Loading...
HomeMy WebLinkAboutNC0090212_Application_20211209 KINGS MOUNTAIN LITHIUM PROJECT NPDES Individual Permit Application North Carolina Department of Environmental Quality Division of Water Resources Water Quality Permitting Section-NPDES 1617 Mail Service Center Raleigh,NC 27699-1617 RE: Albemarle Kings Mountain Lithium Project NPDES Permit Application To Whom It May Concern, Albemarle U.S., INC submits herein a National Pollutant Discharge Elimination System(NPDES)permit package for the proposed temporary discharge of nonprocess pit water. The proposed temporary discharge is to dewater the primarily stormwater filled pit and does not include future mining activities or future discharges associated with mining activities. Please find enclosed a complete Permit application Package including: • EPA Form 1 • Existing Environmental Permits Attachment • Facility Location Maps Attachment • EPA Form 2E • Effluent Characteristics Attachment • Engineering Alternatives Analysis Attachment • Kings Creek Stability and Water Quality Assessment • Plan Set Thank you in advance for your assistance in processing this permit application. If you have any questions regarding the information provided,please contact Joey Dean at 208-850-8539 or by email at joey.dean@albemarle.com. Regards, NPDES INDIVIDUAL PERMIT APPLICATION Table of Contents EPA Form 1 • Section 6.1 Attachment -Facility Location Maps • Section 7.1 Attachment - Existing Environmental Permits EPA Form 2E •Section 4.0 Attachment - Effluent Characteristics •Section 7.1 Attachment - Engineering Alternatives Analysis •Section 7.1 Attachment— Kings Creek Stability and Water Quality Assessment •Section 7.1 Attachment - Plan Set Print All Pages Print Form Only United States Office of Water EPA Form 3510-1 Environmental Protection Agency Washington, D.C. Revised March 2019 Water Permits Division : EPA Application Form 1 General Information NPDES Permitting Program Note: All applicants to the National Pollutant Discharge Elimination System (NPDES)permits program, with the exception of publicly owned treatment works and other treatment works treating domestic sewage, must complete Form 1. Additionally, all applicants must complete one or more of the following forms: 213, 2C, 21), 2E, or 2F. To determine the specific forms you must complete, consult the "General Instructions" for this form. EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 Form U.S. Environmental Protection Agency t \.EPA Application for NPDES Permit to Discharge Wastewater NPDES GENERAL INFORMATION SECTION • •• i 1.1 Applicants Not Required to Submit Form 1 Is the facility a new or existing publicly owned Is the facility a new or existing treatment works 1.1.1 treatment works? 1.1.2 treating domestic sewage? If yes,STOP. Do NOT complete 0 No If yes,STOP. Do NOT 0 No Form 1.Complete Form 2A. complete Form 1.Complete Form 2S. 1.2 Applicants Required to Submit Form 1 1.2.1 Is the facility a concentrated animal feeding 1.2.2 Is the facility an existing manufacturing, operation or a concentrated aquatic animal commercial, mining,or silvicultural facility that is a production facility? currently discharging process wastewater? cYes 4 Complete Form 1 0 No ❑ Yes -* Complete Form 0 No a and Form 2B. 1 and Form 2C. z R 1.2.3 Is the facility a new manufacturing,commercial, 1.2.4 Is the facility a new or existing manufacturing, mining,or silvicultural facility that has not yet commercial, mining,or silvicultural facility that commenced to discharge? discharges only nonprocess wastewater? a Yes 4 Complete Form 1 0 No 0 Yes 4 Complete Form No and Form 2D. 1 and Form 2E. 1.2.5 Is the facility a new or existing facility whose '— discharge is composed entirely of stormwater a associated with industrial activity or whose discharge is composed of both stormwater and non-stormwater? Yes 4 Complete Form 1 0 No and Form 2F unless exempted by 40 CFR 122.26(b)(14)(x)or b (15). SECTIOND•• AND LOCATION 2.1 Facilit Name Albemarle Kings Mountain Lithium Project 0 2.2 EPA Identification Number Y V 7C N/A J >3 2.3 Facility Contact Vl Name(first and last) Title Phone number L Joey Dean Group Hydrogeologist (208)850-8539 Q Email address joey.dean@albemarle.com 2.4 Facility Mailing Address ZStreet or P.O. box 348 Holiday Inn Drive City or town State ZIP code Kings Mountain North Carolina 28086 EPA Form 3510-1(revised 3-19) Page 1 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 N 2.5 Facility Location rStreet, route number,or other specific identifier Q 0 348 Holiday Inn Drive a� 0 County name County code(if known) Cleveland E _j City or town State ZIP code z @ Kings Mountain North Carolina 28086 SECTION •D I 3.1 SIC Code(s) Description(optional) E149 Chemical and Fertilizer Mineral Mining, Not Elsewhere Classified a v 0 U U) U Z 3.2 NAICS Code(s) Description(optional) f° 212390 Lithium mineral mining and/or beneficiating U N 4.1 Name of Operator Albemarle U.S.,INC 0 4.2 Is the name you listed in Item 4.1 also the owner? c0 Yes ❑ No L 4.3 Operator Status � ❑ Public—federal El Public—state El Other public(specify) 0 0 Private ❑ Other(specify) 4.4 Phone Number of Operator (704)739-2501 4.5 Operator Address ° Street or P.O. Box R E 0 348 Holiday Inn Drive r City or town State ZIP code 0 0 Kings Mountain North Carolina 28086 m Q Email address of operator O joey.dean@albemarle.com SECTION1 1 I 5.1 Is the facility located on Indian Land? J ❑ Yes 0 No EPA Form 3510-1(revised 3-19) Page 2 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 SECTION '• 1 6.1 Existing Environmental Permits(check all that apply and print or type the corresponding permit number for each) � ❑ NPDES(discharges to surface ❑ RCRA(hazardous wastes) ❑ UIC(underground injection of c water) fluids) 0 See attachment for permits w a ❑ PSD(air emissions) ❑ Nonattainment program(CAA) ❑ NESHAPs(CAA) c r X ❑ Ocean dumping(MPRSA) ElDredge or fill(CWA Section 404) 0 Other(specify) LU See attachment for permit list SECTION1 7.1 Have you attached a topographic map containing all required information to this application?(See instructions for R specific requirements.) 0 Yes ❑ No ❑ CAFO—Not Applicable(See requirements in Form 213.) SECTIONOF 1 CFR 1122.21(ffl8)) 8.1 Describe the nature of your business. The Kings Mountain project is a lithium mine facility that operated from the 1940s through the the mid-1980s. y Albemarle U.S.,Inc is evaluating the feasibility of restarting the Kings Mountain mine. This permit request is for a temporary discharge permit for the dewatering of the former mine pit and does not include future mining activities or future discharges associated with mining activities. m_ Dewatering activities will include installing 4 Flyght pumps with sufficient capacity to dewater the pit,running two c L 18"HDPE pipelines in the pit for dewatering,and one aboveground 20"HDPE pipeline that will run from the pit to 2 South Reservoir along existing internal roads with no additional ground disturbance. is z SECTION •• 1 9.1 Does your facility use cooling water? d ❑ Yes 0 No -* SKIP to Item 10.1. 5 a 9.2 Identify the source of cooling water. (Note that facilities that use a cooling water intake structure as described at ' 40 CFR 125,Subparts I and J may have additional application requirements at 40 CFR 122.21(r).Consult with your a,r oY NPDES permitting authority to determine what specific information needs to be submitted and when.) o @ U � SECTION I VARIANCE REQUESTS1 I 10.1 Do you intend to request or renew one or more of the variances authorized at 40 CFR 122.21(m)?(Check all that y apply.Consult with your NPDES permitting authority to determine what information needs to be submitted and when.) C ❑ Fundamentally different factors(CWA ❑ Water quality related effluent limitations(CWA Section Section 301(n)) 302(b)(2)) ❑ Non-conventional pollutants(CWA ❑ Thermal discharges(CWA Section 316(a)) Section 301(c)and(g)) 0 Not applicable EPA Form 3510-1(revised 3-19) Page 3 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 SECTION1 CERTIFICATION STATEMENT(40 11.1 In Column 1 below,mark the sections of Form 1 that you have completed and are submitting with your application. For each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority.Note that not all applicants are required to provide attachments. Column 1 Column 2 0 Section 1:Activities Requiring an NPDES Permit ❑ w/attachments 0 Section 2: Name, Mailing Address,and Location ❑ w/attachments 0 Section 3:SIC Codes ❑ w/attachments 0 Section 4:Operator Information ❑ w/attachments 0 Section 5: Indian Land ❑ w/attachments 0 Section 6: Existing Environmental Permits 0 w/attachments d ❑ 0 Section 7: Map w/topographic 4c map ❑ w/additional attachments co c 0 Section 8: Nature of Business ❑ w/attachments •R w 0 Section 9:Cooling Water Intake Structures ❑ w/attachments 0 Section 10:Variance Requests ❑ w/attachments 0 Section 11:Checklist and Certification Statement ❑ w/attachments Y 11.2 Certification Statement U I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name(print or type first and last name) Official title Joey Dean Group Hydrogeologist Signature Date signed 11/22/2022 Click to go back to the beginning of Form EPA Form 3510-1(revised 3-19) Page 4 APPLICATION FORM 1 Section 6.1 Attachment Existing Environmental Permits I l 2/68 Char Robert D.Snyder Road,Suite 436 SWCA Charlotte,919.2,North Carolina 28223 Tel 919.292.2200 www._.00m ENVIRONMENTAL CONSULTANTS 2/36 Sound Science.Creative Solutions TECHNICAL MEMORANDUM To: Trevor Chesal Albemarle 4250 Congress Street, Suite 900 Charlotte, NC 28209 From: Melissa Arnold, Assistant Project Environmental Scientist, Mining Date: November 11, 2022 Re: Existing Environmental Permits, Albemarle Kings Mountain Lithium Project INTRODUCTION This memorandum is prepared in support of a NPDES application to document the existing environmental permits at the Albemarle Lithium Project(Project)in Kings Mountain,North Carolina as an attachment to section 6 on Form 1 of the application. PERMITS While the proposed temporary discharge of pit water is a one-off and will be under a new NPDES Permit, there are other existing environmental permits associated with the Kings Mountain Facility. These permits, all issued by the North Carolina Department of Environmental Quality,include: Air Permit No 02894R36 NPDES Stormwater Permit No.NCS000096 State Stormwater management permit NO SW3110401 Discharge to Industrial Wastes Permit No. 505 Mining Permit No. 23-01 Mining Permit No 23-24 NPDES General Permit No.NCG02 APPLICATION FORM 1 Section 7.1 Attachment Facility Location Maps X. �' �i 1 ♦ �' < Al KINGS MOUNTi;IN LITHIUM MINE develmd Co.ulty,NC 0 1 000 2.000 Project Area USGS 7.5'Quadrangle: Feet USGS Map Meters Kings Mountain,NC,35081-33 0 310 620 NAD A83 StatePlarle North Carolina FIPS 3296 Feet 35.2161N 81.3483°W, N A J BaseM.p:ESR1aroGISOM e. 1:30,000 accessed September 2022 Upda /�2'2022 V\v/ S ] CA, Projectted Na.11 0316 Layoul 02 USGS v2 ENVIRONMENTAL CONSULTANTS � l / � Pill �.,���'��\ KEY PREPARED BY: ALBEMARLE PROPERTY BOUNDARY FROM SHAPEFILE �PUISI�ALL.OW io 1 /��/w/l,/6�/%/ \ 1 1 -\ _ I /i i�-i/ ///�/�%�//// // 11/ ///%' EXISTING CULVERT \\��-, / lj//�/�/%l r- 'j/ ,---r r XXX SWCA Pl7 %/,,V/// /// //%// l // \ i r ////// // ///%// l _ -, WATER SAMPLING POINT ��p//%/��� ll//��./ I _ \ 1� XXX 113 Edinburgh South Drive,Suite 120 \ \ i I/I %l I / / �,�/`l` /I\ I_- `1 • HYDRO WELL LOCATION AND DESIGNATOR Cary North 919292I2200ina 7511 i/,,'//////,/%' // \I a XXX w wca.com /////- S-���� ) �� �, i�l�\\ �,�I llgla,I IIII I,1 \ \\ 711,�_/_/, r%' //�J%/// r�/�%/i 111 l`-i\�.., .-� ,-I \\,, ', • GEOTECH WELL LOCATION AND DESIGNATOR I PREPARED FOR: DRILL HOLE LOCATION AND DESIGNATOR Zr . 21 3 / KM-SW-2 / IIIIIII III11 II KINGS MOUNTAIN PIT LAKE Ij /Ilylhlj 11 II , 1 / i I; / /✓//IIII I Land uses In the map area KM-SW-5 include a mix of residential, 1 ... .. \ WRD-1 commercial,and forested lands / KAZMW2f-1 v i� � 'l/ si' - _ /fir' /I // r; QNN l 1 - / //� I r V BR �/ / i/ r. / / /I( 3 SW 8/( KIN GS MOUNTAIN- � / \ f / EXISTING SU FACE �rLAKt NEAT 12,IMPOl7NDMENT /, �/i "o, A _ • Uj 'IP'W-WRD-3-3 AA m ._-^ -, -- I 1 r \ \\ / V A // I / r _%�� •_11 AIV -_. r,/ -�/, �.AIA1 I _ - I )/ - /� / I - - l _�- 1 � n / v I i I � i 1 �- -. - / ����` /, � �.I,... I'I i '�� 1// / kMMW21L�a 1 / A J VAV / I 1\ � v,_ /MMW-00 • /'Y'` "RAN /SECU,RI GATE V r l r I �a l kM_Mw-ooLTtNGSURFA WAT R/IIMPOLINDMEN PLANAC LIALITY /-/ / /r\1 46"o NT 1'21'11.3"W LONG O 1EEjREq I - LLI KMIV1W21 12 =--1/ 6 1 1 31 M/gV/I[ #i P;O�ND -_- MW-PLANT-DOWNGRAD MW WD34WR 6 LQ�L •A - o / -/ _ A \ _ _ rl, �. �// � �,-I \ _ _ -_ -__ IIII ,%ram'_ ,7 -"j- �/ / !' r j- .�� � � ,I 'III \^ A\�--- v 1!' - IIIII 2 /// ���: w - 01: o ....Ar'f �`., VA V AV A �' - -� F-pAc2 /I,lilllj�MW-WR6- / T1 ' . - a V h I I l �, r�'A <%TSM�/9 i il;., i;//// 1A _ _ v / ,' / / TSFEaCP .•MVU-/W)2D 1-1��- v \ I / %�i lei/ �N�1 a-' / 1 / /.' ' /• / /,/�j% - _1 / I ,r A_ ///l , LIB �A� 'F'C-1 l �\KM-SW-3 I KIA�,iMWA/-1'51S HALL O'NKMMW21-4 • TSFM-8l \� WIKMM W211�A�EP - - UQ TSFM-CPT1/� AI V� /i DISCHARGECULVERTS ULVERTS TSFM-1 O KINGS CTr REEK PROPOSEDTS DISCHARGE POINT I W 81'24'4905'W TSFC=2 / ' �..._// _ •S'- /r I �,�' 1\VAA,rAV / ../, OPT2�% E V�`•_ / / / / V i / I.A. A (TSFM-5 r/ T 'x'y�F 1Ar _. i ( 1 i d ( �) l r// K / ��', ✓ A 1 /g / ////--- / ��I SFC A TSFM-CPT4 ,r /%// THCREE // RESERVOIR/// w \� -_�� m •^ -.' TSFC:3 TSFM-7: vA • �/: 1 ` rq / / �� 1 I ��� - / I 1\ ��\ �, TS PT /�M 5 X CyITroE W \_ �\� p II %f t`C-6 TST-MJ �ii>r, '•, �, � •, \ \III, CLUB LAKE- _- _ /r- //.\�_- r /. / l I•\ /�)/^.�/ �/ l/ a \\�\` rG/ �. '�(/�._ ♦/ \ I �ii 'Yg ( \, // ( ( \ i/r / 1 ` \ �- /I II \\ �' �l I-/ice '\ l / l ` p /� KMMW2'If9 � `�,\ Imo. 1 I I 1, i \ 1 / /� / �•\�\ \ /. J/ l (\ �1 ��_ ;�' r /� -18 --- 1SFC- PT3 � \ /� /- _ I / / w •' •F \ 0 o -� m % o / _- "J ',I r -\ _ TS \\ / / FC-4 `' I 1� _ --�i \ \ l f fv�VVTSF-1-2/��A /// /.. I" r' /_.. / / l 111 m q m _� � ' I / / ..��� � /r / / I 1 \ \\ / �\ •� \ i// // III \ - �- \ \ �� - /�/�lI \ - �//// � r _ Ht­ .,IK^ / WEIR# /'�/,'a`f�irifl�y.. ..€' j^-/ r. W c ;�Y,�J - ,f k/ � I r / KM-SW- / / IL +- /, I r / I DATE: 1111/2022 \I 'A� ,.,, / / ` -\ 1 \ / / IIIYS-PQ OUTi-1 1<Mi�W 1-1 / - ••.__ a. �1,., \ �, / \. / / r / PROJECTM: 70316 / i �/ °o' �....' .• .v y ka.. � --KM�N.W21--& I4 L1 W 500 10000 SCALE IN FEET z _ o �1IN \ �.I� SHEET a Print All Pages Print Form Only United States Office of Water EPA Form 3510-2E Environmental Protection Agency Washington, D.C. Revised March 2019 Water Permits Division .".EPA Application Form 2E Manufacturing, Commercial , Mining, and Silvicultural Facilities Which Discharge Only Nonprocess Wastewater NPDES Permitting Program Note: Complete this form and Form l if your facility is a new or existing manufacturing, commercial, mining, and silvicultural facility that discharges only nonprocess wastewater. EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 U.S. Environmental Protection Agency FORM Application for NPDES Permit to Discharge Wastewater NPDES �"�EPA MANUFACTURING,COMMERCIAL, MINING,AND SILVICULTURAL FACILITIES WHICH DISCHARGE ONLY NONPROCESS WASTEWATER SECTIONOUTFALL LOCATIONi 1.1 Provide information on each of the facilit 's outfalls in the table below. c Outfa Number Receiving Water Name Latitude Longitude — 0 01 Kings Creek 35' 12' 42.70" N 81, 21' 19.05" W J o » o » 7 0 o o » SECTIONDISCHARGE 1 1 2.1 Are you a new or existing discharger?