N N § N O M o in L CU Uros V O ? m an VI M N s-aN W O .I a a O m a E 0- C 1.1. -IL 3 U m p ti Si ; v, �V cr in a2 .1 p a)i m 0 vci h 2 o v, n 1. O N pmp W 5 p� "" a Let O O O ^^ In C7 U co rtm, m n p$ U ON1 N ON vi. m .y 00 00 10 V, M a-I N. an r \ N.....•. �V �i \ • .. .0 i dam. d :- a� z La Q - y.s M ac, E IC E7, or o _o «I ;I J F \ //1j11111111j1�` w w a a. V m �_' �a *' Us w c c ,�, EILL 1 °' I.' C ` C — 41 '= d 3 K pp� 7 Y t- W vs arc N c S a E c C C c c « +' 7, In Q. 0 t- a ae Q 0 0 0 0 Ii lu SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION _....". , r.' '_.-" - _.�.�._. _ �v . "`. ." "` `� "' ..-_.. __. 1 Project Name SIDBURY F_ARMS-PHASE 1 2 Project Area(ac) - 118.68 _ 3 Coastal Wetland Area(ac) -^ -_ ._ 0 -- --- - 4 Surface Water Area(ac) i 1.04 - 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No q.—. ..-.-w.:-a..w._r --. -..-.c..+T....,--w...a........w.-..-: -_.:....-._..--__-...._.'-'"--'s...-....-�F.v_,_.w...-..-.•.��-..._.-.,z ;COMPLIANCE WITH 02H.1003(4) �:.._; - - -�---- .�y�.,��:a4�_,;:_,.._.�=._,,:�..�.trn�-F-_x••�.x-,�-,a..�.•a..,.=vim,-:._s.:.,s�,=z-m,,.,��,�-- ---- ._.�.t-.,__._...-_ 7 Width of vegetated setbacks provided(feet) _ >50 8 Will the vegetated setback remain vegetated? Yes 0 Is BUA other that as listed in o osed d)out of the setback? Yes 10 Is streambank stabilization proposed on this project? � No - -- NUMBER AND TYPE OF SCMs: 11 Infiltration System _..___._. -. -----_- !^ 12 Bioretention Cell 0 14 Wet Pond • 4 -_ � 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter e_ 0 µ---- --- 17 Rainwater Harvesting(RWH) 0_ 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) _ ___0.... ..__ _ — - ... 20 Disconnected Impervious Surface(DIS) 0 - - 21 Treatment Swale ._.. .- -._--0 _ -- ....._.__. t • 22 Dry Pond 0 23 StormFilter __ ^ 0 24 Silva Cell 0 25 Bayfilter f_ . . .. � .. -..__-._ -__..__,. __ 26 Filterra 0 - - FORMS LOADED DESIGNER CERTIFICATION z--._- .-:— , -= --- •'-` — -1 ._...._.... ...�.-.-�._�:c. f.+a_Ya..+..x.�.«:::.s.'+'G•�.-.�•vz•.y..�._y.. l+cs'.-- :r:a� '-- 27 Name and Title: _ Richard A.Moore PE 28 Organization: — -Mckim&Creed 29 Street address: I .._ 243N Front St 30 City,State,Zip: Wilmin ton NC 28401 31 Phone number(s): I _ " T - (910)343-1048 32 ,Email: j ramoore©mckimcreed.com y-�- Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. .--7,.ner 0.0 -rrt r., • �• l% - (.. /...40........1/4,....00,_ `; AL 025503 J = Signet ign • - I ......II ....7 .1( Date :11Z )11a°1314) A . fi i ! II iI�I • co ct coi o ea a c r a co 1 P. U I ter.-N e. Of N !' nlr d•ca 1 , i . I i Ca 0. 0 E. 10 a.CO 01:tv m i IDNJ, !28 I COIr..-Lc?W t r00 N, NI 1 v. a)t42 CO I i 1 I j i J I I CO C, O rc s.. V' I1i tZelI 1 1 1- 'a�I c co N 1 1 aall a ,c�IO p itl-2 CD CO NI N 1r ; CO m � 1 I I I 1 w y- sir I m a m+ ` �+ LEI }Off to �' I m o 3Q Ci pJ' a E c ._ o Im a) °�i a E iiE - o o o ci m v Ud v N O O a .0 0�0 m a y - a c c 3 m m ``� t' 0 a a m 8 E E c E i- if ' I°' W i :a a z. v a . = °� E ;o N y N c O p._ — a = c . IL c c c vi +" 0 m m c W , t O. T a of o Qto 4gcc - 3 -m o -Y - m coco¢ -< < < E 0 -cm Z - c m c 4 -m >cD c cm 0Y . = `N -6Ag 4 Cmmm w = of - ®gyp 0mmMmg o 61 Y m F7 7L c > c 'S c C C C c air`i. N m �w_ L tw'! � w3EoE ' ' Eain � LL� o3 `o; wE.ufwE'wia � g _w1 "' �' i_i_z °.fz . 00 m �z Hz wu'� °-'wwaa • OwE a h Q ‘-N. �'LO CDr- a O rr-- N C)IP CO CO Ps CO01 ®f N i CO I 0 QC, NET POND 1 Drainage area number 1 Pond 1 i Pond 2 1 Pond 3 1 Pond 4 2 Design volume of SCM(cu ft) 81593 cf 39195 d 68585 cf 42057 cf ENM RAL MDC FROM 02tr.:1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? g Yes Yes _f__ Yes Yes 4 Is the SCM located away from contaminated soils? ( Yes Yes Yes _ Yes 5 What are the side slopes of the SCM(H:V)? ! 3:1 Ti1 f _ 3.1 Does the SCM have retaining walls,gabion walls or other 6 engineered side slopes? No No No No Are the inlets,outlets,and receiving stream protected from erosion 7(10-year storm)? Yes Yes Yes Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes Yes Yes Yes 9 What is the method for dewatering the SCM for maintenance? I Pump(preferred) Pump(preferred) Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be deaned out after construction? I Yes _ Yes Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes _ Yes Yes Yes' 12 Does the drainage easement comply with General MDC(9)? Yes - Yes - _ Yes_ Yes-_ If the SCM is on a single family lot,does(will?)the plat comply with - - -13 General MDC(10)? I 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes _ Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes Yes Yes I 16 Does the SCM follow the device specific MDC? Yes Yes _ Yes _ Yes _ 17 Was the SCM designed by an NC licensed professional? Yes Yes Yes Yes JET POND MDC FROM 02H.1053 18 Method used SA/DA _f____SA/DA SA/DA 1 SA/DA 19 Has a stage/storage table been provided in the calculations? ( Yes Yes Yes Yes Elevation of the excavated main pool depth(bottom of sediment20 removal)(fmsl) 23.00 26.00 28 00 25.00 21 Elevation of the main pool bottom-(top of sediment removal)(fmsl) 24.00 27.00 29.00 26.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 27.00 32.00 34.00 _ 34.00 23 Elevation of the permanent pool(fmsl) 27.50 32.50 34.50 34.50 24 Elevation of the top of the vegetated shelf(fmsl) 28.00 - -_33.00 , 35.00 35.00 25 Elevation of the temporary pool(fmsl) 29.00' - 33.75 36.15 36.20 _ 26 Surface area of the main permanent pool(square feet) 41744 sf"- 22640 sf 28985 sf 17318 sf 27 Volume of the main permanent pool(cubic feet) 126409 of _ 90175 cf 121150 cf 79792 cf 28 Average depth of the main pool(feet) 3.01 ft • 3.96 ft 4.54 ft 5.21 ft� 29 Average depth equation used Equation 3 Equation 3 Equation 3 Equation 3 30 If using equation 3,main pool perimeter(feet) 840.0 ft 677.D ft 739.0 ft 640.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 3.0 ft 3.0 ft 3.0 ft 1 32 Volume of the forebay(cubic feet) 23425 cf 17263 cf 23632 cf 12077 cf _ 33 Is this 15-20%of the volume in the main pool? Yes Yes Yes Yes'34 Clean-out depth for forebay(inches) 6 in 1. 12 in 12 in 6 in 35 Design volume of SCM(cu ft) 81593 cf �39195 cf 68585 cf -42057 cf 36 Is the outlet an orifice or a weir? _ Orifice Orifice Orifice Orifice 37 If orifice,orifice diameter(inches) 3.50 in 2.50 in • 3.00 in 2.75 in ',. 38 If weir,weir height(inches) i _T _.__ ., _. _ __...', 39 If weir,weir length(inches) II - - 40 Drawdown time for the temporary pool(days) _, 3.68 - 4 f45 4.56 �3.33 -4 Are the inlet(s)and outlet located in a manner that avoids short- 41 circuiting? Yes _ Yes Yes Yes_ _ 42 Are berms or baffles provided to improve the flow path? No No No No 43 Depth of forebay at entrance(inches) 54 in 78in �66 in 102 in 44 Depth of forebay at exit(inches) • 48 in 66 in 54 in 96 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes _ Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 tt- - 6 ft ft 6 47 Slope of vegetated shelf(H:V) �. _6:1. .._ 61 -- _ .61.. -6'1_�- Does the orifice drawdown from below the top surface of the t 1-48 permanent pool? Yes Yes - Yes - Yes Does the pond minimize impacts to the receiving channel from the 1- 49 yr,24-hr storm? Yes Yes Yes Yes Are fountains proposed?(If Y,please provide documentation that 50 MDC(9)is met.) I - No _ No No - No f 51 Is a trash rack or other device provided to protect the outlet system?1 Yes Yes Yes _...Yes --.i� 52 Are the dam and embankment planted in non-clumping turf grass? 1 Yes Yes Yes Yes 53 Species of turf that will be used on the dam and embankment Bermuda 4 Bermuda Bermuda °x Bermuda • 54 Has a olantina plan been provided for the vegetated shelf? '"Yes L. Vis -" `"QeS""". ..I._._ ales DD111ONALINFOR NATION ••••.ems -..- -- -- 55lPlease use this space to provide any additional information about the wet pond(s): 1 ATTACHMENT C- CALCULATIONS , III %•` .A 104/�',,,,� r I• '�' -AL 025503 _ :��5'•;,HGINEiite �',: •....•. SIDBURY FARMS NC DENR Retention Requirements PHASE 1 POND 1 Site Data Total DA I 839,746 SF Value from CAD On-Site Drainage Area I 839,746 SF Value from CAD Off-Site Drainage Area I 0.00 SF Value from CAD Impervious 563,354 SF Value from CAD Buildings I 392,000 'SF Value from CAD Sidewalks I 20,963 SF Value from CAD Streets I 125,391 SF Value from CAD Parking 0 1SF Value from CAD Other(Amenity Center) 0 (SF Value from CAD Future 25,000 I SF Value from CAD Offsite I SF Impervious Cover 67.09% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.654 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 68,626 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 81,593 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay I 23.0 FT Value selected by designer Bottom of Pond Elevation-Forebay I 23.5 I FT Sediment Storage Elevation-Main Bay I 24.0 _ FT Value selected by designer Sediment Storage Elevation-Forebay 24.0 FT Sediment Storage Volume L 33,277_ - CF Pond volume below sediment storage elev. Permanent Pool Elevation I 27.50 FT Value selected by designer Temporary Pool Elevation I 29.00 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00_ FT Max Depth of Vegetated Shelf 0.50 I FT Perimeter of Permanent Pool I 840 FT Main Bay only Average Depth Provided I 3.01 FT See formula below Required SA/DA Ratio for 90%TSS Removal I—4.95% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 41,571 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 41,744 SF Value from stage-storage calculations Forebay Permanent Pool Volume 126,409 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 25,282 CF 20%of permanent pool volume Provided Volume Forebay 23,425 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 18.53% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 3.50 IN Value selected by designer Weir Elevation of Outlet Structure 29.00 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.35 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 1.45 FT 1/3 of total elevation head Cd,Coefficient of Discharge 1 0.60 I Value selected by designer Q,Flowrate Through Low-flow Orifice 0.22 CFS Q=Cd*WeirArea*sgrt(2*32.2*Avg Head) Drawdown Time 3.68 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 Reiman 3 Average.*Or when the.nwn we*eew.ene "" ellaDa m•XeRd adIr a*`e"mo*O"°""'""°" Average Depth formula: VPP-Mall 0... Aboua>nafsheif '• .Mesa. 4.: • +••a*9**w"h+'*'� 1 W;- Val rCNmssa}Mnl enemy i eli-'. vr• ee`aaa........'►wlrastor.....e•Va71M1a......w i wmr.: b....... • uew'arpMrSIM awuelieof*este as I miasmal a wlawret Cea Alba K eon.....,.. • PNmpOrMya lo!codMow uarpaerme I dltu ...a • WWew i�m„ .. r isrAceo WO II Oaav we MYlc i wassmereed 4 px,:ralCrteoa!AA 1 SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1 -POND 1 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.50 50,977 0 0 *Permanent Pool 28.00 53,891 26,217 26,217 *Top of Shelf 28.50 55,376 27,317 53,534 29.00 56,862 28,060 81,593 *Temporary Pool 30.00 59,889 58,376 139,969 31.00 62,973 61,431 201,400 32.00 66,114 64,544 265,943 *Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 *Pond Bottom 24.00 31,902 30,780 30,780 *Sed.Storage 25.00 34,206 33,054 63,834 26.00 36,570 35,388 99,222 27.00 38,994 37,782 137,004 *Bottom of Shelf 27.50 41,744 20,185 157,189 'Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.50 4,577 0 0 *Bottom of Forebay 24.00 4,993 2,393 2,393 *Sed.Storage 25.00 5,880 5,437 7,829 26.00 6,839 6,360 14,189 27.00 7,868 7,354 21,542 27.50 9,233 4,275 25,817 *Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 *Pond Bottom 24.00 36,895 33,277 33,277 *Sed.Storage 25.00 40,086 38,491 71,767 26.00 43,409 41,748 113,515 27.00 46,862 45,136 158,650 *Bottom of Shelf 27.50 50,977 24,460 183,110 *Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 2 site Data Total DA 405,130 SF Value from CAD On-Site Drainage Area 405,130 •SF Value from CAD Off-Site Drainage Area I 0.00 SF Value from CAD Impervious 325,115 SF Value from CAD Buildings 212,000 I SF Value from CAD Sidewalks 10,248 ISF Value from CAD Streets 57,367 I SF Value from CAD Parking I—01 SF Value from CAD Other(Amenity Center) 0 I SF Value from CAD Future 45,500 I SF Value from CAD Offsite 1 0 I SF Impervious Cover 80.25% Impervious Cover=(impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.772 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 39,108 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 39,195 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay 1 26.0 FT Value selected by designer Bottom of Pond Elevation-Forebay 27.0 FT Sediment Storage Elevation-Main Bay 27.0 FT Value selected by designer Sediment Storage Elevation-Forebay I 28.0 FT Sediment Storage Volume 11,617 CF Pond volume below sediment storage elev. Permanent Pool Elevation I 32.50 I FT Value selected by designer Temporary Pool Elevation I 33.75 I FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 677 FT Main Bay only Average Depth Provided 3.96 FT See formula below Required SA/DA Ratio for 90%TSS Removal I 4.59% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 18,589 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 22,640 SF Value from stage-storage calculations Forebav Total pond volume between permanent pool Permanent Pool Volume 90,175 CF elevation&sediment storage elevation Total Required Forcbay Volume 18,035 CF 20%of permanent pool volume Provided Volume-Forebay 17,263 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 19.14% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice I 2.50 I IN Value selected by designer Weir Elevation of Outlet Structure I 33.75__ FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.15 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.38 FT 1/3 of total elevation head Cd,Coefficient of Discharge 0.60 71 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.10 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 4.45 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 eamm"7 Ungar aufh when fbe."al ea vabbeup.d erd Average Depth formula: ug°"°"'I y enamel Wm Ow malt"web °`µ'"'°" PPP-vrae j Onr• Abnttwttg/11rtj • Vontaefah Ni 0./lket'>-eer pe4o- a • MpaivRimeetn'bown,AO"hl11kw'> alrn. • ONO dnur atilt*deep woe aMe then ya 'IMYaa II ea"rr>ent p0al Miele ! wwlW�..,•.. • m0arrVaarnr"wtpeelSt to MiresWr viuh.:,y,.+.,,�..• '*um WO weabvamrrlx4141 OW!a Amstrad etpf arom pal 11141 SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE I-POND 2 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 32.50 28,778 0 0 +-Permanent Pool 33.00 31,280 15,015 15,015 Hop of Shelf 33.75 33,200 24,180 39,195 +-Temporary Pool 34.00 33,640 8,380 47,575 35.00 36,456 35,148 82,723 36.00 39,128 37,792 120,515 Kop of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) _6.00 9,983 0 0 +-Pond Bottom 27.00 11,524 10,754 10,754 +-Sad.Storage 28.00 13,182 12,353 23,107 29.00 14,915 14,049 37,155 30.00 16,712 15,814 52,969 31.00 18,572 17,642 70,611 32.00 20,496 19,534 90,145 +-Bottom of Shelf 32.50 22,640 10,784 100,929 -Permanent Pool rspiker Forebay 1 Cumulative Contour incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.00 1,726 0 0 +-Bottom of Forebay 28.00 2,274 2,000 2,000 +-Sed.Storage 29.00 2,887 2,581 4,581 30.00 3,564 3,226 7,806 31.00 4,306 3,935 11,741 32.00 5,113 4,710 16,451 32.50 6,137 2,813 19,263 +-Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.00 9,983 0 0 +-Pond Bottom 27.00 13,250 11_A17 11,617 +-Sed.Storage 28.00 15,456 14,353 25,970 29.00 17,802 16,629 42,599 30.00 20,276 19,039 61,638 31.00 22,878 21,577 83,215 32.00 25,609 24,244 107,458 -Bottom of Shelf 32.50 28,777 13,597 121,055 +-Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 3 Site Data Total DA 641,248 SF Value from CAD On-Site Drainage Area 641,248 I SF Value from CAD Off-Site Drainage Area J 0.00 I SF Value from CAD Impervious 555,912 SF Value from CAD Buildings 292,000 SF Value from CAD Sidewalks 16,205 SF Value from CAD Streets I 92,707 'SF Value from CAD Parking I 0 i SF Value from CAD Other 0 SF Value from CAD Future 155,000 SF Value from CAD Offsite I 0 I SF Impervious Cover 86.69% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.830 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 66,548 CF 1.5 inch*Rv*1ftt/12 in*(Total DA) Provided Treatment Volume 68,585 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay 28.0 FT Value selected by designer Bottom of Pond Elevation-Forebay I 30.0 FT Sediment Storage Elevation-Main Bay I 29.0 FT Value selected by designer Sediment Storage Elevation-Forebay Ir 31.0 'FT Sediment Storage Volume 17,558 CF Pond volume below sediment storage elev. Permanent Pool Elevation I 34.50 FT Value selected by designer Temporary Pool Elevation I 36.15 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width I 3.00 FT Max Depth of Vegetated Shelf I 0.50 FT Perimeter of Permanent Pool 739 FT Main Bay only Average Depth Provided 4.54 FT See formula below Required SA/DA Ratio for 90%TSS Removal 4.40% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 28,220 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 28,985 I SF Value from stage-storage calculations Forebav Permanent Pool Volume 121,150 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 24,230 CF 20%of permanent pool volume Provided Volume-Forebay 23,632 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 19.51% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice I 3.00 I IN Value selected by designer Weir Elevation of Outlet Structure I 36.15 I FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert I 1.53 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.51 FT 1/3 of total elevation head Cd,Coefficient of Discharge I 0.60 .JI Value selected by designer Q,Flowrate Through Low-flow Orifice 0.17 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 4.56 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 LWRmn 1.Longer WOlb.hoa II Mif es submerge*e"e Average Depth formula: ch.Mg, Norm adiard/nap7"'^""'""" VPP—Vstelf qa- 4bOtromOfsMklf fs�.t 0.. *...V.pepmeeeK Ar Tud+q,me OrgenunMi pool ON*: wume over its orelfonYOne,.lee*km Mw- 0.s•Cefik....r..'Primwr rr'M�h.wrw..r.r j Whys depAdvore*Me deap sift Wm/ebed:4 I meowed otimmere tpool Meg) PpMnRirq..�.r + +Mmewdowmar eloomm iaoeml9mMme - WldelAac It*&a.c ,ahaat MO vaa 'Die'a...a ed YPNouncra pool dew SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1-POND 3 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 34.50 38,324 0 0 Permanent Pool 35.00 40,901 19,806 19,806 *Top of Shelf 36.00 43,535 42,218 62,024 36.15 43,939 6,561 68,585 *Temporary Pool 37.00 46,225 38,320 106,905 37.50 47,591 23,454 130,359 4-Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 28.00 14,858 0 0 *Pond Bottom 29.00 16,633 15,746 15,746 'Sed.Storage 30.00 18,483 17,558 33,304 31.00 20,399 19,441 52,745 32.00 22,379 21,389 74,134 33.00 24,425 23,402 97,536 34.00 26,535 25,480 123,016 Bottom of Shelf 34.50 28,985 13,880 136,896 *Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 30.00 4,167 0 0 *-Bottom of Forebay 31.00 5,012 4,590 4,590 '-Sed.Storage 32.00 5,924 5,468 10,058 33.00 6,904 6,414 16,472 34.00 7,951 7,428 23,899 34.50 9,339 4,323 28,222 *Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 16,633 0 0 Pond Bottom 18,483 17,558 17,558 4-Bed.Storage 25,411 21,947 39,505 28,303 26,857 66,362 31,329 29,816 96,178 34,486 32,908 129,086 *Bottom of Shelf 38,324 18,203 147,288 'Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1 POND 4 Site Data Total DA I 650,096 SF Value from CAD On-Site Drainage Area I 650,096 SF Value from CAD Off-Site Drainage Area I 0.00 IISF Value from CAD Impervious 334,158 SF Value from CAD Buildings I 136,000 SF Value from CAD Sidewalks 12,063 SF Value from CAD Streets 1 76,695 I SF Value from CAD Parking 0 I SF Value from CAD Other 0 I SF Value from CAD Future I 109,400 I SF Value from CAD Offsite I 0 I SF Impervious Cover 51.40% Impervious Cover=(impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.513 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 41 656 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 42,057 CF Volume between permanent pool&next-highest L_ orifice Stormwater Pond Bottom of Pond Elevation Main Bay I 25.0 IFT Value selected by designer Bottom of Pond Elevation Forebay I 26.5 I FT Sediment Storage Elevation-Main Bay I 26.0 I FT Value selected by designer Sediment Storage Elevation-Forebay 27.0 FT + Sediment Storage Volume 20,871 �CF Pond volume below sediment storage elev. Permanent Pool Elevation I 34.50 FT Value selected by designer Temporary Pool Elevation I 36.20 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 I FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 640 FT Main Bay only Average Depth Provided I __ 5.21 FT See formula below Required SA/DA Ratio for 90%TSS Removal 2.30% 1% Value from 90%TSS removal chart Required Permanent Pool Surface Area 14,973 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area I 17,318 ISF Value from stage-storage calculations Forebav Permanent Pool Volume 79,792 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 15,958 CF 20%of permanent pool volume Provided Volume Forebay 12,077 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 15.14% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 1 2.75 IN Value selected by designer Weir Elevation of Outlet Structure I 36.20 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert J 1.59 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.53 FT 1/3 of total elevation head Cd,Coefficient of Discharge II 0.60 1 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.14 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 3.33 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 tawtw.l#vm.q.thsMh+th.n M.MO i..uam..Vw!a... Average Depth formula: m.aaay.aa.my..NvyMhWn M..v.rat.a6rW CekWall.n VPA-vsha} `+ Abottomsfyhell I mt. 4. JWrr+y.C+y+n.iW 1 .• • T alwit•mdpmaan*a pool(1•0; I v V.. • set.neen.,aa.MyaKyMat,'.ale!Okla he,r-rsa+ 'as.d.e.(POW MOD tyw^el Oft!aNp1WY • K.." as emoa,...r'Peraa ..r,.wisitR,.rr.r..w I x«ra: o +.,» ' Mpnd.+4rat Ire d.ep WV"Vee Nih.N.. ` nla a.ee«mewRrtv PO MO • pneabY:.••m� + ?aeia!'l+elPsngaEetDaN at Me aat`}va.M akaSeM‘ Vlralvicer.rew. VOM%a«V..dm Neomtaoyd6td.ae I Slot as m.q,e.d atom-men-pool rho) • SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1-POND 4 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 21,791 0 0 •Permanent Poo! 24,081 11,468 11,468 -Top of Shelf 26,429 25,255 36,723 26,909 5,334 42,057 .-Temporary Pool 28,832 22,296 64,353 30,055 14,722 79,075 ...Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 25.00 3,149 0 0 •Pond Bottom 26.00 3,995 3,572 3,572 •Sed.Storage 26.60 4,466 2,115 5,687 27.00 4,937 4,466 8,038 28.00 5,978 5,458 13,496 29.00 7,190 6,584 20,080 30.00 8,604 7,897 27,977 31.00 10,131 9,368 37,344 32.00 11,746 10,939 48,283 33.00 13,453 12,600 60,882 34.00 15,235 14,344 75,226 .-Bottom of Shelf 34.50 17,318 8,138 83,364 .-Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.50 65 0 0 '-Bottom of Forebay 27.00 133 50 50 •Sed.Storage 28.00 340 237 286 29.00 639 490 776 30.00 1,028 834 1,609 31.00 1,504 1,266 2,875 32.00 2,067 1,786 4,661 33.00 2,716 2,392 7,052 34.00 3,464 3,090 10,142 34.50 4,473 1,984 12,126 .-Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 25.00 3,149 0 0 ...Pond Bottom 26.00 3,995 3,572 3,572 •Sed.Storage 26.50 4,531 2,132 5,704 27.00 5,070 2,400 8,104 28.00 6,318 5,694 13,798 29.00 7,829 7,074 20,871 30.00 9,632 8,731 29,602 31.00 11,635 10,834 40,235 32.00 13,813 12,724 52,959 33.00 16,169 14,991 67,950 34.00 18,699 17,434 85,384 .-Bottom of Shelf 34.50 21,791 10,123 95,507 *-Permanent Pool ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 1 RIP-RAP OUTLET NCDEMLR ENGINEER: �� PREPARED BY: REVIEWED BY: e`, RAS RAM PROJECT NO.04245-0012 Outlet flowrate 10.15 cfs Pipe diameter 18 inches Outlet pipe slope 0.5 percent Des.flow velocity 5.74 ft/sec Figure 8.06.b.1 25 20 Zone 6 ` Zone-7 1 u g 15 10 ` .--__ 5 .."''''-'5. sec Zone - ,�. Zone 2 0 1 2 3 4 5 6 7 8 9 10 ' Pipe diameter(ft) i Zone from graph above= 1 Outlet pipe diameter 18 in. Length= 6.0 ft. Outlet flowrate 10.2 cfs Width= 4.5 ft. Outlet velocity 5.7 ft/sec Max.Stone Dia= 6 in. Material= Thickness= 9 in. Zone Material Max Stone Dia. Thickness Length Width 1 Class A 6 9 4 x Djo) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(o) 3 Class I 17 26 8 x D(o) 3 x D(o) 1 4 ' Class II I 23 35 . 