Loading...
HomeMy WebLinkAbout090166_Routine Inspection_20240304 (2)for Visit: ADIRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: zr4"_ Farm Name: (�� p� %�. �ty���f Owner Email: Owner Name: {�l�j�tt i 'C".. LPL Phone: 1—� Mailing Address: Physical Address: FacilityContact: �l—`OUj,p Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: 6i Latitude: Phone: Region: lev Integrator: GO/lC9�tGf P Certification Number: /Uliiv�l� Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes .,[Q-No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 4'No ❑ NA ❑ NE ❑ Yes 2-I(ro ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: - lb4a I Date of Inspection: 3 t/ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ' ffNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 Structure 2 l Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 [—]Yes E]-No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes e No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes „E3 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E;'tklo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ,❑/ '&o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes Q'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes -e'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop C�ropnWinndow ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Types) eeo'< �%' /.� erin�tr ua�i 1, ) /Zj'e !�_5 l 13. Soil Type(s):�� G�rrn 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes CaXo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E;?No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checldists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes [ No ❑ Yes 8No ❑ Yes Ea*�o ❑ Yes 2f No [:]Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [allo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ["No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [El No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued [Facility Number: Date of Inspection: . 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Aallo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check „'Yes ❑ No the appropriate box(es) below. .,Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes -E]'No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes e ❑i No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes -E�-No ❑ NA ❑ NE ❑ Yes 40j 1 o ❑ NA ❑ NE ❑ Yes ,e-710 ❑ NA ❑ NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes E�`No ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes J:]-No 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes f"No 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 2-�o U0, Reviewer/Inspector Name: Reviewer/Inspector Signature: ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE M Phone: <F,/j 3:�5" 9ZT— Date:!/�'y Page 3 of 3 511212020 FACILITY#:- l /6(7 FARM NAME: cpee4� LAGOON LEVEL tit PERMIT (na) DUE EVERY 5 YEARS EXPERIATION DATE CURRENT NUMBER OF ANIMAL OIC CARD YES OR NO NUMBER OF ANIMALS WASTE UTILIZATION PLAN (WUP) (#20) SOILTYPES 6 C)QWX CROP TYPES SL+o /,P.6 LIY� - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT 1#21) -GOOD FOR 60%%DAYS BEFORE OR AFTER Al 4 LEVEL 4/ DATE `r-y NITROGEN DATE 101111 NITROGEN LEVEL /c�-3 �l �4 �✓� NITROGEN LEVEL • �d DATE al'!�-bY-3 1-c/s EVERY 3 YEARS: P-1 (NO MORE THEN 400) PH (Note it4.,I..) Cu/ZN (NO MORE THEN 8000) (IF PEANUTS NO MORE THEN 300) / SOIL REPORT xi) DATE `OZ/11/a-9' Not over PAN CROP TYPES FLOW RATES IRR2 (#2i) NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES _ FLOW RATES NITROGEN (N) CALBRIATION (#24) EACH REEL SHOULD BE CALIB AT,ED EVERY OTHER YEAR DATE OF CALIBRATION �� / a FLOW RATES.__ -INITIAL AFTER 1RAIN FALL ym)" RAIN EVENT �/ -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. -DUE EVERY YEAR: DATE SLUDGE (aztszs) 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE OTHER FORMS (#zz AND #21) RAIN BREAKER FORM _CROP YEILDS MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREASTREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED. BINS_ LAGOON GARBAGE Bermuda grass: Opens March 1-t- Ends September 30t Small Grain Over seed: Opens October 1 n- Ends March 31st Corn: Opens February 15t - Ends June 30t Cotton: Opens March 15u - Ends August 1st Rye: Opens September 1rt- Ends March 31st Oats: Opens September 1-t- Ends April 15n Wheat: Opens September 1st - Ends April 30w Soybeans: Opens April 1st -Ends September 15t . Fescue: Opens August 1st - Ends July 31 st Sorghum Hay: Opens March 15w - Ends August 31 st