(Check only one response.) 2 0 New discharger ❑ Existing discharger SKIP to Section 3. o2.2 Specify your anticipated discharge date: 07/01/2023 SECTIONi 3.1 What types of wastes are currently being discharged if you are an existing discharger or will be discharged if you are a new discharger?(Check all that apply.) ❑ Sanitary wastes 0 Other nonprocess wastewater(describe/explain ❑ Restaurant or cafeteria waste directly below) Q ❑ Non-contact cooling water Storm water that has accumulated in the pit d 3.2 Does the facility use cooling water additives? R ❑ Yes 0 No -* SKIP to Section 4. 3:: 3.3 List the cooling water additives used and describe their com osition. Cooling Water Additives Composition of Additives list if available toyou) SECTION 1 4.1 Have you completed monitoring for all parameters in the table below at each of your outfalls and attached the results to this application package? 0 Yes ❑ No;a waiver has been requested from my NPDES permitting authority attach waiver request and additional information -* SKIP to Section 5. 4.2 Provide data as requested in the table below. See instructions for specifics. Number of Maximum Daily Average Daily Source y Parameter or Pollutant Analyses Discharge Discharge (use codes (if actual data s ecif units (specify units per reported) Mass Conc. Mass Conc. instructions) R Biochemical oxygen demand(BODs) 14 1121.7 kg 58.8 mg/L 272.8 kg 14.3 mg) 1 Total suspended solids(TSS) 18 <381.5 kg <20 mg/L <381.5 kg <20 mg/ 1 Oil and grease 14 <38.2 kg <2 mg/L <38.2 kg <2 mg/L 1 w Ammonia(as N) 23 703.9 kg 36.9 mg/L 76.3 kg 4 mg/L 1 Discharge flow 5.04 mgd 4 pH(report as range) 222 6.1-9.2 1 Temperature(winter) 2 13.2 C 1 Temperature(summer) 19 25 C 1 Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2E(revised 3-19) Page 1 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 4.3 Is fecal coliform believed present,or is sanitary waste discharged(or will it be discharged)? ❑ Yes 0 No 4 SKIP to Item 4.5. 4.4 Provide data as requested in the table below. See instructions for specifics.) Number of Maximum Daily Average Daily Source Parameter or Pollutant Analyses Discharge Discharge (Use codes (if actual data s ecif f units (specify units per reported) Mass Conc. Mass Conc. Instructions.) Fecal coliform E. coli Enterococci 0 4.5 Is chlorine used(or will it be used)? ❑ Yes 0 No 4 SKIP to Item 4.7. y 4.6 Provide data as requested in the table below.1 (See instructions for specifics.) 'i Number of Maximum Daily Average Daily Source Parameter or Pollutant Analyses Discharge Discharge (use codes (if actual data s eci units s ecif units per reported) Mass Conc. Mass Conc. instructions) c 3 Total Residual Chlorine w 4.7 Is non-contact cooling water discharged(or will it be discharged)? ❑ Yes 0 No 4 SKIP to Section 5. 4.8 Provide data as requested in the table below. See instructions for specifics. Number of Maximum Daily Average Daily Source Parameter or Pollutant Analyses Discharge Discharge (use codes (if actual data (specify units (specify units per reported) Mass Conc. Mass Conc. instructions) Chemical oxygen demand(COD) Total organic carbon(TOC) SECTION • t 5.1 Except for stormwater water runoff,leaks,or spills,are any of the discharges you described in Sections 1 and 3 of this application intermittent or seasonal? ❑ Yes 4 Complete this section. 0 No 4 SKIP to Section 6. c 5.2 Briefly describe the frequency and duration of flow. This discharge will be temporary,for approximately a year or until the pit lake has been dewatered.The flow will be continuous throughout this time with an approximate flow of 3500 gpm. SECTION • I E 6.1 Briefly describe any treatment system(s)used(or to be used). co d E Y VD L Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3). EPA Form 3510-2E(revised 3-19) Page 2 EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19 Albemarle Kings Mountain OMB No.2040-0004 SECTIONOTHER INFORMATION1 7.1 Use the space below to expand upon any of the above items. Use this space to provide any information you believe the reviewer should consider in establishing permit limitations.Attach additional sheets as needed. c Samples in Section 4 reflect expected discharge quality;the samples were taken from the Pit Lake,not the outfall point. Water quality of the discharge water contained within Pit Lake does not exceed Class C aquatic water standards(See E Engineering Alternative Analysis Attachment).The attached Kings Creek Stability and Water Quality Assessment `o c demonstrates that minor increases in flow due to the mine pit dewatering is not expected to adversely impact the banks of Kings Creek,and is not expected increase flood or adversely effect elevations beyond the subject property lines. Based on the attached Engineering Alternatives Analysis,direct discharge to Kings Creek is deemed the most environmentally sound alternative of the economically viable alternatives for dewatering Pit Lake. The dewatering configuration under consideration is conveyance of pit water to the South Creek Reservoir prior to SECTIONI CERTIFICATION STATEMENT(40 8.1 In Column 1 below,mark the sections of Form 2E that you have completed and are submitting with your application. For each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority. Note that not all applicants are required to provide attachments. Column 1 Column 2 0 Section 1:Outfall Location ❑ w/attachments(e.g., responses for additional outfalls) 0 Section 2: Discharge Date ❑ w/attachments 0 Section 3:Waste Types ❑ w/attachments a� 0 Section 4: Effluent Characteristics 0 w/attachments 0 Section 5: Flow ❑ w/attachments Cn c 0 Section 6:Treatment System ❑ w/attachments 1` 0 Section 7:Other Information 0 w/attachments a� 0 Section 8:Checklist and Certification Statement 0 w/attachments c 8.2 Certification Statement 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. Name(print or type first and last name) Official title Joey Dean Group Hydrogeologist Signature Date signed �—Y 11/22/2022 Click to go back to the beginning of Form EPA Form 3510-2E(revised 3-19) Page 3 APPLICATION FORM 2E Section 4 Attachment Effluent Characteristics S9319WCA Robes D.Snyder Road,Suite 436 Charlotte,North Carolina 28223 Tel 919,292-2200 wwwswca.com ENVIRONMENTAL CONSULTANTS - Sound Science.Creative Solutions.' TECHNICAL MEMORANDUM To: Trevor Chesal Albemarle 4250 Congress Street, Suite 900 Charlotte, NC 28209 From: Sophie Swanson, Senior Water Resource Engineer, Mining Date: November 11, 2022 Re: Pit Lake Water Quality Results, Kings Mountain Mine/SWCA Project No. 70316 INTRODUCTION This memorandum is prepared in support of a NPDES application to document the water sampling events and laboratory results that have occurred to date for the pit lake at the Albemarle Lithium Project (Project)in Kings Mountain,North Carolina. The water quality results presented in this memorandum were utilized in the NPDES application in Section 4 and represent the expected discharge quality. SAMPLING EVENTS TO DATE 2018 Sample Collection SRK Consulting(SRK) conducted a preliminary sampling event in November 2018. During that event two pit lake samples were collected. The collected samples are described as: • Sampled from middle of the pit lake by boat, 10 cm below surface; and • Sampled from boat,near historic divide between two pit lake areas,recently overtopped as a result of recent rains, forming one mixed pit lake. A memorandum documenting the 2018 sampling event and results is included in Appendix A. 2022 Sample Collection SWCA Environmental Consultants (SWCA)began the collection of baseline water quality data of the Project pit lake in 2022; sample collection locations are displayed in Table 1 below. Table 1. Summary of Sampling Locations and Their Aliases Location Name Latitude Longitude Location Type Description PL-DEEP 35'13'27.61"N 81°2114.42"W Pit lake Deepest portion of lake PL-2 35°13'28.77"N 81°21'9.17"W Pit lake Northeastern third of lake Pit Lake Water Quality Monitoring Results—Kings Mountain Lithium Mining Project Location Name Latitude Longitude Location Type Description PL-5 35°13'24.25"N 81°21'11.08"W Pit lake Middle third of lake PL-8 35°13'19.83"N 81°21'16.44"W Pit lake Southwestern third of lake Quarterly Monitoring SWCA collected water quality samples in the pit lake for the second quarter and third quarter of 2022. Water quality samples for PL-2,PL-5, and PL-8 were collected at depths of 10 feet, 50 feet, and 80 feet. The deep pit lake sampling location was to the third quarter water quality sampling event; samples were collected at 80 feet, 100 feet, 120 feet, 140 feet, and 160 feet. The water samples were processed by ACZ Laboratories in Steamboat,Colorado. The third quarter water quality data is preliminary in nature. The laboratory results are attached in Appendix A. Field Parameters SWCA collected field parameter readings for the pit lake in four separate sampling events. The field parameters collected are temperature,pH, specific conductivity,and dissolved oxygen. Locations PL-2, PL-5, and PL-8 were sampled in 5-foot intervals in-situ from total depth to surface. These three locations were sampled in April 2022,May 2022, and September 2022. An additional pit lake sampling location, PL-DEEP,was added in September 2022 to assess the water quality in the deepest portion of the pit lake. PL-DEEP was sampled in 20-foot intervals using a flow-through cell. The field parameter results are included in Appendix B. Data Usage on Permit Application The laboratory and field parameter results from the pit lake samples presented in Appendices A and B were utilized to complete Section 4. Effluent Characteristics of the EPA Form 2E. APPENDIX A 2018 Pit Lake Sampling SRI s rk consulting Van Consulting(Canada)Inc. 2200-1066 West Hastings Street Vancouver,BC V6E 3X2 T:+1.604.681.4196 F:+1.604.687.5532 vancouver@srk.com www.srk.com Memo To: David Bird, SRK Consulting Client: Albemarle From: Samantha Barnes, SRK Consulting Project No: 515800.020 Cc: <Name>, <Company> Date: November 27, 2018 Subject: Kings Mountain Water Sampling Program 1 Introduction SRK Consulting completed a preliminary sampling program to provide baseline water quality information to support the PFS engineering study. Samantha Barnes from SRK Canada was on site at the Albemarle facilities on November 21s'and 22nd, 2018. The goal of the program was to collect water samples from water features across the historic working areas, including pit lakes, natural lakes, streams, or ponded areas. A total of 8 surface water samples were collected. The following memorandum summarizes the data collected during the sampling program. 2 Sampling Program 2.1 Sample Locations A total of 8 surface water samples were collected on site. Sample locations are presented as green dots in Figure 1. Three additional locations were visited, including GW Well #2 and Well#3, as well as the Pegmatite 25 Pond. Samples were not collected at these locations due to issues with access or equipment. <Author/Reviewer> KingsMountain_SamplingMemo_515800-020_11272018_sab.docx November 2018 SRK Consulting Page 2 467000 467500 468000 468500 �. a C • r Pit Lake M i 01, il v ��•• KM_SW_0 J r L CL � I• � '��i�r I E LL 1 r o * j.- {s KM_SW_07IM 1 00 n Goo C t•') 1 .A 49 Y � 6 �`I M 16 � '• �• • � KM_SW_01 0 0 g West Mine Middle i g n 8 KM_SW_04 Impoundment n a fA -. m I 01 - a U) a 'm Kill r o N c $ ed a' Club Lake 0 CD o M p KM_SW_02 ARM- o fee N 05 m W O O ~ O O s Legend h N KM_SW_03 • Sampled Locations, Nov2018 N - a - w Visited,but not sampled sour- . i, 'i.•i I 1eoEye,'OrWstafGe• ®R- E G:N.E- i u �'S,AcroGRID IGN,.n• SC o Gommuni[- 0 467000 467500 468000 468500 Figure 1: Kings Mountain November 2018 Sampling Locations <Author/Reviewer> KingsMountain_SamplingMemo_515800-020_11272018_sab.docx November 2018 SRK Consulting Page 3 2.2 Sample Data A YSI DSS water quality probe was used to measure in-situ water quality at each sample location, including pH, electric conductivity(pS/cm), oxygen reduction potential (ORP, in mV), and temperature (degrees Celsius). Sample coordinates were collected using a handheld Garmin GPS and reflect metric UTM coordinates in Zone 17S. Data collected at each location are presented in Table 1. Sampling included collection of water in the following bottles for associated lab analysis: • 1 x 500 mL bottle for wet chemistry • 2 x 4L bottles and 1 x 1000 mL bottle for radiochemistry (total) • 1 x 250 mL bottle for total metals • 1 x 250 mL bottle for dissolved wet chemistry(filtering recommended) • 1 x 250 mL bottle for COD, TOC, Phenols and total wet chemistry Insufficient 4L jugs were provided to collect the radiochemistry samples for all locations. Samples KM_SW_01 through KM_SW_06 included the two 4L bottles for radiochemistry, while KM_SW_07 and KM_SW_08 do not include the 4L bottles, as denoted by the grey hatch in Table 1. Filtering of samples for dissolved wet chemistry bottles was achieved using a syringe and 0.45 pm filter. Filters were depleted after sampling KM_SW_01 through KM_SW_04, as denoted by the blue hatch cells in Table 1. All other sample locations did not receive filtering for the dissolved wet chemistry bottles. <Author/Reviewer> KingsMountain_SamplingMemo_515800-020_11272018_sab.docx November 2018 SRK Consulting Page 4 Table 1: Sample Summary Data Sample ID Date Time pH Temp ORP EC Easting Northing Description West Mine Middle Impoundment. sampled beside KM_SW_01 11/21/2018 9:20 6.7 10.4 140.8 139.8 467681 3897110 metal grated dock from shoreline.Water was clear, odorless. Club Lake. sampled at edge of lake, using sampling KM-SW-02 11/21/2018 13:45 6.9 12.4 167.1 692 468281 3896343 arm (approx. 1.0m reach).Water was clear, odorless. Observed fish in water Sampled from stream near edge of property boundary. KM SW 03 11/21/2018 14:45 7.3 11.5 185.9 225.8 467880 3895856 Collected sample downstream of small weir/waterfall (approx. 1.5m in height). Sampled at edge of stream, mild turbulence. Clearwater, odorless Ponded area, currently flooded as a result of recent KM SW 04 11/21/2018 15:40 7.5 12.5 162.6 110.6 467259 3896960 rains, much higher than regular water level. Brown, murky water, visibly high TSS. Sampled with sampling arm from shore. Odorless KM SW 05 11/22/2018 8:30 6.4 13.3 207.5 521 467823 3897879 Sampled from middle of pit lake by boat, 10cm below surface. Clearwater, odorless Sampled from boat, near historic divide between two KM SW 06 11/22/2018 9:00 6.6 13.1 220.9 520 467606 3897678 pit lake areas, recently overtopped as a result of recent rains,forming one mixed pit lake. Clear water, odorless. Ponded area on pit bench,overtops and discharges KM SW 07 11/22/2018 10:00 7.1 7 142.1 280.4 467417 3897507 into pit lake via small waterfall (low flow at time of visit). Sampled from upstream stagnant water pond. Reeds and algae. Clear and odorless South Mine Impoundment. Sampled from edge of KM-SW-08 11/22/2018 15:30 6.6 11.7 23.1 151.7 467653 3896571 pond, at water surface with sampling arm. Clear, odorless Notes: 1. Grey hatch rows indicate samples where radiochemistry sample bottles(2 x 4L jugs)were not available.At these locations,only the 1 L bottle was filled for radiochemistry analysis. 