10 x D(o) I 3 x D(o) Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 2 RIP-RAP OUTLET NCDEMLR ENGINEER: PREPARED BY: REVIEWED BY: / RAS RAM PROJECT NO.04245-0012 Outlet flowrate 4.07 cfs Pipe diameter 24 inches Outlet pipe slope 0.5 percent Des.flow velocity 1.29 ft/sec Figure 8.06.6.1 25 I ----T 20 Zo0e 6 y �� _— Zone 7 N _ i [5 - T _ J_ ��ie�__�` u —y v 10 1 -o-nea 5 Zone31 s. . �,_ Zoned Zama • 1.3 fthec 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) . Zone from graph above= 1 Outlet pipe diameter 24 in. Length 8.0 ft. Outlet flowrate 4.1 cfs Width= 6.0 ft. Outlet velocity 1.3 ft/sec Max. Stone Dia= 6 in. Material= Class A Thickness= 9 in. Zone Material Max Stone Dia. Thickness Length Width_ 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(o) 3 I Class I 17 26 8 x D(o) 3 x D(o) 4 1 Class II 23 I 35 10 x D(o) 13 x D(o) Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 4 RIP-RAP OUTLET NCDEMLR ENGINEER: A � � PREPARED BY: REVIEWED BY: RAS RAM , PROJECT NO.04245-0012 Outlet flowrate 18.83 cfs Pipe diameter 54 inches Outlet pipe slope 0.5 percent Des.flow velocity 1.18 ft/sec Fieure 8.06.b.1 25 I _I i 20 Zoee-6k _ ,___,, -�� Z'gie 7 . IS ---,_,.. w © 10 —��_L 7 11111M11111.11111111111 I r _tone — 5 ---� e == -� __— ra f ......... 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= l Outlet pipe diameter 54 in. Length= 18.0 ft. Outlet flowrate 18.8 cfs Width= 13.5 ft. Outlet velocity 1.2 ft/sec Max.Stone Dia= 6 in. Material= Class A Thickness= 9 in. Zone Material Max Stone Dia. Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(o) I 3 Class I 17 26 8 x D(o) 3 x D(o) 4 ! Class II ! 23 1 35 10 x D(o) I 3 x D(o) 1 Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 3 RIP-RAP OUTLET NCDEMLR ENGINEER: , � PREPARED BY: REVIEWED BY: RAS RAM PROJECT NO.04245-0012 Outlet flowrate 4.86 cfs Pipe diameter 42 inches Outlet pipe slope 0.5 percent Des.flow velocity 0.51 ft/sec P Fieure 8.06.b.1 25 ------1 ' 20 —$oge4 I � � iZ_ uue 7 N u �` a l5 TJ 10 �_ `� I 0 �L I ihmF2 ~ Zonel � 0 • n5tt I 0 1 2 3 4 5 6 7 8 9 1- Pipe diameter(ft) Zone from graph above= 1 Outlet pipe diameter 42 in. Length= 14.0 ft. Outlet flowrate 4.9 cfs Width= 10.5 ft. Outlet velocity 0.5 ft/sec Max.Stone Dia 6 in. Material= Class A Thickness= 9 in. Zone Material Max Stone Dia Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(o) 3 Class I 17 26 8 x D(o) 3 x D(o) 4 Class II 23 l 35 10 x D(o) i 3 x D( Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ATTACHMENT C - CALCULATIONS / % • , 9< - -AL • : = 025503 sz. HGINEB;a� g- % O . y A 1O ...S/lll 1���,,4 SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE I -POND I Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.50 50,977 0 0 4-Permanent Pool 28.00 53,891 26,217 26,217 +Top of Shelf 28.50 55,376 27,317 53,534 29.00 56,862 28,060 81,593 +Temporary Pool 30.00 59,889 58,376 139,969 31.00 62,973 61,431 201,400 32.00 66,114 64,544 265,943 +Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 +Pond Bottom 24.00 31,902 30,780 30,780 i-Sed.Storage 25.00 34,206 33,054 63,834 26.00 36,570 35,388 99,222 27.00 38,994 37,782 137,004 4-Bottom of Shelf 27.50 41,744 20,185 157,189 +Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.50 4,577 0 0 +Bottom of Forebay 24.00 4,993 2,393 2,393 i-Sed.Storage 25.00 5,880 5,437 7,829 26.00 6,839 6,360 14,189 27.00 7,868 7,354 21,542 27.50 9,233 4,275 25,817 •Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 Pond Bottom 24.00 36,895 33,277 33,277 +Sed.Storage 25.00 40,086 38,491 71,767 26.00 43,409 41,748 113,515 27.00 46,862 45,136 158,650 4-Bottom of Shelf 27.50 50,977 24,460 183,110 4-Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 1 Site Data Total DA I 839,746 SF Value from CAD On-Site Drainage Area I 839,746 SF Value from CAD Off-Site Drainage Area I 0.00 SF Value from CAD Impervious 563,354 SF Value from CAD Buildings 392,000 SF Value from CAD Sidewalks 20,963 SF Value from CAD Streets 125,391 I SF Value from CAD Parking 0 �JII SF Value from CAD Other(Amenity Center) 0 SF Value from CAD Future 25,000 SF Value from CAD Offsite 15F Impervious Cover 67.09% impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.654 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 68,626 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 81,593 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation Main Bay 23.0 FT Value selected by designer Bottom of Pond Elevation Forebay 23.5 FT Sediment Storage Elevation-Main Bay r 24.0 FT Value selected by designer Sediment Storage Elevation-Forebay 24.0 FT Sediment Storage Volume ( 33,277 CF Pond volume below sediment storage elev. Permanent Pool Elevation ( 27.50 FT Value selected by designer Temporary Pool Elevation I 29.00 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool I 840 I FT Main Bay only Average Depth Provided 3.01 FT See formula below Required SA/DA Ratio for 90%TSS Removal ( 4.95% I% Value from 90%TSS removal chart Required Permanent Pool Surface Area 41,571 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 41,744 SF Value from stage-storage calculations Forebay Permanent Pool Volume 126,409 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 25,282 CF 20%of permanent pool volume Provided Volume-Forebay 23,425 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 18.53% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 3.50 IN Value selected by designer Weir Elevation of Outlet Structure 29.00 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert I 1.35 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.45 FT 1/3 of total elevation head Cd,Coefficient of Discharge I 0.60 I Value selected by designer Q,Flowrate Through Low-flow Orifice 0.22 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 3.68 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 Ca4e03 Memo depth what.th.hean*at m:rodaid Average Depth formula: Argot is bow "` "gtlbongtha aw d `"`a""°" irPP-•YahMIf I ° Abattontufshstf law uwagedirobr Yn • sopl,gymedpimomtwf(bee yr • mlepaweeeaacwilfeeek.aeaerm Arca•ear• Me of kprod fOiedFle i 1 Yar- u"trw.+en" r.w' t.rr+rrar %Thor e,, y Oege Ore dagakodMaM'eap 1 meelaasdpmleaarpaorthe 7 Plaaae�eerrew • /naf oloommepalateiebaYmente ViSIN4 ww..wa*- WiOhtemipdeepliWaeatlry.datlfeta —. .�._...__.shall rmrfrad aeprawnt pad pap__'f SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 2 Site Data Total DA r 405,130 I SF Value from CAD On-Site Drainage Area 405,130 SF Value from CAD Off-Site Drainage Area P 0.00 ISF Value from CAD Impervious 325,115 SF Value from CAD Buildings I 212,000 ISF Value from CAD Sidewalks I 10,248 ISF Value from CAD Streets I 57,367 ISF Value from CAD Parking 0 SF Value from CAD Other(Amenity Center) 0 SF Value from CAD Future 45,500 SF Value from CAD Offsite 0 SF Impervious Cover 80.25% Impervious Cover=(impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.772 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 39,108 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 39,195 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation Main Bay ) 26.0 FT Value selected by designer Bottom of Pond Elevation Forebay 27.0 FT Sediment Storage Elevation-Main Bay 27.0 I FT Value selected by designer Sediment Storage Elevation-Forebay I 28.0 FT Sediment Storage Volume 11,617 CF Pond volume below sediment storage elev. Permanent Pool Elevation 32.50 I FT Value selected by designer Temporary Pool Elevation I 33.75 I FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 I FT Max Depth of Vegetated Shelf I 0.50 FT Perimeter of Permanent Pool 677 FT Main Bay only Average Depth Provided 3.96 I FT See formula below Required SA/DA Ratio for 90%TSS Removal 4.59% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 18,589 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 22,640 SF Value from stage-storage calculations Forebay Total pond volume between permanent pool Permanent Pool Volume 90,175 CF elevation&sediment storage elevation Total Required Forebay Volume 18,035 CF 20%of permanent pool volume Provided volume between permanent pool elev.& Provided Volume-Forebay 17,263 CF sediment storage elevation Total Forebay%of Permanent Pool 19.14% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice I 2.50 I IN Value selected by designer Weir Elevation of Outlet Structure 33.75 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.15 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.38 FT 1/3 of total elevation head Cd,Coefficient of Discharge II 0.60 1 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.10 CFS Q=Cd*WeirArea*sgrt(2*32.2*Avg Head) Drawdown Time 4.45 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 limn?Amens*Orton fY OMis*aherepodand Average Depth formula: am OW"bring&`lohahamthsw""°"�"""a°" Abaucmel stet f Was O. ttripv t v.. wog..ov.mnrwdpae0ee6. Vr • tPoaaormure alarraypear!tvoatt aewaaeataaNaesota4adaoa9est7erti v..- oh'oN7R.�re•t'aaaeerieee.i r .e,..rrnre YAW" Coae.,e.r tAg7edaale;d:+eaeapuoed72re7Wan naaewedatoa um%peapea7 IPNaEter,...rr • ttareter* mentpeal itas bolas aire , 1•41%......rr- Mom livmWa&IF adatew divide doh eMlae21011 adtdpmnnwppm7tim SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE I-POND 2 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour incremental Volume,S Contour Area(SF) Volume(CF) (CF) 32.50 28,778 0 0 *Permanent Pool 33.00 31,280 15,015 15,015 4-Top of Shelf 33.75 33,200 24,180 39,195 Kemporary Pool 34.00 33,840 8,380 47,575 35.00 36,456 35,148 82,723 36.00 39,128 37,792 120,515 'lop of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.00 9,983 0 0 -Pond Bottom 27.00 11,524 10,754 10,754 +Sed.Storage 28.00 13,182 12,353 23,107 29.00 14,915 14,049 37,155 30.00 16,712 15,814 52,969 31.00 18.572 17,642 70,611 32.00 20,496 19,534 90,145 +Bottom of Shelf 32.50 22,640 10,784 100,929 +Permanent Pool rspiker Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.00 1,726 0 0 4-Bottom of Forebay 28.00 2,274 2,000 2,000 +Sed.Storage 29.00 2,887 2,581 4,581 30.00 3,564 3,226 7,806 31.00 4,306 3,935 11,741 32.00 5,113 4,710 16,451 32.50 6,137 2,813 19,263 •lop of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.00 9,983 0 0 +Pond Bottom 27.00 13,250 11,617 11,617 +Sed.Storage 28.00 15,456 14,353 25,970 29.00 17,802 16,629 42,599 30.00 20,276 19,039 61,638 31.00 22,878 21,577 83,215 32.00 25,609 24,244 107,458 +Bottom of Shelf 32.50 28,777 13,597 121,055 +Permanent Pool SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE I-POND 3 Stacie/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 34.50 38,324 0 0 +Permanent Pool 35.00 40,901 19,806 19,806 +Top of Shelf 36.00 43,535 42,218 62,024 36.15 43,939 6,561 68,585 +Temporary Pool 37.00 46,225 38,320 106,905 37.50 47,591 23,454 130,359 +Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 28.00 14,858 0 0 +Pond Bottom 29.00 16,633 15,746 15,746 +Bed.Storage 30.00 18,483 17,558 33,304 31.00 20,399 19,441 52,745 32.00 22,379 21,389 74,134 33.00 24,425 23,402 97,536 34.00 26,535 25,480 123,016 +Bottom of Shelf 34.50 28,985 13,880 136,896 +Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 30.00 4,167 0 0 +Bottom of Forebay 31.00 5,012 4,590 4,590 4-Bed.Storage 32.00 5,924 5,468 10,058 33.00 6,904 6,414 16,472 34.00 7,951 7,428 23,899 34.50 9,339 4,323 28,222 +Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 29.00 16,633 0 0 +Pond Bottom 30.00 18,483 17,558 17,558 +Sed.Storage 31.00 25,411 21,947 39,505 32.00 28,303 26,857 66,362 33.00 31,329 29,816 96,178 34.00 34,486 32,908 129,086 +Bottom of Shelf 34.50 38,324 18,203 147,288 +Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 3 Site Data Total DA 641,248 SF Value from CAD On-Site Drainage Area 641,248 SF Value from CAD Off-Site Drainage Area r 0.00 SF Value from CAD Impervious 555,912 SF Value from CAD Buildings 292,000 SF Value from CAD Sidewalks I 16,205 I SF Value from CAD Streets I 92,707 I SF Value from CAD Parking I 0 I SF Value from CAD Other ( 0 SF Value from CAD Future I 155,000 I SF Value from CAD Offsite 0 SF Impervious Cover 86.69% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.830 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 66 548 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 68,585 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay I 28.0 FT Value selected by designer Bottom of Pond Elevation-Forebay 30.0 FT Sediment Storage Elevation-Main Bay I 29.0 I FT Value selected by designer Sediment Storage Elevation-Forebay _ 31.0 FT Sediment Storage Volume 17,558 CF Pond volume below sediment storage elev. Permanent Pool Elevation 34.50 FT Value selected by designer Temporary Pool Elevation 36.15 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 I FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 739 FT Main Bay only Average Depth Provided I 4.54 FT See formula below Required SA/DA Ratio for 90%TSS Removal L 4.40% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 28,220 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 28,985 ,SF Value from stage-storage calculations Forebay Permanent Pool Volume 121,150 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 24,230 CF 20%of permanent pool volume Provided volume between permanent pool elev.& Provided Volume-Forebay 23,632 CF sediment storage elevation Total Forebay%of Permanent Pool 19.51% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 3.00 I IN Value selected by designer Weir Elevation of Outlet Structure I 36.15 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.53 —,FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.51 FT 1/3 of total elevation head Cd,Coefficient of Discharge I 0.60 II Value selected by designer Q,Flowrate Through Low-flow Orifice 0.17 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 4.56 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 Amigo e Awn,depth•ha•a•Mee 1.=hevpdawl Average Depth formula: r— a""'""°""""`m"°°Imo°"°""""'.�"a"'""" VPP-Vshdf I °"0• xbottamofslieif tiara: t►A ••••••anate4R *aaPt»dorrownptaptPet v • vrmaeawerrwaayenti-aaebon• A"o•r.r• Pm n wet meal nlebaotamethe KeyNO V.,. O.S D.Nr.__P.aw°r_,,..Mara...-ve.... Wog (6.-g.. dvaaaar'MOW waeatayaaru I name p+aaw,.,,..,,e • PptaarapeswOrepaayacemamaen p°e(Irot; Mid)...wo.••or Wdlaara$deep WOO ra04,613Oita aiMesrtsc*.rae aptnerrapaa paq SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 4 Site Data Total DA I 650,096 [SF Value from CAD On-Site Drainage Area L. 650,096 SF Value from CAD Off-Site Drainage Area J 0.00 SF Value from CAD Impervious 334,158 ,SF Value from CAD Buildings 136,000 IISF Value from CAD Sidewalks 12,063 SF Value from CAD Streets 76,695 SF Value from CAD Parking I 0 SF Value from CAD Other I 0 SF Value from CAD Future 109,400 SF Value from CAD Offsite I 0 [SF Impervious Cover 51.40% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.513 IN/IN Rv=0.05+0.009*(%impervious) Required 1.5"Runoff Volume 41,656 CF 1.5 inch*Rv*.lftt/11 in*(Total DA) Provided Treatment Volume 42,057 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay 25.0 I FT Value selected by designer Bottom of Pond Elevation-Forebay 26.5 I FT Sediment Storage Elevation-Main Bay 26.0 FT Value selected by designer Sediment Storage Elevation-Forebay 27.0 FT Sediment Storage Volume 20,871 CF Pond volume below sediment storage elev. Permanent Pool Elevation 34.50 I FT Value selected by designer Temporary Pool Elevation 36.20 I FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 640 I FT Main Bay only Average Depth Provided 5.21 I FT See formula below Required SA/DA Ratio for 90%T55 Removal 2.30% I% Value from 90%TSS removal chart Required Permanent Pool Surface Area 14,973 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area L 17,318 SF Value from stage-storage calculations Forebay Permanent Pool Volume 79,792 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 15,958 CF 20%of permanent pool volume Provided Volume-Forebay 12,077 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 15.14% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 2.75 IN Value selected by designer Weir Elevation of Outlet Structure 36.20 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.59 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.53 FT 1/3 of total elevation head Cd,Coefficient of Discharge I 0.60 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.14 CFS Q=Cd*Weir Area*sgrt(2*31.2*Avg Head) Drawdown Time 3.33 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 'Ammon 2 iwaviodrpM wine If..Owl.submrprtrtl a Mosheberm,= eilhemOmmim'°'w"""""°" Average Depth formula: OW-Yshelf Oft" Abosto;riofssrif man t6, MIMSdiOnhet v,. ?swwsdtsadbRawdpsapety Vag a mvsondwaNt'1eKh-wseww a-r.ee..» aaawtaeradatmsbetin(wnrrrpraR V ai•On}i6ura:Aafi.w,,,,,,.a ', . WWI u..,..e.. ID�¢fi+a+ti° 310*Mspam2ininetw erawne et waranrd rsa 02t: 41padronreosdstthe0 412* Yrar4."w-r"-*- %Oliam Ave dwpwantwdatlwadnr stenmewwd eiraminanpaeltkeJ , SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1-POND 4 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 34.50 21,791 0 0 +-Permanent Pool 35.00 24,081 11,468 11,468 +-Top of Shelf 36.00 26,429 25,255 36,723 36.20 26,909 5,334 42,057 +-Temporary Pool 37.00 28,832 22,296 64,353 37.50 30,055 14,722 79,075 •-Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 25.00 3,149 0 0 Pond Bottom 26.00 3,995 3,572 3,572 +-Sed.Storage 26.50 4,466 2,115 5,687 27.00 4,937 4,466 8,038 28.00 5,978 5,458 13,496 29.00 7,190 6,584 20,080 30.00 8,604 7,897 27,977 31.00 10,131 9,368 37,344 32.00 11,746 10,939 48,283 33.00 13,453 12,600 60,882 34.00 15,235 14,344 75,226 +-Bottom of Shelf 34.50 17,318 8,138 83,364 +-Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.50 65 0 0 +-Bottom of Forebay 27.00 133 50 50 +-led.Storage 28.00 340 237 286 29.00 639 490 776 30.00 1,028 834 1,609 31.00 1,504 1,266 2,875 32.00 2,067 1,786 4,661 33.00 2,716 2,392 7,052 34.00 3,464 3,090 10,142 34.50 4,473 1,984 12,126 +-Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 25.00 3,149 0 0 Pond Bottom 26.00 3,995 3,572 3,572 +-Sed.Storage 26.50 4,531 2,132 5,704 27.00 5,070 2,400 8,104 28.00 6,318 5,694 13,798 29.00 7,829 7,074 20,871 30.00 9,632 8,731 29,602 31.00 11,635 10,634 40,235 32.00 13,813 12,724 52,959 33.00 16,169 14,991 67,950 34.00 18,699 17,434 85,384 *-Bottom of Shelf 34.50 21,791 10,123 95,507 '-Permanent Pool ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 1 RIP-RAP OUTLET NCDEMLR ENGINEER:4MCKIM&CREED PREPARED BY: REVIEWED BY RAS RAM PROJECT NO.04245-0012 Outlet flowrate 10.15 cfs Pipe diameter 18 inches Outlet pipe slope 0.5 percent Des.flow velocity 5.74 ft/sec Figure 8.06.b.1 25 20 \ Zuge 6 pene7 w15 N.. � ~�- '� \ NIL.,1 ...., ZorMS s 10 Zone 4— \„ -- r 5 �5 7 ft/se I Gone 31 �---�_� Zon — 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 1 Outlet pipe diameter 18 in. Length= 6.0 ft. Outlet flowrate 10.2 cfs Width= 4.5 ft. Outlet velocity 5.7 ft/sec Max.Stone Dia= 6 in. Material= Class A Thickness= 9 in. Zone , Material Max Stone Dia. Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(a) 3 Class I 17 26 8 x D(o) 3 x D(o) 4 Class II 23 35 10 x D(o) 3 x D(o) 1 Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 2 RIP-RAP OUTLET NCDEMLR ENGINEER:41VFICIVI&CREED PREPARED BY: REVIEWED BY: RAS RAM PROJECT NO.04245-0012 Outlet flowrate 4.07 cfs Pipe diameter 24 inches Outlet pipe slope 0.5 percent Des.flow velocity 1.29 ft/sec Fieure 8.06.b.1 25 20 Zone 6 '70'2 7 � I _ht 15 I� — y, -Zone 5- 'u 10 5 Zone s� Zone2- 7oni_L 111__L'ulicer 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 1 Outlet pipe diameter 24 in. Length= 8.0 ft. Outlet flowrate 4.1 cfs Width= 6.0 ft. Outlet velocity 1.3 ft/sec Max.Stone Dia= 6 in. Material= Class A Thickness= 9 in. Zone Material Max Stone Dia. Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class R 12 18 6 x D(o) 3 x D(o) 3 Class I 17 26 8 x D(o) 3 x D(o) 4 , _Class II , 23 35 10 x D(o) 3 x D(o) Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 24.3 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 4 RIP-RAP OUTLET NCDEMLR ENGINEER: PREPARED BY: REVIEWED BY: �� RAS RAM , PROJECT NO.04245-0012 Outlet flowrate 18.83 cfs Pipe diameter 54 inches Outlet pipe slope 0.5 percent Des.flow velocity 1.18 ft/sec Figure 8.06.6.1 25 I —ii=M=-----I E=MI ili, IINIM Iif, IIIM �_------ i, i 20 gm �- --- kon0 - ----- imm..i,i,i,lii.. «, 15 _- — ------.—_=_ — -- E 1......-.-,��-- i --- 1 ��E-- — — --- �'„to y ����--- f,f,lf,f,i,�.=f, _toss `f,f,f,i�f,�:f,i�f, 5 ..! zone- 1� . i•i•� f,f,�i�ite 0 Zan..1 !� ;i-.-- -.- 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 1 Outlet pipe diameter 54 in. Length= 18.0 ft. Outlet flowrate 18.8 cfs Width= 13.5 ft. Outlet velocity 1.2 ft/sec Max.Stone Dia 6 in. Material= Class A Thickness= 9 in. Zone Material Max Stone Dia Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 _ 6 x D(o) 3 x D(o) 1 3 Class I 17 26 8 x D(o) 3 x D(o) 4 Class II 23 35 10 x D(o) 3 x D(o) Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: SIDBURY FARMS:PHASE 1 7/24/2020 DESCRIPTION: PREPARED FOR: POND 3 RIP-RAP OUTLET NCDEMLR ENGINEER:lam&cREED PREPARED BY: REVIEWED BY: RAS RAM PROJECT NO.04245-0012 Outlet flowrate 4.86 cfs Pipe diameter 42 inches Outlet pipe slope 0.5 percent Des.flow velocity 0.51 ft/sec Figure 8.06.b.1 25 l 20 Zone4ti I � 1,4 15 ° 10 tone 5 Gone s Zon_e 2 Tn-el 1 0 - 05 cec 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 1 Outlet pipe diameter 42 in. Length= 14.0 ft. Outlet flowrate 4.9 cfs Width= 10.5 ft. Outlet velocity 0.5 ft/sec Max.Stone Dia= 6 in. Material= Class A Thickness= 9 in. Zone Material Max Stone Dia, Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(o) I 3 Class I 17 I 26 8 x D(o) 3 x D(o) 4 Class II I 23 I 35 10 x D(o) 3 x D(o) Notes: 1. Calculations based on NY DOT method-Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed,Inc. 243 N Front Street Wilmington,North Carolina 28401 (910)343-1048 Page 1 of 1 a, e u Q 3 it o « crt $ m O 01 N N N p N GI in O m N p Q O a O 00 F 0 U 05 M M 00 M ~ O to ai M n 11 .-1 vi vi .-i .i M M ,-i O c Oa N Ib ml -le at N. v v V M N is S m '^ o1Do m •E e o m n of o of o o w o o o o o o a o E c7 u ob n c 7 U0.1 IN ni N. c C a` Y W U u CO e to 1D COtD OD OOp V/1 C`W O D1 in R in M rz o vj n p o L:Lip '" g O T p o p R o vvt 0 U 00 IA m m in m tv N o m .-a tD tO M to 14 1� N N M at c •a` Y 0! E U al M co CO r.1 m La in O N U O N n ti o --1 to t 20 rev O N p N p S arap O~f an in 17 as U 00 I00 up tillre N N ON1 -4 N in a C 'C a Y •J O1 v U p p N '' M A .�-i N 8 p w ri • p •.-i 'i ry M O N O in p In 0 U 00 Q M M N N In O a to y M L a C c H a E R Y y 3 U d M 1pp pppp T.i rl ; N V V�1 00 O M tM0 o M N VUf U GO U 0i p CO ^ N to CT O1 N O d co pui' p tmD 01 N CO tD CO T-1 N N arm U C 0 111 IIII,,, :,. S• 0......V .... 0 A • s \ �' _ e• = �'� ° �� E i- ? Q ' - s 9 I g- 11—f '`-r1j111111►1.1,```a O A • IaO 1�I� . N ad m g 10p� 7z 00 00 a ,U v L C 06 IO co C. i Y 1M w C C /a E 3 H W at Y �.at N .�.. mf0 C .� i C O j = i+ 01 'O w Q 7 * C U - O p N a O m H a. 4, C m m az E E :: « al o es z :� �' r 01 O E c u w : . c '� ',CI' •E - c c c c t rc In cc in_y1 0 0 I- a.aE E 0 0 C 0 O tat JUL 16 2020 • fl BY,• SIDBURY FARMS PHASE 1 (LOTS 1 -258) and AMENITY CENTER NEW HANOVER COUNTY, NC STORMWATER NARRATIVE Prepared for: D. R. Horton, Inc. 131 Racine Drive,Suite 201 Wilmington,NC 28403 Prepared by: 4,MCKEVI&CREED 243 North Front Street Wilmington, NC 28401 (910)343-1048 Project#04245-0012 (40) ? loti_4y v July 2020 _ SEAL 025503 *04 =•,'c , IN ,cr SIDBURY FARMS STORMWATER NARRATIVE Table of Contents DESIGN NARRATIVE I. EXISTING SITE II. PROPOSED IMPROVEMENTS ATTACHMENTS — SUPPORTING INFORMATION A. USGS QUAD MAP B. SCS SOIL SURVEY MAP C. CALCULATIONS D. HYDRAFLOW MODEL RESULTS E. ECS SOILS REPORT F. LAND MANAGEMENT GROUP WETLANDS MAP G. PROPERTY DEED H. SECRETARY OF STATE DOCUMENTATION Design Narrative I. Existing Site The proposed.314.3 acre development, known as Sidbury Farms, is located in New Hanover County, 1.80 miles North East of the intersection of Blue Clay Road (SR 1318) and Sidbury Road (SR 1336). This development will consist of single family residential, multifamily residential, open space, an amenity center and private streets. This phase (Phase 1)of the development consists of approximately 115 acres of single family residential development and the amenity center. The existing site is undeveloped farmland and woods with vegetation that is primarily row crops with crop residue, woods,wetlands and understory growth.A copy of the USGS quadrangle map is attached indicating project vicinity and general drainage patterns in the area.The New Hanover County SCS Soil Survey(copy attached)indicates the underlying soils within the project area predominantly Johnston Soils (JO), Leon Sand (Le), Murville Fine Sand (Mu), and Seagate Fine Sand (Se). The Hydraulic Soil Group Classifications are A/D, A/D,A/D, and B respectively. The project site is in the Cape Fear River Basin and drains to Prince George Creek. According to the latest surface water classifications published by NCDEQ Prince George Creek is classified as C;Sw.Prince George Creek Drains to the North East Cape Fear River (B;Sw,Index-No. 18-74- (47.5)) as illustrated on the attached USGS Topo Map.Wetlands do exist within the site boundary but will not be disturbed. The wetlands have been flagged and we are awaiting USACE approval. Because the Corps has not been making routine site visits since the beginning of the Covid-19 Pandemic, and our reviewer is still not able to schedule site visits, our wetland consultant is working with the Corps towards issuance of a delineation concurrence letter. The site does not drain to ORW designated waters, is not within 1 -mile of and draining to SA classified waters, and is not within 1-mile and draining to HWQ designated waters. IL Proposed Improvements The proposed improvements are consistent with any residential subdivision.The basic improvements proposed at this time consist of the construction of roadways with standard curb and gutter, water and sewer utilities, and storm drainage collection and treatment systems (consisting of four wet detention ponds) to allow for the construction of 258 single family residential homes and the amenity center. The systems ultimately drain to the North East Cape Fear River via wetlands and Prince George Creek. ATTACHMENT A - USGS QUAD MAP ENT W U.S.DEUSRGEOLOGICAL SURVEY RIORN`a SCOTTS�MTM CAROADu QUADRANGLE .