Engineer's Certification
i,4pQ�s
/"j C, J -3 q
1,9�a14, 14 4 4:;r as a du
ly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/weekly/full time) the
construction of the modifications and improvements to the Moore County Water Pollution Control
Plant WWTP, located on Addor Road in Moore County for Moore County, hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the following construction:
Modification of the existing headworks including raising the wet well wall elevation of the
existing grit unit to accommodate proposed peak flows, a parshall flume, installation of two (2)
170 gpm aerated grit units including two (2) 180 sefin blowers; refurbishment of a flow splitter
box; refurbishment of equipment in two existing primary clarifiers and construction of a new 75-
ftdiameter 9.75-ft sidewall depth primary clarifier; refurbishment of two existing first stage
aeration basins and construction of a new 4-cell 463,792 gallon first stage aeration basin,
refurbishment of the first stage RAS/WAS pump station and the installation of four (4) 2,940 gpm
centrifugal RAS pumps; refurbishment of two (2) existing intermediate clarifiers and
construction of a new 90-ft diameter 11.75-ft sidewater depth intermediate clarifier;
refurbishment of two (2) existing second stage aeration basins, construction of a new
598,441gallon second stage aeration basin; refurbishment of the existing second stage RAS/WAS
pumping station, four (4) 2,940 gpm centrifugal R.A,S pumps; refurbishment of the existing
blower building, installation of five (5) 4,200 scfm aeration blowers; refurbishment of two
existing final clarifiers and construction of a 105-#t diameter 16.2 sidewall depth final clarifier;
six (6) 750 fe traveling bridge tertiary filters; a dual channel UV disinfection system with 4
modules per channel; two (2)-200 gpm vertical turbine pumps; sludge handling equipment
including two (2) 200 gpm sludge recirculation pumps, sludge heaters, combined sludge thickener
and 2.2-meter gravity belt press, three (3)175 gpm sludge transfer pumps, 16,700 fl� sludge
drying bed metal roof; magnetic flow meters; eight (8) wastewater sample pumps; SCADA
system; three (3) 750 KW generators; 1400 fi2 operations building addition, in conformity with
the project plans, specifications, and other supporting data subsequently filed and approved by the
Department of Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
We understand that the new limits associated with the modifications to expand to 10.0 MGD
now apply.
Signature Registration No.
Date
Send to: Construction Gr & Loans
DENR/DW
1633 Service Center
R igh, NC 27699-1633
tie 099 9 ?9 3
p '4'01l1�' 00�
Berry, Ron
From: Berry, Ron
Sent: Friday, August 07, 2015 11:28 AM
To: 'Fred Hobbs, P.E.'
Subject: Original Engineer's Certificate for Moore County WPCP ATC#037508A03
Attachments: Engineer Certificate from 037508A03.pdf
Mr. Hobbs,
Attached is the original Engineer's Certificate form that was attached to the Authorization to Construct permit. As we
discussed the Division needs the original certificate completed and returned (in this case return via email is fine). If
you have any questions let me know.
Ron Berry, Engineer
Division of Water Resources/NCDENR
Phone: (919) 807 - 6396
Email: ron.berrv@ncdenr.eov
Location Address - Archdale Building, Office 925K
512 N. Salibury St.
Raleigh, NC 27699
Mailing Address - Archdale Building, NCDENR/DWR
1617 Mail Service Center
Raleigh, NC 27669-1617
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
retAA q-t s 02 C
1
ENGINEER'S CERTIFICATION
as a duly registered Professional
Engineer in the State dNorth Carolina, having been authorized to observe
(periodically/weekly/full time) the construction of the project(s),
Project Name: Water Pollution Control Plant Upgrade & Expansion
Project Location: Addor, NC (Moore County)
Project Number(s): CS370496-02
Project Owner: County of Moore
Project Description: This project upgraded the Plant capacity from 6.7 MGD to 10
MGD. The expansion included a third train of clarifiers and aeration basins. New
technologies: including sand filtration, ultra violet disinfection, enhanced grit removal,
and a bio-solids belt press, were also added.
hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the project construction such that the construction was observed to be built
within substantial compliance and intent of the approved plans and specifications.