2. Blue hatch rows indicate samples where the 250 mL dissolved wet chemistry bottle was filtered.All other sample bottles were not filtered for dissolved wet chemistry bottles. <Author/Reviewer> KingsMountain_SamplingMemo_515800-020_11272018_sab.docx November 2018 SRK Consulting Page 5 2.3 Additional Sampling Attempts 2.3.1 Groundwater Wells Malfunction of the Geotech bladder pump resulted in inability to sample from GW Wells#2 and #3. Depths to water were measured to be 31.4 ft and 14.1 ft, for GW#2 and GW#3 respectively. 2.3.2 Waterbodies Access to the Pegmatite 25 Pond included two sets of old steel staircases, which had not been maintained. Sampling of the pond was deemed unsafe due to the steep pit walls and old staircases. No sample was collected. The property boundary at the time of the site visit limited sampling on the south side of Highway 85 to the two sites. Nearby waterbodies noted from aerial imagery were not within the boundary area and were therefore not sampled. 3 Summary A total of eight surface water samples were collected over a two day period on site in November 2018. Future investigations should also target groundwater wells to evaluate baseline water quality in the groundwater. Disclaimer—SRK Consulting (Canada) Inc. has prepared this document for Albemarle. Any use or decisions by which a third party makes of this document are the responsibility of such third parties. In no circumstance does SRK accept any consequential liability arising from commercial decisions or actions resulting from the use of this report by a third party. The opinions expressed in this report have been based on the information available to SRK at the time of preparation.SRK has exercised all due care in reviewing information supplied by others for use on this project.Whilst SRK has compared key supplied data with expected values,the accuracy of the results and conclusions from the review are entirely reliant on the accuracy and completeness of the supplied data.SRK does not accept responsibility for any errors or omissions in the supplied information,except to the extent that SRK was hired to verify the data. <Author/Reviewer> KingsMountain_SamplingMemo_515800-020_11272018_sab.docx November 2018 SRK Consulting Page 6 4 References <Author/Reviewer> KingsMountain_SamplingMemo_515800-020_11272018_sab.docx November 2018 APPENDIX A 2022 Quarterly Monitoring Laboratory Results AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-01 Project ID: Date Sampled: 05116122 11:45 Sample ID: PL-2-80 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 11:05 mrd Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 17:18 wtc Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 3 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-01 Project ID: Date Sampled: 05116122 11:45 Sample ID: PL-2-80 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:21 kja Aluminum,total M200.8 ICP-MS 1 0.0076 B * mg/L 0.005 0.015 05/31/22 17:06 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:21 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:06 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00395 mg/L 0.0002 0.001 05/27/22 22:21 kja Arsenic,total M200.8 ICP-MS 1 0.00504 * mg/L 0.0002 0.001 05/31/22 17:06 kja Barium,dissolved M200.7 ICP 1 0.0159 B mg/L 0.007 0.035 06/03/22 20:21 kehl Barium,total M200.7 ICP 1 0.0133 B mg/L 0.007 0.035 06/01/22 18:34 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:21 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:06 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:21 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 18:34 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:21 kehl Boron,total M200.7 ICP 1 0.033 B mg/L 0.03 0.1 06/01/22 18:34 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:21 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:06 kja Calcium,dissolved M200.7 ICP 1 62.8 mg/L 0.1 0.5 06/03/22 20:21 kehl Calcium,total M200.7 ICP 1 64.2 mg/L 0.1 0.5 06/01/22 18:34 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:21 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:06 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:21 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 18:34 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:21 kehl Copper,total M200.7 ICP 1 0.061 * mg/L 0.01 0.05 06/01/22 18:34 kehl Iron,dissolved M200.8 ICP-MS 1 0.0142 B mg/L 0.007 0.02 05/27/22 22:21 kja Iron,total M200.8 ICP-MS 1 0.0592 mg/L 0.007 0.02 05/31/22 17:06 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:21 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:06 kja Lithium,dissolved M200.7 ICP 1 0.996 mg/L 0.008 0.04 06/03/22 20:21 kehl Lithium,total M200.7 ICP 1 1.02 mg/L 0.008 0.04 06/01/22 18:34 kehl Magnesium,dissolved M200.7 ICP 1 14.6 mg/L 0.2 1 06/03/22 20:21 kehl Magnesium,total M200.7 ICP 1 15.2 mg/L 0.2 1 06/01/22 18:34 kehl Manganese,dissolved M200.7 ICP 1 3.37 mg/L 0.01 0.05 06/03/22 20:21 kehl Manganese,total M200.7 ICP 1 3.31 * mg/L 0.01 0.05 06/01/22 18:34 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 5 <2 U * ng/L 2 5 06/02/22 10:43 mfm Mercury,total M1631 E,Atomic Fluorescence 5 <1.5 U * ng/L 1.5 5 05/26/22 11:39 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:21 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:06 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:21 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 18:34 kehl Phosphorus,dissolved M200.7 ICP 1 1.07 mg/L 0.1 0.5 06/03/22 20:21 kehl Phosphorus,total M200.7 ICP 1 1.12 mg/L 0.1 0.5 06/01/22 18:34 kehl Potassium,dissolved M200.7 ICP 1 5.61 mg/L 0.2 1 06/03/22 20:21 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 4 of 180 ACZ Laboratories, Inc. "d2sk 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-01 Project ID: Date Sampled: 05116122 11:45 Sample ID: PL-2-80 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 5.76 mg/L 0.2 1 06/01/22 18:34 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:21 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 18:34 kehl Selenium,dissolved M200.8 ICP-MS 1 0.0840 * mg/L 0.0001 0.00025 05/27/22 22:21 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:06 kja Silicon,dissolved M200.7 ICP 1 6.53 * mg/L 0.1 0.5 06/03/22 20:21 kehl Silicon,total M200.7 ICP 1 5.39 * mg/L 0.1 0.5 06/04/22 2:05 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:04 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:06 kja Sodium,dissolved M200.7 ICP 1 13.1 mg/L 0.2 1 06/03/22 20:21 kehl Sodium,total M200.7 ICP 1 13.2 mg/L 0.2 1 06/01/22 18:34 kehl Strontium,dissolved M200.7 ICP 1 0.222 mg/L 0.009 0.045 06/03/22 20:21 kehl Strontium,total M200.7 ICP 1 0.223 mg/L 0.009 0.045 06/01/22 18:34 kehl Sulfur,dissolved M200.7 ICP 1 86.4 * mg/L 0.25 1.25 06/03/22 20:21 kehl Sulfur,total M200.7 ICP 1 34.8 * mg/L 0.25 1.25 06/04/22 2:05 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:21 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:06 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:21 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:06 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:21 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 18:34 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:21 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 18:34 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00057 mg/L 0.0001 0.0005 05/27/22 22:21 kja Uranium,total M200.8 ICP-MS 1 0.00048 B * mg/L 0.0001 0.0005 05/31/22 17:06 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:21 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 18:34 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:21 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 05/31/22 17:06 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 5 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-01 Project ID: Date Sampled: 05116122 11:45 Sample ID: PL-2-80 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 125 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCC3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 125 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 33.0 * mg/L 1 5 05/27/22 19:36 mad Carbon,total organic SM5310B 1 2.8 B * mg/L 1 5 05/27/22 14:00 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -0.9 % 06/23/22 0:00 talc Sum of Anions 5.7 meq/L 06/23/22 0:00 talc Sum of Cations 5.6 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 7.52 * mg/L 0.5 2 05/25/2215:43 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:31 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 06/13/22 14:05 bls Fluoride SM450OF-C 1 0.39 * mg/L 0.15 0.35 06/02/22 22:25 emk Hardness as CaCO3 SM2340B-Calculation 217 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 3.93 * mg/L 0.05 0.2 05/25/22 11:01 mJ1 w/gas diffusion Residue, Filterable SM2540C 1 352 mg/L 20 40 05/20/22 10:22 anc (TDS)@180C Residue, Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:44 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 142 mg/L 5 25 05/24/22 13:22 bls Sulfide as S SM4500S2-D 75 29.2 mg/L 1.5 7.5 05/20/22 15:26 jck TDS(calculated) Calculation 330 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.07 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 6 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-02 Project ID: Date Sampled: 05116122 12:00 Sample ID: PL-2-50 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 11:16 mrd Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 17:31 wtc Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 7 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-02 Project ID: Date Sampled: 05116122 12:00 Sample ID: PL-2-50 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:23 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U * mg/L 0.005 0.015 05/31/22 17:08 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:23 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:08 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00517 mg/L 0.0002 0.001 05/27/22 22:23 kja Arsenic,total M200.8 ICP-MS 1 0.00559 * mg/L 0.0002 0.001 05/31/22 17:08 kja Barium,dissolved M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/03/22 20:25 kehl Barium,total M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/01/22 18:38 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:23 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:08 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:25 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 18:38 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:25 kehl Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/01/22 18:38 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:23 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:08 kja Calcium,dissolved M200.7 ICP 1 51.7 mg/L 0.1 0.5 06/03/22 20:25 kehl Calcium,total M200.7 ICP 1 52.1 mg/L 0.1 0.5 06/01/22 18:38 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:23 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:08 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:25 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 18:38 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:25 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 18:38 kehl Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 05/27/22 22:23 kja Iron,total M200.8 ICP-MS 1 0.0268 * mg/L 0.007 0.02 05/31/22 17:08 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:23 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:08 kja Lithium,dissolved M200.7 ICP 1 0.815 mg/L 0.008 0.04 06/03/22 20:25 kehl Lithium,total M200.7 ICP 1 0.821 mg/L 0.008 0.04 06/01/22 18:38 kehl Magnesium,dissolved M200.7 ICP 1 11.9 mg/L 0.2 1 06/03/22 20:25 kehl Magnesium,total M200.7 ICP 1 12.3 mg/L 0.2 1 06/01/22 18:38 kehl Manganese,dissolved M200.7 ICP 1 0.616 mg/L 0.01 0.05 06/03/22 20:25 kehl Manganese,total M200.7 ICP 1 0.649 * mg/L 0.01 0.05 06/01/22 18:38 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 06/02/22 10:48 mfm Mercury,total M1631 E,Atomic Fluorescence 2 <0.6 U * ng/L 0.6 2 05/26/22 11:44 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:23 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:08 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:25 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 18:38 kehl Phosphorus,dissolved M200.7 ICP 1 0.27 B mg/L 0.1 0.5 06/03/22 20:25 kehl Phosphorus,total M200.7 ICP 1 0.27 B mg/L 0.1 0.5 06/01/22 18:38 kehl Potassium,dissolved M200.7 ICP 1 4.67 mg/L 0.2 1 06/03/22 20:25 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 8 of 180 ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-02 Project ID: Date Sampled: 05116122 12:00 Sample ID: PL-2-50 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 4.76 mg/L 0.2 1 06/01/22 18:38 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:25 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 18:38 kehl Selenium,dissolved M200.8 ICP-MS 1 0.00012 B mg/L 0.0001 0.00025 06/06/22 14:34 mfm Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:08 kja Silicon,dissolved M200.7 ICP 1 3.13 * mg/L 0.1 0.5 06/03/22 20:25 kehl Silicon,total M200.7 ICP 1 2.31 mg/L 0.1 0.5 06/04/22 2:14 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:06 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:08 kja Sodium,dissolved M200.7 ICP 1 10.9 mg/L 0.2 1 06/03/22 20:25 kehl Sodium,total M200.7 ICP 1 10.6 mg/L 0.2 1 06/01/22 18:38 kehl Strontium,dissolved M200.7 ICP 1 0.168 mg/L 0.009 0.045 06/03/22 20:25 kehl Strontium,total M200.7 ICP 1 0.165 mg/L 0.009 0.045 06/01/22 18:38 kehl Sulfur,dissolved M200.7 ICP 1 40.7 * mg/L 0.25 1.25 06/03/22 20:25 kehl Sulfur,total M200.7 ICP 1 40.2 * mg/L 0.25 1.25 06/04/22 2:14 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:23 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:08 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:23 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:08 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:25 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 18:38 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:25 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 18:38 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00062 mg/L 0.0001 0.0005 05/27/22 22:23 kja Uranium,total M200.8 ICP-MS 1 0.00065 * mg/L 0.0001 0.0005 05/31/22 17:08 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:25 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 18:38 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:23 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 05/31/22 17:08 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 9 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-02 Project ID: Date Sampled: 05116122 12:00 Sample ID: PL-2-50 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 80.9 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCC3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 80.9 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 20.2 * mg/L 1 5 05/27/22 20:12 mad Carbon,total organic SM5310B 1 3.2 B * mg/L 1 5 05/27/22 14:24 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -3.4 % 06/23/22 0:00 talc Sum of Anions 4.5 meq/L 06/23/22 0:00 talc Sum of Cations 4.2 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.53 * mg/L 0.5 2 05/25/2215:44 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:37 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 06/13/22 14:06 bls Fluoride SM450OF-C 1 0.34 B * mg/L 0.15 0.35 06/02/22 22:30 emk Hardness as CaCO3 SM2340B-Calculation 178 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 0.264 * mg/L 0.05 0.2 05/25/22 11:02 mJ1 w/gas diffusion Residue, Filterable SM2540C 1 280 * mg/L 20 40 05/20/22 10:25 anc (TDS)@180C Residue, Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:46 