��..�.��,. �r US Topo 7.5-,MNUTE SERIES .n.nsa .n.7sm' 14.I750. '36®"E _. 38 39 40 41 42 43 44 45 40_ 47 07 • �� IS m r w p r-`'. l } w 1 1 _ 1 . :,.'•..;1 : :... -T- -I I. -'1_ -: _ ! it \ _ I t _ -. ti N. two �.T i—� t 7 i ;. @ \s l 02 \4�* �°z ./ `\n IPHASE 1 _' PROJECT �\• �;��. Scotts 3311 e `L • _ _ BOUNDARY = _ \s, ..,, cr. . _ _,. _., .. _... , _., ,_,. , ........ .„ , _ .... • W1 A �� 99 .. _v^i"'` '`"y., I _. : 4' " iG.idana 4 a- , o :, a ,.� ( °� i ki # d 44 R'SEIE NECK F - .MIJKRAYSVILL6 i9B _ - _ 1 % z ?ae 1 ,l..ey,. r"' - - �ehlorry , `ry' wrt4rs Neck r < Po F' 3 �.. a r '° ?"�.a , p .. 8 1. 21 • 97 r.' s 8 .ry euw .. F 1, • - $ ''' '. iyt '. g, yr. !. 1 em 3QNGS GRA.NT T � . %^ay 9�p;Y �.♦OGDL7N �tVY,* a 95 nwm a 9s N� .. c'n. -- ''', i A yy [' \ - II. T , a '0, ,_ g $ d mute Eight I WII ., . :+r``-'° - , .Pis'YAFGTObT" Nye \ w �, POW 94 . - ysn �im0 76 77 y38 39 � 41 42 43 4445 M6m.E n.e s9 n.nm ATTACHMENT B - SCS SOIL SURVEY MAP z z b COLm3E 003m36 00503E commE OOF.m3E comic COME N'OIDBE OC6103E O M N M,2?OS eU M„BZ AS dl N O 47 d N co a • 1 w -I • 0 U T z _ fA C L �r •zl�_ 1. i•O E U '— m > co 0 \ 0 1 y a , i (.) -'0 i . g i; - ' T. • u) 01 x Vr _ iii i • Pa BeIS ' _' - --; i g -T-* • rail g...-. • . e.�% .�. �. • is t. AA 1 t a a frel o a lQ r . w • t. f �y 8 z� �U M dZ SS oLL - - .. - M w[.Z as dl Q I I 1 I I I 00673 E COMORE COMM00MM ODZD OODWBE avowCOME OOIZEBE 000703E OO M E 11 z z e5, ?Li o r) N..- O 0 VI N CNI ,o N o « of >O N a) a) Cn m W O7 co� i a) M N 'mo m 8 0v a) a a) co 3c `o a W a) g O dV j _ 0 E a) L'O Of N O` n N L Y a) E cCL U O w CO ti L co N 7 U E N .y a 0 ® E co O"a 0 of C O M O-U) e U • O O y w-:C 2 O a0 C Ey C L C O a7 a) O Z N m w E f0 3 W a) d 0 c >.0 2 Z Zo w cLi E 'wa Q 3 in o c) 0co Cl)ca d co a yv 'a ¢ Z;N c o r o O .) n y E U wo o o p 3 � L CD 9. 3 m y ix�/ a V y coLO L a) fL7 2 L O n of = U a) O tC ¢ >, o E w� a) coco ._ c o m rn ILL 0 T a) .+O C co CO a7 a) cs CO '�i C E a) O N go O. L E 2' co y z `� a c 10 -o cg ot y m wai o ° � m e �° a � � aEi Q O T.as co .. E V co o al cc, 7 J n 11-2 0 O - y> L ,, L n O C W— a m E ao a) a m � ma 0 CO) din Z a) a) o N oa w m Em. 0 Lo Za. 0 a 0mi° •, a)C m •• A m `m m o �� 'c a w m v„ � o 2 a. rn m m E a) > O o c'o c '3 o a mL m to S u)a � p co oa m e a) o c W Z N w c) • c a m o a m m • U) m co E m a' E g� w E 3 m ° `i3 3 m m = o `y nm E 0o c) myW m Ooc 2 .oa, aai ) oa jai, moo COm -ca_a, >, w cm 0 w .E o'c n m_di H in Cl)-� w a) c 12 c o_am CO a) E o a:o o 'e. co e out `a, w a) c m co CO � a O tom m -_c(L) — — o dN m E 0) a) L C•— C O U O O O O to O N 2 O L,, 0 3 O LO co L o c I- . 5 W E_ o uJ a E V)5 U M d'O a co H O O U) u)— p N H U E m O 0 U - N 0 Z 3 Cl) ct a a)) O ooa Z a3) U w `) o coa 0 O lL U) a) O COC La Z` E aa ry) N O _ 0 0 CO T. _C U? 3:ala'43 m g o. 75- a)0 n LL U c Elc co -o ca w a o N a c J CO y w a) m .c 0 cc_ •2 o 0 Z _ C a) 'U a) onX 6- l0 To co co . .00. W C E co in O Q (00 co El F J re .E 7 2 'a 0 te > z : 4 a r LU o o o' 0 3 m W J a -- ,0 C aQ Ooo) a) � m o if) rn-0000 a a ym aE a, a, n a)Y o 0. v O a a a a o O a 2 0 o OCO y N > m N n 2 2 2 it.. g o co )7 i v m c d E 0 0 >. d t ° cei p Q^� y Y C •O a) x N w 2 El3 'a 'O 'a C 3o O as ° E E 2 N N C m 8 m m >m C a o Q Cl) CO CO 'o CO m 0 0 C) C7 J J 2 a a a re Cl) Cl) CO Cl) V) CO a' as a) g� LJa ❑ I ea 0 0co w co O c O 02 7w c m O 0 Soil Map—New Hanover County,North Carolina Sidbury Farms: Phase 1 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI JO Johnston soils 23.9 19.8% Le Leon sand 1.2 1.0% Mu Murville fine sand 40.7 33.8% Se Seagate fine sand 54.5 45.3% Totals for Area of Interest 120.3 100.0% USDA Natural Resources Web Soil Survey 3/25/2020 mos Conservation Service National Cooperative Soil Survey Page 3 of 3 ATTACHMENT C- CALCULATIONS SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 1 Site Data Total DA 839,746 SF Value from CAD On-Site Drainage Area 839,746 SF Value from CAD Off-Site Drainage Area 0.00 SF Value from CAD Impervious 678,354 SF Value from CAD Buildings I 392,000 ISF Value from CAD Sidewalks I 20,963 I SF Value from CAD Streets L_125,391 I SF Value from CAD Parking 0 I SF Value from CAD Other(Amenity Center) 0 'SF Value from CAD Future [ 140,000 SF Value from CAD Offsite SF Impervious Cover 80.78% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume • Runoff Coefficient,Rv 0.777 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 81,563 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 81,593 CF Volume between permanent pool&next-highest orifice Stonnwater Pond Bottom of Pond Elevation-Main Bay 1 23.0 (FT Value selected by designer Bottom of Pond Elevation-Forebay I 23.5 I FT Sediment Storage Elevation-Main Bay 24.0 1 FT Value selected by designer Sediment Storage Elevation-Forebay 24.0 I FT Sediment Storage Volume I 33,277 CF Pond volume below sediment storage elev. Permanent Pool Elevation 27.50 FT Value selected by designer Temporary Pool Elevation 29.00 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width F. 3.00 I FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 840 J FT Main Ray only Average Depth Provided 3.75 FT See formula below Required SA/DA Ratio for 90%TSS Removal I 4.91% % Value from 90%TSS removal chart Required Permanent Pool Surface Area 41,251 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 41,744 SF Value from stage-storage calculations Forebav Total pond volume between permanent pool Permanent Pool Volume 126,409 1CF elevation&sediment storage elevation Total Required Forebay Volume 25,282 CF 20%of permanent pool volume Provided volume between permanent pool elev.& Provided Volume-Forebay 23,425 CF sediment storage elevation Total Forebay%of Permanent Pool 18.53% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 1 3.50 IN Value selected by designer Weir Elevation of Outlet Structure I 29.00 I FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.35 FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.45 FT 1/3 of total elevation head Cd,Coefficient of Discharge I- 0.60 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.22 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 4.37 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 Egrtl.r3 Avenge dap*when the shell iv u+Eairyad and Average Depth formula: M""=""°'"""°",a"`°r""'"""-°'"—"`.a""'°°"- — 1 a.• vrr-•shed abogoixolsaeif whet Oaa moierid.pi,nbe Vr, %gMwNcndpamr.+s,tidMtame, , Won emits shell aogise6-ace tates v... 0.6, 11...~ePate=...aw' .w.re... I Whom 0,-...* -- Dotal tk.:::,..M.14.1 alto OWes i mum.almgr. GM 001) P ,.....r • Pa adecalsemonalpoolMho Man ddK 41.10.11) WM...awavr• Widdatom Immo oat ma,adyddalM shot isiare red alPNia7he.owl OM SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASEI -PONDI Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 27.50 50,977 0 0 ••Permanent Pool 28.00 53,891 26,217 26,217 ••Top of Shelf 28.50 55,376 27,317 53,534 29.00 56,862 28,060 81,593 *Temporary Pool 30.00 59,889 58,376 139,969 31.00 62,973 61,431 201,400 32.09 66,114 64,544 265,943 •Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 •Pond Bottom 24.00 31,902 30,780 30,780 •Sed.Storage 25.00 34,206 33,054 63,834 26.00 36,570 35,388 99,222 27.00 38,994 37,782 137,004 ••Bottom of Shelf 27.50 41,744 20,185 157,189 •Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.50 4,577 0 0 •Bottom of Forebay 24.00 4,993 2,393 2,393 ••Sed.Storage 25.00 5,880 5,437 7,829 26.00 6,839 6,360 14,189 27.00 7,868 7,354 21,542 27.50 9,233 4,275 25,817 •Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 23.00 29,658 0 0 •Pond Bottom 24.00 36,895 33,277 33,277 •Sed.Storage 25.00 40,086 38,491 71,767 26.00 43,409 41,748 113,515 27.00 46,862 45,136 158,650 •Bottom of Shelf 27.50 50,977 24,460 183,110 Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 2 Site Data Total DA 405,130 SF Value from CAD On-Site Drainage Area 405,130 SF Value from CAD Off-Site Drainage Area 0.00 SF Value from CAD Impervious 325,115 SF Value from CAD Buildings 212,000 (SF Value from CAD Sidewalks 10,248 SF Value from CAD Streets 57,367 SF Value from CAD Parking I 0 I SF Value from CAD Other(Amenity Center) I 0 I SF Value from CAD Future 45,500 SF Value from CAD Offsite I 0 (SF Impervious Cover 80.25% Impervious Cover=(Impervious Drainage Area)/(Total Drainage Area)*100% Treatment Volume Runoff Coefficient,Rv 0.772 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 39,108 CF 1.5 inch*Rv*lftt/12 in*(Total DA) Provided Treatment Volume 40,449 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay 26.0 (FT Value selected by designer Bottom of Pond Elevation-Forebay 28.0 I FT Sediment Storage Elevation-Main Bay 27.0 _ FT Value selected by designer Sediment Storage Elevation-Forebay 29.0 FT Sediment Storage Volume 10,754 CF Pond volume below sediment storage elev. Permanent Pool Elevation I 32.50 I FT Value selected by designer Temporary Pool Elevation 33.75 I FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width I 3.00 FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 677 I FT Main Bay only Average Depth Provided I 3.96 I FT See formula below Required SA/DA Ratio for 90%TSS Removal 4.59% I% Value from 90%TSS removal chart Required Permanent Pool Surface Area 18,594 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 22,647 4SF Value from stage-storage calculations Forebav Total pond volume between permanent pool Permanent Pool Volume 90,184 CF elevation&sediment storage elevation Total Required Forebay Volume 18,037 CF 20%of permanent puul volume Provided volume between permanent pool elev.& Provided Volume-Forebay 17,327 CF sediment storage elevation Total Forebay%of Permanent Pool 19.21% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 2.50 I IN Value selected by designer Weir Elevation of Outlet Structure 33.75 I FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.15 I FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.38 FT 1/3 of total elevation head Cd,Coefficient of Discharge 0.60 71 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.10 CFS Q=Cd*Weir Area*sgrt(2*32.2*Avg Head) Drawdown Time 4.45 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 Eq.Mgrt *wow depth whoa the Molt Is sat"rgw/rd --- Um WWI "°r"E" i°""n tin wimps i psap""'"CYfi0O/Average Depth formula: — VPP-.Vshetf De.i Abottmnpfshail roam 45 kw.redtpwnold Tolivaimilopormionegivocitfriki ;etameow Medial aer:a ry-taeiabe P.S. Ain Of Wet=MOM berm.11ht ON Met, V,, M"aWI , _'Pa,l. 4rr.e�Wldet e:ymrrrx •veers p,e.,ew = ovonofvwu wa-Ndeop Weartouter at emaetedetre'tsvwdoomtiep aeo wt .. • tNPIrns►arammmerool eellxndte Vndhomelo r•w' Widilthrt VAMO&Anredv met atMe aletaseamuroA atonaurrmpad ifeeti SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE I-POND 2 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 32.50 29,710 0 0 Permanent Pool 33.00 32,283 15,498 15,498 *Top of Shelf 33.75 34,251 24,950 40,449 4-Temporary Pool 34.00 34,914 8,646 49,094 35.00 37,601 36,258 85,352 36.00 40,344 38,973 124,324 +Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.00 9,983 0 0 -Pond Bottom 27.00 11,524 10,754 10,754 -Sed.Storage 28.00 13,182 12,353 23,107 29.00 14,916 14,049 37,156 30.00 16,713 15,815 52,970 31.00 18,575 17,644 70,614 32.00 20,499 19,537 90,151 4-Bottom of Shelf 32.50 22,647 10;787 100,938 +Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 28.00 2,822 0 0 i-Bottom of Forebay 29.00 3,509 3,166 3,166 -Sed.Storage 30.00 4,261 3,885 7,051 31.00 5,077 4,669 11,720 32.00 5,958 5,518 17,237 32.50 7,062 3,255 20,492 +Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forabay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.00 9,983 0 0 -Pond Bottom 27.00 11,524 10,754 10,754 +Sod.Storage 28.00 16,004 13,764 24,518 29.00 18,425 17,215 41,732 30.00 20,974 19,700 61,432 31.00 23,652 22,313 83,745 32.00 26,457 25,055 108,799 ••Bottom of Shelf 32.50 29,709 14,042 122,841 ••Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 3 Site Data Total DA 641,248 SF Value from CAD On-Site Drainage Area 641,248 I SF Value from CAD Off-Site Drainage Area 0.00 I SF Value from CAD Impervious 555,912 SF Value from CAD Buildings 292,000 15F Value from CAD Sidewalks 16,205 ISF Value from CAD Streets 92,707 I SF Value from CAD Parking 0 I SF Value from CAD Other 0 I SF Value from CAD Future 155,000 SF Value from CAD 0ffsite L 0 I SF Impervious Cover 86.69% Impervious Cover=(Impervious Drainage Areal/(Total Drainaae Areal*100% Treatment Volume Runoff Coefficient,Rv 0.830 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 66,548 CF 1.5 inch*Rv*lftt/11 in*(Total DA) Provided Treatment Volume 68,585 ICF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay 28.0 FT Value selected by designer Bottom of Pond Elevation-Forebay 30.0 FT Sediment Storage Elevation-Main Bay 29.0 FT Value selected by designer Sediment Storage Elevation-Forebay 31.0 FT Sediment Storage Volume I 17,558 CF Pond volume below sediment storage elev. Permanent Pool Elevation 34.50 FT Value selected by designer Temporary Pool Elevation 36.15 FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 739 FT Main Bay only Average Depth Provided 5.14 FT See formula below Required SA/DA Ratio for 90%TSS Removal 3.85% '% Value from 90%TSS removal chart Required Permanent Pool Surface Area 24,702 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 28,985 SF Value from stage-storage calculations Forebay Permanent Pool Volume 121,150 CF Total pond volume between permanent pool elevation&sediment storage elevation Total Required Forebay Volume 24,230 CF 20%of permanent pool volume Provided Volume Forebay 23,632 CF Provided volume between permanent pool elev.& sediment storage elevation Total Forebay%of Permanent Pool 19.51% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 1 3.00 1 IN Value selected by designer Weir Elevation of Outlet Structure I 36.15 1 FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert 1.53 IFT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.51 FT 1/3 of total elevation head Cd,Coefficient of Discharge I 0.60 I Value selected by designer Q Flowrate Through Low-flow Orifice 0.17 CFS Q=Cd*WeirArea*sgrt(1*32.2*Avg Head) Drawdown Time 4.56 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 ayv...0 A..e.9.limpet Wu.th.a1Wo W,m yd an Average Depth formula: --"""'"qOiM"�`""`°Item"'"mow*M°1b`'�'"'"° vPP-vshell Abottnatu(sks11 tell o' h .oM1M tatm:ratiana1ONO) V • vain~Oa atWfpiy Pee)-ale W m Ar...r• Almalpataemtattla0rO0atd11VIPMIaer) V.... OS'tMpY6.nu...'IwYWiF'.r,.`VAIlko.ynovo..m :Parr a.,,..*. - eapet•Niler'tile downs t*ga. n.avnd etre aantppxOMa ,..m • termsr.earremrArtamo aura t`rananaa '�:>y14«,wm•...• e�mtfram dm Oft trxe won dale shTWtaWatada0erraanev)mai t -_ SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1-POND 3 Stage/Storage Above Permanent Pool (Main+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 34.50 38,324 0 0 +Permanent Pool 35.00 40,901 19,806 19,806 +Top of Shelf 36.00 43,535 42,218 62,024 36.15 43,939 6,561 68,585 +Temporary Pool 37.00 46,225 38,320 106,905 37.50 47,591 23,454 130,359 +Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 28.00 14,858 0 0 +Pond Bottom 29.00 16,633 15,746 15,746 +Sad.Storage 30.00 18,483 17,558 33,304 31.00 20,399 19,441 52,745 32.00 22,379 21,389 74,134 33.00 24,425 23,402 97,536 34.00 26,535 25,480 123,016 +Bottom of Shelf 34.50 28,985 13,880 136,896 +Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 30.00 4,167 0 0 +Bottom of Forebay 31.00 5,012 4,590 4,590 +Sed.Storage 32.00 5,924 5,468 10,058 33.00 6,904 6,414 16,472 34.00 7,951 7,428 23,899 34.50 9,339 4,323 28,222 +Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 29.00 16,633 0 0 +Pond Bottom 30.00 18,483 17,558 17,558 +Sed.Storage 31.00 25,411 21,947 39,505 32.00 28,303 26,857 66,362 33.00 31,329 29,816 96,178 34.00 34,486 32,908 129,086 +Bottom of Shelf 34.50 38,324 18,203 147,288 +Permanent Pool SIDBURY FARMS NC DENR Retention Requirements PHASE 1-POND 4 Site Data Total DA 650,096 SF Value from CAD On-Site Drainage Area 650,096 SF Value from CAD Off-Site Drainage Area f 0.00 'SF Value from CAD Impervious 334,158 SF Value from CAD Buildings 136,000 SF Value from CAD Sidewalks I 12,063 SF Value from CAD Streets I 76,695 SF Value from CAD Parking I 0 J SF Value from CAD Other I 108,900 I SF Value from CAD Future I 500 SF Value from CAD Offsite d 0 SF Impervious Cover=(impervious Drainage Impervious Cover 51.40% Areal/(Total Drainage Areal*100% Treatment Volume Runoff Coefficient,Rv 0.513 IN/IN Rv=0.05+0.009*(%Impervious) Required 1.5"Runoff Volume 41,656 CF 1.5 inch*Rv*1ftt/12 in*(Total DA) Provided Treatment Volume 42,057 CF Volume between permanent pool&next-highest orifice Stormwater Pond Bottom of Pond Elevation-Main Bay I 25.0 FT Value selected by designer Bottom of Pond Elevation-Forebay 26.5 FT Sediment Storage Elevation-Main Bay 26.0 FT Value selected by designer Sediment Storage Elevation-Forebay 27.0 FT Sediment Storage Volume I 20,871 CF Pond volume below sediment storage elev. Permanent Pool Elevation 34.50 FT Value selected by designer Temporary Pool Elevation I 36.20 I FT Elevation of the next-highest outlet Submerged Vegetated Shelf Width 3.00 FT Max Depth of Vegetated Shelf 0.50 FT Perimeter of Permanent Pool 640 FT Main Bay only Average Depth Provided I 5.21 FT See formula below Required SA/DA Ratio for 90%TSS Removal 2.30% l% Value from 90%TSS removal chart Required Permanent Pool Surface Area 14,973 SF (Req'd SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area L 17,318 SF Value from stage-storage calculations Forebay Total pond volume between permanent pool Permanent Pool Volume 79,792 CF elevation&sediment storage elevation Total Required Forebay Volume 15,958 CF 20%of permanent pool volume Provided volume between permanent pool elev.& Provided Volume-Forebay 12,077 CF sediment storage elevation Total Forebay%of Permanent Pool 15.14% Total between 15-20%-OK Drawdown Diameter of Low Flow Orifice 1 2.75 I IN Value selected by designer Weir Elevation of Outlet Structure I 36.20 I FT Elevation of the next-highest weir Total Elevation Head Above Orifice Invert I 1.59 I FT Total elevation head above center of orifice Average Elevation Head Above Orifice Invert 0.53 FT 1/3 of total elevation head Cd,Coefficient of Discharge J 0.60 Value selected by designer Q,Flowrate Through Low-flow Orifice 0.14 CFS Q=Cd*Weir Area*sgrt(2*32.1*Avg Head) Drawdown Time 3.33 DAYS 1.5"Runoff Volume/Flowrate through Wier/86400 &memo *Neve&Fr*when the duets submerged ud Average Depth formula: r— the`"•""""'p"""'°'°"°" """"`°'"'"fir"'"`""°` Dee* Abottonwfskeij I OaetheedielhObil V. Yabeeaaera atti y4MM)-tra h,>rar• MlAwntpaitlal�eiaobmaaraiartr I Y,mi• s.8-Opdyw„N. r-hrYule[ aWidel....e+arwna i �Naib D�.,,.eua R Depthstrwerstectigteide Itwitafig I meemntlMifem iipawl{A00 ?41 a • PlmialeMpetwoM1poi alembeside* j, Valthmua.Mrwo• MOtiam*adios&kWh(sky aeascaw germ aam Nei Kpereame 6"West) SIDBURY FARMS Stage-Storage Calculations for the Proposed Wet Detention Pond PHASE 1-POND 4 Stage/Storage Above Permanent Pool (Main 4,Forebay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 34.50 21,791 0 0 ' Permanent Pool 35.00 24,081 11,468 11,468 '-Top of Shelf 36.00 26,429 25,255 36,723 36.20 26,909 5,334 42,057 -Temporary Pool 37.00 28,832 22,296 64,353 37.50 30,055 14,722 79,0750-Top of Pond Stage/Storage Below Permanent Pool Main Bay Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 25.00 3,149 0 0 +-Pond Bottom 28.00 3,995 3,572 3,572 +-Sed.Storage 26.50 4,466 2,115 5,687 27.00 4,937 4,466 8,038 28.00 5,978 5,458 13,496 29.00 7,190 6,584 20,080 30.00 8,604 7,897 27,977 31.00 10,131 9,368 37,344 32.00 11,746 10,939 48,283 33.00 13,453 12,600 60,882 34.00 15,235 14,344 75,226 •-Bottom of Shelf 34.50 17,318 8,138 83,364 -Permanent Pool Forebay 1 Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 26.50 65 0 0 -Bottom of Forebay 27.00 133 50 50 +-Sed.Storage 28.00 340 237 286 29.00 639 490 776 30.00 1,028 834 1,609 31.00 1,504 1,266 2,875 32.00 2,067 1,786 4,661 33.00 2,716 2,392 7,052 34.00 3,464 3,090 10 147 34.50 4,473 1,984 12,126 -Top of Forebay Stage/Storage Below Permanent Pool Total(Main Bay+Farabay) Cumulative Contour Incremental Volume,S Contour Area(SF) Volume(CF) (CF) 25.00 3,149 0 0 -Pond Bottom 28.00 3,995 3,572 3,572 -Sed.Storage 26.50 4,531 2,132 5,704 27.00 5,070 2,400 8,104 28.00 6,318 5,694 13,798 29.00 7,829 7,074 20,871 30.00 9,632 8,731 29,602 31.00 11,635 10,634 40,235 32.00 13,813 12,724 52,959 33.00 16,169 14,991 67,950 34.00 18,699 17,434 85,384 +-Bottom of Shelf 34.50 21,791 10,123 95,507 -Permanent Pool ATTACHMENT D -HYDRAFLOW MODEL RESULTS Hydraflow Table of Contents Phase 1 Pre Post.gpw Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 4 Hydrograph No. 2, Reservoir, Routed Pond 1 5 Pond Report- Pond 1 6 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 8 Hydrograph No. 5, Reservoir, Routed Pond 2 9 Pond Report- Pond 2 10 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 12 Hydrograph No. 8, Reservoir, Routed Pond 3 13 Pond Report - Pond 3 14 Hydrograph No. 10, SCS Runoff, Pond 4 Post 16 Hydrograph No. 11, Reservoir, Routed Pond 4 17 Pond Report- Pond 4 18 Hydrograph No. 13, SCS Runoff, Offsite - Post 20 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 21 Hydrograph No. 16, Combine, Combined Post 22 2 - Year Summary Report 23 Hydrograph Reports 24 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 24 Hydrograph No. 2, Reservoir, Routed Pond 1 25 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 26 Hydrograph No. 5, Reservoir, Routed Pond 2 27 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 28 Hydrograph No. 8, Reservoir, Routed Pond 3 29 Hydrograph No. 10, SCS Runoff, Pond 4 Post 30 Hydrograph No. 11, Reservoir, Routed Pond 4 31 Hydrograph No. 13, SCS Runoff, Offsite - Post 32 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 33 Hydrograph No. 16, Combine, Combined Post 34 3 - Year Summary Report 35 Hydrograph Reports 36 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 36 Hydrograph No. 2, Reservoir, Routed Pond 1 37 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 38 Hydrograph No. 5, Reservoir, Routed Pond 2 39 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 40 Hydrograph No. 8, Reservoir, Routed Pond 3 41 Hydrograph No. 10, SCS Runoff, Pond 4 Post 42 Contents continued... Phase 1 Pre Post.gpw Hydrograph No. 11, Reservoir, Routed Pond 4 43 Hydrograph No. 13, SCS Runoff, Offsite - Post 44 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 45 Hydrograph No. 16, Combine, Combined Post 46 5 - Year Summary Report 47 Hydrograph Reports 48 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 48 Hydrograph No. 2, Reservoir, Routed Pond 1 49 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 50 Hydrograph No. 5, Reservoir, Routed Pond 