Signature Registration No. POb 18,3
Date - - 2`�l -- I P.E.Seal:
"Please note, if your project received a Division of 'Water Quality permit or
Authorization to Construct, you should use the certification that was attached to your
permit or ATC.
S. `I / k(
�v
Mev uaie . U.11LL/LUU0
NCDEHR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Mr. Dennis Brobst
Moore County Public Utilities
5227 US 151501
Carthage, North Carolina 28327
Dear Mr. Brobst:
Division of Water Quality
Coleen H. Sullins
Dee Freeman
Director Secretary
May 2, 2011
SUBJECT: Authorization to Construct
A to C No. 037508A03
Moore County Public Utilities
Moore County
Project No. CS370496-02
A letter of request for an Authorization to Construct was received January 27, 2011, by
the Division of Water Quality (Division), and final plans and specifications for the subject
project have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 6.7 MGD Wastewater Treatment Plant, with
discharge of treated wastewater into Aberdeen Creek in the Lumber River Basin.
This authorization results in an increase in design and permitted capacity to 10.0 MGD,
and is awarded for the construction of the following specific modifications:
Modification of the existing headworks including raising the wet well wall
elevation of the existing grit unit to accommodate proposed peak flows, a parshall
flume, installation of two (2) 170 gpm aerated grit units including two (2) 180
scfm blowers; refurbishment of a flow splitter box; refurbishment of equipment
in two existing primary clarifiers and construction of a new 75-ft diameter 9.75-ft
sidewall depth primary clarifier; refurbishment of two existing first -stage aeration
basins and construction of a new 4-cell, 463,792, gallon first stage aeration basin;
refurbishment of the first stage RAS/WAS pump station and the installation of
four (4) 2,940 gpm centrifugal RAS pumps; refurbishment of two (2) existing
intermediate clarifiers and construction of a new 90-ft diameter 11.75-ft
sidewater depth intermediate clarifier; refurbishment of two (2) existing second
stage aeration basins; and construction of a new 598,441 gallon second stage
aeration basin; refurbishment of the existing second stage RAS/WAS pumping
station including installation of four (4) 2,940 gpm centrifugal RAS pumps;
refurbishment of the existing blower building including installation of five (5)
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 NorthCarolina
Phone: 919-807-63001 FAX: 919-807-64921 Customer Seroice:1-877-623-6748 Natunallff
Internet; www.ncwaterquality.orgAn Equal Opportunity 1 Affirmative Action Employer
c
Mr. Dennis Brobst
May 2, 2011
Page 2
4,200 scfm aeration blowers; refurbishment of two existing final clarifiers and
construction of a 105-ft diameter 16.2 sidewall depth final clarifier; six (6) 750 ft2
traveling bridge tertiary filters; a dual channel UV disinfection system with 4
modules per channel; sludge handling equipment including two (2) 200 gpm
sludge recirculation pumps, sludge heaters, combined sludge thickener and 2.2-
meter gravity belt press, three (3) 175 gpm sludge transfer pumps, 16,700 ft2
sludge drying bed metal roof; magnetic flow meters; eight (8) wastewater sample
pumps; SCADA system; three (3) 750 KW generators; 1400 ft operations
building addition, in conformity with the project plans, specifications, and other
supporting data subsequently filed and approved by the Department of
Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO037508 issued November 5, 2010, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0037508.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Fayetteville Regional Office, telephone number (910) 433-3300, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
' e
• Mr. Dennis Brobst
a
May 2, 2011
Page 3
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T I 5A: 8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
Mr. Dennis Brobst
May 2, 2011
Page 4
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Seth Robertson, P.E. at telephone
number (919) 715-6206.
Sincerely,
Coleen H. Sullins
MM:sr
cc: Adam P. Kiker, P.E. — Hobbs, Upchurch & Associates, P.A., Consulting Engineers,
Post Office Box 1737, Southern Pines, NC 28388
Moore County Health Department
DWQ Fayetteville Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Point Source Branch, NPDES Program
Michelle McKay, E.I.