Loading...
HomeMy WebLinkAboutNC0037508_Correspondence_20060720AJ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director July 20, 2006 Dennis L. Brobst Moore County Public Utilities P.O. Box 1927 _ Carthage, NC28327 Subject: Guidance Document for WWTP Expansions Moore County WPCF Moore County Dear Permittee: Recognizing that many local governments face the need of planning for expansions of wastewater treatment plants, the Division has developed the enclosed guidance document. The purpose of this document is to assist local governments in the planning process by summarizing the steps needed to obtain all the permits necessary for an expansion. The Division tracks average flows on a calendar -year basis for all permitted facilities. Those approaching 80 % of the design hydraulic load of the treatment system are encouraged to start the planning process to address the increasing flows. The average flow for calendar year 2005 at your facility was 71% of the hydraulic permitted flow. Please review this document and consider its applicability to your particular treatment system. If you need more detailed information or assistance identifying the steps needed to address an expansion, please contact the NPDES or Planning Units at (919) 733-5083. Sincerely, Matt Matthews Point Source Branch cc: Central Files Fayetteville Regional Office / Surface Water Protection NPDES file 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 512 North Salisbury Street, Raleigh, North Carolina 27604 Phone: 919 733-5083 / FAX 919 733-0719 / Internet: h2o.enr.state.nc.us An Equal OpportunitylAfnnative Action Employer — 50% Recyded/10% Post Consumer Paper NonrthCarohna Natma!!tf