HomeMy WebLinkAboutMajor Permit Design 20a - CAMA Revised WorkplanMatthew SCa�es
286 China Clove Rd.
Ahapahoe, C2 28510
Sept 16, 2025
SCALP- V - 40'
DFawing # 1 of 2
Revision # 2 0
O Proposed mooring ba(( 100'
BALL 1 fLOLL end of I o c k
(Depth 6' 61
60' dFE of swing
from mooring ball
Property line
extension 15
15' property
Na th
line buffer SLIP 1
14'6" (De,r, s 6
P oposed 4 plling
Ift lift
(10" pilings)
AAUAA RIVUE'
A m ile s wI'd e a t
this la ation
Average water
depth A A` at seawall
Proposed 80'x8' ramp
side Lock
Existing ---
Fetaining wall
a�
EL
Coco
15' property line
buffer
Property line
extension
Proposed 4'x8' _xfenfion of
p(atfOFM (fofa( D f 12' x 81
Proposed piling boat lift
(8'' pilin s)
126
SLIP 2 12'6"
Proposed rep( cement of 6 pilings
and Fedecking of xisfing 180' dock.
WOFk has bee sf Ffed in previous
,PP Fmit
Proposed kayak dock (4'x16')
(4'x8' pl fform IQWPF to water
with ano her 4'x8' section containing
stairs an d upper platf(Drm)
170
Proposed boat ramp
6 / Proposed riprap
Existing riprap
>Qo aQ000aQo aQoQoaQo aQo
An AAaa�AAo°O� Ae�goa A N W L
O
C
o
u
Riparian boundaries