Loading...
HomeMy WebLinkAboutSW6230604_Response To Comments_20240327 FOX FIELD FARMS —SW6230604 ADDITIONAL INFORMATION—REVIEW LETTER DATED 03-27-2024 COMMENT RESPONSE 1. Previous Comments: 6: Supplement-EZ, Cover, Line 4— The surface water area provided in this line should match the project area provided in the Application Section IV, 6. This item was not revised. REVISED ATTACHED 9: Per the calculations provided on Sheet C5.1, the velocity of the roadside ditch 24 and swales 32 and 33 exceed the allowable velocity. This would result in erosion during the 10-year storm. Per 15A NCAC 02H.1003 (2) (c) (ii), the conveyance shall be designed so that it does not erode during the peak flow from the10-year storm. Using the values provided in the swale table, calculations, and on the plans, the actual velocities of roadside ditch 24 and swale 32 seem to exceed the allowable velocity for the 10 year storm, which does not met the requirements of 15A NCAC 02H .1003 (2) (c) (ii), 15A NCAC 2H .1003(2)(d)(i), and 15A NCAC 2H .1003(5). Equations were presented in the design calculations, but individual swale calculations were not provided. If another method was used to find the actual velocities of these swales which meets the allowable velocities, please provide. Otherwise, the design of the swales will need to be revised. Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. WAS USED FOR SWALE CALCULATIONS — SEE ATTACHED FOR SWALES 24, 32, AND 33