2 51 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 52 Hydrograph No. 8, Reservoir, Routed Pond 3 53 Hydrograph No. 10, SCS Runoff, Pond 4 Post 54 Hydrograph No. 11, Reservoir, Routed Pond 4 55 Hydrograph No. 13, SCS Runoff, Offsite - Post 56 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 57 Hydrograph No. 16, Combine, Combined Post 58 10 - Year Summary Report 59 Hydrograph Reports 60 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 60 Hydrograph No. 2, Reservoir, Routed Pond 1 61 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 62 Hydrograph No. 5, Reservoir, Routed Pond 2 63 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 64 Hydrograph No. 8, Reservoir, Routed Pond 3 65 Hydrograph No. 10, SCS Runoff, Pond 4 Post 66 Hydrograph No. 11, Reservoir, Routed Pond 4 67 Hydrograph No. 13, SCS Runoff, Offsite - Post 68 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 69 Hydrograph No. 16, Combine, Combined Post 70 25 - Year Summary Report 71 Hydrograph Reports 72 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 72 Hydrograph No. 2, Reservoir, Routed Pond 1 73 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 74 Hydrograph No. 5, Reservoir, Routed Pond 2 75 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 76 Hydrograph No. 8, Reservoir, Routed Pond 3 77 Hydrograph No. 10, SCS Runoff, Pond 4 Post 78 Hydrograph No. 11, Reservoir, Routed Pond 4 79 Hydrograph No. 13, SCS Runoff, Offsite - Post 80 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 81 Hydrograph No. 16, Combine, Combined Post 82 50 - Year Contents continued... Phase I Pre Post.gpw Summary Report 83 Hydrograph Reports 84 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 84 Hydrograph No. 2, Reservoir, Routed Pond 1 85 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 86 Hydrograph No. 5, Reservoir, Routed Pond 2 87 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 88 Hydrograph No. 8, Reservoir, Routed Pond 3 89 Hydrograph No. 10, SCS Runoff, Pond 4 Post 90 Hydrograph No. 11, Reservoir, Routed Pond 4 91 Hydrograph No. 13, SCS Runoff, Offsite - Post 92 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 93 Hydrograph No. 16, Combine, Combined Post 94 100 - Year Summary Report 95 Hydrograph Reports 96 Hydrograph No. 1, SCS Runoff, Pond 1 - Post 96 Hydrograph No. 2, Reservoir, Routed Pond 1 97 Hydrograph No. 4, SCS Runoff, Pond 2 - Post 98 Hydrograph No. 5, Reservoir, Routed Pond 2 99 Hydrograph No. 7, SCS Runoff, Pond 3 - Post 100 Hydrograph No. 8, Reservoir, Routed Pond 3 101 Hydrograph No. 10, SCS Runoff, Pond 4 Post 102 Hydrograph No. 11, Reservoir, Routed Pond 4 103 Hydrograph No. 13, SCS Runoff, Offsite - Post 104 Hydrograph No. 15, SCS Runoff, TOTAL SITE PRE 105 Hydrograph No. 16, Combine, Combined Post 106 IDF Report 107 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 ed.:3 10 13 V 15 Legend Hysi, gLign Descriotioq 1 SCS Runoff Pond 1 -Post 2 Reservoir Routed Pond 1 4 SCS Runoff Pond 2-Post 5 Reservoir Routed Pond 2 16 ? SCS Runoff Pond 3-Post 8 Reservoir Routed Pond 3 10 SCS Runoff Pond 4 Post 11 Reservoir Routed Pond 4 13 SCS Runoff Offsite-Post 15 SCS Runoff TOTAL SITE PRE 16 Combine Combined Post Project: Phase 1 Pre Post.gpw Friday, 07/10/2020 2 Hydrograph Return Period Reycap. ra o ydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff - 19.99 30.52 0.486 49.26 67.96 84.87 100.45 117.04 Pond 1 -Post 2 Reservoir 0.339 1.672 0.024 7.293 10.15 11.59 12.84 25.48 Routed Pond 1 4 SCS Runoff - 4.642 8.560 0.012 16.10 23.88 31.13 38.01 45.52 Pond 2-Post 5 Reservoir 0.125 0.161 0.004 1.149 3.730 10.71 18.04 24.61 Routed Pond 2 7 SCS Runoff --- 7.347 13.55 0.019 25.48 37.79 49.27 60.16 72.05 Pond 3-Post 8 Reservoir 7 0.199 0.258 0.008 1.487 4.825 13.93 25.31 40.68 Routed Pond 3 10 SCS Runoff ---- 7.447 13.73 0.019 25.83 38.31 49.94 60.98 73.03 Pond 4 Post 11 Reservoir 10 0.215 0.755 0.010 4.806 18.83 34.14 52.10 69.50 Routed Pond 4 13 SCS Runoff - 8.646 23.21 0.000 60.50 104.08 146.39 187.29 232.51 Offsite Post 15 SCS Runoff - 16.45 36.28 0.000 80.13 128.89 175.97 221.35 271.18 TOTAL SITE PRE 16 Combine 2,5,8, 9.135 23.82 0.045 61.28 105.04 171.46 244.80 336.44 Combined Post 11, 13, Proj. the: Phase 1 Pre Post.gpw Friday, 07/10/2020 3 Hydrograph Summary Report Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 19.99 ^ 730 81,825 ---- -- --- Pond 1 Post 2 Reservoir 0.339 ! 1444 69,806 1 28.76 68,291 Routed Pond 1 4 SCS Runoff 4.642 2 732 23,154 -- -- --- Pond 2-Post 5 Reservoir 0.125 2 1444 22,711 4 33.08 18,214 Routed Pond 2 7 SCS Runoff 7.347 2 732 36,648 -- — -- Pond 3-Post 8 Reservoir 0.199 2 1444 36,085 7 35.21 28,763 Routed Pond 3 10 SCS Runoff 7.447 2 732 37,146 -- ---- --- Pond 4 Post 11 Reservoir 0.215 2 1442 36,983 10 35.68 28,583 Routed Pond 4 13 SCS Runoff 8.646 2 742 74,339 --- — ----- Offsite-Post 15 SCS Runoff 16.45 2 770 184,455 ---- --- ---- TOTAL SITE PRE 16 Combine 9.135 2 742 239.924 2,5,8, ---- Combined Post 11, 13, Phase 1 Pre Post.gpw 1 Year Friday, 07/10/2020 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 19.99 cfs Storm frequency = 1 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 81,825 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.70 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Hyd. No. 1 — 1 Year Q (cfs) 21.00 I 21.00 I H 1 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 — 6.00 3.00 3.00 0.00 — I I I —A i - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 0.339 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 69,806 cuft Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 28.76 ft Reservoir name = Pond 1 Max. Storage = 68,291 cuft Storage Indication method used. Routed Pond 1 Q (cfs) Hyd. No. 2- 1 Year Q (cfs) 21.00 I I 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 - — — 6.00 3.00 3.00 .. I A 0.00 - I 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 2 Hyd No. 1 11 1 1 1 1 1 0 Total storage used =68,291 cuft Pond Report 6 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Pond No. 1 - Pond 1 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=27.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 27.50 50,977 0 0 0.50 28.00 53,891 26,217 26,217 1.50 25.00 56,862 55,377 81,594 2.50 30.00 59,889 58,376 139,969 3.50 31.00 62,973 61,431 201,400 4.50 32.00 64,536 63,755 265,155 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 3.50 Inactive 0.00 Crest Len(ft) = 20.00 20.00 0.00 0.00 Span(in) = 18.00 3.50 48.00 0.00 Crest El.(ft) = 29.00 31.00 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El.(ft) = 27.00 27.50 17.00 0.00 Weir Type = 1 Broad - -- Length(ft) = 120.00 0.01 0.01 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.01 0.01 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 27.50 0.00 0.00 0.00 - 0.00 0.00 - -- - --- 0.000 0.05 2,622 27.55 1.27 is 0.01 is 0.00 - 0.00 0.00 --- -- --- 0.006 0.10 5,243 27.60 1.27 is 0.02 is 0.00 - 0.00 0.00 -- --- --- 0.022 0.15 7,865 27.65 1.27 is 0.05 is 0.00 -- 0.00 0.00 - - - 0.046 0.20 10,487 27.70 1.27 is 0.08 is 0.00 --- 0.00 0.00 --- - - 0.075 0.25 13,109 27.75 1.27 is 0.10 is 0.00 --- 0.00 0.00 - - --- --- 0.104 0.30 15,730 27.80 1.27 is 0.13 is 0.00 -- 0.00 0.00 --- -- --- 0.126 0.35 18,352 27.85 1.27 is 0.15 is 0.00 --- 0.00 0.00 - - -• 0.145 0.40 20,974 27.90 1.27 is 0.16 is 0.00 -- 0.00 0.00 - - - 0.162 0.45 23,595 27.95 1.27 is 0.18 is 0.00 -- 0.00 0.00 -- - - 0.177 0.50 26,217 28.00 1.27 is 0.19 is 0.00 -- 0.00 0.00 - - --- --- 0.191 0.60 31,755 28.10 1.27 is 0.22 is 0.00 -- 0.00 0.00 --- - --- 0.217 0.70 37,292 28.20 1.27 is 0.24 is 0.00 --- 0.00 0.00 --- --- -- --- 0.239 0.80 42,830 28.30 1.27 is 0.26 is 0.00 --- 0.00 0.00 -- -- -, --- 0.260 0.90 48,368 28.40 1.27 is 0.28 is 0.00 -- 0.00 0.00 -- -- -. 0.279 1.00 53,905 28.50 1.27 is 0.30 is 0.00 -- 0.00 0.00 - -- --- --- 0.297 1.10 59,443 28.60 1.27 is 0.31 is 0.00 -- 0.00 0.00 --- - -- --- 0.314 1.20 64,981 28.70 1.27 is 0.33 is 0.00 - 0.00 0.00 -- --- -- -- 0.330 1.30 70,518 28.80 1.27 is 0.35 is 0.00 - 0.00 0.00 - -- --- --- 0.346 1.40 76,056 28.90 1.27 is 0.36 is 0.00 -- 0.00 0.00 -- -- -- - 0.360 1.50 81,594 29.00 1.27 is 0.37 is 0.00 - 0.00 0.00 -- -- --- --- 0.374 1.60 87,431 29.10 2.51 is 0.38 is 0.00 - 2.11 0.00 - --- -- --- 2.483 1.70 93,269 29.20 6.21 oc 0.25 is 0.00 -- 5.96 0.00 -- --- -- - 6.206 1.80 99,106 29.30 8.41 oc 0.11 is 0.00 - 8.31 s 0.00 - -- - --- 8.413 1.90 104,944 29.40 8.91 oc 0.07 is 0.00 - 8.83 s 0.00 -- - - -- 8.904 2.00 110,781 29.50 9.28 oc 0.06 is 0.00 --- 9.22 s 0.00 -- -- --- - 9.271 2.10 116,619 29.60 9.60 oc 0.04 is 0.00 -- 9.55 s 0.00 -- --- - --- 9.591 2.20 122,456 29.70 9.90 oc 0.04 is 0.00 --- 9.84 s 0.00 --- --- -- -- 9.874 2.30 128,294 29.80 10.18 oc 0.03 is 0.00 -- 10.13 s 0.00 -- - -- --- 10.17 2.40 134,131 29.90 10.45 oc 0.03 is 0.00 - 10.40 s 0.00 -- - - -- 10.43 2.50 139,969 30.00 10.71 oc 0.02 is 0.00 - 10.64 s 0.00 --- - - - 10.66 2.60 146,112 30.10 10.97 oc 0.02 is 0.00 -- 10.89 s 0.00 --- -- - --- 10.92 2.70 152,255 30.20 11.22 oc 0.02 is 0.00 - 11.15 s 0.00 --- -- - - 11.17 2.80 158,398 30.30 11.46 oc 0.02 is 0.00 - 11.41 s 0.00 -- - - -- 11.43 2.90 164,541 30.40 11.70 oc 0.02 is 0.00 - 11.61 s 0.00 -- - - - 11.62 3.00 170,685 30.50 11.93 oc 0.02 is 0.00 --- 11.78 S 0.00 -- - - - 11.80 3.10 176,828 30.60 12.16 oc 0.01 is 0.00 - 12.00 s 0.00 -- -- - - 12.01 Continues on next page... 7 Pond 1 Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.20 182,971 30.70 12.38 oc 0.01 is 0.00 - 12.33 s 0.00 -- -- -- - 12.34 3.30 189,114 30.80 12.60 oc 0.01 is 0.00 -- 12.55 s 0.00 -- -- -- -- 12.56 3.40 195257 30.90 12.82 oc 0.01 is 0.00 - 12.65 s 0.00 -- - - - 12.67 3.50 201,400 31.00 13.03 oc 0.01 is 0.00 - 13.02 s 0.00 --- - - - 13.03 3.60 207,776 31.10 13.24 oc 0.01 is 0.00 12.89 s 1.90 --- - --- - 14.79 3.70 214,151 31.20 13.45 oc 0.01 is 0.00 - 13.08 s 5.37 --- - --- -- 18.46 3.80 220,526 31.30 13.65 oc 0.01 is 0.00 --- 13.19 s 9.86 -- -- --- -- 23.05 3.90 226,902 31.40 13.85 oc 0.01 is 0.00 -- 13.83 a 15.18 -- 29.02 4.00 233,277 31.50 14.05 oc 0.01 is 0.00 -- 13.82 s 21.21 --- -- - --- 35.04 4.10 239,653 31.60 14.24 oc 0.01 is 0.00 --- 13.71 s 27.89 -- -- --- 41.60 4.20 246,028 31.70 14.43 oc 0.01 is 0.00 14.29 s 35.14 --- --- -- 49.44 4.30 252,404 31.80 14.62 oc 0.01 is 0.00 --- 1,4.00 s 42.93 - -- 56.94 4.40 258,779 31.90 14.81 oc 0.01 is 0.00 -- 14.55 s 51.23 - --- -- --- 65.79 4.50 265,155 32.00 14.99 oc 0.01 is 0.00 -- 14.07 s 60.00 -- --- -- 74.08 ...End 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 4.642 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 23,154 cuft Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.70 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Hyd. No. 4- 1 Year Q (cfs) 5.00 — 5.00 4.00 4.00 1 3.00 3.00 2.00 2.00 1.00 1.00 0.00 I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time(min) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 0.125 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 22,711 cuft Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 33.08 ft Reservoir name = Pond 2 Max. Storage = 18,214.cuft Storage Indication method used. Routed Pond 2 Q (cfs) Q (cfs) Hyd. No. 5-- 1 Year 5.00 I T 5.00 4.00 1 4.00 3.00 3.00 2.00 2.00 1.00 1.00 1 IL. I1 0.00 -� �.i . I t I , I _ _ 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 5 Hyd No. 4 I111■11I Total storage used = 18,214 cuft Pond Report 10 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Pond No. 2- Pond 2 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=32.50 ft Stage I Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 32.50 29,710 0 0 0.50 33.00 32,283 15,498 15,498 1.50 34.00 34,914 33,599 49,097 2.50 35.00 37,601 36,258 85,354 3.50 36.00 40,344 38,973 124,327 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 2.50 Inactive Inactive Crest Len(ft) = 20.00 20.00 0.00 0.00 Span(in) = 24.00 2.50 0.00 0.00 Crest El.(ft) = 33.75 35.20 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El.(ft) = 30.00 30.50 0.00 0.00 Weir Type = 1 Broad -- - Length(ft) = 85.00 0.01 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.01 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. - 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000(by Wet area) Multi-Stage n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Civ A Clv 13 Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 32.50 0.00 0.00 --- - 0.00 0.00 --- --- --- - 0.000 0.05 1,550 32.55 15.19 oc 0.04 is - 0.00 0.00 - - -- --- 0.037 0.10 3,100 32.60 15.19 oc 0.05 ic -- 0.00 0.00 --- --- - --- 0.052 0.15 4,649 32.65 15.19 oc 0.06 ic - 0.00 0.00 - --- --- 0.064 0.20 6,199 32.70 15.19 oc 0.07 ic --- - 0.00 0.00 - -- -- 0.073 0.25 7,749 32.75 15.19 oc 0.08 ic -- 0.00 0.00 --- --- - 0.082 0.30 9,299 32.80 15.19 oc 0.09 ic -- 0.00 0.00 -- - --- 0.090 0.35 10,849 32.85 15.19 oc 0.10 ic -- 0.00 0.00 --- --- -- 0.097 0.40 12,399 32.90 15.19 oc 0.10 ic --- -- 0.00 0.00 - --- --- --- 0.104 0.45 13,948 32.95 15.19 oc 0.11 ic --- -- 0.00 0.00 - _-- -- -- 0.110 0.50 15,498 33.00 15.19 oc 0.12 is -- - 0.00 0.00 --- --- - --- 0.116 0.60 18,858 33.10 15.19 oc 0.13 ic -- - 0.00 0.00 - - - --- 0.127 0.70 22,218 33.20 15.19 oc 0.14 is -- - 0.00 0.00 --- -- - --- 0.137 0.80 25,578 33.30 15.19 oc 0.15 is -- - 0.00 0.00 - -- --- 0.147 0.90 28,938 33.40 15.19 oc 0.16 is -- - 0.00 0.00 - --- - -- 0.156 1.00 32,298 33.50 15.19 oc 0.16 is -- - 0.00 0.00 --- --- - --- 0.164 1.10 35,657 33.60 15.19 oc 0.17 is -- - 0.00 0.00 --- - -- 0.172 1.20 39,017 33.70 15.19 oc 0.18 is - -- 0.00 0.00 --- -- --- -- 0.180 1.30 42,377 33.80 15.19 oc 0.19 is -- - 0.74 0.00 -- --- - -- 0.932 1.40 45,737 33.90 15.19 oc 0.19 is - 3.87 0.00 -- -- -- -- 4.063 1.50 49,097 34.00 15.19 oc 0.20 is - -- 8.32 0.00 --- -- -- -- 8.526 1.60 52,723 34.10 15.19 oc 0.21 is - --- 13.79 0.00 - - -- --- 14.00 1.70 56,348 34.20 20.27 oc 0.16 is - -- 20.10 0.00 -- - -- -- 20.27 1.80 59,974 34.30 24.43 oc 0.09 is -- -- 24.33 S 0.00 - -- - -- 24.43 1.90 63,600 34.40 25.54 oc 0.08 is - -- 25.47 s 0.00 - - -- -- 25.54 2.00 67,226 34.50 26.34 oc 0.06 ic --- - 26.27 s 0.00 --- - --- --- 26.33 2.10 70,851 34.60 26.99 oc 0.05 ic --- -- 26.93 s 0.00 - - --- -- 26.98 2.20 74,477 34.70 27.56 oc 0.05 is - - 27.51 s 0.00 - - -- -- 27.55 2.30 78,103 34.80 28.09 oc 0.04 is -- - 28.03 s 0.00 --- -- -- --- 28.07 2.40 81,729 34.90 28.58 oc 0.04 ic - -- 28.54 s 0.00 -- - -- - 28.58 2.50 85,354 35.00 29.05 oc 0.03 ic -- - 29.02 s 0.00 - -- -- --- 29.05 2.60VJ 5^,LJL JJ 252 3C. ---10 29.51 oc 0.03 ic - 29.46 s 0.00 - -- --- --- 29.49 2.70 93,149 35.20 29.95 oc 0.03 is - - 29.89 s 0.00 -- --- --- -- 29.92 2.80 97,046 35.30 30.38 oc 0.03 is --- - 30.34 s 1.90 -- --- -- -- 32.26 2.90 100,943 35.40 30.80 oc 0.02 is - - 30.76 s 5.37 --- - -- - 36.15 3.00 104,841 35.50 31.22 oc 0.02 ic - - 31.17 s 9.86 --- - -- -- 41.05 3.10 108,738 35.60 31.62 oc 0.02 is - - 31.59 s 15.18 -- - - --- 46.78 3.20 112,635 35.70 32.02 oc 0.02 is - - 31.93 s 21.21 --- -- -- -- 53.16 Continues on next page... 11 Pond 2 Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.30 116,532 35.80 32.41 oc 0.02 is — -- 32.36 s 27.88 -- — — — 60.26 3.40 120,430 35.90 32.80 oc 0.02 is — — 32.75 s 35.14 -- — -- — 67.91 3.5o 124,327 36.00 33.18 oc 0.02 is — — 33.16 s 42.93 --- — — -- 76.11 ...End 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10 1 2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 7.347 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 36,648 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.70 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Q (cfs) Hyd. No. 7— 1 Year 8.00 I I I f 8.00 6.00 4.00 4.00 2.00 — 2.00 0.00 1 —1 I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type - Reservoir Peak discharge = 0.199 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 2 min Hyd. volume = 36,085 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 35.21 ft Reservoir name = Pond 3 Max. Storage = 28,763 cuft Storage Indication method used. Routed Pond 3 Q(cfs) Hyd. No. 8-- 1 Year Q (cfs) 8.00 - 8.00 6.00 - - 6.00 4.00 4.00 2.00 -- I 0.00 - I i ! I 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 8 Hyd No. 7 II I I I I 1 0 Total storage used =28,763 cuft Pond Report 14 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Pond No.3 - Pond 3 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=34.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cult) 0.00 34.50 38,324 0 0 0.50 35.00 40,901 19,806 19,806 1.50 36.00 43,535 42,218 62,024 2.50 37.00 46,225 44,880 106,904 3.00 37.50 47,591 23,454 130,358 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 42.00 3.00 Inactive Inactive Crest Len(ft) = 20.00 75.00 0.00 0.00 Span(in) = 42.00 3.00 0.00 0.00 Crest El.(ft) = 36.15 36.80 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El.(ft) = 30.00 30.50 0.00 0.00 Weir Type = 1 Broad -- Length(ft) = 465.00 0.01 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.01 0.00 n/a N-Value .013 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage n/a Yes No No TW Elev.(ft) 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence Isl. Stage I Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 34.50 0.00 0.00 - 0.00 0.00 0.000 0.05 1,981 34.55 68.51 oc 0.05 ic 0.00 0.00 --- 0.053 0.10 3,961 34.60 68.51 oc 0.07 is 0.00 0.00 --- --- --- 0.075 0.15 5,942 34.65 68.51 oc 0.09 is --- 0.00 0.00 --- 0.092 0.20 7,923 34.70 68.51 oc 0.11 ic 0.00 0.00 0.106 0.25 9,903 34.75 68.51 oc 0.12 is 0.00 0.00 --- -- 0.118 0.30 11,884 34.80 68.51 oc 0.13 is 0.00 0.00 -- --• 0.129 0.35 13,864 34.85 68.51 oc 0.14 ic -- 0.00 0.00 -- -- -- 0.140 0.40 15,845 34.90 68.51 oc 0.15 is --- 0.00 0.00 --- - --- 0.149 0.45 17,826 34.95 68.51 oc 0.16 is -- 0.00 0.00 --- - 0.159 0.50 19,806 35.00 68.51 oc 0.17 is --- 0.00 0.00 --- -- --- 0.167 0.60 24,028 35.10 68.51 oc 0.18 is --- 0.00 0.00 -- -- --- 0.183 0.70 28,250 35.20 68.51 oc 0.20 ic - 0.00 0.00 --- -- 0.198 0.80 32,472 35.30 68.51 oc 0.21 is 0.00 0.00 -- -- -- 0.211 0.90 36,693 35.40 68.51 oc 0.22 is - --- 0.00 0.00 --- - - --- 0.224 1.00 40,915 35.50 68.51 oc 0.24 is -- -- 0.00 0.00 -- -- -- -- 0.236 1.10 45,137 35.60 68.51 oc 0.25 is --- -- 0.00 0.00 - --- --- 0.248 1.20 49,359 35.70 68.51 oc 0.26 ic -- -- 0.00 0.00 - --- -- --- 0.259 1.30 53,581 35.80 68.51 oc 0.27 is -- --- 0.00 0.00 --- --- - - 0.269 1.40 57,802 35.90 68.51 oc 0.28 ic 0.00 0.00 - --- --- 0.280 1.50 62,024 36.00 68.51 oc 0.29 ic --- - 0.00 0.00 - --- -- -- 0.289 1.60 66,512 36.10 68.51 oc 0.30 is --- - 0.00 0.00 - --- --- -- 0.299 1.70 71,000 36.20 68.51 oc 0.31 ic -- - 0.74 0.00 - --- - -- 1.053 1.80 75,488 36.30 68.51 oc 0.32 ic -- --- 3.87 0.00 --- -- - 4.186 1.90 79,976 36.40 68.51 oc 0.33 is --- 8.32 0.00 -- --- -- -- 8.650 2.00 84,464 36.50 68.51 oc 0.33 is -- -- 13.79 0.00 -- -- -- - 14.12 2.10 88,952 36.60 68.51 oc 0.34 is --- - 20.10 0.00 - --- --- - 20.45 2.20 93,440 36.70 68.51 oc 0.35 is -- - 27.16 0.00 - - -- --- 27.52 2.30 97,928 36.80 68.51 nc 0.36 is - --- 34.90 0.00 --- - -- - 35.26 2.40 102,416 36.90 68.51 oc 0.37 is - 43.26 7.11 -- --- --- --- 50.74 2.50 106,904 37.00 68.51 oc 0.37 is - 52.19 20.12 -- - - - 72.69 2.55 109,250 37.05 68.51 OC 0.38 is - - 56.86 28.13 --- --- - 85.3f 2.60 111,595 37.10 68.51 oc 0.38 is - - 61.67 36.97 - - - -- 99.02 2.65 113,940 37.15 68.51 oc 0.38 is - --- 66.60 46.59 --- - -- - 113.57 2.70 116,286 37.20 72.02 oc 0.36 is 71.66 56.92 -- - 128.94 2.75 118,631 37.25 77.16 oc 0.32 is --- - 76.84 67.92 -- - -- - 145.08 2.80 120,977 37.30 82.40 oc 0.27 is --- -- 82.13 79.55 - --- -• - 161.95 2.85 123,322 37.35 85.46 oc 0.24 is - -- 85.22 s 91.77 --- --- -- - 177.23 Continues on noxt page... 15 Pond 3 Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.90 125,667 37.40 86.94 oc 0.22 is — -- 86.72 s 104.57 — -- — — 191.51 2.95 128,013 37.45 88.14 oc 0.21 is — -- 87.93 s 117.91 — -- — -- 206.05 3.00 130,358 37.50 89.17 oc 0.2o is — — 88.98 s 131.77 — — -- 220.95 ...End 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type = SCS Runoff Peak discharge = 7.447 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 37,146 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.70 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Q (cfs) Hyd. No. 10— 1 Year 8.00 I I I 8.00 I 6.00 6.00 4.00 4.00 2.00 2.00 i 1 1 . I 0.00 - I I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time(min) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 0.215 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 36,983 cult Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 35.68 ft Reservoir name = Pond 4 Max. Storage = 28,583 cult Storage Indication method used. Q (ems) Routed Pond 4 Hyd. No. 11 -- 1 Year Q (cfs) 8.00 - i 8.00 6.00 goo 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 11 Hyd No. 10 II 1 1 1 I I 1 Total storage used =28,583 cuft Pond Report 18 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Pond No.4- Pond 4 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=34.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 34.50 21,791 0 0 0.50 35.00 24,081 11,468 11,468 1.50 36.00 26,429 25,255 36,723 1.70 36.20 26,909 5,334 42,057 2.50 37.00 28,832 22,296 64,353 3.00 37.50 30,055 14,722 79,075 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 54.00 2.75 Inactive Inactive Crest Len(ft) = 24.00 100.00 0.00 0.00 Span(in) = 54.00 2.75 0.00 0.00 Crest El.(ft) = 36.20 36.80 0.00 0.00 No.Barrels 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) 31.00 31.50 0.00 0.00 Weir Type = 1 Broad - - Length(ft) _ 57.00 0.01 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 0.01 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 34.50 0.00 0.00 -- 0.00 0.00 -- - -- --- 0.000 0.05 1,147 34.55 43.99 oc 0.04 ic - --- 0.00 0.00 - -- -- 0.044 0.10 2,294 34.60 43.99 oc 0.06 is - -- 0.00 0.00 - -- - --- 0.063 0.15 3,440 34.65 43.99 oc 0.08 is --- -- 0.00 0.00 --- -- -- -- 0.077 0.20 4,587 34.70 43.99 oc 0.09 ic - - 0.00 0.00 --- -- --- 0.089 0.25 5,734 34.75 43.99 oc 0.10 is - -- 0.00 0.00 --- --- -- -- 0.099 0.30 6,881 34.80 43.99 oc 0.11 is -- --- 0.00 0.00 -- -- --- -- 0.109 0.35 8.02R 34.85 43.99 oc 0.12 is - -- 0.00 0.00 - --- --- 0.117 0.40 9,174 34.90 43.99 oc 0.13 is --- - 0.00 0.00 --- -- - -- 0.126 0.45 10,321 34.95 43.99 oc 0.13 ic -- 0.00 0.00 -- -- --- 0.133 0.50 11,468 35.00 43.99 oc 0.14 is - - 0.00 0.00 --- --- - 0.140 0.60 13,994 35.10 43.99 oc 0.15 is --- 0.00 0.00 - -- --- -- 0.154 0.70 16,519 35.20 43.99 oc 0.17 is --- - 0.00 0.00 -- -- - --- 0.166 0.80 19,045 35.30 43.99 oc 0.18 ic --- - 0.00 0.00 - - -- 0.178 0.90 21,570 35.40 43.99 oc 0.19 is --- 0.00 0.00 -- --- -- 0.188 1.00 24,096 35.50 43.99 oc 0.20 ic - - 0.00 0.00 --- -- 0.199 1.10 26,621 35.60 43.99 oc 0.21 is --- --- 0.00 0.00 -- --- - -- 0.208 1.20 29,147 35.70 43.99 oc 0.22 is --- -- 0.00 0.00 --- -- -- -- 0.218 1.30 31,672 35.80 43.99 oc 0.23 is --- -- 0.00 0.00 --- --- -- -- 0.226 1.40 34,198 35.90 43.99 oc 0.23 is --- --- 0.00 0.00 - -- -- - 0.235 1.50 36,723 36.00 43.99 oc 0.24 is -- - 0.00 0.00 --- - -- -- 0.243 1.52 37,256 36.02 43.99 oc 0.24 is -- --- 0.00 0.00 -- --- - -- 0.245 1.54 37,790 36.04 43.99 oc 0.25 is - 0.00 0.00 --- -- -- --- 0.246 1.56 38,323 36.06 43.99 oc 0.25 is - - 0.00 0.00 --- -- - --- 0.248 1.58 38,857 36.08 43.99 oc 0.25 is - --- 0.00 0.00 -- - --- --- 0.250 1.60 39,390 36.10 43.99 oc 0.25 ic - - 0.00 0.00 --- - - -- 0.251 1.62 39,923 36.12 43.99 oc 0.25 is -- -- 0.00 0.00 --- --- -- --- 0.253 1.64 40,457 36.14 43.99 oc 0.25 is - -- 0.00 0.00 -- - -- .•-.