Loading...
HomeMy WebLinkAboutNCG140539_Site Plans 3_20240328 1 g Area #1 2 3 4 5 6 7 Drainage8 Draina a Area #2 Stormwater lands on A Stormwater lands on the in A property the property in Drainage Area #2 Drainage Area #1 Stormwater flows down-gradient following natural and man-made Stormwater flows down-gradient topography at the site following natural and man-made 'topography at the site B B Stormwater drains through a "French drain" Stormwater drains to the east style entrapment system at the base of a and to the south through a stone- Stormwater drains to the west large stone lined slope to the water lined swale with stone check dams and to the south through astone- management detention basin for reuse to the truck washout / process lined swale with stone check dams water settling basin system Process water generated from "Load-n-Go" or similar truck washing equipment, which drains to plant loading area drainage system c c Process water generated from batching procedures. Plant loading area drainage system drains to the water management detention basin for reuse Process water generated from truck washing into concrete truck washout / process water settling basin system where trucks washout mixer barrels (etc. ) . Water drains from basin to basin, ultimately draining to the water ° Stormwater flaws down-gradient management detention basin for reuse ° following natural and man-made topography at the site to the water management detention basin for reuse : .. Stormwater and Process Water drain to and commingle in an unlined water management detention basin . Stormwater drains to and collects in an Water from this basin is reused for truck washing in a unlined settlingbasin (trap) rior to closed-loop system and wetting aggregate in a closed- p discharging off-site through Outfall SDO-1 loop system . Water is added to this basin / system as E g g g Stormwater flows down-gradient E needed during dryer months. This basin has the following natural and man-made potential to overflow and discharge off-site through topographyat the site to the g g Outfall PDO-2 during extreme weather events water management detention v basin for reuse 'v v 0 Ln Q - M - C v° SWPPP - Water Usage/Flow Line Drawing � �; sc o� 4 O — ° ° ° Mocksville Concrete Company, LLC c O ' o F v 252 Eaton Road, Mocksville, Davie County, NC 27028 F L v v .� E o " ° a) a � ai t c Q L DRAWN BY: APPVD BY: TDRAWING DATE: SHEET: CC 0 0C CW R CW R 23-211 03/12/2024 3 OF 3 � a RV NUMBER: �>, w O � � Q U 'i <C N a) ° v Resource 888- RMA-0230 r s �. E �� W � � a) Management info@rmagreen . com O r6 C PMA � Q � o � Associates www. rmagreen .com V1 2 3 4 5 6 7 8