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 128 * mg/L 5 25 05/24/22 13:22 bls Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 05/20/22 15:30 jck TDS(calculated) Calculation 264 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.06 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 10 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-03 Project ID: Date Sampled: 05116122 12:45 Sample ID: PL-2-10 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 11:28 mrd Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 17:44 wtc Digestion REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 11 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-03 Project ID: Date Sampled: 05116122 12:45 Sample ID: PL-2-10 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:24 kja Aluminum,total M200.8 ICP-MS 1 0.0092 B * mg/L 0.005 0.015 05/31/22 17:09 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:24 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:09 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00536 mg/L 0.0002 0.001 05/27/22 22:24 kja Arsenic,total M200.8 ICP-MS 1 0.00559 * mg/L 0.0002 0.001 05/31/22 17:09 kja Barium,dissolved M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/03/22 20:28 kehl Barium,total M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/01/22 18:41 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:24 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:09 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:28 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 18:41 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:28 kehl Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/01/22 18:41 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:24 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:09 kja Calcium,dissolved M200.7 ICP 1 50.0 mg/L 0.1 0.5 06/03/22 20:28 kehl Calcium,total M200.7 ICP 1 49.7 mg/L 0.1 0.5 06/01/22 18:41 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:24 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:09 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:28 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 18:41 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:28 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 18:41 kehl Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 05/27/22 22:24 kja Iron,total M200.8 ICP-MS 1 0.0186 B mg/L 0.007 0.02 05/31/22 17:09 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:24 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:09 kja Lithium,dissolved M200.7 ICP 1 0.790 mg/L 0.008 0.04 06/03/22 20:28 kehl Lithium,total M200.7 ICP 1 0.780 mg/L 0.008 0.04 06/01/22 18:41 kehl Magnesium,dissolved M200.7 ICP 1 11.5 mg/L 0.2 1 06/03/22 20:28 kehl Magnesium,total M200.7 ICP 1 11.7 mg/L 0.2 1 06/01/22 18:41 kehl Manganese,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:28 kehl Manganese,total M200.7 ICP 1 0.066 mg/L 0.01 0.05 06/01/22 18:41 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 06/02/22 10:53 mfm Mercury,total M1631 E,Atomic Fluorescence 2 <0.6 U * ng/L 0.6 2 05/26/22 11:48 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:24 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:09 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:28 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 18:41 kehl Phosphorus,dissolved M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 06/03/22 20:28 kehl Phosphorus,total M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 06/01/22 18:41 kehl Potassium,dissolved M200.7 ICP 1 4.39 mg/L 0.2 1 06/03/22 20:28 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 12 of 180 ACZ Laboratories, Inc. "d2sk 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-03 Project ID: Date Sampled: 05116122 12:45 Sample ID: PL-2-10 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 4.43 mg/L 0.2 1 06/01/22 18:41 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:28 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 18:41 kehl Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 06/06/22 14:36 mfm Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:09 kja Silicon,dissolved M200.7 ICP 1 0.62 mg/L 0.1 0.5 06/03/22 20:28 kehl Silicon,total M200.7 ICP 1 0.59 * mg/L 0.1 0.5 06/04/22 2:17 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:08 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:09 kja Sodium,dissolved M200.7 ICP 1 10.4 mg/L 0.2 1 06/03/22 20:28 kehl Sodium,total M200.7 ICP 1 10.1 mg/L 0.2 1 06/01/22 18:41 kehl Strontium,dissolved M200.7 ICP 1 0.160 mg/L 0.009 0.045 06/03/22 20:28 kehl Strontium,total M200.7 ICP 1 0.154 mg/L 0.009 0.045 06/01/22 18:41 kehl Sulfur,dissolved M200.7 ICP 1 38.1 * mg/L 0.25 1.25 06/03/22 20:28 kehl Sulfur,total M200.7 ICP 1 40.1 * mg/L 0.25 1.25 06/04/22 2:17 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:24 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:09 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:24 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:09 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:28 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 18:41 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:28 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 18:41 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00068 mg/L 0.0001 0.0005 05/27/22 22:24 kja Uranium,total M200.8 ICP-MS 1 0.00073 * mg/L 0.0001 0.0005 05/31/22 17:09 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:28 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 18:41 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:24 kja Zinc,total M200.8 ICP-MS 1 0.0065 B mg/L 0.006 0.015 05/31/22 17:09 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 13 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-03 Project ID: Date Sampled: 05116122 12:45 Sample ID: PL-2-10 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 78.5 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCC3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 78.5 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 18.7 * mg/L 1 5 05/27/22 20:39 mad Carbon,total organic SM5310B 1 4.7 B * mg/L 1 5 05/27/22 14:34 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -2.4 % 06/23/22 0:00 talc Sum of Anions 4.2 meq/L 06/23/22 0:00 talc Sum of Cations 4.0 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.35 * mg/L 0.5 2 05/25/2215:45 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:39 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 06/13/22 14:07 bls Fluoride SM450OF-C 1 0.32 B * mg/L 0.15 0.35 06/02/22 22:35 emk Hardness as CaCO3 SM2340B-Calculation 172 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 <0.05 U * mg/L 0.05 0.2 05/23/22 12:25 bls w/gas diffusion Residue, Filterable SM2540C 1 264 mg/L 20 40 05/20/22 10:27 anc (TDS)@180C Residue, Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:49 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 117 mg/L 5 25 05/24/22 13:22 bls Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 05/20/22 15:33 jck TDS(calculated) Calculation 248 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.06 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 14 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-04 Project ID: Date Sampled: 05116122 14:00 Sample ID: PL-5-80 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 11:39 mrd Total Hot Plate M200.2 ICP 05/28/22 17:57 wtc Digestion Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 15 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-04 Project ID: Date Sampled: 05116122 14:00 Sample ID: PL-5-80 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:30 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U * mg/L 0.005 0.015 05/31/22 17:15 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:30 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:15 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00434 mg/L 0.0002 0.001 05/27/22 22:30 kja Arsenic,total M200.8 ICP-MS 1 0.00516 * mg/L 0.0002 0.001 05/31/22 17:15 kja Barium,dissolved M200.7 ICP 1 0.0161 B mg/L 0.007 0.035 06/03/22 20:31 kehl Barium,total M200.7 ICP 1 0.0140 B mg/L 0.007 0.035 06/01/22 18:44 kehl Beryllium,dissolved M200.8 ICP-MS 1 0.000082 B mg/L 0.00008 0.00025 05/27/22 22:30 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:15 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:31 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 18:44 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:31 kehl Boron,total M200.7 ICP 1 0.032 B mg/L 0.03 0.1 06/01/22 18:44 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:30 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:15 kja Calcium,dissolved M200.7 ICP 1 63.1 mg/L 0.1 0.5 06/03/22 20:31 kehl Calcium,total M200.7 ICP 1 64.6 mg/L 0.1 0.5 06/01/22 18:44 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:30 kja Chromium,total M200.8 ICP-MS 1 0.00052 B mg/L 0.0005 0.002 05/31/22 17:15 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:31 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 18:44 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:31 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 18:44 kehl Iron,dissolved M200.8 ICP-MS 1 0.0148 B mg/L 0.007 0.02 05/27/22 22:30 kja Iron,total M200.8 ICP-MS 1 0.0880 * mg/L 0.007 0.02 06/01/22 12:46 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:30 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:15 kja Lithium,dissolved M200.7 ICP 1 1.01 mg/L 0.008 0.04 06/03/22 20:31 kehl Lithium,total M200.7 ICP 1 1.02 mg/L 0.008 0.04 06/01/22 18:44 kehl Magnesium,dissolved M200.7 ICP 1 14.6 mg/L 0.2 1 06/03/22 20:31 kehl Magnesium,total M200.7 ICP 1 15.4 mg/L 0.2 1 06/01/22 18:44 kehl Manganese,dissolved M200.7 ICP 1 3.41 mg/L 0.01 0.05 06/03/22 20:31 kehl Manganese,total M200.7 ICP 1 3.51 mg/L 0.01 0.05 06/01/22 18:44 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 5 <2 U * ng/L 2 5 06/02/22 10:57 mfm Mercury,total M1631 E,Atomic Fluorescence 5 <1.5 U * ng/L 1.5 5 05/26/22 11:53 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:30 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:15 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:31 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 18:44 kehl Phosphorus,dissolved M200.7 ICP 1 1.09 mg/L 0.1 0.5 06/03/22 20:31 kehl Phosphorus,total M200.7 ICP 1 1.14 mg/L 0.1 0.5 06/01/22 18:44 kehl Potassium,dissolved M200.7 ICP 1 5.62 mg/L 0.2 1 06/03/22 20:31 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 16 of 180 ACZ Laboratories, Inc. ' 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-04 Project ID: Date Sampled: 05116122 14:00 Sample ID: PL-5-80 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 5.77 mg/L 0.2 1 06/01/22 18:44 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:31 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 18:44 kehl Selenium,dissolved M200.8 ICP-MS 1 0.0631 * mg/L 0.0001 0.00025 05/27/22 22:30 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:15 kja Silicon,dissolved M200.7 ICP 1 6.52 mg/L 0.1 0.5 06/03/22 20:31 kehl Silicon,total M200.7 ICP 1 5.61 mg/L 0.1 0.5 06/04/22 2:20 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:14 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:15 kja Sodium,dissolved M200.7 ICP 1 13.3 mg/L 0.2 1 06/03/22 20:31 kehl Sodium,total M200.7 ICP 1 13.4 mg/L 0.2 1 06/01/22 18:44 kehl Strontium,dissolved M200.7 ICP 1 0.224 mg/L 0.009 0.045 06/03/22 20:31 kehl Strontium,total M200.7 ICP 1 0.223 mg/L 0.009 0.045 06/01/22 18:44 kehl Sulfur,dissolved M200.7 ICP 1 88.2 * mg/L 0.25 1.25 06/03/22 20:31 kehl Sulfur,total M200.7 ICP 1 35.9 * mg/L 0.25 1.25 06/04/22 2:20 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:30 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:15 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:30 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:15 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:31 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 18:44 kehl Titanium,dissolved M200.7 ICP 1 0.0053 B mg/L 0.005 0.025 06/03/22 20:31 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 18:44 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00060 mg/L 0.0001 0.0005 05/27/22 22:30 kja Uranium,total M200.8 ICP-MS 1 0.00044 B * mg/L 0.0001 0.0005 05/31/22 17:15 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:31 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 18:44 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:30 kja Zinc,total M200.8 ICP-MS 1 0.0450 * mg/L 0.006 0.015 05/31/22 17:15 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 17 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-04 Project ID: Date Sampled: 05116122 14:00 Sample ID: PL-5-80 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 121 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 121 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 31.2 * mg/L 1 5 05/27/22 20:55 mad Carbon,total organic SM5310B 1 2.9 B * mg/L 1 5 05/27/22 14:43 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 5.7 % 06/23/22 0:00 talc Sum of Anions 5.0 meq/L 06/23/22 0:00 talc Sum of Cations 5.6 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 7.42 * mg/L 0.5 2 05/25/2215:46 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:41 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 0.0031 BH mg/L 0.003 0.01 06/13/22 14:08 bls Fluoride SM450OF-C 1 0.41 * mg/L 0.15 0.35 06/02/22 22:59 emk Hardness as CaCO3 SM2340B-Calculation 218 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 3.61 * mg/L 0.05 0.2 05/25/22 11:07 mJ1 w/gas diffusion Residue, Filterable SM2540C 1 332 mg/L 20 40 05/20/22 10:30 anc (TDS)@180C Residue,Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:52 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 114 mg/L 5 25 05/24/2213:24 bls Sulfide as S SM4500S2-D 75 27.0 * mg/L 1.5 7.5 05/20/22 15:36 jck TDS(calculated) Calculation 300 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.11 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 18 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-05 Project ID: Date Sampled: 05116122 14:30 Sample ID: PL-5-50 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 11:51 mrd Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 18:10 wtc Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 19 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-05 Project ID: Date Sampled: 05116122 14:30 Sample ID: PL-5-50 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:35 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U * mg/L 0.005 0.015 05/31/22 17:17 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:35 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:17 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00519 mg/L 0.0002 0.001 05/27/22 22:35 kja Arsenic,total M200.8 ICP-MS 1 0.00553 * mg/L 0.0002 0.001 05/31/22 17:17 kja Barium,dissolved M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/03/22 20:34 kehl Barium,total M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/01/22 18:47 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:35 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:17 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:34 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 18:47 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:34 kehl Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/01/22 18:47 