- 0.254 1.66 40,990 36.16 43.99 oc 0.26 is - -- 0.00 0.00 --- - -- -- 0.256 1.68 41,523 36.18 43.99 oc 0.26 ic --- -- 0.00 0.00 - --- -- 0.257 1.70 42,057 36.20 43.99 oc 0.26 ic -- --- 0.00 0.00 --- --- - --- 0.259 1.78 44,286 36.28 43.99 oc 0.26 is --- --- 1.81 0.00 -- - -- --- 2.073 1.86 46,516 36.36 43.99 oc 0.27 is - 5.11 0.00 -- -- - -- 5.386 1.94 48,746 36.44 43.99 oc 0.28 is --- --- 9.40 0.00 --- - -- -- 9.673 2.02 50,975 36.52 43.99 oc 0.28 is -- --- 14.47 0.00 - --- - -- 14.75 2.10 53,205 36.60 43.99 oc 0.29 is - -- 20.22 0.00 --- -- - - 20.51 2.18 55,435 36.68 43.99 oc 0.29 is --- --- 26.58 0.00 - --- - - 26.87 Continues on next page... 19 Pond 4 Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.26 57,664 36.76 43.99 oc 0.30 ic - - 33.49 0.00 -- - - --- 33.79 2.34 59,894 36.84 43.99 oc 0.30 ic -- -- 40.92 2.08 -- - - -- 43.30 2.42 62,124 36.92 49.11 oc 0.28 is - - 48.82 10.81 -- -- -- -- 59.91 2.50 64,353 37.00 57.42 oc 0.24 is -- 57.19 23.26 - -- - 80.68 2.55 65,825 37.05 62.87 oc 0.24 is - - 62.63 32.50 -- -- -- -- 95.37 2.60 67,298 37.10 68.47 oc 0.23 is - - 68.24 42.72 - -- --- -- 111.19 2.65 68,770 37.15 74.23 oc 0.23 ic - --- 74.00 53.84 - --- -- -- 128.07 2.70 70,242 37.20 80.15 oc 0.23 is - --- 79.92 65.78 --- --- -- -- 145.92 2.75 71,714 37.25 86.21 cc 0.22 is - -- 85.99 78.49 - --- - 164.70 2.80 73,186 37.30 92.42 oc 0.22 is - -- 92.20 91.92 --- --- -- -- 184.34 2.85 74,658 37.35 98.43 oc 0.21 is - --- 98.22 s 106.05 - --- --- - 204.48 2.90 76,131 37.40 103.35 oc 0.20 is -- --- 103.14 s 120.83 -- - 224.18 2.95 77,603 37.45 107.80 oc 0.20 is -- --- 107.59 s 136.25 --- - - 244.04 3.00 79,075 37.50 111.92 oc 0.19 is -- 111.72 s 152.27 -- -- --- 264.19 ...End 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 8.646 cfs Storm frequency = 1 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 74,339 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.70 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Hyd. No. 13—I1 Year Q (cfs) 10.00 I — 10.00 I I i 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 1 . .' -....." U.UU - I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time(min) 21 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 16.45 cfs Storm frequency = 1 yrs Time to peak = 770 min Time interval = 2 min Hyd. volume = 184,455 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 3.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Q (cfs) Hyd. No. 15- 1 Year 18.00 I — 18.00 15.00I\ 15.00 12.00 - 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - I / - -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) - - Hyd No. 15 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 9.135 cfs Storm frequency = 1 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 239,924 cuft Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q(cfs) Hyd. No. 16-- 1 Year Q (cfs) -- 10.00 I I 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 1 — I•m"w'" .4' 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 16 Hyd No. 2 Hyd No. 5 Hyd No. 8 Hyd No. 11 Hyd No. 13 23 Hydrograph Summary Report ydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 30.52 2 730 120,800 -- --_ -- Pond 1 -Post 2 Reservoir 1.672 960 104,488 1 29.06 85,185 Routed Pond 1 4 SCS Runoff 8.560 2 730 37,573 ----- --- Pond 2-Post 5 Reservoir 0.161 2 1446 34,370 4 33.47 Routed Pond 2 7 SCS Runoff 13.55 2 730 59,471 ---- --- --- Pond 3-Post 8 Reservoir 0.258 2 1446 54,686 7 35.69 49,141 Routed Pond 3 10 SCS Runoff 13.73 2 730 60,279 ---- — ---- Pond 4 Post 11 Reservoir 0.755 2 1030 58,821 10 36.22 42,666 Routed Pond 4 13 SCS Runoff 23.21 2 736 142,070 --- --- ---- Offsite-Post 15 SCS Runoff 36.28 2 764 329,510 ---- - TOTAL SITE PRE 16 Combine 23.82 2 736 394,435 2,5,8, Combined Post 11, 13, Phase 1 Pre Post.gpw Return Period: 2 Year Friday, 07/10/2020 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type - SCS Runoff Peak discharge = 30.52 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 120,800 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Hyd. No. 1 —2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 -I l I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 1.672 cfs Storm frequency = 2 yrs Time to peak = 960 min Time interval = 2 min Hyd. volume = 104,488 cuft Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 29.06 ft Reservoir name = Pond 1 Max. Storage = 85,185 cuft Storage Indication method used. Routed Pond 1 Q (ems) Hyd. No. 2 --2 Year Q (cfs) 35.00 35.00 • 30.00 - — 30.00 25.00 25.00 20.00 - — 20.00 15.00 15.00 10.00 - 10.00 5.00 - — 5.00 0.00 - I 1 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 540U 6000 Time(min) Hyd No. 2 — Hyd No. 1 11 1 1 1 1 I II Total storage used= 85,185 cuft 26 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 8.560 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 37,573 cuft Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (off) Hyd. No.4—2 Year Q (cfs) 10.00 I 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 1 r 2.00 1 1 I 0.00 - J I ! I i l - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No.4 Time(min) 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 0.161 cfs Storm frequency = 2 yrs Time to peak = 1446 min Time interval = 2 min Hyd. volume = 34,370 cuft Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 33.47 ft Reservoir name = Pond 2 Max. Storage = 31,124 cuft Storage Indication method used. Routed Pond 2 Q (cfs) Hyd. No. 5-2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 • • 4.00 4.00 2.00 — 2.00 111116•....-5. 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 5 Hyd No.4 ILL! I I 1 8 Total storage used= 31,124 cuft 28 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 13.55 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 59,471 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Hyd. No. 7--2 Year Q (cfs) 14.00 I I —y 14.00 12.00 12.00 10.00 - - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - I I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) 29 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 0.258 cfs Storm frequency = 2 yrs Time to peak = 1446 min Time interval = 2 min Hyd. volume = 54,686 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 35.69 ft Reservoir name = Pond 3 Max. Storage = 49,141 cuft Storage Indication method used. Routed Pond 3 Q (cfs) Q (cfs) Hyd. No. 8-2 Year 14.00 - -- 14.00 12.00 - - 12.00 10.00 - - 10.00 8.00 - - 8.00 6.00 6.00 4.00 — - 4.00 2.00 2.00 0.00 -I 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 8 Hyd No. 7 Total storage used =49,141 cuft 30 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type e SCS Runoff Peak discharge = 13.73 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 60,279 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Hyd. No. 10--2 Year Q (cfs) 14.00 -- — 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 — - 4.00 • 2.00 2.00 0.00 - l` - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 0.755 cfs Storm frequency = 2 yrs Time to peak = 1030 min Time interval = 2 min Hyd. volume = 58,821 cuft Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 36.22 ft Reservoir name = Pond 4 Max. Storage = 42,666 cuft Storage Indication method used. Routed Pond 4 Q (cfs) Hyd. No. 11 —2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 • 4.00 - 4.00 2.00 2.00 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 11 Hyd No. 10 I 1 1 1 1 1 Total storage used =42,666 cuft 32 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 23.21 cfs Storm frequency = 2 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 142,070 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Hyd. No. 13--2 Year Q (cfs) 24.00 24.00 I 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 I . - — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 36.28 cfs Storm frequency = 2 yrs Time to peak = 764 min Time interval = 2 min Hyd. volume = 329,510 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Q (cfs) Hyd. No. 15—2 Year 40.00 40.00 • 30.00 — 30.00 20.00 20.00 10.00 10.00 ,I \\ 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time(min) 34 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 23.82 cfs Storm frequency = 2 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 394,435 cuft Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (cfs) Hyd. No. 16—2 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 I \\41_1" I 0.00 ... --_, .� _ 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 16 — Hyd No. 2 Hyd No. 5 Hyd No. 8 — Hyd No. 11 Hyd No. 13 35 Hydrograph Summary Report ydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.486 2 748 6,050 — -- T.-_-• Pond 1 -Post 2 Reservoir 0.024 2 1450 3,638 1 27.60 5,454 Routed Pond 1 4 SCS Runoff 0.012 2 1328 258 — -- Pond 2-Post 5 Reservoir 0.004 2 1448 216 4 32.51 186 Routed Pond 2 7 SCS Runoff 0.019 1328 408 -- — ---- Pond 3-Post 8 Reservoir 0.008 1448 370 7 34.51 282 Routed Pond 3 10 SCS Runoff 0.019 2 1328 414 ---- -- --- Pond 4 Post 11 Reservoir 0.010 2 1446 388 1 34.51 Routed Pond 4 13 SCS Runoff 0.000 2 n/a 0 - — Offsite-Post 15 SCS Runoff 0.000 2 n/a 0 -- TOTAL SITE PRE 16 Combine 0.045 2 1448 4,612 — -- Combined Post Phase i Pre Post.gpw Return Period: 3 Year Friday, 07/10/2020 36 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 0.486 cfs Storm frequency = 3 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 6,050 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 1.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (c ) Hyd. No. 1 —3 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 . 0.35 0.30 0.30 0.25 0.25 • 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 I • 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time(min) 37 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 0.024 cfs Storm frequency = 3 yrs Time to peak = 1450 min Time interval = 2 min Hyd. volume = 3,638 cufk Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 27.60 ft Reservoir name = Pond 1 Max. Storage = 5,454 cuft Storage Indication method used. Routed Pond 1 Q (cfs) Hyd. No. 2-3 Year Q (cfs) 0.50 0.50 1 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 Iii. 0.25 0.20Mi 0.20 At W . 0.15 - if{ - 0.15 0.10 - _ - 0.10 0.05 0.05 i �,.. I 0.00 i - 0.00 0 600 -1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. Hyd No. 1 II I I I I I 1 Total storage used 5,454 cuft 38 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 0.012 cfs Storm frequency = 3 yrs Time to peak = 1328 min Time interval = 2 min Hyd. volume = 258 cuff Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 1.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Hyd. No.4—3 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 l 0.00 —1 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time(min) 39 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 0.004 cfs Storm frequency = 3 yrs Time to peak = 1448 min Time interval = 2 min Hyd. volume = 216 cuft Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 32.51 ft Reservoir name = Pond 2 Max. Storage = 186 cuft Storage Indication method used. Routed Pond 2 Q (cfs) Hyd. No. 5—3 Year Q (cfs) 0.10 0.10 0.09 0.09 • 0.08 • 0.08 0.07 0.07 0.06 0.06 • 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 I -1- - -- _-_�_ , 0.00 - — 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) Hyd No. 5 Hyd No.4 11 1 1 1 1 1 II Total storage used= 186 cuft 40 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 0.019 cfs Storm frequency = 3 yrs Time to peak = 1328 min Time interval = 2 min Hyd. volume = 408 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 1.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Q (cfs) Hyd. No. 7—3 Year 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 I 0.00 - r 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) 41 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 0.008 cfs Storm frequency = 3 yrs Time to peak = 1448 min Time interval = 2 min Hyd. volume = 370 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 34.51 ft Reservoir name = Pond 3 Max. Storage = 282 cuft Storage Indication method used. Routed Pond 3 Q (cfs) Hyd. No. 8—3 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 — 0.01 0.00 - i 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time(min) Hyd No. 8 Hyd No. 7 11111110 Total storage used =282 cuft 42 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type = SCS Runoff Peak discharge = 0.019 cfs Storm frequency = 3 yrs Time to peak = 1328 min Time interval = 2 min Hyd. volume = 414 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 1.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Q (cfs) Hyd. No. 10—3 Year 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time(min) 43 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 0.010 cfs Storm frequency = 3 yrs Time to peak = 1446 min Time interval = 2 min Hyd. volume = 388 cuff Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 34.51 ft Reservoir name = Pond 4 Max. Storage = 245 cuft Storage Indication method used. Routed Pond 4 Q (c ) Hyd. No. 11 —3 Year Q (cfs) 0.10 0.10 • 0.09 0.09 0.08 0.08 • 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 J 0.01 - 0.01 IIIF y 0.00 __ 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time(min) Hyd No. 11 Hyd No. 10 11111111111 Total storage used =245 cuft 44 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 3 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 1.50 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Hyd. No. 13--3 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 - 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 13 Time (min) 45 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 3 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 1.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q(cfs) Hyd. No. 15—3 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 - — 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 15 Time(min) 46 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 0.045 cfs Storm frequency = 3 yrs Time to peak = 1448 min Time interval = 2 min Hyd. volume = 4,612 cult Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (cfs) Hyd. No. 16-3 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 - 0.02 ft141111111161111L--- 0.01 - 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 16 r Hyd No. 2 — Hyd No. 5 Hyd No. 8 Hyd No. 11 Hyd No. 13 47 Hydrograph Summary Report Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) .(ft) (cuft) 1 SCS Runoff 49.26 2 728 191,073 ---- --- --- Pond 1 -Post 2 Reservoir 7.293 2 778 174,631 1 29.25 96,145 Routed Pond 1 4 SCS Runoff 16.10 2 730 65,203 --- — --- Pond 2-Post 5 Reservoir 1.149 2 928 58,875 4 33.81 42,610 Routed Pond 2 7 SCS Runoff 25.48 2 730 103,203 --- -- -- Pond 3-Post 8 Reservoir 1.487 2 962 91,426 - 71,623 Routed Pond 3 10 SCS Runoff 25.83 730 104,606 - -- ---- Pond 4 Post 11 Reservoir 4.806 2 770 103,122 10 36.35 46,126 Routed Pond 4 13 SCS Runoff 60.50 2 730 284,280 --- --- -- Offsite-Post 15 SCS Runoff 80.1 s 760 623,253 --- TOTAL SITE PRE 16 Combine 61.28 2 732 712,336 2,5,8, - Combined Post 11, 13, Phase 1 Pre Post.gpw Return Period: 5 Year Friday, 07/ 10/2020 • 48 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 49.26 cfs Storm frequency = 5 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 191,073 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.80 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Hyd. No. 1 —5 Year Q(cfs) 50.00 I II I i 50.00 I 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 -- I ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) — Hyd No. 1 49 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 7.293 cfs Storm frequency = 5 yrs Time to peak = 778 min Time interval = 2 min Hyd. volume = 174,631 cult Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 29.25 ft Reservoir name = Pond 1 Max. Storage = 96,145 cuff Storage Indication method used. Routed Pond 1 Q (cfs) Hyd. No. 2—5 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 - 10.00 l i 0.00 - i 1 I 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 2 Hyd No. 1 11 1 1 1 1 1 1 Total storage used =96,145 cuft 50 Hydrograph Report . Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 16.10 cfs Storm frequency = 5 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 65;203 cuft Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.80 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Hyd. No. 4—5 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 I 0.00 I I I I 1 1 I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No.4 Time (min) 51 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 1.149 cfs Storm frequency = 5 yrs Time to peak = 928 min Time interval = 2 min Hyd. volume = 58,875 cuft Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 33.81 ft Reservoir name = Pond 2 Max. Storage = 42,610 cuft Storage Indication method used. Routed Pond 2 Q (cfs) Q (cfs) Hyd. No. 5-5 Year 18.00 18.00 15.00 - — 15.00 12.00 - — 12.00 9.00 — - 9.00 6.00 - — 6.00 3.00 - - 3.00 0.00 • 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 5 - Hyd No. 4 111111111 Total storage used =42,610 cuft 52 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 25.48 cfs Storm frequency = 5 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 103,203 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.80 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Hyd. No. 7—5 Year Q (cfs) 28.00 I I — 28.00 24.00 ! 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 -F I I I I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) 53 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 1.487 cfs Storm frequency = 5 yrs Time to peak = 962 min Time interval = 2 min Hyd. volume = 91,426 cult Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 36.21 ft Reservoir name = Pond 3 Max. Storage = 71,623 cult Storage Indication method used. Routed Pond 3 Q (cfs) Hyd. No. 8--5 Year Q (cfs) 28.00 28.00 24.00 - 24.00 20.00 - — 20.00 16.00 - — 16.00 12.00 - 12.00 8.00 - - 8.00 4.00 I 4.00 1 0.00 - I f 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 8 Hyd No. 7 111111111 Total storage used =71,623 cuft 54 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10 12020 Hyd. No. 10 Pond 4 Post Hydrograph type = SCS Runoff Peak discharge = 25.83 cfs Storm frequency = 5 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 104,606 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.80 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Q (cfs) Pond 4 Post Hyd. No. 10—5 Year Q (cfs) 28.00 I 28.00 24.00 I 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 I 4.00 1 J I 0.00 I I I I f I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 4.806 cfs Storm frequency = 5 yrs Time to peak = 770 min Time interval = 2 min Hyd. volume = 103,122 cuft Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 36.35 ft Reservoir name = Pond 4 Max. Storage = 46,126 cuft Storage Indication method used. Routed Pond 4 Q (cfs) Q (cfs) Hyd. No. 11 —5 Year 28.00 I 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 - 12.00 8.00 — 8.00 4.00 4.00 0.00 - F 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 11 Hyd No. 10 11 1 1 1 1 1 0 Total storage used =46,126 cuft 56 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type - SCS Runoff Peak discharge = 60.50 cfs Storm frequency = 5 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 284,280 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.80 in Distribution • = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Q (cfs) Hyd. No. 13—5 Year 70.00 T I I i 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 A 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) - Hyd No. 13 57 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 80.13 cfs Storm frequency = 5 yrs Time to peak = 760 min Time interval = 2 min Hyd. volume = 623,253 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 5.80 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Hyd. No. 15—5 Year Q (cfs) 90.00 - 90.00 80.00 t 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 , . • 20.00 I . 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time(min) 58 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 61.28 cfs Storm frequency = 5 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 712,336 cult Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (cfs) Hyd. No. 16—5 Year Q (cfs) 70.00 - — 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 -I 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 16 — Hyd No. 2 — Hyd No. 5 — Hyd No. 8 Hyd No. 11 - Hyd No. 13 59 Hydrograph Summary Report Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 67.96 2 728 261,152 --- -- ---- Pond 1 -Post 2 Reservoir 10.15 2 774 244,620 1 127,949 Routed Pond 1 4 SCS Runoff 23.88 2 730 94,065 — ----- Pond 2-Post 5 Reservoir 3.730 2 778 87,644 33.89 45,379 Routed Pond 2 7 SCS Runoff 37.79 2 730 148,886 ---- ----- ---- Pond 3-Post 8 Reservoir 4.825 2 792 136,900 7 36.31 76,131 Routed Pond 3 10 SCS Runoff 38.31 2 730 150,909 -- -- Pond 4 Post 11 Reservoir 18.83 2 746 149,409 10 36.58 52,557 Routed Pond 4 13 SCS Runoff 104.08 2 730 442,746 ---- Offsite Post 15 SCS Runoff 128.89 2 758 942,652 --- — TOTAL SITE PRE 16 Combine 105.04 2 730 1,061.318 2,5,8, — Combined Post 11, 13, Phase 1 Pre Posi.gpw Return Period: 10 Year Friday, 07/ 10/2020 60 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 67.96 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 261,152 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Hyd. No. 1 — 10 Year Q (cfs) 70.00 70.00 I 60.00 60.00 I� 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 j I 0.00 - I I i, . 1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time(min) 61 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type - Reservoir Peak discharge = 10.15 cfs Storm frequency = 10 yrs Time to peak = 774 min Time interval = 2 min Hyd. volume = 244,620 cult Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 29.79 ft Reservoir name = Pond 1 Max. Storage = 127,949 cult Storage Indication method used. Routed Pond 1 Q (cfs) Q (cfs) Hyd. No. 2— 10 Year 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 • 10.00 10.00 0.00 - 0.00 0 6000 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 2 Hyd No. 1 II 1 1 1 1 1 Total storage used = 127,949 cuft Hydrograph Report 62 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 23.88 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 94,065 cuft Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Hyd. No. 4— 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 ` 4.00 0.00 — \ — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No.4 Time(min) Hydrograph Report 63 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 3.730 cfs Storm frequency = 10 yrs Time to peak = 778 min Time interval = 2 min Hyd. volume = 87,644 cuft Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 33.89 ft Reservoir name = Pond 2 Max. Storage = 45,379 cuft Storage Indication method used. Routed Pond 2 Q (cfs) Q (cfs) Hyd. No. 5— 10 Year 24.00 - — 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 — -- 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 5 Hyd No. 4 II 1 1 1 1 1 1 Total storage used =45,379 cuft 64 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 37.79 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 148,886 cuft Drainage area _ 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Hyd. No. 7— 10 Year Q (cfs) 40.00 -r I 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - I I ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) Hydrograph Report 65 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 4.825 cfs Storm frequency = 10 yrs Time to peak = 792 min Time interval = 2 min Hyd. volume = 136,900 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 36.31 ft Reservoir name = Pond 3 Max. Storage = 76,131 cuft Storage Indication method used. Routed Pond 3 Q (cfs) Q (cfs) Hyd. No. 8-- 10 Year 40.00 — — 40.00 30.00 - — - 30.00 20.00 20.00 10.00 10.00 j I 0.00 - - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 8 Hyd No. 7 11 I I I I I l Total storage used =76,131 cuft 66 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type = SCS Runoff Peak discharge = 38.31 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 150,909 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Q (cfs) Hyd. No. 10-- 10 Year 40.00 40.00 30.00 I - - 30.00 20.00 20.00 10.00 - 10.00 1. I. 0.00 I / I I I i ' I_ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 67 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 18.83 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 149,409 cuft Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 36.58 ft Reservoir name = Pond 4 Max. Storage = 52,557 cuft Storage Indication method used. Routed Pond 4 Q (cfs) Hyd. No. 11 — 10 Year Q (cfs) 40.00 - 40.00 II I 30.00 -. -. 30.00 20.00 20.00 10.00 10.00 0.00 - I 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time(min) Hyd No. 11 Hyd No. 10 11111111 Total storage used = 52,557 cuft Hydrograph Report 68 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 104.08 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 442,746 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Hyd. No. 13-- 10 Year Q (cfs) 120.00 100.00 100.00 4 80.00 - 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time(min) Hydrograph Report 69 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 128.89 cfs Storm frequency = 10 yrs Time to peak = 758 min Time interval = 2 min Hyd. volume = 942,652 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Hyd. No. 15-- 10 Year Q (cfs) 140.00 f I - 140.00 f 120.00 120.00 100.00 100.00 80.00 80.00 60.00 I 60.00 40.00 40.00 i _ 20.00 20.