Loading...
HomeMy WebLinkAbout820184_Routine Inspection_20240319�. ype u1 v isu: .c.'; v.umpuance inspection v uperarion xeview U structure E;vamanon U t ecnmcat Assistance I Reason for Visit: —Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: �/Ja Arrival Time: ,'p0I9p7 Departure Time: County:( Farm Name: �n// Owner Email: —` Owner Name: JC&,e_ � 14a,4,�1' Phone: Mailing Address: Physical Address: Facility Contact: .1�21U( Title: Onsite Representative: ti Certified Operator: Back-up Operator: Location of Farm: // Latitude: Region: Z.-) Phone: 19 Integrator: Z_ (� Certification Number: 99 3c cll Certification Number: Longitude: hil j i i E $ Wean to Fin ILayer Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish �Nb ` Dairy Heifer Farrow to Wean Dry Cow Farrow to Feeder Non -Dairy Farrow to Finish Layers Beef Stockerjl �a j Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow jE q;m- 'I4' itE+: ! � i�� �' Turkeys t El4j 4 Ei ��f Turkey Poults���1 J, Other ­ i £ ",4i0N {Pill €♦� Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes �0'110 ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ®'&o ❑ NA ❑ NE ❑ Yes J J No ❑ NA ❑ NE Page I of 511212020 Continued Facility Number: - Date of Inspection: 5; Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes_,E2'No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): �y Observed Freeboard (in): Illy 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ..®'No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes gTNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes EENo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Af 1-yes rNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes -E�J'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Q`&o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind /Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes „allo ❑ NA ❑ NE I� t' 'es E5No ❑ NA ❑ NE r❑ Yes J2No ❑ NA ❑ NE ❑ Yes -ff'No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes .®'No ❑ NA ❑ NE ❑ Yes A;]No ❑ NA ❑ NE ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 2rYes ❑ No Ej Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ Yes _No ❑ NA ❑ NE ❑ Yes 4E�rNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: F- - / Date of Ins ection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [21'No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [ o ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: [:]Yes F_j-No ❑ NA ❑ NE ❑ Yes JE] No ❑ NA ❑ NE ❑ Yes ®'No ❑ NA ❑ NE ❑ Yes Q'No ❑ NA ❑ NE ❑ Yes Ej`No ❑ NA ❑ NE ❑ Yes [5No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? [:]Yes .E�f No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E5 No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency?y ❑ Yes i No ❑ NA ❑ NE 'i�fa�ih ark ame Run,-, a� �w sexa rions u a'Iv a "6 aim§sR'�ms#� . w+xa#aa awl ,001 h ei Reviewer/Inspector Name: `Qv+ < so )1) Phone: 916 973S — ` 2&S i Reviewer/Inspector Signature: Date: �j / `,'l y Page 3 of 3 511212020 FACILITY#: " a - l a FARM NAME: "alLAGOON PERMIT (Nv) DUE EVERY 5 YEARS EXPERIATION DATE CURRENT NUMBER OF ANIMAL OIC CARD YES OR NO NUMBER OF ANIMALS WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (*21) -GOOD FOR 60 DAYS BEFORE OR AFTER DATE 07//Ll aJ NITROGEN LEVEL'2'641 DATE y� NITROGEN LEVEL 2 720 r DATE (fr15_`a-3 NITROGEN LEVEL_ { SO1LJREPOR? (4211 - EVERY 3 YEARS: DATE - P-1 (NO MORE THEN 400) - PH (Note if4 or less) - Cu/ZN (NO MORE THEN 3000) CU ZN (IF PEANUTS NO MORE THEN 300) Not over PAN CROP TYPES FLOW RA Not over PAN CROP TYPES FLOW Not over PAN CROP TYPES FLOW RA IRR2 (=q NITROGEN (N) NITROGEN (N) NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Az 2_0 a 1�r CALBRIATION (uza) EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR DATE OF CALIBRATION //Z 3 d /;X 2 FLOW RATES a E6 RAIN FALL ym) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. LUDGE (zzi 625) DU jEYERY YEAR: DATE ' W 11; 43 O: J Q0 % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE OTHER FORMS ($22 AND #21) RAIN BREAKER FORM CROP YEILDSMORTALITY_ 'If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS _ PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREASTREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE Bermuda grass: Opens March 1�- Ends September 30* Small Grain Over seed: Opens October 1st- Ends March 31A Corn: Opens February 15t5 - Ends .tune 30u Cotton: Opens March 15* - Ends August 1st Rye: Opens September 1st- Ends March 31 st Oats: Opens September 1�t-Ends April 15th Wheat: Opens September 1st - Ends April 30u Soybeans: Opens April 1 �- Ends September 15t Fescue: Opens August 1st- Ends July 31A Sorghum Hay: Opens March 15t - Ends August 31 st