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:35 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:17 kja Calcium,dissolved M200.7 ICP 1 52.7 mg/L 0.1 0.5 06/03/22 20:34 kehl Calcium,total M200.7 ICP 1 51.5 mg/L 0.1 0.5 06/01/22 18:47 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:35 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:17 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:34 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 18:47 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:34 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 18:47 kehl Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 05/27/22 22:35 kja Iron,total M200.8 ICP-MS 1 0.0249 * mg/L 0.007 0.02 06/01/22 12:48 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:35 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:17 kja Lithium,dissolved M200.7 ICP 1 0.827 mg/L 0.008 0.04 06/03/22 20:34 kehl Lithium,total M200.7 ICP 1 0.814 mg/L 0.008 0.04 06/01/22 18:47 kehl Magnesium,dissolved M200.7 ICP 1 12.1 mg/L 0.2 1 06/03/22 20:34 kehl Magnesium,total M200.7 ICP 1 12.2 mg/L 0.2 1 06/01/22 18:47 kehl Manganese,dissolved M200.7 ICP 1 0.644 mg/L 0.01 0.05 06/03/22 20:34 kehl Manganese,total M200.7 ICP 1 0.664 mg/L 0.01 0.05 06/01/22 18:47 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 06/02/22 11:02 mfm Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:35 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:17 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:34 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 18:47 kehl Phosphorus,dissolved M200.7 ICP 1 0.27 B * mg/L 0.1 0.5 06/03/22 20:34 kehl Phosphorus,total M200.7 ICP 1 0.26 B * mg/L 0.1 0.5 06/01/22 18:47 kehl Potassium,dissolved M200.7 ICP 1 4.75 mg/L 0.2 1 06/03/22 20:34 kehl Potassium,total M200.7 ICP 1 4.73 mg/L 0.2 1 06/01/22 18:47 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 20 of 180 ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-05 Project ID: Date Sampled: 05116122 14:30 Sample ID: PL-5-50 Date Received: 05119122 Sample Matrix: Surface Water Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:34 kehl Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/01/22 18:47 kehl Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 06/06/22 14:38 mfm Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:17 kja Silicon,dissolved M200.7 ICP 1 3.22 mg/L 0.1 0.5 06/03/22 20:34 kehl Silicon,total M200.7 ICP 1 2.88 * mg/L 0.1 0.5 06/04/22 2:23 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:15 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:17 kja Sodium,dissolved M200.7 ICP 1 11.0 mg/L 0.2 1 06/03/22 20:34 kehl Sodium,total M200.7 ICP 1 10.5 mg/L 0.2 1 06/01/22 18:47 kehl Strontium,dissolved M200.7 ICP 1 0.171 mg/L 0.009 0.045 06/03/22 20:34 kehl Strontium,total M200.7 ICP 1 0.164 mg/L 0.009 0.045 06/01/22 18:47 kehl Sulfur,dissolved M200.7 ICP 1 41.1 mg/L 0.25 1.25 06/03/22 20:34 kehl Sulfur,total M200.7 ICP 1 39.9 * mg/L 0.25 1.25 06/04/22 2:23 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:35 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:17 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:35 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:17 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:34 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 18:47 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:34 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 18:47 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00061 mg/L 0.0001 0.0005 05/27/22 22:35 kja Uranium,total M200.8 ICP-MS 1 0.00064 * mg/L 0.0001 0.0005 05/31/22 17:17 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:34 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 18:47 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:35 kja Zinc,total M200.8 ICP-MS 1 0.0113 B mg/L 0.006 0.015 05/31/22 17:17 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 21 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-05 Project ID: Date Sampled: 05116122 14:30 Sample ID: PL-5-50 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 80.6 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCC3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 80.6 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 20.3 * mg/L 1 5 05/27/22 21:12 mad Carbon,total organic SM5310B 1 3.8 B * mg/L 1 5 05/27/22 14:53 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -2.3 % 06/23/22 0:00 talc Sum of Anions 4.5 meq/L 06/23/22 0:00 talc Sum of Cations 4.3 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.44 * mg/L 0.5 2 05/25/2215:46 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:43 mJ1 Cyanide,total M335.4-Colorinnetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 06/13/22 14:09 bls Fluoride SM450OF-C 1 0.34 B * mg/L 0.15 0.35 06/02/22 23:04 emk Hardness as CaCO3 SM2340B-Calculation 181 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 0.284 mg/L 0.05 0.2 05/25/22 11:08 mJ1 w/gas diffusion Residue, Filterable SM2540C 1 270 * mg/L 20 40 05/20/22 10:32 anc (TDS)@180C Residue, Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:54 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 126 * mg/L 5 25 05/24/22 13:24 bls Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 05/20/22 15:39 jck TDS(calculated) Calculation 264 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.02 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 22 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-06 Project ID: Date Sampled: 05116122 15:00 Sample ID: PL-5-10 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 12:02 mrd Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 18:24 wtc Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 23 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-06 Project ID: Date Sampled: 05116122 15:00 Sample ID: PL-5-10 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:37 kja Aluminum,total M200.8 ICP-MS 1 0.0093 B * mg/L 0.005 0.015 05/31/22 17:19 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:37 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:19 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00540 mg/L 0.0002 0.001 05/27/22 22:37 kja Arsenic,total M200.8 ICP-MS 1 0.00556 * mg/L 0.0002 0.001 05/31/22 17:19 kja Barium,dissolved M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/03/22 20:38 kehl Barium,total M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/01/22 18:57 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:37 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:19 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:38 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 18:57 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:38 kehl Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/01/22 18:57 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:37 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:19 kja Calcium,dissolved M200.7 ICP 1 50.4 mg/L 0.1 0.5 06/03/22 20:38 kehl Calcium,total M200.7 ICP 1 49.5 mg/L 0.1 0.5 06/01/22 18:57 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:37 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:19 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:38 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 18:57 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:38 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 18:57 kehl Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 05/27/22 22:37 kja Iron,total M200.8 ICP-MS 1 0.0172 B mg/L 0.007 0.02 06/01/22 12:50 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:37 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:19 kja Lithium,dissolved M200.7 ICP 1 0.794 mg/L 0.008 0.04 06/03/22 20:38 kehl Lithium,total M200.7 ICP 1 0.780 mg/L 0.008 0.04 06/01/22 18:57 kehl Magnesium,dissolved M200.7 ICP 1 11.6 mg/L 0.2 1 06/03/22 20:38 kehl Magnesium,total M200.7 ICP 1 11.7 mg/L 0.2 1 06/01/22 18:57 kehl Manganese,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:38 kehl Manganese,total M200.7 ICP 1 0.047 B mg/L 0.01 0.05 06/01/22 18:57 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 06/02/22 11:07 mfm Mercury,total M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 05/26/22 12:07 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:37 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:19 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:38 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 18:57 kehl Phosphorus,dissolved M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 06/03/22 20:38 kehl Phosphorus,total M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 06/01/22 18:57 kehl Potassium,dissolved M200.7 ICP 1 4.42 mg/L 0.2 1 06/03/22 20:38 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 24 of 180 ACZ Laboratories, Inc. ' 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-06 Project ID: Date Sampled: 05116122 15:00 Sample ID: PL-5-10 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 4.39 mg/L 0.2 1 06/01/22 18:57 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:38 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 18:57 kehl Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 06/06/22 14:40 mfm Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:19 kja Silicon,dissolved M200.7 ICP 1 0.61 mg/L 0.1 0.5 06/03/22 20:38 kehl Silicon,total M200.7 ICP 1 0.53 * mg/L 0.1 0.5 06/04/22 2:26 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:21 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:19 kja Sodium,dissolved M200.7 ICP 1 10.4 mg/L 0.2 1 06/03/22 20:38 kehl Sodium,total M200.7 ICP 1 9.98 mg/L 0.2 1 06/01/22 18:57 kehl Strontium,dissolved M200.7 ICP 1 0.160 mg/L 0.009 0.045 06/03/22 20:38 kehl Strontium,total M200.7 ICP 1 0.153 mg/L 0.009 0.045 06/01/22 18:57 kehl Sulfur,dissolved M200.7 ICP 1 38.6 * mg/L 0.25 1.25 06/03/22 20:38 kehl Sulfur,total M200.7 ICP 1 37.8 * mg/L 0.25 1.25 06/04/22 2:26 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:37 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:19 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:37 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:19 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:38 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 18:57 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:38 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 18:57 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00066 mg/L 0.0001 0.0005 05/27/22 22:37 kja Uranium,total M200.8 ICP-MS 1 0.00071 * mg/L 0.0001 0.0005 05/31/22 17:19 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:38 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 18:57 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:37 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 05/31/22 17:19 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 25 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-06 Project ID: Date Sampled: 05116122 15:00 Sample ID: PL-5-10 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 78.6 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 78.6 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 18.6 * mg/L 1 5 05/27/22 21:28 mad Carbon,total organic SM5310B 1 4.1 B * mg/L 1 5 05/27/22 15:02 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -2.4 % 06/23/22 0:00 talc Sum of Anions 4.3 meq/L 06/23/22 0:00 talc Sum of Cations 4.1 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.30 * mg/L 0.5 2 05/25/2215:47 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:45 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 06/13/22 14:09 bls Fluoride SM450OF-C 1 0.32 B * mg/L 0.15 0.35 06/02/22 23:08 emk Hardness as CaCO3 SM2340B-Calculation 174 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 <0.05 U * mg/L 0.05 0.2 05/23/22 12:32 bls w/gas diffusion Residue, Filterable SM2540C 1 260 * mg/L 20 40 05/20/22 10:35 anc (TDS)@180C Residue,Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:57 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 120 * mg/L 5 25 05/24/2213:24 bls Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 05/20/22 15:48 jck TDS(calculated) Calculation 252 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.03 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 26 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-07 Project ID: Date Sampled: 05116122 15:20 Sample ID: PL-8-80 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 06/08/22 12:13 mrd Total Hot Plate M200.2 ICP 05/28/22 18:37 wtc Digestion Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 27 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-07 Project ID: Date Sampled: 05116122 15:20 Sample ID: PL-8-80 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:39 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U * mg/L 0.005 0.015 05/31/22 17:20 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:39 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:20 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00392 mg/L 0.0002 0.001 05/27/22 22:39 kja Arsenic,total M200.8 ICP-MS 1 0.00516 * mg/L 0.0002 0.001 05/31/22 17:20 kja Barium,dissolved M200.7 ICP 1 0.0131 B mg/L 0.007 0.035 06/03/22 20:41 kehl Barium,total M200.7 ICP 1 0.0139 B mg/L 0.007 0.035 06/01/22 19:00 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:39 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:20 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:41 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 19:00 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:41 kehl Boron,total M200.7 ICP 1 0.031 B mg/L 0.03 0.1 06/01/22 19:00 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:39 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:20 kja Calcium,dissolved M200.7 ICP 1 60.1 mg/L 0.1 0.5 06/03/22 20:41 kehl Calcium,total M200.71CP 1 63.5 mg/L 0.1 0.5 06/01/22 19:00 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:39 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:20 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:41 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 19:00 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:41 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 19:00 kehl Iron,dissolved M200.8 ICP-MS 1 0.0187 B mg/L 0.007 0.02 05/27/22 22:39 kja Iron,total M200.8 ICP-MS 1 0.0595 * mg/L 0.007 0.02 06/01/22 12:55 kja Lead,dissolved M200.8 ICP-MS 5 <0.0005 U * mg/L 0.0005 0.0025 06/03/22 14:23 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:20 kja Lithium,dissolved M200.7 ICP 1 0.947 mg/L 0.008 0.04 06/03/22 20:41 kehl Lithium,total M200.7 ICP 1 1.01 mg/L 0.008 0.04 06/01/22 19:00 kehl Magnesium,dissolved M200.7 ICP 1 13.9 mg/L 0.2 1 06/03/22 20:41 kehl Magnesium,total M200.7 ICP 1 15.1 mg/L 0.2 1 06/01/22 19:00 kehl Manganese,dissolved M200.7 ICP 1 2.70 mg/L 0.01 0.05 06/03/22 20:41 kehl Manganese,total M200.7 ICP 1 3.32 mg/L 0.01 0.05 06/01/22 19:00 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 5 <2 U * ng/L 2 5 06/02/22 11:31 mfm Mercury,total M1631 E,Atomic Fluorescence 5 <1.5 U * ng/L 1.5 5 05/26/22 12:12 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:39 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:20 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:41 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 19:00 kehl Phosphorus,dissolved M200.7 ICP 1 0.85 mg/L 0.1 0.5 06/03/22 20:41 kehl Phosphorus,total M200.7 ICP 1 1.11 mg/L 0.1 0.5 06/01/22 19:00 kehl Potassium,dissolved M200.7 ICP 1 5.35 mg/L 