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - -- Hyd No. 15 70 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 105.04 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,061,318 cuft Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (cfs) Hyd. No. 16- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 - 20.00 i\\''' -.w . t... . �__... -.�..�r 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 16 Hyd No. 2 Hyd No. 5 - Hyd No. 8 Hyd No. 11 Hyd No. 13 71 Hydrograph Summary Report Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 84.87 2 728 325,307 -- ----- -- Pond 1 -Post 2 Reservoir 11.59 2 778 308,711 1 30.38 163,531 Routed Pond 1 4 SCS Runoff 31.13 2 730 121,251 ---- -- ---- Pond 2-Post 5 Reservoir 10.71 2 752 114,764 4 34.04 50,544 Routed Pond 2 7 SCS Runoff 49.27 2 730 191,916 --- -- --- Pond 3-Post 8 Reservoir 13.93 2 756 179,797 7 36.50 84,304 Routed Pond 3 10 SCS Runoff 49.94 2 730 194,524 -- --- -- Pond 4 Post 11 Reservoir 34.14 2 740 193,011 10 36.77 57,746 Routed Pond 4 13 SCS Runoff 146.39 2 730 597,883 — --- — Offsite-Post 15 SCS Runoff 175.97 2 756 1,250,885 -- — --- TOTAL SITE PRE 16 Combine 171.46 2 734 1,394,167 2,5,8, --- --- Combined Post 11, 13, Phase 1 Pre Post.gpw Return Period: 25 Year Friday, 07/10/2020 72 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 84.87 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 325,307 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.05 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Q (cfs) Hyd. No. 1 —25 Year 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 73 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 11.59 cfs Storm frequency = 25 yrs Time to peak = 778 min Time interval = 2 min Hyd. volume = 308,711 cuft Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 30.38 ft Reservoir name = Pond 1 Max. Storage = 163,531 cuft Storage indication method used. Routed Pond 1 Q (cfs) Q (cfs) Hyd. No. 2--25 Year 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 - 20.00 10.00 - - - ----— — 10.00 iiiir\-- L0.00 I 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 2 Hyd No. 1 11 1 1 1 1 Ill Total storage used= 163,531 cuft 74 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 31.13 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 121,251 cuff Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.05 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Hyd. No.4--25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 - 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 I - . 0.00 - \1/4 ***--.***. I i i - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time(min) 75 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 10.71 cfs Storm frequency = 25 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 114,764 cuft Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 34.04 ft Reservoir name = Pond 2 Max. Storage = 50,544 cuft Storage Indication method used. Routed Pond 2 Q (cfs) Hyd. No. 5-25 Year Q (cfs) 35.00 - - 35.00 30.00 ( 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 - — 5.00 41 0.00 - . - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 5 Hyd No. 4 ILL I l l l Q Total storage used = 50,544 cuft 76 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 49.27 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 191,916 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.05 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Q (cfs) Hyd. No. 7—25 Year 50.00 i 50.00 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 \ '`I 1 0.00 - H I 1 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) 77 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 13.93 cfs Storm frequency = 25 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 179,797 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 36.50 ft Reservoir name = Pond 3 Max. Storage = 84,304 cuft Storage Indication method used. Routed Pond 3 Q (cfs) Hyd. No. 8-25 Year Q (cfs) 50.00 - ) -- 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 - 10.00 i L _ 0.00 �..._:��. _. 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 8 Hyd No. 7 IuliulI Total storage used = 84,304 cuft 78 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type = SCS Runoff Peak discharge = 49.94 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 194,524 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.05 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Hyd. No. 10—25 Year Q (cfs) 50.00 i 50.00 40.00 40.00 30.00 30.00 • 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 79 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 34.14 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 193,011 cuft Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 36.77 ft Reservoir name = Pond 4 Max. Storage = 57,746 cuft Storage Indication method used. Routed Pond 4 Q (cfs) Hyd. No. 11 —25 Year Q (cfs) — 50.00 40.00 40.00 30.00 30.00 • 20.00 20.00 • • 10.00 10.00 _ • 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) Hyd No. 11 Hyd No. 10 Total storage used = 57,746 cuft 80 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 146.39 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 597,883 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.05 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Q (cfs) Hyd. No. 13--25 Year 160.00 160.00 140.00 140.00 120.00 — - __. 120.00 100.00 100.00 80.00 80.00 60.00 60.00 • 40.00 40.00 20.00 — 20.00 0.00 - - o.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time(min) 81 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07 1 10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 175.97 cfs Storm frequency = 25 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 1,250,885 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 8.05 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Hyd. No. 15--25 Year Q (cfs) 180.00 -- I 1 - -- 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 I t �0.00 1 I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 15 82 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 171.46 cfs Storm frequency = 25 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 1,394,167 cuff Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (cfs) Hyd. No. 16—25 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 -- 20.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) Hyd No. 16 Hyd No. 2 Hyd No. 5 Hyd No. 8 Hyd No. 11 Hyd No. 13 83 Hydrograph Summary Report Hydrographs Extension for AutoCADO Civil 3DO 2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 100.45 2 728 385,044 --- --- -- Pond 1 -Post 2 Reservoir 12.84 2 780 368,398 1 30.95 198,139 Routed Pond 1 4 SCS Runoff 38.01 2 728 147,049 --- -- --- Pond 2-Post 5 Reservoir 18.04 2 746 140,512 4 34.16 55,059 Routed Pond 2 7 SCS Runoff 60.16 2 728 232,749 ---- ----- -- Pond 3-Post 8 Reservoir 25.31 2 748 220,560 7 36.67 92,041 Routed Pond 3 10 SCS Runoff 60.98 2 728 235,911 --- --- --- Pond 4 Post 11 Reservoir 52.10 2 734 234,389 10 36.89 61,076 Routed Pond 4 13 SCS Runoff 187.29 2 730 748,915 -- -- Offsite-Post 15 SCS Runoff 221.35 2 756 1,548,129 — TOTAL SITE PRE 16 Combine 244.80 2 734 1,712,772 2,5,8, -- Combined Post 11, 13, 1 Phase 1 Pre Post.gpw Return Period: 50 Year Friday, 07/ 10/2020 84 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 100.45 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 385,044 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 9.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Hyd. No. 1 —50 Year Q (cfs) 120.00 i 120.00 100.00 1 100.00 80.00 80.00 • 60.00 60.00 40.00 40.00 20.00 20.00 • 0.00 — I i I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time(min) 85 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 12.84 cfs Storm frequency = 50 yrs Time to peak = 780 min Time interval = 2 min Hyd. volume = 368,398 cuft Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 30.95 ft Reservoir name = Pond 1 Max. Storage = 198,139 cuft Storage Indication method used. Routed Pond 1 Q (cfs) Hyd. No. 2—50 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 • 40.00 40.00 20.00 20.00 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time(min) Hyd No. 2 Hyd No. 1 11 1 1 1 1 1 1 Total storage used= 198,139 cuft 86 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 38.01 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 147,049 cult Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 9.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Q (cfs) Hyd. No. 4-50 Year 40.00 I T 40.00 30.00 - 30.00 20.00 20.00 10.00 10.00 —40.00 - I I ' - 0.00 0 120 240 360 480 600 720 840 96u 1080 1200 1320 1440 1560 Hyd No.4 Time(min) 87 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10 1 2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 18.04 cfs Storm frequency = 50 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 140,512 cult Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 34.16 ft Reservoir name = Pond 2 Max. Storage = 55,059 cult Storage Indication method used. Routed Pond 2 Q (cfs) Q (cfs) Hyd. No. 5—50 Year 40.00 , 40.00 30.00 30.00 20.00 20.00 10.00 10.00 • 0.00 - - - 0.00 0 120 240 360 480 600 720 840 960 1080 12UU 1320 1440 1560 Time(min) Hyd No. 5 Hyd No.4 it 1 1 1 1 1 1 Total storage used = 55,059 cuft 88 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge = 60.16 cfs Storm frequency = 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 232,749 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 9.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Q (cfs)Hyd. No. 7--50 Year 70.00 — 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) 89 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 25.31 cfs Storm frequency = 50 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 220,560 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 36.67 ft Reservoir name = Pond 3 Max. Storage = 92,041 cuft Storage Indication method used. Routed Pond 3 Q (cfs) Hyd. No. 8—50 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 - , 50.00 40.00 40.00 30.00 30.00 20.00 20.00 • 10.00 - 10.00 0.00 - - 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 8 Hyd No. 7 ,I I I I I I 0 Total storage used =92,041 cuft 90 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type SCS Runoff Peak discharge = 60.98 cfs Storm frequency 50 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 235,911 cuft Drainage area 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 9.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Hyd. No. 10--50 Year Q (cfs) 70.00 - 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 1 ...) 0.00 - I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time(min) 91 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 52.10 cfs Storm frequency = 50 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 234,389 cuft inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 36.89 ft Reservoir name = Pond 4 Max. Storage = 61,076 cult Storage Indication method used. Routed Pond 4 Q (cfs) Hyd. No. 11 --50 Year Q (cfs) 70.00 70.00 60.00 ► 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - I -. I -- . - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) Hyd No. 11 Hyd No. 10 111111 1 Total storage used =61,076 cult 92 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 187.29 cfs Storm frequency = 50 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 748,915 cuff Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 9.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Hyd. No. 13--50 Year Q (cfs) 210.00 l 210.00 180.00 180.00 150.00 l 150.00 120.00 - . 120.00 90.00 1 90.00 60.00 60.00 30.00 I 30.00 _....) 0.00 - I I I I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time (min) 93 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 221.35 cfs Storm frequency = 50 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 1,548,129 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 9.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Hyd. No. 15--50 Year Q (cfs) 240.00 240.00 210.00 210.00 180.00 - 180.00 150.00 150.00 120.00 120.00 90.00 - 90.00 60.00 60.00 30.00 - - 30.00 f �\ 0.00 - I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time (min) 94 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type = Combine Peak discharge = 244.80 cfs Storm frequency = 50 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 1,712,772 cuft Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (cfs) Q (cfs) Hyd. No. 16—50 Year 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 - 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 16 Hyd No. 2 Hyd No. 5 - Hyd No. 8 Hyd No. 11 Hyd No. 13 95 Hydrograph Summary Report Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 117.04 2 728 449,274 ---- -- --- Pond 1 -Post 2 Reservoir 25.48 2 758 432,583 1 31.34 223,120 Routed Pond 1 4 SCS Runoff 45.52 2 728 175,193 -- -- ---- Pond 2-Post 5 Reservoir 24.61 2 742 168,612 4 34.32 60,571 Routed Pond 2 7 SCS Runoff 72.05 2 728 277,294 ---- --- — Pond 3-Post 8 Reservoir 40.68 2 742 265,072 7 36.84 99,499 Routed Pond 3 10 SCS Runoff 73.03 2 728 281,062 ---- -- Pond 4 Post 11 Reservoir 69.50 2 732 279,531 10 36.96 63,154 Routed Pond 4 13 SCS Runoff 232.51 2 730 916,958 — — — Offsite-Post 15 SCS Runoff 271.18 2 756 1,876,452 -- -- -- TOTAL SITE PRE 16 Combine 336.44 2 7'7 2,062,756 2,5,8, — Combined Post 11, 13, Phase 1 Pre Post.gpw Return Period: 100 Year Friday, 07/10/2020 96 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 1 Pond 1 - Post Hydrograph type = SCS Runoff Peak discharge = 117.04 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 449,274 cuft Drainage area = 19.280 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(14.110 x 36)+(18.450 x 64)]/19.280 Pond 1 - Post Q (cfs) Hyd. No. 1 --100 Year Q (cfs) 120.00 120.00 100.00 - 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 97 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 2 Routed Pond 1 Hydrograph type = Reservoir Peak discharge = 25.48 cfs Storm frequency = 100 yrs Time to peak = 758 min Time interval = 2 min Hyd. volume = 432,583 cuff Inflow hyd. No. = 1 - Pond 1 - Post Max. Elevation = 31.34 ft Reservoir name = Pond 1 Max. Storage = 223,120 cult Storage Indication method used. Routed Pond 1 Q (cfs) Q (cfs) Hyd. No. 2-- 100 Year 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 • 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time(min) Hyd No. 2 Hyd No. 1 1111111 I Total storage used =223,120 cuft 98 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 4 Pond 2 - Post Hydrograph type = SCS Runoff Peak discharge = 45.52 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 175,193 cuft Drainage area = 9.300 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 2 - Post Q (cfs) Q (cfs) Hyd. No. 4— 100 Year 50.00 T i 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - I I I ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No.4 Time (min) 99 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 5 Routed Pond 2 Hydrograph type = Reservoir Peak discharge = 24.61 cfs Storm frequency = 100 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 168,612 cult Inflow hyd. No. = 4 - Pond 2 - Post Max. Elevation = 34.32 ft Reservoir name = Pond 2 Max. Storage = 60,571 cult Storage Indication method used. Routed Pond 2 Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 - 10.00 I Is 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 4 11111111 Total storage used = 60,571 cuft 100 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 7 Pond 3 - Post Hydrograph type = SCS Runoff Peak discharge _ 72.05 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 277,294 cuft Drainage area = 14.720 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 3 - Post Q (cfs) Q (cfs) Hyd. No. 7-- 100 Year 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time(min) 101 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civi13D®2018 by Autodesk,Inc.v2018.3 Friday, 07/10/2020 Hyd. No. 8 Routed Pond 3 Hydrograph type = Reservoir Peak discharge = 40.68 cfs Storm frequency = 100 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 265,072 cuft Inflow hyd. No. = 7 - Pond 3 - Post Max. Elevation = 36.84 ft Reservoir name = Pond 3 Max. Storage = 99,499 cuft Storage Indication method used. Routed Pond 3 Q (cfs) Q (cfs) Hyd. No. 8— 100 Year 80.00 80.00 70.00 70.00 60.00 60.00 50.00 F 50.00 40.00 I 40.00 .. 30.00 ` 30.00 20.00 20.00 10.00 10.00 0.00 - 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) Hyd No. 8 Hyd No. 7 11111111 Total storage used=99,499 cuft Hydrograph Report 102 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 10 Pond 4 Post Hydrograph type = SCS Runoff Peak discharge = 73.03 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 281,062 cuft Drainage area = 14.920 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Pond 4 Post Q (cfs) Hyd. No. 10-- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 4 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 103 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 11 Routed Pond 4 Hydrograph type = Reservoir Peak discharge = 69.50 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 279,531 cuft Inflow hyd. No. = 10 - Pond 4 Post Max. Elevation = 36.96 ft Reservoir name = Pond 4 Max. Storage = 63,154 cuft Storage Indication method used. Q (cfs) Routed Pond 4 Hyd. No. 11 -- 100 Year Q(cfs) 80.00 80.00 70.00 - 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 _ 30.00 20.00 _ 20.00 10.00 10.00 0.00 - I I I - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) Hyd No. 11 Hyd No. 10 II 1 1 1 1 I I Total storage used =63,154 cult 104 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Friday,07/10/2020 Hyd. No. 13 Offsite - Post Hydrograph type = SCS Runoff Peak discharge = 232.51 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 916,958 cuft Drainage area = 64.050 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 10.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Offsite - Post Q (cfs) Q (cfs) Hyd. No. 13-- 100 Year 240.00 240.00 210.00 210.00 180.00 — 180.00 150.00 ------ 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 Time(min) 105 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 15 TOTAL SITE PRE Hydrograph type = SCS Runoff Peak discharge = 271.18 cfs Storm frequency = 100 yrs Time to peak = 756 min Time interval = 2 min Hyd. volume = 1,876,452 cuft Drainage area = 122.270 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 50.00 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 TOTAL SITE PRE Q (cfs) Hyd. No. 15-- 100 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 Time (min) 106 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Hyd. No. 16 Combined Post Hydrograph type Combine Peak discharge = 336.44 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 2,062,756 cuft Inflow hyds. = 2, 5, 8, 11, 13 Contrib. drain. area = 64.050 ac Combined Post Q (off) Hyd. No. 16-- 100 Year Q (cfs) 350.00 - - - 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 -.s - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 16 Hyd No. 2 Hyd No. 5 — Hyd No. 8 Hyd No. 11 Hyd No. 13 107 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk,Inc.v2018.3 Friday,07/10/2020 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 77.3751 12.8000 0.8932 ------- 2 62.7796 10.2000 0.8083 --- 3 61.7501 10.1000 0.7846 ----- 5 62.6173 10.2000 0.7529 ---- 10 66.8179 10.5000 0.7356 -------- 25 68.7026 10.2000 0.7030 -- 50 73.6504 10.3000 0.6927 ----- 100 78.7729 10.4000 0.6846 ------ File name:New Hanover.IDF Intensity= B I(Tc+ D)"E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.91 4.74 3.97 3.42 3.02 2.70 2.45 2.24 2.06 1.92 1.79 1.68 2 6.96 5.53 4.62 3.99 3.53 3.17 2.88 2.65 2.45 2.29 2.14 2.02 3 7.34 5.86 4.92 4.27 3.79 3.41 3.11 2.86 2.66 2.48 2.33 2.20 5 8.07 6.51 5.51 4.81 4.29 3.88 3.55 3.28 3.06 2.86 2.70 1 2.55 10 8.90 7.24 6.17 5.41 4.84 4.39 4.03 3.73 3.48 3.27 3.08 2.92 25 10.14 8.31 7.11 6.26 5.62 5.12 4.71 4.38 4.10 3.85 3.64 3.46 50 11.13 9.15 7.86 6.93 6.24 5.69 5.25 4.88 4.57 4.30 4.07 3.87 100 12.12 9.99 8.60 7.61 6.85 6.26 5.78 5.38 5.04 4.75 4.50 4.28 Tc=time in minutes.Values may exceed 60. Precip.file name: L:1 PDNR 20131Design Tools\Stormwater1Hydraflow\NHC-Published-DDF.pcp Rainfall Precipitation Table(in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.70 4.50 1.50 5.80 7.00 8.05 9.00 10.00 SCS 6-Hr 0.00 0.00 0.00 4.20 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 2.75 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 2.75 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 2.80 0.00 0.00 0.00 0.00 ATTACHMENT E-ECS SOILS REPORT CS'S ECS SOUTHEAST, LLP -Setting the Standard for Service" t tr +1-• Geotechnical • Construction Materials • Environmental - Facilities NC Registered Engineeang Firm F.107i5 NC Registered Geoiogtsts Fern C•406 SC Registerev Fngineermg Finn 3239 April 15, 2020 Mr. Patrick Wahl D.R. Horton 200 Aerial Center Parkway Morrisville, North Carolina 27560 Reference: Report of Seasonal High Water Table Estimation and Infiltration Testing Farm at Sidbury Lakes Castle Hayne, New Hanover County, North Carolina ECS Project No. 49.11539 Dear Mr. Wahl: ECS Southeast, LLP (ECS) recently conducted a seasonal high water table (SHWT) estimation and infiltration testing within the stormwater control measure (SCM) area(s) off of Sidbury Road in Castle Hayne, New Hanover County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing On April 10th and 14th, 2020, ECS conducted an exploration of the subsurface soil and groundwater conditions, in accordance with the NCDEQ Stormwater Design Manual section A- 2, at ten requested locations shown on the attached Boring Location Plan (Figure 1). ECS used GPS equipment in order to determine the boring locations. The purpose of this exploration was to obtain subsurface information of the in situ soils for the SCM area(s). ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at each of the requested boring locations. ECS visually classified the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the SHWT and groundwater elevation observed at the time of the hand auger borings. The attached Infiltration Testing Form provides a summary of the subsurface conditions encountered at the hand auger boring locations. The SHWT and groundwater elevation was estimated at the boring locations below the existing grade elevation. A summary of the findings are as follows: Location SHWT Groundwater I-1 24 inches 36 inches 1-2 32 inches 42 inches 1-3 24 inches 32 inches 1-4 24 inches 40 inches 1-5 16 inches 24 inches 1-6 15 inches 22 inches 1-7 15 inches 22 inches 1-8 10 inches 18 inches 1-9 16 inches 26 inches 1-10 14 inches 20 inches ECS Capitol Services.PLLC • ECS Florida,LLC • ECS Mid-Atlantic,LLC • ECS Midwest LLC • ECS Southeast,LLP • ECS Texas,LLP www.ecslimited.com Report of SHWT Estimation and Infiltration Testing Fame at Sidbury Lakes Castle Hayne, New Hanover County, North Carolina ECS Project No. 49.11539 April 15, 2020 ECS has conducted two infiltration tests utilizing a compact constant head permeameter near the hand auger borings in order to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT or in the most restrictive soil horizon. Tests in clayey conditions are conducted for durations of up to 30 minutes. If a more precise hydraulic conductivity value is desired for these locations, then ECS recommends collecting samples by advancing Shelby tubes and performing laboratory permeability testing. Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour I-1 Gray silty SAND 24 inches 0.11 1-2 Gray fine SAND w/silty 12 inches 6.03 1-3 Tan fine SAND wl clay 18 inches 5.24 1-4 Black/brown silty SAND 24 inches 0.088 1-5 Black/brown silty SAND 12 inches 0.21 1-6 Black/brown silty SAND 12 inches 0.15 1-7 Black/brown silty SAND 12 inches 0.052 1-8 Black/brown silty SAND 10 inches 0.007 1-9 Black silty SAND 16 inches 0.025 1-10 Black/brown silty SAND 10 inches 0.18 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation, soil classification and subsurface conditions. 2 Report of SHWT Estimation and Infiltration Testing Farm at Sidbury Lakes Castle Hayne, New Hanover County, North Carolina ECS Project No. 49.11539 April 15, 2020 Closure ECS's analysis of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, analysis and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. ECS appreciates the opportunity to provide our services to you on this project. If you have any questions concerning this report or this project, please contact us. Respectfully, ECS SOUTHEAST, LLP ghoe)‘ /%1 IA) • I 5,41,..if4, ____.F14; K. Brooks Wall W. Brandon Fulton, PSC, PWS, LSS Project Manager Environmental Department Manager bwallaecslimited.com bfulton c ecslimited.com 910-686-9114 704-525-5152 Attachments: Figure 1 - Boring Location Plan Infiltration Testing Form GBA Document 3 Y C i w8 - ' - .