HomeMy WebLinkAbout820657_Routine Inspection_20240319of
for Visit: .0 Routine O
Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: pp Departure Time:
Farm Name: (7 4-,d
Owner Name:
Mailing Address:
Physical Address:
Facility Contact: Title:
Onsite Representative:
</
Certified Operator:
Back-up Operator:
Owner Email:
Phone:
Region:
Phone:
Integrator:
Certification Number:
Certification Number:
Location of Farm: Latitude: Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes 0 No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
. allo
❑ NA
❑ NE
❑ Yes
2 No
❑ NA
❑ NE
Page I of 3 511212020 Continued
Facility Number: Date of Inspection:
3
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
[7rNo
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure
6
Identifier:
Spillway?:
Designed Freeboard (in): c%
Observed Freeboard (in): 921
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
,P:fiVo
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
4--I'No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
[�^No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
2 No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
12-No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
.P?No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop ❑ Evidence of Wind ❑ Application
Outside of Approved Area
nWindoow �Drift
t
12. Crop TYpe(s): C,Pl�t"i LJ vY C� ct '
6? ,a& cibe
f G�
13. Soil Type(s): 104 4, Afy')Ct2
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
,®'No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
..i'es
fAo
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
2 No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
Z? No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
1] No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
0 No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
allo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
N Yes
❑ No
❑ NA
❑ NE
E Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections []Monthly and V Rainfall
Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
❑ No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
'iff No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: Date of Inspection: l9 Y
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Q-No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes <eNo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes —❑/ No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
[—]Yes .E No
❑ NA
❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes .❑o
❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes 2No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes EErl To
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes [2�No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes .Eno
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes 4�yNo
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes -&No
❑ NA
❑ NE
eh 6veUe - Cerro-�
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
0
Phone: _09/0 F,36--
Date: 31,917 rl -
Page 3 of 3
511212020
FACILITY#: FARM NAME: �"'LAGOON
PERMIT miq)
DUE EVERY 5 YEARS
EXPERIATION DATE
CURRENT NUMBER OF ANIMAL
OIC CARD YES OR NO
NUMBER OF ANIMALS
WASTE UTILIZATION PLAN (WUP) (#20)
SOILTYPES
CROP TYPES
- ODOR CONTROL CHECKLIST YES OR NO
- Irrigation Plan Maps YES OR NO
WASTE REPORT (u21)
-GOOD FOR 6/0 /DAYS BEFORE OR AFTER
DATE NITROGEN LEVEL
DATE/-3 NITROGEN LEVEL 2,�/G
DATE,nZ/ /J-Y NITROGEN LEVEL
iou
111-4/93 /�
`pL// / e� ( - SOIIL REPCRT
- EVERY 3 YEARS: DATE
- P-1 (NO MORE THEN 400)
- PH (Nutaif4ul..)
- Cu/ZN (NO MORE THEN 8000) CU ZN
(IF PEANUTS NO MORE THEN 300)
Not over PAN - CROP TYPES
FLOW RA
Not over PAN CROP TYPES
FLOW
Not over PAN CROP TYPES
IRR2 (#21)
NITROGEN (N)
NITROGEN (N)
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
mx�
CALBRIATION (*24)
EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR
DATE OF CALIBRATION
FLOW RATES
-INITIAL AFTER 1 °RAIN EVENT RAIN FALL (*21)
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED.
�U(l /y SLUDGE(u21a25
-DUE L�VERYYEAR: DATE '�
0: 'V P: 40 %RATIO OF SLUDGE
O: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
0: P: % RATIO OF SLUDGE
OTHER FORMS (#22AND #21)
RAIN BREAKER FORM - CROP YEILDS MORTALITY
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS - LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT
CROPS NO PONDING REELS_ FEED, BINS_ LAGOON GARBAGE
Bermuda grass: Opens March 1n- Ends September 30th
Small Grain Over seed: Opens October 1st- Ends March 31st -
Corn: Opens February 15t - Ends June 30t
t
Cotton: Opens March 15*h - Ends August 1st
Rye: Opens September 1 A- Ends March 31 A
Oats: Opens September 1� - Ends April 15t
Wheat: Opens September 1 d- Ends April 30th
.Soybeans: Opens April 13t- Ends September 15u
Fescue: Opens August 1st -Ends July 31st
Sorghum Hay: Opens March 15th - Ends August 31 st
i