0.2 1 06/03/22 20:41 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 28 of 180 ACZ Laboratories, Inc. ' 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-07 Project ID: Date Sampled: 05116122 15:20 Sample ID: PL-8-80 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 5.69 mg/L 0.2 1 06/01/22 19:00 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:41 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 19:00 kehl Selenium,dissolved M200.8 ICP-MS 1 0.0411 * mg/L 0.0001 0.00025 05/27/22 22:39 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:20 kja Silicon,dissolved M200.7 ICP 1 5.66 * mg/L 0.1 0.5 06/03/22 20:41 kehl Silicon,total M200.7 ICP 1 5.83 * mg/L 0.1 0.5 06/04/22 2:29 wtc Silver,dissolved M200.8 ICP-MS 5 <0.0005 U * mg/L 0.0005 0.0025 06/03/22 14:23 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:20 kja Sodium,dissolved M200.7 ICP 1 12.6 mg/L 0.2 1 06/03/22 20:41 kehl Sodium,total M200.7 ICP 1 12.9 mg/L 0.2 1 06/01/22 19:00 kehl Strontium,dissolved M200.7 ICP 1 0.208 mg/L 0.009 0.045 06/03/22 20:41 kehl Strontium,total M200.7 ICP 1 0.220 mg/L 0.009 0.045 06/01/22 19:00 kehl Sulfur,dissolved M200.7 ICP 1 56.0 * mg/L 0.25 1.25 06/03/22 20:41 kehl Sulfur,total M200.7 ICP 1 34.8 * mg/L 0.25 1.25 06/04/22 2:29 wtc Thallium,dissolved M200.8 ICP-MS 5 <0.0005 U * mg/L 0.0005 0.0025 06/06/22 15:21 mfm Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:20 kja Thorium,dissolved M200.8 ICP-MS 5 <0.005 U * mg/L 0.005 0.025 06/03/22 14:23 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:20 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:41 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 19:00 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:41 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 19:00 kehl Uranium,dissolved M200.8 ICP-MS 5 0.00056 B * mg/L 0.0005 0.0025 06/06/22 15:21 mfm Uranium,total M200.8 ICP-MS 1 0.00042 B * mg/L 0.0001 0.0005 05/31/22 17:20 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:41 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 19:00 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:39 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 05/31/22 17:20 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 29 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-07 Project ID: Date Sampled: 05116122 15:20 Sample ID: PL-8-80 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 135 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 135 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 33.2 * mg/L 1 5 05/27/22 21:45 mad Carbon,total organic SM5310B 1 2.8 B * mg/L 1 5 05/27/22 15:11 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -3.6 % 06/23/22 0:00 talc Sum of Anions 5.7 meq/L 06/23/22 0:00 talc Sum of Cations 5.3 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.50 * mg/L 0.5 2 05/25/2215:47 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:47 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 06/13/22 14:10 bls Fluoride SM450OF-C 1 0.34 B * mg/L 0.15 0.35 06/02/22 23:12 emk Hardness as CaCO3 SM2340B-Calculation 207 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 3.83 * mg/L 0.05 0.2 05/25/22 11:10 mJ1 w/gas diffusion Residue, Filterable SM2540C 1 320 * mg/L 20 40 05/20/22 10:38 anc (TDS)@180C Residue,Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 11:59 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 131 mg/L 5 25 05/24/2213:26 bls Sulfide as S SM4500S2-D 75 18.4 mg/L 1.5 7.5 05/20/22 15:51 jck TDS(calculated) Calculation 319 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.00 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 30 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-08 Project ID: Date Sampled: 05116122 15:50 Sample ID: PL-8-50 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 05/27/22 9:35 mrd/bls Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 18:50 wtc Digestion REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 31 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-08 Project ID: Date Sampled: 05116122 15:50 Sample ID: PL-8-50 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 05/27/22 22:41 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U * mg/L 0.005 0.015 05/31/22 17:22 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:41 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:22 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00521 mg/L 0.0002 0.001 05/27/22 22:41 kja Arsenic,total M200.8 ICP-MS 1 0.00554 * mg/L 0.0002 0.001 05/31/22 17:22 kja Barium,dissolved M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/03/22 20:51 kehl Barium,total M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/01/22 19:04 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:41 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:22 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:51 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 19:04 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:51 kehl Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/01/22 19:04 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:41 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:22 kja Calcium,dissolved M200.7 ICP 1 52.4 mg/L 0.1 0.5 06/03/22 20:51 kehl Calcium,total M200.71CP 1 53.1 mg/L 0.1 0.5 06/01/22 19:04 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:41 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:22 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:51 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 19:04 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:51 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 19:04 kehl Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 05/27/22 22:41 kja Iron,total M200.8 ICP-MS 1 0.0354 mg/L 0.007 0.02 06/01/22 12:57 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:41 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:22 kja Lithium,dissolved M200.7 ICP 1 0.825 mg/L 0.008 0.04 06/03/22 20:51 kehl Lithium,total M200.7 ICP 1 0.835 mg/L 0.008 0.04 06/01/22 19:04 kehl Magnesium,dissolved M200.7 ICP 1 12.1 mg/L 0.2 1 06/03/22 20:51 kehl Magnesium,total M200.7 ICP 1 12.6 mg/L 0.2 1 06/01/22 19:04 kehl Manganese,dissolved M200.7 ICP 1 0.690 mg/L 0.01 0.05 06/03/22 20:51 kehl Manganese,total M200.7 ICP 1 0.723 mg/L 0.01 0.05 06/01/22 19:04 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 06/02/22 11:36 mfm Mercury,total M1631 E,Atomic Fluorescence 2 <0.6 U * ng/L 0.6 2 05/26/22 12:27 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:41 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:22 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:51 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 19:04 kehl Phosphorus,dissolved M200.7 ICP 1 0.25 B mg/L 0.1 0.5 06/03/22 20:51 kehl Phosphorus,total M200.7 ICP 1 0.28 B mg/L 0.1 0.5 06/01/22 19:04 kehl Potassium,dissolved M200.7 ICP 1 4.72 mg/L 0.2 1 06/03/22 20:51 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 32 of 180 ACZ Laboratories, Inc. ' 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-08 Project ID: Date Sampled: 05116122 15:50 Sample ID: PL-8-50 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 4.83 mg/L 0.2 1 06/01/22 19:04 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:51 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 19:04 kehl Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 06/06/22 14:42 mfm Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:22 kja Silicon,dissolved M200.7 ICP 1 3.22 mg/L 0.1 0.5 06/03/22 20:51 kehl Silicon,total M200.7 ICP 1 3.22 mg/L 0.1 0.5 06/04/22 2:32 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:25 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:22 kja Sodium,dissolved M200.7 ICP 1 10.8 mg/L 0.2 1 06/03/22 20:51 kehl Sodium,total M200.7 ICP 1 10.7 mg/L 0.2 1 06/01/22 19:04 kehl Strontium,dissolved M200.7 ICP 1 0.170 mg/L 0.009 0.045 06/03/22 20:51 kehl Strontium,total M200.7 ICP 1 0.168 mg/L 0.009 0.045 06/01/22 19:04 kehl Sulfur,dissolved M200.7 ICP 1 40.4 * mg/L 0.25 1.25 06/03/22 20:51 kehl Sulfur,total M200.7 ICP 1 42.2 * mg/L 0.25 1.25 06/04/22 2:32 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:41 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:22 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:41 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:22 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:51 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 19:04 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:51 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 19:04 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00060 mg/L 0.0001 0.0005 05/27/22 22:41 kja Uranium,total M200.8 ICP-MS 1 0.00063 * mg/L 0.0001 0.0005 05/31/22 17:22 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:51 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 19:04 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:41 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 05/31/22 17:22 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 33 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-08 Project ID: Date Sampled: 05116122 15:50 Sample ID: PL-8-50 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 79.5 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCC3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 79.5 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 20.2 * mg/L 1 5 05/27/22 21:55 mad Carbon,total organic SM5310B 1 3.3 B * mg/L 1 5 05/27/22 15:44 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -2.3 % 06/23/22 0:00 talc Sum of Anions 4.5 meq/L 06/23/22 0:00 talc Sum of Cations 4.3 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.64 * mg/L 0.5 2 05/25/2215:49 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:55 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 05/31/22 12:02 bls Fluoride SM450OF-C 1 0.33 B * mg/L 0.15 0.35 06/02/22 23:15 emk Hardness as CaCO3 SM2340B-Calculation 181 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 0.324 mg/L 0.05 0.2 05/25/22 11:11 mJ1 w/gas diffusion Residue, Filterable SM2540C 1 270 * mg/L 20 40 05/20/22 10:40 anc (TDS)@180C Residue, Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 12:02 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 127 mg/L 5 25 05/24/22 13:26 bls Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 05/20/22 16:00 jck TDS(calculated) Calculation 264 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.02 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 34 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-09 Project ID: Date Sampled: 05116122 16:15 Sample ID: PL-8-10 Date Received: 05119122 Sample Matrix: Surface Water Inorganic Prep Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 05/27/22 10:10 mrd/bls Total Hot Plate M200.2 ICP-MS 05/27/22 8:55 mfm Digestion Total Hot Plate M200.2 ICP 05/28/22 19:03 wtc Digestion REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 35 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L7334O-09 Project ID: Date Sampled: 05116122 16:15 Sample ID: PL-8-10 Date Received: 05119122 Sample Matrix: Surface Water Metals Analysis Parameter EPA Method Dilution Result Qual XQ Units MDL PQL- Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 0.0063 B mg/L 0.005 0.015 05/27/22 22:43 kja Aluminum,total M200.8 ICP-MS 1 0.0088 B * mg/L 0.005 0.015 05/31/22 17:24 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/27/22 22:43 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 05/31/22 17:24 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00522 mg/L 0.0002 0.001 05/27/22 22:43 kja Arsenic,total M200.8 ICP-MS 1 0.00571 * mg/L 0.0002 0.001 05/31/22 17:24 kja Barium,dissolved M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/03/22 20:54 kehl Barium,total M200.7 ICP 1 <0.007 U mg/L 0.007 0.035 06/01/22 19:07 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/27/22 22:43 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 05/31/22 17:24 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/03/22 20:54 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 06/01/22 19:07 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/03/22 20:54 kehl Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 06/01/22 19:07 kehl Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 05/27/22 22:43 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 05/31/22 17:24 kja Calcium,dissolved M200.7 ICP 1 50.9 mg/L 0.1 0.5 06/03/22 20:54 kehl Calcium,total M200.7 ICP 1 49.3 mg/L 0.1 0.5 06/01/22 19:07 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/27/22 22:43 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 05/31/22 17:24 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/03/22 20:54 kehl Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 06/01/22 19:07 kehl Copper,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:54 kehl Copper,total M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 06/01/22 19:07 kehl Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 05/27/22 22:43 kja Iron,total M200.8 ICP-MS 1 0.0182 B mg/L 0.007 0.02 06/01/22 12:59 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:43 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:24 kja Lithium,dissolved M200.7 ICP 1 0.800 mg/L 0.008 0.04 06/03/22 20:54 kehl Lithium,total M200.7 ICP 1 0.779 mg/L 0.008 0.04 06/01/22 19:07 kehl Magnesium,dissolved M200.7 ICP 1 11.7 mg/L 0.2 1 06/03/22 20:54 kehl Magnesium,total M200.7 ICP 1 11.6 mg/L 0.2 1 06/01/22 19:07 kehl Manganese,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 06/03/22 20:54 kehl Manganese,total M200.7 ICP 1 0.061 mg/L 0.01 0.05 06/01/22 19:07 kehl Mercury,dissolved M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 06/02/22 11:40 mfm Mercury,total M1631 E,Atomic Fluorescence 1 <0.3 U ng/L 0.3 1 05/26/22 12:31 scp Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/27/22 22:43 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 05/31/22 17:24 kja Nickel,dissolved M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/03/22 20:54 kehl Nickel,total M200.7 ICP 1 <0.008 U mg/L 0.008 0.04 06/01/22 19:07 kehl Phosphorus,dissolved M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 06/03/22 20:54 kehl Phosphorus,total M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 06/01/22 19:07 kehl Potassium,dissolved M200.7 ICP 1 4.48 mg/L 0.2 1 06/03/22 20:54 kehl REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 36 of 180 ACZ Laboratories, Inc. "d2sk 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-09 Project ID: Date Sampled: 05116122 16:15 Sample ID: PL-8-10 Date Received: 05119122 Sample Matrix: Surface Water Potassium,total M200.7 ICP 1 4.41 mg/L 0.2 1 06/01/22 19:07 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 06/03/22 20:54 kehl Scandium,total M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 06/01/22 19:07 kehl Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 06/06/22 14:47 mfm Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 05/31/22 17:24 kja Silicon,dissolved M200.7 ICP 1 0.62 mg/L 0.1 0.5 06/03/22 20:54 kehl Silicon,total M200.7 ICP 1 0.55 * mg/L 0.1 0.5 06/04/22 2:35 wtc Silver,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.0005 06/03/22 14:26 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:24 kja Sodium,dissolved M200.7 ICP 1 10.5 mg/L 0.2 1 06/03/22 20:54 kehl Sodium,total M200.7 ICP 1 9.94 mg/L 0.2 1 06/01/22 19:07 kehl Strontium,dissolved M200.7 ICP 1 0.161 mg/L 0.009 0.045 06/03/22 20:54 kehl