�ri r , * ,• 34, WI 'It. i• ��. ri �1'2"k � x r: : .p .r r ..raM f .• -' ._ ' . 3. - ri 9 7 67,_ H 1_ 10 I -S I illi•- T. Alle ,' • 4830 fr L ___ _ - , I 1 I I 70,,, , iqtliffitififty.,, F.,,,,,,y,............1._ APPROXIMATE BORING LOCATIONS W -� E SCALE SHOWN ABOVE i Farm at Sidbury Road Figure 1—Boring Location Plan Castle Hayne, New Hanover County, North Carolina EProvided by: Google Earth ECS Project#49.11539 April 10th and 14th,2020 II Castle KBW f - —,I Infiltration Testing Form Farm at Sidbury Lakes Castle Hayne, New Hanover County, North Carolina ECS Project No. 49.11539 April 10th and 14th, 2020 Location Depth USCS Soil Description I-1 0-18" SM Dark brown fine SAND w/ silt 18"-24" SP Gray fine SAND 24"-36" SM Gray silty SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Groundwater was encountered at 36 inches below the existing grade elevation. Test was conducted at 24 inches below existing grade elevation Infiltration Rate: 0.11 inches per hour Location Depth USCS Soil Description 1-2 0-18" SM Dark brown fine SAND w/ silt 18"-24" SP Gray fine SAND 24"-36" SM Gray silty SAND Seasonal High Water Table was estimated to be at 32 inches below the existing grade elevation. Groundwater was encountered at 42 inches below the existing grade elevation. Test was conducted at 12 inches below existing grade elevation Infiltration Rate: 6.03 inches per hour Location Depth USCS Soil Description 1-3 0-12" SP Gray fine SAND 12"-18" SM Brown silty SAND 18"-36" SM Tan fine SAND w/ clay Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Groundwater was encountered at 32 inches below the existing grade elevation. Test was conducted at 18 inches below existing grade elevation Infiltration Rate: 5.24 inches per hour Infiltration Testing Form Farm at Sidbury Lakes Castle Hayne, New Hanover County, North Carolina ECS Project No. 49.11539 April 10th and 14th, 2020 Location Depth USCS Soil Description 1-4 0-18" SP Gray fine to med. SAND 18"-48" SM Black/brown silty SAND Seasonal High Water Table was estimated to be at 24 inches below the existing grade elevation. Groundwater was encountered at 40 inches below the existing grade elevation. Test was conducted at 24 inches below existing grade elevation Infiltration Rate: 0.088 inches per hour Borings 1-5 through 1-10 are not located within this phase of development. Important Information about This • • • „-- Geotechnical-Engineering Report -..„ Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot eliminate all such risks, you can manage them. The following information is provided to help. The Geoprofessional Business Association (GBA) Typical changes that could erode the reliability of this report include has prepared this advisory to help you—assumedly those that affect: a client representative—interpret and apply this • the site's size or shape; geotechnical-engineering report as effectively • the function of the proposed structure,as when it's as possible. In that way, clients can benefit from changed from a parking garage to an office building,or a lowered exposure to the subsurface problems from a light-industrial plant to a refrigerated warehouse; that,for decades, have been a principal cause of • the elevation,configuration,location,orientation,or weight ofthe proposed construction delays,cost overruns, claims,and • design composition of the ure; team;or disputes. If you have questions or want more a project ownership. information about any of the issues discussed below, contact your GBA-member geotechnical engineer. As a general rule,always inform your geotechnical engineer of project Active involvement in the Geoprofessional Business changes-even minor ones-and request an assessment of their Association exposes geotechnical engineers to a impact.The geotechnical engineer who prepared this report cannot accept wide array of risk-confrontation techniques that can responsibility or liability for problems that arise because the geotechnical be of genuine benefit for everyone involved with a engineer was not informed about developments the engineer otherwise construction project. would have considered. This Report May Not Be Reliable Geotechnical-Engineering Services Are Performed for Do not rely on this report if your geotechnical engineer prepared it: Specific Purposes, Persons,and Projects a for a different client; Geotechnical engineers structure their services to meet the specific • for a different project; needs of their clients.A geotechnical-engineering study conducted • for a different site(that may or may not include all or a for a given civil engineer will not likely meet the needs of a civil- portion of the original site);or works constructor or even a different civil engineer.Because each • before important events occurred at the site or adjacent geotechnical-engineering study is unique,each geotechnical- to it;e.g.,man-made events like construction or engineering report is unique,prepared solely for the client.Those who environmental remediation,or natural events like floods, rely on a geotechnical-engineering report prepared for a different client droughts,earthquakes,or groundwater fluctuations. can be seriously misled.No one except authorized client representatives should rely on this geotechnical-engineering report without first Note,too,that it could be unwise to rely on a geotechnical-engineering conferring with the geotechnical engineer who prepared it.And no one report whose reliability may have been affected by the passage of time, -not even you-should apply this report for any purpose or project except because of factors like changed subsurface conditions;new or modified the one originally contemplated. codes,standards,or regulations;or new techniques or tools.If your geotechnical engineer has not indicated an"apply-by"date on the report, Read this Report in Full ask what it should be,and,in general,if you are the least bit uncertain Costly problems have occurred because those relying on a geotechnical- about the continued reliability of this report,contact your geotechnical engineering report did not read it in its entirety.Do not rely on an engineer before applying it.A minor amount of additional testing or executive summary.Do not read selected elements only.Read this report analysis-if any is required at all-could prevent major problems. in full. Most of the "Findings" Related in This Report Are You Need to Inform Your Geotechnical Engineer Professional Opinions about Change Before construction begins,geotechnical engineers explore a site's Your geotechnical engineer considered unique,project-specific factors subsurface through various sampling and testing procedures. when designing the study behind this report and developing the Geotechnical engineers can observe actual subsurface conditions only at confirmation-dependent recommendations the report conveys.A few those specific Iocations where sampling and testing were performed.The typical factors include: data derived from that sampling and testing were reviewed by your • the client's goals,objectives,budget,schedule,and geotechnical engineer,who then applied professional judgment to risk-management preferences; form opinions about subsurface conditions throughout the site.Actual • the general nature of the structure involved,its size, sitewide-subsurface conditions may differ-maybe significantly-from configuration,and performance criteria; those indicated in this report.Confront that risk by retaining your • the structure's location and orientation on the site;and geotechnical engineer to serve on the design team from project start to • other planned or existing site improvements,such as project finish,so the individual can provide informed guidance quickly, retaining walls,access roads,parking lots,and whenever needed. underground utilities. This Report's Recommendation Are perform their own studies if they want to,and be sure to allow enough Confirmation-Dependent time to permit them to do so.Only then might you be in a position The recommendations included in this report-including any options to give constructors the information available to you,while requiring or alternatives-are confirmation-dependent.In other words,they are them to at least share some of the financial responsibilities stemming not final,because the geotechnical engineer who developed them relied from unanticipated conditions.Conducting prebid and preconstruction heavily on judgment and opinion to do so.Your geotechnical engineer conferences can also be valuable in this respect. can finalize the recommendations only after observing actual subsurface conditions revealed during construction.If through observation your Read Responsibility Provisions Closely geotechnical engineer confirms that the conditions assumed to exist Some client representatives,design professionals,and constructors do actually do exist,the recommendations can be relied upon,assuming not realize that geotechnical engineering is far less exact than other no other changes have occurred.The geotechnical engineer who prepared engineering disciplines.That lack of understanding has nurtured this report cannot assume responsibility or liability for confirmation- unrealistic expectations that have resulted in disappointments,delays, dependent recommendations if you fail to retain that engineer to perform cost overruns,claims,and disputes.To confront that risk,geotechnical construction observation. engineers commonly include explanatory provisions in their reports. Sometimes labeled"limitations;many of these provisions indicate This Report Could Be Misinterpreted where geotechnical engineers'responsibilities begin and end,to help Other design professionals'misinterpretation of geotechnical- others recognize their own responsibilities and risks.Read these engineering reports has resulted in costly problems.Confront that risk provisions closely.Ask questions.Your geotechnical engineer should by having your geotechnical engineer serve as a full-time member of the respond fully and frankly. design team,to: • confer with other design-team members, Geoenvironmental Concerns Are Not Covered • help develop specifications, The personnel,equipment,and techniques used to perform an • review pertinent elements of other design professionals' environmental study-e.g.,a"phase-one"or"phase-two"environmental plans and specifications,and site assessment-differ significantly from those used to perform • be on hand quickly whenever geotechnical-engineering a geotechnical-engineering study.For that reason,a geotechnical- guidance is needed. engineering report does not usually relate any environmental findings, conclusions,or recommendations;e.g.,about the likelihood of You should also confront the risk of constructors misinterpreting this encountering underground storage tanks or regulated contaminants. report.Do so by retaining your geotechnical engineer to participate in Unanticipated subsurface environmental problems have led to project prebid and preconstruction conferences and to perform construction failures.If you have not yet obtained your own environmental observation. information,ask your geotechnical consultant for risk-management guidance.As a general rule,do not rely on an environmental report Give Constructors a Complete Report and Guidance prepared for a different client,site,or project,or that is more than six Some owners and design professionals mistakenly believe they can shift months old. unanticipated-subsurface-conditions liability to constructors by limiting the information they provide for bid preparation.To help prevent Obtain Professional Assistance to Deal with Moisture the costly,contentious problems this practice has caused,include the Infiltration and Mold complete geotechnical-engineering report,along with any attachments While your geotechnical engineer may have addressed groundwater, or appendices,with your contract documents,but be certain to note water infiltration,or similar issues in this report,none of the engineer's conspicuously that you've included the material for informational services were designed,conducted,or intended to prevent uncontrolled purposes only.To avoid misunderstanding,you may also want to note migration of moisture-including water vapor-from the soil through that"informational purposes"means constructors have no right to rely building slabs and walls and into the building interior,where it can on the interpretations,opinions,conclusions,or recommendations in cause mold growth and material-performance deficiencies.Accordingly, the report,but they may rely on the factual data relative to the specific proper implementation of the geotechnical engineer's recommendations times,locations,and depths/elevations referenced. Be certain that will not of itself be sufficient to prevent moisture infiltration.Confront constructors know they may learn about specific project requirements, the risk of moisture infiltration by including building-envelope or mold including options selected from the report,only from the design specialists on the design team.Geotechnical engineers are not building- drawings and specifications.Remind constructors that they may envelope or mold specialists. O GEPROFESSIONAL$ BUSINESS '�/® . ASSOCIATION Telephone:301/565-2733 e-mail:info@geoprofessional.org www.geoprofessional.org Copyright 2016 by Geoprofessional Business Association(GBA).Duplication,reproduction,or copying of this document,in whole or in part,by any means whatsoever,is strictly prohibited,except with GBAs specific written permission.Excerpting,quoting,or otherwise extracting wording from this document is permitted only with the express written permission of GBA,and only for purposes of scholarly research or book review.Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind Any other firm,individual,or other entity that so uses this docurent without being a GBA member could be committing negligent ATTACHMENT F-PROPERTY DEED 2012004180 FOR REGISTRATION REGISTER OF DEEDS JENNIFER H SACNEISH NEW HANOVER COUNTY, NC 2012 FEB 1010 43.57 R� BK 5617 PG 442-445 FEE $26 00 latli S 2013/418 Prepared by and when recorded,return to Kent Davis Jones,Esq The Law Offices of Swindell&Jones 227 W Trade St, Suite 2030 Charlotte,NC 28202 Excise Tax $0 00(N C G S §105-228 29(6)) Tax Parcel No R01900-002-004-000&R01900-002-009-000 Brief Description for Index Two Tracts(196 9817 Acres MB 20,P 89 and 117 33 Acres MB 15,P 27) STATE OF NORTH CAROLINA NORTH CAROLINA COUNTY OF NEW HANOVER SPECIAL WARRANTY DEED THIS NORTH CAROLINA SPECIAL WARRANTY DEED is made as of thel5 y of January,2011 by GRANTOR: PATRICK WILLIAMS HOLDINGS,LLC, a North Carolina limited liability company Grantor's Address: 900 Harvard Place Charlotte,NC 28207 to GRANTEE: RMP SIDBURY ROAD,LLC,a North Carolina limited liability company Grantee's Address: 1401 Central Avenue, Suite 200-D Charlotte,NC 28205 Attn Herman A.Moore, III For good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Grantor does grant, bargain, sell and convey unto Grantee, in fee simple, all of Grantor's right, title and interest in and to that certain real property located in New Hanover County, State of North Carolina more particularly described as follows(the"Land") See Exhibit A TOGETHER with all buildings and improvements on the Land (jointly, the "Improvements"), and all appurtenances, easements, rights of way, licenses, interests, alleys, strips or gores of land located on or pertaining to the Land (the "Appurtenances")(the Land, the Improvements, and the Appurtenances are collectively referenced herein as the"Real Property") The Real Property hereinabove described was acquired by Grantor by instrument recorded in Book 5055, Page 2940,of the New Hanover County Public Registry All or a portion of the Real Property herein conveyed does not include the primary residence of a Grantor TO HAVE AND TO HOLD the aforesaid Land and Improvements in fee simple, and all privileges and appurtenances thereto belonging,to Grantee And Grantor covenants with Grantee that (i) Grantor is seized of the Land and Improvements in fee simple and otherwise is entitled to the use and enjoyment of the Appurtenances,(ii)Grantor has the right to convey the Land and Improvements in fee simple and to assign the Appurtenances,(iii)that title to the Real Property is marketable and free and clear of all encumbrances, except as set forth below, and (iv) that Grantor will warrant and defend the title against the lawful claims of all persons claiming by and through Grantor only,except for the exceptions hereinafter stated Title to the Real Property is subject to the following exceptions 1 Ad valorem taxes for the year 2011,and subsequent years,and 2 All easements,restrictions and covenants appearing on the public record IN WITNESS WHEREOF,Grantor,by authority duly given,has executed this instrument as of the day and year first above written GRANTOR: PATRICK WILLIAMS HOLDINGS,LLG By r.1 Name ,• �` -� '.4/.4- Title STATE OF NORTH CAROLINA COUNTY OF Atialotigii I certify that the following person(s)personally appeared before me this day, each acknowledging to me that he or she voluntarily signed th4foTegoin#d unjent the purpose stated therein and in the capacity indicated u.ri,a t.er f 15�'*•� A'l W' rt f•c Date /ftiv/le Printed or Typed ame Whoix- 6�i1,rfit.�. �, Notary Public ♦�' �'S1k � Jeeeeeeeee [Seal] t. m0♦Q�• °.e'9 �t My commission expires ld /�A®// € e OTARjVa s6;r-U8LG •c, ¢.4 •e , b A' EXHIBIT A LEGAL DESCRIPTION LYING AND BEING situate in New Hanover County,North Carolina and more particularly described as follows TRACT ONE Being all of that tract or parcel of land containing 196 9817 acres, more or less, as the same is shown on the map entitled Map of Survey for Newman Buck, recorded in Map Book 20 at Page 89 in the New Hanover County Public Registry TRACT TWO Being all of that tract or parcel of land containing 117 33 acres, more or less, as the same is shown on the map entitled Map of Survey for Newman Buck, recorded in Map Book 15 at Page 27 in the New Hanover County Public Registry 0ON1 Y. 0 4A44., 0 1/ram i1I I ,i19%r Istl{t y JENNIFER H MACNEISH REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 wrrw rwrrwr�wrrrwrwwewrrrw wwwwwwwwwrwww wrrwwrwrwwr wwrrrrrwwwrrwr ww+rw+�w+tr*+k+twrww+ew*rwwrwwrtrwrrwwrr ww*w,�***r Filed For Registration: 0211012012 10:43:57 AM Book: RE 5617 Page: 442.445 Document No.: 2012004180 4 PGS $26 00 Recorder: CARTER, CAROLYN State of North Carolina,County of New Hanover PLEASE RETAIN YELLOW TRAILER PAGE WITH ORIGINAL DOCUMENT. * 20 2004 80 * 2012004180 ATTACHMENT G - SECRETARY OF STATE DOCUMENTATION • rue an Hrlrlual I-(epor L/Hrnenu an /-Ulrnual i- epor l • uploau a rur riling • uruer a uocurnenl unnne • HUU Cflllly lU My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name RMP Sidbury Road, LLC Information Sosld: 0822632 Status: Current-Active O Date Formed: 1/13/2006 Citizenship: Domestic Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: Rudolph, John C Addresses Mailing Principal Office Reg Office 1401 Central Avenue Suite 200-D 1401 Central Avenue Suite 200-D 172 Huntley Place Charlotte, NC 28205-5366 Charlotte, NC 28205-5366 Charlotte, NC 28207 Reg Mailing 172 Huntley Place Charlotte, NC 28207 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager JOHN C RUDOLPH 1401 Central Avenue Suite 200-D Charlotte NC 28207 fly Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print an Amended a Annual Report form Business Corporation _egal Name ).R. Horton, Inc. Information Sosld: 0296009 Status: Current-Active 0 )ate Formed: 11/5/1991 citizenship: Foreign State of Incorporation: DE =iscal Month: September 4nnual Report Due Date: January 15th CurrentAnnual Report Status: Registered Agent: CT Corporation System **Note load times may be long** ECEIVE 4ddresses JUL 11 2020 1) sir:....,Mailing Principal Office Reg Office Reg M—ailing 1341 Horton Circle 1341 Horton Circle 160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 Arlington, TX 76011 Arlington, TX 76011 Raleigh, NC 27615-6417 Raleigh, NC 27615-6417 Officers Vice President Chief Executive Officer Chairman of the Board Vice President Cade C. Anderson David V Auld Donald R. Horton Thomas B. Montano 1341 Horton Circle 1341 Horton Circle 1341 Horton Circle 1341 Horton Circle Arlington TX 76011 Arlington TX 76011 Arlington TX 76011 Arlington TX 76011 Chief Operating Officer Chief Financial Officer Michael J Murray Bill W. Wheat 1341 Horton Circle 1341 Horton Circle Arlington TX 76011 Arlington TX 76011 Rfnrk CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. She is a duly elected, qualified and acting Assistant Secretary of D.R. Horton,Inc.- Torrey, a Delaware corporation (the "Company"), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Sole Director of the Company dated January 12, 2015 (the "Resolutions"). The Resolutions have not been amended,rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Secretary and NPDES Administrator RESOLVED,that Ian E.Flannery is hereby elected to the office of Assistant Secretary of the Company (the "Assistant Secretary") in the Company's Coastal Carolina Division (the "Division"), to serve until the next annual meeting of directors of the Company and until his successor is duly elected and qualified or until his earlier death, resignation or removal. RESOLVED FURTHER,that the Assistant Secretary is hereby authorized and empowered, in the Jacksonville, Myrtle Beach and Wilmington areas (collectively, the "Areas") of the Division and in the name and on behalf of(i) the Company, (ii)any partnership of which the Company is a general partner, manager or agent, and(iii)any limited liability company of which the Company is a member, manager or agent (collectively, the "Entities") to sign, modify and terminate, from time to time as he deems it to be in the best interest of the Entities, permit applications,notifications,exemption requests, agreements,reports and documents related to federal, state or local implementation of National Pollutant Discharge Elimination System("NPDES")storm water or associated wetlands related matters for the Areas including,but not limited to,independent contractor and subcontractor agreements, consultant agreements, Storm Water Pollution Prevention Plans ("SWPPPs"), Notices of Intent("NOls"), Notices of Termination("NOTs"), plans and other similar or equivalent agreements or documents for the Areas relating to the business of the Entities but excluding any enforcement related documents including, but not limited, to settlement agreements and consent decrees. IN WITNESS WHEREOF, the undersigned has set her hand on the 14th day of January, 2015. Ooklup cre_fzi„..„ Ashley Dagley Assistant Secretary U.