Loading...
HomeMy WebLinkAboutNC0037508_Authorization to Construct_20150807rI Ur Moore County A To C No. 037508A03 Project No. CS370496-02 Issued May 2, 2011 Engineer's Certification i,4pQ�s /"j C, J -3 q 1,9�a14, 14 4 4:;r as a du ly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Moore County Water Pollution Control Plant WWTP, located on Addor Road in Moore County for Moore County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Modification of the existing headworks including raising the wet well wall elevation of the existing grit unit to accommodate proposed peak flows, a parshall flume, installation of two (2) 170 gpm aerated grit units including two (2) 180 sefin blowers; refurbishment of a flow splitter box; refurbishment of equipment in two existing primary clarifiers and construction of a new 75- ftdiameter 9.75-ft sidewall depth primary clarifier; refurbishment of two existing first stage aeration basins and construction of a new 4-cell 463,792 gallon first stage aeration basin, refurbishment of the first stage RAS/WAS pump station and the installation of four (4) 2,940 gpm centrifugal RAS pumps; refurbishment of two (2) existing intermediate clarifiers and construction of a new 90-ft diameter 11.75-ft sidewater depth intermediate clarifier; refurbishment of two (2) existing second stage aeration basins, construction of a new 598,441gallon second stage aeration basin; refurbishment of the existing second stage RAS/WAS pumping station, four (4) 2,940 gpm centrifugal R.A,S pumps; refurbishment of the existing blower building, installation of five (5) 4,200 scfm aeration blowers; refurbishment of two existing final clarifiers and construction of a 105-#t diameter 16.2 sidewall depth final clarifier; six (6) 750 fe traveling bridge tertiary filters; a dual channel UV disinfection system with 4 modules per channel; two (2)-200 gpm vertical turbine pumps; sludge handling equipment including two (2) 200 gpm sludge recirculation pumps, sludge heaters, combined sludge thickener and 2.2-meter gravity belt press, three (3)175 gpm sludge transfer pumps, 16,700 fl� sludge drying bed metal roof; magnetic flow meters; eight (8) wastewater sample pumps; SCADA system; three (3) 750 KW generators; 1400 fi2 operations building addition, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. We understand that the new limits associated with the modifications to expand to 10.0 MGD now apply. Signature Registration No. Date Send to: Construction Gr & Loans DENR/DW 1633 Service Center R igh, NC 27699-1633 tie 099 9 ?9 3 p '4'01l1�' 00� Berry, Ron From: Berry, Ron Sent: Friday, August 07, 2015 11:28 AM To: 'Fred Hobbs, P.E.' Subject: Original Engineer's Certificate for Moore County WPCP ATC#037508A03 Attachments: Engineer Certificate from 037508A03.pdf Mr. Hobbs, Attached is the original Engineer's Certificate form that was attached to the Authorization to Construct permit. As we discussed the Division needs the original certificate completed and returned (in this case return via email is fine). If you have any questions let me know. Ron Berry, Engineer Division of Water Resources/NCDENR Phone: (919) 807 - 6396 Email: ron.berrv@ncdenr.eov Location Address - Archdale Building, Office 925K 512 N. Salibury St. Raleigh, NC 27699 Mailing Address - Archdale Building, NCDENR/DWR 1617 Mail Service Center Raleigh, NC 27669-1617 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. retAA q-t s 02 C 1 ENGINEER'S CERTIFICATION as a duly registered Professional Engineer in the State dNorth Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project(s), Project Name: Water Pollution Control Plant Upgrade & Expansion Project Location: Addor, NC (Moore County) Project Number(s): CS370496-02 Project Owner: County of Moore Project Description: This project upgraded the Plant capacity from 6.7 MGD to 10 MGD. The expansion included a third train of clarifiers and aeration basins. New technologies: including sand filtration, ultra violet disinfection, enhanced grit removal, and a bio-solids belt press, were also added. hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration No. POb 18,3 Date - - 2`�l -- I P.E.Seal: "Please note, if your project received a Division of 'Water Quality permit or Authorization to Construct, you should use the certification that was attached to your permit or ATC. S. `I / k( �v Mev uaie . U.11LL/LUU0 NCDEHR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Dennis Brobst Moore County Public Utilities 5227 US 151501 Carthage, North Carolina 28327 Dear Mr. Brobst: Division of Water Quality Coleen H. Sullins Dee Freeman Director Secretary May 2, 2011 SUBJECT: Authorization to Construct A to C No. 037508A03 Moore County Public Utilities Moore County Project No. CS370496-02 A letter of request for an Authorization to Construct was received January 27, 2011, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 6.7 MGD Wastewater Treatment Plant, with discharge of treated wastewater into Aberdeen Creek in the Lumber River Basin. This authorization results in an increase in design and permitted capacity to 10.0 MGD, and is awarded for the construction of the following specific modifications: Modification of the existing headworks including raising the wet well wall elevation of the existing grit unit to accommodate proposed peak flows, a parshall flume, installation of two (2) 170 gpm aerated grit units including two (2) 180 scfm blowers; refurbishment of a flow splitter box; refurbishment of equipment in two existing primary clarifiers and construction of a new 75-ft diameter 9.75-ft sidewall depth primary clarifier; refurbishment of two existing first -stage aeration basins and construction of a new 4-cell, 463,792, gallon first stage aeration basin; refurbishment of the first stage RAS/WAS pump station and the installation of four (4) 2,940 gpm centrifugal RAS pumps; refurbishment of two (2) existing intermediate clarifiers and construction of a new 90-ft diameter 11.75-ft sidewater depth intermediate clarifier; refurbishment of two (2) existing second stage aeration basins; and construction of a new 598,441 gallon second stage aeration basin; refurbishment of the existing second stage RAS/WAS pumping station including installation of four (4) 2,940 gpm centrifugal RAS pumps; refurbishment of the existing blower building including installation of five (5) 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 NorthCarolina Phone: 919-807-63001 FAX: 919-807-64921 Customer Seroice:1-877-623-6748 Natunallff Internet; www.ncwaterquality.orgAn Equal Opportunity 1 Affirmative Action Employer c Mr. Dennis Brobst May 2, 2011 Page 2 4,200 scfm aeration blowers; refurbishment of two existing final clarifiers and construction of a 105-ft diameter 16.2 sidewall depth final clarifier; six (6) 750 ft2 traveling bridge tertiary filters; a dual channel UV disinfection system with 4 modules per channel; sludge handling equipment including two (2) 200 gpm sludge recirculation pumps, sludge heaters, combined sludge thickener and 2.2- meter gravity belt press, three (3) 175 gpm sludge transfer pumps, 16,700 ft2 sludge drying bed metal roof; magnetic flow meters; eight (8) wastewater sample pumps; SCADA system; three (3) 750 KW generators; 1400 ft operations building addition, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO037508 issued November 5, 2010, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0037508. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Fayetteville Regional Office, telephone number (910) 433-3300, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. ' e • Mr. Dennis Brobst a May 2, 2011 Page 3 The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T I 5A: 8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Mr. Dennis Brobst May 2, 2011 Page 4 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 715-6206. Sincerely, Coleen H. Sullins MM:sr cc: Adam P. Kiker, P.E. — Hobbs, Upchurch & Associates, P.A., Consulting Engineers, Post Office Box 1737, Southern Pines, NC 28388 Moore County Health Department DWQ Fayetteville Regional Office, Surface Water Protection Technical Assistance and Certification Unit Point Source Branch, NPDES Program Michelle McKay, E.I. SRF File