Strontium,total M200.7 ICP 1 0.153 mg/L 0.009 0.045 06/01/22 19:07 kehl Sulfur,dissolved M200.7 ICP 1 39.1 * mg/L 0.25 1.25 06/03/22 20:54 kehl Sulfur,total M200.7 ICP 1 38.6 * mg/L 0.25 1.25 06/04/22 2:35 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/27/22 22:43 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 05/31/22 17:24 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 05/27/22 22:43 kja Thorium,total M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 05/31/22 17:24 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/03/22 20:54 kehl Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 06/01/22 19:07 kehl Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/03/22 20:54 kehl Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 06/01/22 19:07 kehl Uranium,dissolved M200.8 ICP-MS 1 0.00067 mg/L 0.0001 0.0005 05/27/22 22:43 kja Uranium,total M200.8 ICP-MS 1 0.00071 * mg/L 0.0001 0.0005 05/31/22 17:24 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/03/22 20:54 kehl Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 06/01/22 19:07 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 05/27/22 22:43 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 05/31/22 17:24 kja REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L73340-2206231013 Page 37 of 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L73340-09 Project ID: Date Sampled: 05116122 16:15 Sample ID: PL-8-10 Date Received: 05119122 Sample Matrix: Surface Water Wet Chemistry Parameter EPA Method Dilution Result Qual XQ Units MDL PQL Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 67.3 * mg/L 2 20 05/27/22 0:00 jck CaCO3 Carbonate as CaCC3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U mg/L 2 20 05/27/22 0:00 jck Total Alkalinity 1 67.3 mg/L 2 20 05/27/22 0:00 jck Carbon,total inorganic SM5310B 1 15.8 * mg/L 1 5 05/27/22 22:31 mad Carbon,total organic SM5310B 1 4.8 B * mg/L 1 5 05/27/22 15:54 mad (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 1.2 % 06/23/22 0:00 talc Sum of Anions 4.0 meq/L 06/23/22 0:00 talc Sum of Cations 4.1 meq/L 06/23/22 0:00 talc Chloride SM4500CI-E 1 6.38 * mg/L 0.5 2 05/25/2215:49 bls Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 05/20/22 14:57 MJ1 Cyanide,total M335.4-Colorimetric w/distillation 0.5 <0.003 UH mg/L 0.003 0.01 05/31/22 12:04 bls Fluoride SM450OF-C 1 0.32 B * mg/L 0.15 0.35 06/02/22 23:19 emk Hardness as CaCO3 SM2340B-Calculation 175 mg/L 0.2 5 06/23/22 0:00 talc (dissolved) Nitrogen,ammonia M350.1 Auto Salicylate 1 <0.05 U * mg/L 0.05 0.2 05/25/22 11:14 mJ1 w/gas diffusion Residue, Filterable SM2540C 2 252 mg/L 40 80 05/20/22 10:46 anc (TDS)@180C Residue, Non- SM2540D 1 <5 U * mg/L 5 20 05/20/22 12:05 anc Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 118 * mg/L 5 25 05/24/22 13:26 bls Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 05/20/22 16:03 jck TDS(calculated) Calculation 244 mg/L 06/23/22 0:00 talc TDS(ratio- Calculation 1.03 06/23/22 0:00 talc measured/calculated) REPIN.02.06.05.01 `Please refer to Qualifier Reports for details. L73340-2206231013 Page 38 of 180 Accredited 2773 Downhill Drive Environmental Steamboat Springs,CO 80487 Testing (970)879-6590 Name: Address:ss' 1 4 �j � 1 Company: 47- L E-mail: Telephone: hone: t, Copy of Report to: IName: —LE-mail lCompany: ITelephone: Invoice to: Name: I lAddress: Company:E-mail: ITelephone: Copy of Invoice to: Name: Address: Company: E-mail: Telephone: If sample(s)received past holding time(HT),or if insufficient HT remains to complete YES analysis before expiration,shall ACZ proceed with requested short HT analyses? NO If"NOP'then ACZ will contact client for further instruction.N neither"YES"nor"NO"is Indicated,ACZ will proceed with the requested analyses,even N HT is expired,and data will be qualified Are samples for SDWA Compliance Monitoring? Yes No If yes,please include state forms.Results will be reported to POL for Colorado. Sampler's Name: Sampler's Site Information State—ZZJ(�,Zip code Time Zone *Sampler's Signature: -1-Nest to th—thentiity and validity of this sample.I understand that Intentionally Mislabeling the finneldatellocation or tampering with the sample in anyway,Is considered fraud and punishable by State Law. PROJECT INFORMATION ANALYSES REQUESTED Quote PO#: Reporting state for compliance testing: 0 Check box if samples include NRC licensed material? 0 material? PLL I 7PLI —LL ew 7 Matrix SW(Surface Water)•GW(Ground Water) WW(Waste Water) DW(Drinking Water) SL(Sludge) SO(Soil) OL(Oil) Other(Specify) REMARKS 0 to a-1 Please refer to AM terms&conditions located on the reverse side of this COC. RELINQUISHED BY: DATE:TIME RECEIVED BY: DATE:TIME �171 SOW ire M 1 79 o 180 �'�3340a&W$231QW Revision#: 2 White-Return with sample. Yellow-Retain for your recorid g.ge g.ge pe pe ccredfted 2773 Downhill Drive Environmental Steamboat Springs,CO 80487 Testing (970)879-6590 Name: Address: Company: 411 E-mail: L- Telephone: Copy of Report to: ,Name: [E-mail: j IT—elephone7 ------------------- Invoice to: Name: Address: Company:E-mail: Telephone: Copy of Invoice to: Name: Address: Company: E-mail: Telephone: If sample(s)received past holding time(HT),or if insufficient HT remains to complete YES ,analysis before expiration,shall ACZ proceed with requested short HT analyses? No ff"NO"then ACZ will contact client for further instruction.IF neither"YES"nor"NO"is indicated,ACZ will Proceed with the requested analyses,even if HT is expired,and data will be qualifi. Are samples for SDWA Compliance Monitoring? Yes No If yes,please include state forms.Results will be reported to PQL for Colorado. C 7 - -, Samplers Name: j Sampler's Site Information State—ld/—� Zip codeTime Zone I*Samplees Signature: 'I attest to the authenticity and validity of this sample.I understand that""nti""i=51.bling the tinneldateflocation or t4flnistring with the sample tanyway,is considered fraud and punishable by State PROJECT INFORMATION ANALYSES REQUESTED(attach list or use quote number) Quote PO#: Reporting state for compliance testing: 0 Check box if samples include NRC licensed material? 0 F imlimillilill :ft I I I 7-1 N2,J. LM-lq 17 ,quo ru-1VO, L40 7y IMatrix JSW(Surface Water) GW(Ground Water)-WW I(Waste Water) DW(Drinking Water) SL(Sludge) SO(Soil) OL(Oil) Other REMARKS T-/7 Please refer ACZ's terms&conditions located on the reverse side of this COC- RELINCI,UIS!IED BY: DATE:TIME RECEIVED BY: DATE:TIME 7 7' 15A L7308UMElPO9623@1 3 Revision#: 2 White-Return with sample. Yellow-Retain for your records.�j f 180 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-01 Project ID: 8000177267 Date Sampled: 09/13/22 12:30 Sample ID: PL-5-50 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 12:28 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 13:31 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Pagel of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-01 Project ID: 8000177267 Date Sampled: 09/13/22 12:30 Sample ID: PL-5-50 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/21/22 10:07 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/19/22 14:12 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U * mg/L 0.0004 0.002 09/21/22 20:11 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:12 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00524 mg/L 0.0002 0.001 09/21/22 10:07 kja Arsenic,total M200.8 ICP-MS 1 0.00522 mg/L 0.0002 0.001 09/19/22 14:12 mfm Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 4:56 wtc Barium,total M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 23:00 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:07 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:12 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/23/22 9:53 wtc Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 23:00 aeh Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 4:56 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 23:00 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:07 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:12 mfm Calcium,dissolved M200.7 ICP 1 55.7 mg/L 0.1 0.5 09/22/22 4:56 wtc Calcium,total M200.7 ICP 1 54.4 mg/L 0.1 0.5 09/22/22 23:00 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:07 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:12 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 4:56 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 23:00 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:07 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:12 mfm Iron,dissolved M200.8 ICP-MS 1 0.0328 * mg/L 0.007 0.02 09/21/22 10:07 kja Iron,total M200.8 ICP-MS 1 0.0454 * mg/L 0.007 0.02 09/19/22 14:12 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:07 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:12 mfm Lithium,dissolved M200.7 ICP 1 0.815 mg/L 0.008 0.04 09/22/22 4:56 wtc Lithium,total M200.7 ICP 1 0.807 mg/L 0.008 0.04 09/22/22 23:00 aeh Magnesium,dissolved M200.7 ICP 1 12.6 mg/L 0.2 1 09/22/22 4:56 wtc Magnesium,total M200.7 ICP 1 12.5 mg/L 0.2 1 09/22/22 23:00 aeh Manganese,dissolved M200.7 ICP 1 0.825 * mg/L 0.01 0.05 09/22/22 4:56 wtc Manganese,total M200.7 ICP 1 0.823 mg/L 0.01 0.05 09/22/22 23:00 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:07 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:12 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00134 mg/L 0.0004 0.001 09/21/22 10:07 kja Nickel,total M200.8 ICP-MS 1 0.00127 mg/L 0.0004 0.001 09/19/22 14:12 mfm Phosphorus,dissolved M200.7 ICP 1 0.28 B mg/L 0.1 0.5 09/22/22 4:56 wtc Phosphorus,total M200.7 ICP 1 0.26 B mg/L 0.1 0.5 09/22/22 23:00 aeh Potassium,dissolved M200.7 ICP 1 4.81 mg/L 0.2 1 09/22/22 4:56 wtc Potassium,total M200.7 ICP 1 4.71 mg/L 0.2 1 09/22/22 23:00 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 09/22/22 4:56 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 2 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-01 Project ID: 8000177267 Date Sampled: 09/13/22 12:30 Sample ID: PL-5-50 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 23:00 aeh Selenium,dissolved M200.8 ICP-MS 1 0.00020 B mg/L 0.0001 0.00025 09/21/22 10:07 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/19/22 14:12 mfm Silicon,dissolved M200.7 ICP 1 3.25 mg/L 0.1 0.5 09/22/22 4:56 wtc Silicon,total M200.7 ICP 1 3.11 mg/L 0.1 0.5 09/22/22 23:00 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:07 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:12 mfm Sodium,dissolved M200.7 ICP 1 11.0 mg/L 0.2 1 09/22/22 4:56 wtc Sodium,total M200.7 ICP 1 10.4 mg/L 0.2 1 09/22/22 23:00 aeh Strontium,dissolved M200.7 ICP 1 0.172 mg/L 0.009 0.045 09/22/22 4:56 wtc Strontium,total M200.7 ICP 1 0.166 mg/L 0.009 0.045 09/22/22 23:00 aeh Sulfur,dissolved M200.7 ICP 1 40.7 mg/L 0.25 1.25 09/22/22 4:56 wtc Sulfur,total M200.7 ICP 1 39.9 * mg/L 0.25 1.25 09/22/22 23:00 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:07 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:12 mfm Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/21/22 20:11 kja Thorium,total M200.8 ICP-MS 1 0.0013 B mg/L 0.001 0.005 09/19/22 14:12 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 4:56 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:00 aeh Titanium,dissolved M200.7 ICP 1 0.0058 B mg/L 0.005 0.025 09/22/22 4:56 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 23:00 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00053 mg/L 0.0001 0.0005 09/21/22 10:07 kja Uranium,total M200.8 ICP-MS 1 0.00060 mg/L 0.0001 0.0005 09/19/22 14:12 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 4:56 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 23:00 aeh Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/21/22 10:07 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 15:57 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 3 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-01 Project ID: 8000177267 Date Sampled: 09/13/22 12:30 Sample ID: PL-5-50 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 89.3 mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 89.3 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 2.0 * mg/L 2 2 09/14/2216:10 emk Demand(5 day) Carbon,total inorganic SM5310B 200 <200 U * mg/L 200 1000 10/11/22 3:04 bls Carbon,total organic SM5310B 1 3.5 B mg/L 1 5 09/22/22 21:42 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 2.3 % 10/18/22 0:00 talc Sum of Anions 4.3 meq/L 10/18/22 0:00 talc Sum of Cations 4.5 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 27 * mg/L 10 20 10/11/2212:25 anc Demand Chloride SM4500CI-E 1 5.94 mg/L 1 2 09/20/2215:51 mrd Color HACH Color Wheel 1 <5 U * Co/Pt 5 5 09/14/22 15:53 svm Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 09/20/22 12:47 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U * mg/L 0.003 0.01 09/16/22 14:40 bls Fluoride SM450OF-C 1 0.31 B mg/L 0.15 0.35 09/20/22 23:09 emk Hardness as CaCO3 SM2340B-Calculation 191 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 187 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 7:40 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 0.428 * mg/L 0.05 0.2 09/19/22 11:37 bls w/gas diffusion Phosphate,total Calculation based on total 0.806 B mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 284 * mg/L 20 40 09/19/22 11:54 mrb (TDS)@180C Residue, Non- SM2540D 2 <10 U mg/L 10 40 09/19/22 12:40 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 109 mg/L 5 25 09/20/22 18:17 mjj Sulfide as S SM450os2-D 1 0.402 mg/L 0.02 0.1 09/14/22 20:04 jck TDS(calculated) Calculation 255 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.11 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 4 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-02 Project ID: 8000177267 Date Sampled: 09/13/22 13:00 Sample ID: PL-5-10 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 12:41 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 13:44 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 5 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-02 Project ID: 8000177267 Date Sampled: 09/13/22 13:00 Sample ID: PL-5-10 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 0.0071 B mg/L 0.005 0.015 09/21/22 10:08 kja Aluminum,total M200.8 ICP-MS 1 0.0091 B mg/L 0.005 0.015 09/19/22 14:14 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 20:16 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:14 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00577 mg/L 0.0002 0.001 09/21/22 10:08 kja Arsenic,total M200.8 ICP-MS 1 0.00572 mg/L 0.0002 0.001 09/19/22 14:14 mfm Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 4:59 wtc Barium,total M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 23:03 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:08 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:14 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/23/22 9:56 wtc Bismuth,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:03 aeh Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 4:59 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 23:03 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:08 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:14 mfm Calcium,dissolved M200.7 ICP 1 39.2 mg/L 0.1 0.5 09/22/22 4:59 wtc Calcium,total M200.7 ICP 1 38.2 mg/L 0.1 0.5 09/22/22 23:03 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:08 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:14 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 