•VTEWAL7Win\TORREYV 5Jan 14-COAS.Hp1 CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. She is a duly elected, qualified and acting Assistant Secretary of D.R. Horton,Inc., a Delaware corporation (the "Company'), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Executive Committee of the Board of Directors of the Company dated April 1, 2019 (the "Resolutions"). The Resolutions have not been amended, rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Vice President and City Manager WHEREAS,effective October 31,2017,Elizabeth Shelton was duly elected to the office of Assistant Secretary of the Company in the Company's Central Carolina Division; and WHEREAS, Elizabeth Shelton transferred to the Company's Coastal Carolina Division and has been promoted to the position of Assistant Vice President of the Company,and it is now desirable to grant her additional duties and authority for that division. NOW, THEREFORE, BE IT RESOLVED, that Elizabeth Shelton is hereby elected to the office of Assistant Vice President of the Company (the "Assistant Vice President") in the Company's Coastal Carolina Division (the "Division'), to serve until the next annual meeting of the directors of the Company and until her successor is duly elected and qualified or until her earlier death, resignation or removal. RESOLVED FURTHER, that the Assistant Vice President is hereby authorized and empowered,in the Wilmington area(the "Area')ofthe Division and in the name and on behalf of(A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities'), (i)subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President, (d)Executive Vice President or(e)the Region President of the Division (the "Approving Officers'), to execute and deliver contracts,agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement,leasehold or other tangible or intangible property,right or interest,and any personal property relating or incident thereto, (ii)subject to written approval by any one of the Approving Officers,to execute and deliver contracts,agreements,deeds, conveyances or other obligations of the Entities, closing statements and other documents and instruments for the sale of improved or unimproved real property,or any interest or right therein,owned,leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER,that in connection with the management of the Entities'business,the Assistant Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property,(ii)contracts,agreements,deeds, closing statements and other documents and instruments for the sale,transfer and/or conveyance of mineral rights,groundwater and other water rights owned, leased or controlled by any of the Entities to DRH Energy,Inc.,an affiliate of the Entities,(iii) home sales contracts,sales person employment agreements and similar or equivalent agreements,documents or instruments and(iv)personal property leases for,among other things,office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities' business in the Area,the Assistant Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family and multi-family homes. RESOLVED FURTHER, that effective as of the date hereof, Elizabeth Shelton is hereby removed from the office of Assistant Secretary of the Company. RESOLVED FURTHER,that effective as of the date hereof,the authority hereby granted to the Assistant Vice President supersedes authority previously granted by Written Consent of Executive Committee of the Board of Directors to the Assistant Vice President. IN WITNESS WHEREOF,the undersigned has signed on the 11t'day of April,2019. Oi*dLkJ\ V ' i " J' Ashley Dagley • Assistant Secretary U:UTEWAVIIMinWH1119Apr11-COAS2.wpd 2 CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. She is a duly elected,qualified and acting Assistant Secretary of C.Richard Dobson Builders,Inc.,a Virginia corporation(the "Company'), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Sole Director of the Company dated April 1, 2019 (the "Resolutions"). The Resolutions have not been amended,rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Vice President and City Manager RESOLVED, that Elizabeth Shelton is hereby elected to the office of Assistant Vice President of the Company (the "Assistant Vice President') in the Company's Coastal Carolina Division(the "Division'),to serve until the next annual meeting of the directors of the Company and until her successor is duly elected and qualified or until her earlier death,resignation or removal. RESOLVED FURTHER, that the Assistant Vice President is hereby authorized and empowered,in the Wilmington area(the "Area')of the Division and in the name and on behalf of(A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities'), (i)subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President,(d)Executive Vice President or(e)the Region President of the Division (the "Approving Officers'), to execute and deliver contracts, agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement,leasehold or other tangible or intangible property,right or interest,and any personal property relating or incident thereto,(ii)subject to written approval by any one of the Approving Officers,to execute and deliver contracts,agreements,deeds, conveyances or other obligations of the Entities, closing statements and other documents and instruments for the sale of improved or unimproved real property,or any interest or right therein,owned,leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER, that in connection with the management of the Entities'business,the Assistant Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property,(ii)contracts,agreements,deeds, closing statements and other documents and instruments for the sale,transfer and/or conveyance of mineral rights,groundwater and other water rights owned,leased or controlled by any of the Entities to DRH Energy,Inc.,an affiliate of the Entities,(iii) home sales contracts,sales person employment agreements and similar or equivalent agreements,documents or instruments and(iv)personal property leases for,among other things,office equipment and construction trailers. RESOLVED FURTHER,that in connection with the management of the Entities' business in the Area,the Assistant Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family and multi-family homes. IN WITNESS WHEREOF,the undersigned has signed on the 11t day of April,2019. OrCitkivilttl Ashley Dagley Assistant Secretary U:lITEWALTivfm1Dobson118Aprl1-COASwpd 2 CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. She is a duly elected,qualified and acting Assistant Secretary of D.R.Horton,Inc. - Torrey, a Delaware corporation(the "Company'), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Sole Director of the Company dated April 1, 2019 (the "Resolutions'). The Resolutions have not been amended,rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Vice President and City Manager RESOLVED, that Elizabeth Shelton is hereby elected to the office of Assistant Vice President of the Company (the "Assistant Vice President') in the Company's Coastal Carolina Division(the "Division'),to serve until the next annual meeting of the directors of the Company and until her successor is duly elected and qualified or until her earlier death,resignation or removal. RESOLVED FURTHER, that the Assistant Vice President is hereby authorized and empowered,in the Wilmington area(the "Area')ofthe Division and in the name and on behalf of(A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities'), (i)subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President, (d)Executive Vice President or(e)the Region President of the Division (the "Approving Officers"), to execute and deliver contracts, agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement,leasehold or other tangible or intangible property,right or interest,and any personal property relating or incident thereto,(ii)subject to written approval by any one of the Approving Officers,to execute and deliver contracts,agreements,deeds, conveyances or other obligations of the Entities, closing statements and other documents and instruments for the sale of improved or unimproved real property,or any interest or right therein,owned,leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER,that in connection with the management of the Entities'business,the Assistant Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property,(ii)contracts,agreements,deeds, closing statements and other documents and instruments for the sale,transfer and/or conveyance of mineral rights,groundwater and other water rights owned,leased or controlled by any of the Entities to DRH Energy,Inc.,an affiliate of the Entities,(iii) home sales contracts,sales person employment agreements and similar or equivalent agreements,documents or instruments and(iv)personal property leases for,among other things,office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities' business in the Area,the Assistant Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family and multi-family homes. IN WITNESS WHEREOF,the undersigned has signed on the 11t day of April, 2019. Ashley Dagl 94/M Assistant Secretary U:V173WAL11Min17ORRrsY119Apr1I-COASwpd 2 CERTIFICATE OF ASSISTANT SECRETARY The undersigned hereby certifies as follows: 1. She is a duly elected, qualified and acting Assistant Secretary of DRHI, Inc., a Delaware corporation (the "Company'), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Sole Director of the Company dated April 1, 2019 (the "Resolutions"). The Resolutions have not been amended,rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Vice President and City Manager RESOLVED, that Elizabeth Shelton is hereby elected to the office of Assistant Vice President of the Company (the "Assistant Vice President') in the Company's Coastal Carolina Division(the "Division'),to serve until the next annual meeting of the directors of the Company and until her successor is duly elected and qualified or until her earlier death,resignation or removal. RESOLVED FURTHER, that the Assistant Vice President is hereby authorized and empowered,in the Wilmington area(the "Area')of the Division and in the name and on behalf of(A) the Company, (B) any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member, manager or agent (collectively the "Entities'), (i)subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President, (d)Executive Vice President or(e)the Region President of the Division (the "Approving Officere), to execute and deliver contracts,agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement,leasehold or other tangible or intangible property,right or interest,and any personal property relating or incident thereto,(ii)subject to written approval by any one of the Approving Officers,to execute and deliver contracts,agreements,deeds, conveyances or other obligations of the Entities, closing statements and other documents and instruments for the sale of improved or unimproved real property,or any interest or right therein,owned,leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER, that in connection with the management of the Entities'business,the Assistant Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property,(ii)contracts,agreements,deeds, closing statements and other documents and instruments for the sale,transfer and/or conveyance of mineral rights,groundwater and other water rights owned,leased or controlled by any of the Entities to DRH Energy,Inc.,an affiliate of the Entities,(iii) home sales contracts,sales person employment agreements and similar or equivalent agreements,documents or instruments and(iv)personal property leases for,among other things,office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities' business in the Area,the Assistant Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family and multi-family homes. IN WITNESS WHEREOF,the undersigned has signed on the 11 `day of April,2019. Gialdbit4 Q Ashley Dagley Assistant Secretary U:IITEWALT Min1DRHI\19Apr11-COAS.wpd 2 For DEQ Use 8... Reviewer: , —4 V North Carolina Department of Environmental Quality Submit 7 14) a00 Request for Express Permit Review Time:Co Confirm: FILL-IN all the information below and CHECK the Permit(s)you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative,site plan(PDF file)and vicinity map(same items expected in the application package of the project location.Please include this form in the application package. • Asheville Region Alison Davidson 828-296-4698;alison.davidson(ancdenr.gov Provided Ehisting Permits related±o this Proiect • Fayetteville and Raleigh Regions-David Lee 919-791-4204;david.lee(ancdenr.gov L�� � • Mooresville and Winston-Salem Regions-Paul Williams 336-776-9631;paul.e.williams(ctncdenr.gov S�'! • Washington Region-Lyn Hardison 252-948-3842 or lvn.hardison(a)ncdenr.gov SW WilmingtonRegion-Cameron Weaver 910-796-7265 or cameron.weave►(a ncdenr.gov SW • NPDES —TI i b I ZO ZO NOTE:Project application received after 12 noon will be stamped in the following work day. N?DES WQ Project Name: SIDBURY STATION-PHASE 1 County: NEW HANOVER ` Q Applicant:JOHN C RUDOLPH Company:RMP SIDBURY ROAD,LLC E&S Address:1401 CENTRAL AVENUE SUITE 200-D City:CHARLOTTE,State:NC Zip:28205-5366 E&S Phone:__ ,Fax:_ ,Email: @ Other Physical Location:MURRAYVILLE,NC-MAIN DEVELOPMENT ENTRANCE OFF SiDBURY ROAD Project Drains into PRINCE GEORGE CREEK waters—Water classification C;SW(DWR Surface Water Classifications Map) Project Located in CAPE FEAR River Basin. Is project draining to class ORW waters?N,within''/2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters?N Engineer/Consultant: RICHARD MOORE, PE Company:MCKIM AND CREED, INC Address:243 NORTH FRONT STREET City:WILMINGTON, State: NC Zip:28401- o. Phone:910-343-1048.Fax:910-251-8282,Email:ramoore@mckimcreed.com E C E IV E', PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED Ei IPLOYIENT,IF AVAILABLE MAY 0 6 2020 $ # JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ BY: Scoping Meeting ONLY ElDWR, ElDCM, ®DEMLR, ❑OTHER: SECTION TWO: CHECK ONLY THE PROGRAM(S)YOU ARE REQUESTING FOR EXPRESS PERMITTING Li 401 Unit LI Stream Origin Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑Intermittent/Perennial Determination:_#of stream calls—Please attach TOPO map marking the areas in questions El 401 Water Quality Certification El Isolated Wetland( linear ft or acres) El Riparian Buffer Authorization El Minor Variance El Major General Variance ®State Stormwater El General ❑SFR, El SFR<1 ac. El Bkhd&Bt Rmp, ❑Clear&Grub, El Utility ❑Other El Low Density ❑Low Density-Curb&Gutter #Curb Outlet Swales El Off-site[SW (Provide permit#)] Z High Density-Detention Pond 4#Treatment Systems El High Density-Infiltration _#Treatment Systems ❑ High Density-Bio-Retention _#Treatment Systems El High Density—SW Wetlands _#Treatment Systems El High Density-Other _#Treatment Systems/❑MOD:❑Major❑ Minor El Plan Revision El Redev.Exclusion SW (Provide perm:#) El Coastal Management ❑Excavation&Fill ❑Bridges&Culverts ❑Structures Information El Upland Development El Marina Development El Urban Waterfront El Land Quality ❑Erosion and Sedimentation Control Plan with acres to be disturbed.(CK# &Amt. (for DEQ use)) SECTiOi4 THREE—PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT(for both scopinq and express meeting request) Wetlands on Site /1 Yes El No Buffer Impacts: ®No El YES: _acre(s) Wetlands Delineation has been completed: ®Yes El No Isolated wetland on Property®Yes El No US ACOE Approval of Delineation completed:El Yes®No 404 Application in Process w/US ACOE: El Yes No Permit Received from US ACOE El Yes® No DEQ ----'-•�rL' rsrcqh Fee Split for multiple permits:(Check# 1 Total Fee Amount$ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance(❑Maj;❑Min) $ SW(❑HD,❑LD,❑Gen) $ 401: $ LQS $ Stream Deter,_ $ NCDEQ EXPRESS June 2019 Design Narrative I. Existing Site The proposed 314.3 acre development,known as Sidbury Station,is located in New Hanover County, 1.80 miles North East of the intersection of Blue Clay Road (SR 1318) and Sidbury Road (SR 1336). This development will consist of single family residential,multifamily residential, open space,an amenity center and private streets.This phase(Phase 1) of the development consists of approximately 115 acres of single family residential development and the amenity center. The existing site is undeveloped farmland and woods with vegetation that is primarily row crops with crop residue,woods,wetlands and understory growth.A copy of the USGS quadrangle map is attached indicating project vicinity and general drainage patterns in the area.The New Hanover County SCS Soil Survey(copy attached)indicates the underlying soils within the project area predominantly Johnston Soils (JO),Leon Sand(Le),Murville Fine Sand (Mu), and Seagate Fine Sand(Se). The Hydraulic Soil Group Classifications are A/D,A/D, A/D, and B respectively. The project site is in the Cape Fear River Basin and drains to Prince George Creek. According to the latest surface water classifications published by NCDEQ Prince George Creek is classified as C;Sw. Prince George Creek Drains to the North East Cape Fear River(B;Sw, Index-No. 18-74-(47.5))as illustrated on the attached USGS Topo Map.Wetlands do exist within the site boundary but will not be disturbed.The wetlands have been flagged however the USACE is not currently performing site visits to confirm flagging. We anticipate this restriction to end, survey to be performed, and have a signed jurisdictional determination prior to submittal of this project for permitting. The site does not drain to ORW designated waters, is not within 1/2-mile of and draining to SA classified waters,and is not within 1-mile and draining to HWQ designated waters. II.Proposed Improvements The proposed improvements are consistent with any residential subdivision.The basic improvements proposed at this time consist of the construction of roadways with standard curb and gutter,water and sewer utilities, and storm drainage collection and treatment systems (consisting of four wet detention ponds)to allow for the construction of 258 single family residential homes and the amenity center.The systems ultimately drain to the North East Cape Fear River via wetlands and Prince George Creek. ATTACHMENT A - USGS QUAD MAP ' 1 11111 a a 1 I fill 1 0 0 !-,...,,,,i.:. m 05 ce z CI- ] '1.18".;144.7.:1: 7!!:1!H•it j 4: . LI • W I .'•!:':•::::*::::.::!_%:'''::::::::.). )- M -1 '::::•:::::.7:.t:tE:2:::'::::::::: : CC m •- M 0 Ill / 0 4( i: -\%::-::::.:::•::*:::.::.:s-i:: , •!••::•:•::::•:•: ..4 PHASE 2 . (FUTURE PHASE) . •••..,,,..1 _:;: ____=___-; i it —-- ..s...., Now ' P8 siral,"4...... - - - ------ --' nol i agy 4 . !:i 1 .... ......_ by. 7.4%.. 1 1 1 I::::II * • ' l' & • ••ihrl ---- ...' I. • ----'---_,11 IV I .11.`.. 7:•':': l'-'- ri1 I-1'1 I\i\ef,iutr..i.:ir•l 1—o0T1''u='1 4'',,' a1rEs3iil1lllll1 l,i.u.8..'8m l.2'l' 1ia•I.1m..Otl g•1i A•.Io1l..g1..i1n..:.%:•g.::.::.:.:::..:A 4'..r.I l•iif O•..:•-. .WZ• i1r Ai,'l.lgV a '•.:•:.•:.::..::':. -:274- i In- , , 13.--, , kil ., 1 i.hprii-.-- 7....., •:::.....::;:, \ A__, Ildfl& .. , i'•:1111, ., 'LW:: , ,r---_ ir--- -- _ I , \, i•;. . 'ea ..,.. ,„....:....- , 0 _ .. --, ,Iii , i'i,:.1111.11, 11romsr)•::H.::•.T:tirit --::: -=.7.7.\'':.7.1-.74::*:•••.. -.. -- . 1 ›- z • cc a .1 . ., 1 \ 11. A ' al 8 ralrim‘Iga 1 Ir.. : 1:11111113 USW- 2 :7" i• IC)F•jrsIQ) ° gar f - t - • 1 tit l' MI a I allit •:CO2s,/1 I:. Oagg co F CC N.01 X 11 I i igq \ 'e:Wi 'ONO '0111r:i (DV iliji _ _.j 14.7.in ifil ..11111114, ;•11114(7::: ;. .:: :::•:.::•:.::.•:::•:. 1 ,Ritir P :•:: ::'::::::'::::'::::::':::::::::::. .::• ''''.".."I 1 ' •• Pair ' 0 ''::':'• '::':•:•::':•::*:•:.::':•:•':•:•::•:•:••: ...'.- 1 i. .1Iti F,V11111113 110' Its/ ip• ,EMI 1- %. 111 . A, gie • t• si s 1 1 '1 1 \ ( . ,.., ik-_-iii*\Willo-•V ::.•i:: . :.:'i:::.i: :i: :iii::.::•:.::.:.i.:.:: :::.:"1\ i I la a . 'fir lii I\ Il?i• A law. imiks-lt,, . -':::: :::::::::::::::::1:::::::::::::::::::::::•.%....... I i 'Ill'Easii 2111;'' "''''. 9- - - . . .:::.:.::::::.:::.:i:::::::.::iii::'::::.::.:•• 1 1 1 .. -...:..,.. —---tii. --- ---c::;4;(• :::::.:::::::::::::::::::::::.:::::.::.:........ 1 1 10._--4. :.::::.:,::•::::::i:::-i:::::::....i:i... • 1 , 1 ii, \\k, _I,- Is\,,El..:,•:.--:::-:-., • 1):- , =7. .::::::•:.::::'::::i::::::i:i:::::::*: ;I 1.\.lis - ,1h, : 0 '•:.,.. .:.: . •. •• •••••77........:...... 1 i•v. . v: 6 •••:.::•:- •- • \ .......-r.. ./..-17.-4,4---t-,,, a ;•, / , I CU ILI,Y // 0 0 LU r Z 2 W [ , ; a ti.i o Z•C 0 ' •- I a , Y 1 , �i ,i z 5 95 L b b a 1$/5 2 1014_, Q JZ_ O U O C t:L1 , II Z W 1.'.'.'.• .'W Z Q U• (A K K W :::: E 8 ‘1 a w PHASE 2 (FUTURE PHASE) 1.1400 GS* 414*Art: - r•SteAfc/4, M run -'-' 4. . 1 \ • -•-inua . .4.0a -tili,ire "*.---.......$ •'��1 II x I�•• r •• ❑o N \ \ :12,:;.•:____,_, yam I g itie :::::::•::::*.'; ( Y I R ❑y ,. m I . rip ' Z1I® i iRIal Imo• di m m I 0 R1 � ..... fimI II • L. I •y I I i to IN 11 P. I EMI 'NW** r o E ?1i —� I Wt W o 1 1 ': U�� I� j r O Q W M QO 2 ` n` s (. ,IIIR. "9 _ � r Zrn1i OOn" w I '(.tea VIIINIFIE I min v•.•: W ���III 1 I I 1• . ) 1 III a®•' , :®I I I! 1 ' 4: Al111 V ..••. ..•••...•••• I, i ...t,,,,."el 5_51_11__S /v.* .0 . .. •.....•.••...•... \ \ :liti 11160111 ••-iiii* :.:.::::7:::•:.:::.:•::•:.::::•::':.::::''' ' . • IIti` f I� ❑ •®.. II U ,' W W , ----�� Q a_WU Z CD g In usGs ILL OiPrUOIT OF TOO INT I OCOTRHILLH WOO/ANGLE U.S.ffOLagCALS& �,I S 1� MIMI flMq=NA x.�r..r"y,:W W tA011meva nA9a .n rxr r;y M'rE D R AO w m w w 19 ♦ I) xm I • 05 • • • w f - - , yam_ - 0:\' ..- PROJECT 'a. • - BOUNDARY - . - .m .u.w. • "°�. "ram s i _ _.•`. k ..' te+a. I { J �_� ; { :..,� • - aT B f,, N 1 •t. w.� •p rt301 .s_ .......... r ti '•r 3 '.,.} ' r,r u • .�:''�Be®a - . e , i _ . . ,.....l- , SC..•• ' �� ,e ... .••t . `Lf y .k " y8. M.1NF IG ]1 m T4 Lh 69 m . .1 -••+k°�[ nAs` .....0 1xliutl tlr+Srt1190 1 :a..r..a a-.r:n:ao�/x fa, SCALE 1'JA WO _ .+rawaa.:vfr.•.r-.r " r sr imam ... ..._.. ....Our r..xn..,.wacmr.vn .,,... �:fm,u.® :.av ._ >a fir:.._._.....:_:"_:'. s. w u .m.pax................... . ..... r.r I artisio. _...._.... ...... ... ,......".f. .:._ r _. 5 SSORS NIL NC a �,. 3F ATTACHMENT B - SCS SOIL SURVEY MAP z z b ry N en COME 001266 002006 COY 026006 002100E maze 000206E 00ma N r, M.9Z,OS e[.L M„BZ,OS dl N O 0) NI c, f0 Oi a F. 1 1- \\\ _ _ -1 8_ Pi �.. iti co f z o k N U .c N O,- c 7 Zy 1 �_ l0 cC >4`o H am - r a) � U E Oi.L -1 a0 2 § U p To L zI _ $m O _ � gyp A z O co 4. • co Q \ . rV. -.:- g n S q d ` m •:I GO[ G c �y : O c, — 1 $ 1 ca o O mt t_ at 1. c 8 z� 2 V 8 4 Ni M,1Zd5 dl E • I I I I I • I I I M,1Z SS dl OOi80i8 =ZO E COMM 005106E COME 0062� fi C 202 0�6 00 as r' z z b h A o Cr) N .o O V) N N a) •� N as as Z ° N m C') CO N W .° U V) O N -O 0- CO Ca tp a) 8 a) .t fQ N � Cl) I > C O (0 U 7.°D n U ) co To y 0 C C U y N Ca a) 7 E y= C y N C 0,E a) U `- 1do E °) a) : N,_ a r 2 n - Y ° D. o)= 2 E co 5 ai.° E a) ° m o ° m C U f0 m o o a) _0 2 a) 5 ° V E N m a o Z E N 'n coii w ° m CO O CO L 0O ° ° ° O n� a) c i6cl n y 7 ° U 0 z C °) () E w C L o (6 °) °) 0 ° y 4- coO O y y N O z Z N V E N U Q O L n C °) 'p N Q ram+ ii L O` 2 N • O w ° n; c co U w o_t as o) c CD Ca a ° re ‘52 m Emu, °°) m ° o io `� $ U m Q� Qto O ° L as U C N '- C C CA os -- y �. > L° o o N °) N m y C V U > O N 0 COas T m E LL ° ° — Cm o v°i o C E ° oN (p L BEd dJo O d L ° W .0 = v) •U'G u)as 0 13 a7 0 `� ° N .0 ° •a) a. E C -0 faa� U ° cn � •o n� v . = 'y m a Q U � < U• 0 L- O 0U y 7 J O y n C 0 N N ° ') n ; ° °E ao CO °7Q $ c ° v z ° a o N o� w n CO L ° ZEE ° nas °c aai ° is ° . "v'E o ns E H N .0 > L ° 2 m CO CO is N o O) E 0O 01 T 7 O C '� C ..N.. 0 > a. a) • U a7 (C U m C 5 0 .0. a) O f0 o. a) N V) 7 D O Ca L C = Cl) a) yE0) t•E 4_ v) 0 E o3U D '` 02 = o CD nmu-n) E No E E a) E o O C a o ° ate) ° ° ZQ n0 °m L��o ° a7 'y O C [6 O ° a) Lo E al ° �` d m m CD 7 Eat CO aa)) P. unit _ a) E00 9N ° nc) O L � >to C y C O U ° a) o a) coO Ca O u) � P. E w 'O 7 'O 'P. °Cp L O E L C H � >. W E_ O N [LE co>O 2 n-E Q a) 1- 0 0)0) Cq n- ON 1- U .- u) C a) U L a) O o.- 7 Z ° Cr (n o a > > U iri cn .' E _ ° o L• PL 0_C la o CO Z m wr U S 7 i t c to a as °I0 a U_ co .0 E o n N Z v Cl) c o 2 y a v i0 I) d O O J o W +�-' O O L Z m 0 a m E Sg o c ca a 2 Q = ca u) a) U m W [C p mTs G O L o W E C 'lp N (n li p m Cl) > O m (n o K O J .01 a ci) •- O m o Z LY �( vo fa a) 0 �r tc T' ❑ m o • 0 .W C 0 Wco H m W a a O a o o o 2 w a a � aE a• w d` a N c c c o d O mm gg Oo O. m7 7 ma« .. O c � r a a• aa n a O 0 a ; Tp O rm to Q a 3 > > vE E 2U 1pTy m a) 5 C a) _o a a O O O C 0 t 1u O e e C > m C m a) o m m a) _ 2 • co v7 co •o m m U U 19 L7 J J 2 e a U (n (n 0 Cl) Cl) Cl) at a. a) C) c s to a y i co • `° wre cc — a o `a o ° c eo Z0 81 .ih t Soil Map— New Hanover County,North Carolina Sidbury Farms:Phase 1 Map Unit Legend limp Unit ay'rata! I lisp Una Warne M En AOI I'rrsant of AM JO Johnston soils 1 23.9 19.8% I Le Leon sand 1.2 1.0% Mu Murville fine sand 40.7 33.8% Se I Seagate fine sand 54.51 45.3% Totals for Area of Interest 120.3 100.0% USR> Natural Resources Web Soi!Survey 3/25/2020 -- Conservation Service National Cooperative Soil Survey Page 3 of 3 S L,4 rn r14) 4 - 6- t.,..co r-._. �,7d�•.� •.y.-,i fY '., 9 il��'.�V�Yy i....C7;'•�I 'i1/4.1' .)•�r.. 1� _ ..+r Y. z J%ri-Ar , I5c '•4Jv� r•.:3'1 r- \Jec. .r .j J.�/'1tr U „ 4-`.\(-_h 'CPC r.St S;r,�le ��. �� rr.e�' -�t `l -,- n C. !d r ,v+-e , 22S SiorSA 6.V Q aUfi in o r i{..,,� . W 000 Sc per �._o� .t'c1 l•� " Stern► �`^~ 't e.v U3(I; Lc rse'r.FA C rc or hn r.� • vy)IvICW ATTACHMENT C— SITE PLAN Ne 3i nt��S core c4ec �. • ►c r 4 f i c,o+i 4 -, �.► ,�.c. • OR S D S • v`r ;drN 1)C nee as }a b,7e., •5,,� rv-,e(— air' cce. {art • . =;ec-s 9 y r opor dSec),'f`d I-0 k i ins +-r.A'a i . • ncecl 21 cornple1c wnr•1 ecAtoot.r1ck Thr ev'f•!re proper hi '. .rc.7 'rip raP C�IcU���tian