4:59 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 23:03 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:08 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:14 mfm Iron,dissolved M200.8 ICP-MS 1 <0.007 U mg/L 0.007 0.02 09/21/22 10:08 kja Iron,total M200.8 ICP-MS 1 0.0083 B mg/L 0.007 0.02 09/19/22 14:14 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:08 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:14 mfm Lithium,dissolved M200.7 ICP 1 0.803 mg/L 0.008 0.04 09/22/22 4:59 wtc Lithium,total M200.7 ICP 1 0.790 mg/L 0.008 0.04 09/22/22 23:03 aeh Magnesium,dissolved M200.7 ICP 1 12.1 mg/L 0.2 1 09/22/22 4:59 wtc Magnesium,total M200.7 ICP 1 12.0 mg/L 0.2 1 09/22/22 23:03 aeh Manganese,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 09/22/22 4:59 wtc Manganese,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 09/22/22 23:03 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:08 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:14 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00068 B mg/L 0.0004 0.001 09/21/22 10:08 kja Nickel,total M200.8 ICP-MS 1 0.00091 B mg/L 0.0004 0.001 09/19/22 14:14 mfm Phosphorus,dissolved M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 09/22/22 4:59 wtc Phosphorus,total M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 09/22/22 23:03 aeh Potassium,dissolved M200.7 ICP 1 4.58 mg/L 0.2 1 09/22/22 4:59 wtc Potassium,total M200.7 ICP 1 4.49 mg/L 0.2 1 09/22/22 23:03 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 4:59 wtc REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 6 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-02 Project ID: 8000177267 Date Sampled: 09/13/22 13:00 Sample ID: PL-5-10 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 23:03 aeh Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/21/22 10:08 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/19/22 14:14 mfm Silicon,dissolved M200.7 ICP 1 1.27 mg/L 0.1 0.5 09/22/22 4:59 wtc Silicon,total M200.7 ICP 1 1.20 * mg/L 0.1 0.5 09/22/22 23:03 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:08 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:14 mfm Sodium,dissolved M200.7 ICP 1 10.7 mg/L 0.2 1 09/22/22 4:59 wtc Sodium,total M200.7 ICP 1 10.2 mg/L 0.2 1 09/22/22 23:03 aeh Strontium,dissolved M200.7 ICP 1 0.149 mg/L 0.009 0.045 09/22/22 4:59 wtc Strontium,total M200.7 ICP 1 0.143 mg/L 0.009 0.045 09/22/22 23:03 aeh Sulfur,dissolved M200.7 ICP 1 39.2 mg/L 0.25 1.25 09/22/22 4:59 wtc Sulfur,total M200.7 ICP 1 38.0 * mg/L 0.25 1.25 09/22/22 23:03 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:08 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:14 mfm Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/21/22 20:16 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:14 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 4:59 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:03 aeh Titanium,dissolved M200.7 ICP 1 0.0055 B mg/L 0.005 0.025 09/22/22 4:59 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 23:03 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00055 mg/L 0.0001 0.0005 09/21/22 10:08 kja Uranium,total M200.8 ICP-MS 1 0.00064 mg/L 0.0001 0.0005 09/19/22 14:14 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 4:59 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 23:03 aeh Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/21/22 10:08 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 15:59 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 7 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75815-02 Project ID: 8000177267 Date Sampled: 09/13/22 13:00 Sample ID: PL-5-10 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 52.0 * mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 52.0 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 3.0 * mg/L 2 09/14/2216:17 emk Demand(5 day) Carbon,total inorganic SM5310B 20 <20 UH mg/L 20 100 10/12/22 6:44 bls Carbon,total organic SM5310B 1 5.5 * mg/L 1 5 09/22/22 22:11 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 2.9 % 10/18/22 0:00 talc Sum of Anions 3.4 meq/L 10/18/22 0:00 talc Sum of Cations 3.6 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 14 B mg/L 10 20 10/11/2212:36 anc Demand Chloride SM4500CI-E 1 6.08 mg/L 1 2 09/20/2215:52 mrd Color HACH Color Wheel 1 <5 U * Co/Pt 5 5 09/14/22 15:56 svm Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 09/20/22 12:49 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/16/22 14:41 bls Fluoride SM450OF-C 1 0.24 B mg/L 0.15 0.35 09/20/22 23:17 emk Hardness as CaCO3 SM2340B-Calculation 148 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 145 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 7:51 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 <0.05 U * mg/L 0.05 0.2 09/19/22 11:40 bls w/gas diffusion Phosphate,total Calculation based on total <0.3 U mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 234 * mg/L 20 40 09/19/22 11:56 mrb (TDS)@180C Residue, Non- SM2540D 2 <10 U mg/L 10 40 09/19/22 12:43 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 103 * mg/L 5 25 09/20/22 18:18 mjj Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 09/14/22 20:08 jck TDS(calculated) Calculation 208 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.13 10/18/22 0:00 Calc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 5-221 01 81 052 Page 8 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800)334-5493 ExplanationsReport Header Batch A distinct set of samples analyzed at a specific time Found Value of the QC Type of interest Limit Upper limit for RPD,in%. Lower Lower Recovery Limit,in% (except for LCSS,mg/Kg) MDL Method Detection Limit. Same as Minimum Reporting Limit unless omitted or equal to the PQL(see comment#5). Allows for instrument and annual fluctuations. PCN/SCN A number assigned to reagents/standards to trace to the manufacturer's certificate of analysis PQL Practical Quantitation Limit. Synonymous with the EPA term"minimum level". QC True Value of the Control Sample or the amount added to the Spike Rec Recovered amount of the true value or spike added,in%(except for LCSS,mg/Kg) RPD Relative Percent Difference,calculation used for Duplicate QC Types Upper Upper Recovery Limit,in% (except for LCSS,mg/Kg) 1k Sample Value of the Sample of interest QC Sample Types AS Analytical Spike(Post Digestion) LCSWD Laboratory Control Sample-Water Duplicate ASD Analytical Spike(Post Digestion)Duplicate LFB Laboratory Fortified Blank CCB Continuing Calibration Blank LFM Laboratory Fortified Matrix CCV Continuing Calibration Verification standard LFMD Laboratory Fortified Matrix Duplicate DUP Sample Duplicate LRB Laboratory Reagent Blank ICB Initial Calibration Blank MS Matrix Spike ICV Initial Calibration Verification standard MSD Matrix Spike Duplicate /CSAB Inter-element Correction Standard-A plus B solutions PBS Prep Blank-Soil LCSS Laboratory Control Sample-Soil PBW Prep Blank-Water LCSSD Laboratory Control Sample-Soil Duplicate PQV Practical Quantitation Verification standard LCSW Laboratory Control Sample-Water SDL Serial Dilution QC Sample Type Explanations Blanks Verifies that there is no or minimal contamination in the prep method or calibration procedure. Control Samples Verifies the accuracy of the method,including the prep procedure. Duplicates Verifies the precision of the instrument and/or method. Spikes/Fortified Matrix Determines sample matrix interferences,if any. Standard Verifies the validity of the calibration. ACZ Qualifiers e . B Analyte concentration detected at a value between MDL and PQL.The associated value is an estimated quantity. H Analysis exceeded method hold time. pH is a field test with an immediate hold time. L Target analyte response was below the laboratory defined negative threshold. U The material was analyzed for,but was not detected above the level of the associated value. The associated value is either the sample quantitation limit or the sample detection limit. FIRM Ww"NAW. -A (1) EPA 600/4-83-020. Methods for Chemical Analysis of Water and Wastes,March 1983. (2) EPA 600/R-93-100. Methods for the Determination of Inorganic Substances in Environmental Samples,August 1993. (3) EPA 600/R-94-111. Methods for the Determination of Metals in Environmental Samples-Supplement I,May 1994. (4) EPA SW-846. Test Methods for Evaluating Solid Waste. (5) Standard Methods for the Examination of Water and Wastewater. (1) QC results calculated from raw data. Results may vary slightly if the rounded values are used in the calculations. (2) Soil,Sludge,and Plant matrices for Inorganic analyses are reported on a dry weight basis. (3) Animal matrices for Inorganic analyses are reported on an"as received"basis. (4) An asterisk in the"XQ"column indicates there is an extended qualifier and/or certification qualifier associated with the result. (5) If the MDL equals the PQL or the MDL column is omitted,the PQL is the reporting limit. For a complete list of ACZ's Extended Qualifiers,please click: https:Hacz.com/wp-content/uploads/2019/04/F,xt-Qual-List.pdf REP001.03.15.02 L7581 5-221 01 81 052 Page 9 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. Accr■dked Steamboat Downhill Drive EnvlronmeMal Steamboat Springs,CO 80487 IMP Testing (970)879-6590 VVV Name:D.Morgan Warren Address:348 Holiday Inn Road Company:Albemarle Corporation Kings Mountain,NC 28086 E-mail:morgan.warren@albemarle.com Telephone:(770)855-9910 ReportCopy of Name:Chris Garrett(SWCA),Amy Prestia(SRK) E-mail: cgarrett@swca.com,aprestia@srk.com Company: SWCA,SRK Telephone: Invoice to: Name: Lisa Smith Address:4250 Congress Street,Suite 900 Company: Albemarle Corporation Charlotte,NC 28209 E-mail:lisa.smith@albemarle.com Telephone:(520)878-7899 .- Copy of Invoice to: - Name: DA, Address: C1 �1 Company: Sett f- C_ e Z4 r!00 D E -2 E-mail FnIf SVvta 1719 1 Telephone; b Z q t y If samplers)received past holding time(HT),or if insufficient HT remains to complete YES analysis before expiration,shall ACZ proceed with requested short HT analyses? NO ■'NO"then AU will eomam client for hwth r irelruction.r naNher-YES'nor'•Ne'is indicated,ACZ will proceed with the requested analyses,ev I HT is expired,and data will be qualirad Are samples for SDWA Compliance Monitoring? Yes No If yes,please include state forms.Results will be reported to PQL for Colorado. Sampler's Name: Sampler's Site Information State NC Zip code 28086 Time Zone ET *Sampler's Signature: 'I attest to the authenticity an va al lidity of this samplc luntlerstand thatimentiorally mislabeling the time/date/bcation or tampering with the sample in anyway,is coreitleretl fraud and punishable by State Law. PROJECT •' • Quote#: 7.00- pQ#:8000177267(Water Quality Sampling)Reporting state for compliance testing:NCCheck box f samples include NRC licensed material? Q� -� 32z 2 30 W Z 11- -- l 22 0' 0 2 Matrix SW(Surface Water)•GW(Ground Water)-WW(Waste Water)-DW(Drinking Water)-SL(Sludge)-SO(Soil)-OL(Oil)•Other(Specify) O r� N 7 -U 0 Please refer to ACZ's terms&conditions located on the reverse side of this COG. RELINQUISHED ■• RECEIVED BY: ■- �� C �ro �n Qualtrax ID: 1984 Revision#: 2 White-Return With sample. Yellow-Retain for your records. L7581 5-221 01 81 052 Page 25 of 25 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-01 Project ID: 8000177267 Date Sampled: 09/13/22 11:30 Sample ID: PL-2-10 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 12:54 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 14:25 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Pagel of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-01 Project ID: 8000177267 Date Sampled: 09/13/22 11:30 Sample ID: PL-2-10 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 0.0072 B mg/L 0.005 0.015 09/21/22 10:18 kja Aluminum,total M200.8 ICP-MS 1 0.0088 B mg/L 0.005 0.015 09/19/22 14:16 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 20:18 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:16 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00581 mg/L 0.0002 0.001 09/21/22 10:18 kja Arsenic,total M200.8 ICP-MS 1 0.00572 mg/L 0.0002 0.001 09/19/22 14:16 mfm Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 5:03 wtc Barium,total M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 23:19 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:18 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:16 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/23/22 9:59 wtc Bismuth,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:19 aeh Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 5:03 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 23:19 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:18 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:16 mfm Calcium,dissolved M200.7 ICP 1 38.7 mg/L 0.1 0.5 09/22/22 5:03 wtc Calcium,total M200.7 ICP 1 38.3 mg/L 0.1 0.5 09/22/22 23:19 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:18 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:16 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 5:03 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 23:19 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:18 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:16 mfm Iron,dissolved M200.8 ICP-MS 1 <0.007 U mg/L 0.007 0.02 09/21/22 10:18 kja Iron,total M200.8 ICP-MS 1 0.0082 B mg/L 0.007 0.02 09/19/22 14:16 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:18 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:16 mfm Lithium,dissolved M200.7 ICP 1 0.792 mg/L 0.008 0.04 09/22/22 5:03 wtc Lithium,total M200.7 ICP 1 0.794 mg/L 0.008 0.04 09/22/22 23:19 aeh Magnesium,dissolved M200.7 ICP 1 12.0 mg/L 0.2 1 09/22/22 5:03 wtc Magnesium,total M200.7 ICP 1 12.0 mg/L 0.2 1 09/22/22 23:19 aeh Manganese,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 09/22/22 5:03 wtc Manganese,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.05 09/22/22 23:19 aeh Molybdenum,dissolved M200.8 ICP-MS 1 0.00020 B mg/L 0.0002 0.0005 09/21/22 10:18 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:16 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00075 B mg/L 0.0004 0.001 09/21/22 10:18 kja Nickel,total M200.8 ICP-MS 1 0.00086 B mg/L 0.0004 0.001 09/19/22 14:16 mfm Phosphorus,dissolved M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 09/22/22 5:03 wtc Phosphorus,total M200.7 ICP 1 <0.1 U mg/L 0.1 0.5 09/22/22 23:19 aeh Potassium,dissolved M200.7 ICP 1 4.53 mg/L 0.2 1 09/22/22 5:03 wtc Potassium,total M200.7 ICP 1 4.51 mg/L 0.2 1 09/22/22 23:19 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 5:03 wtc REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 2 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-01 Project ID: 8000177267 Date Sampled: 09/13/22 11:30 Sample ID: PL-2-10 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 23:19 aeh Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/21/22 10:18 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/19/22 14:16 mfm Silicon,dissolved M200.7 ICP 1 1.24 mg/L 0.1 0.5 09/22/22 5:03 wtc Silicon,total M200.7 ICP 1 1.21 mg/L 0.1 0.5 09/22/22 23:19 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 13:13 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:16 mfm Sodium,dissolved M200.7 ICP 1 10.6 mg/L 0.2 1 09/22/22 5:03 wtc Sodium,total M200.7 ICP 1 10.3 mg/L 0.2 1 09/22/22 23:19 aeh Strontium,dissolved M200.7 ICP 1 0.147 mg/L 0.009 0.045 09/22/22 5:03 wtc Strontium,total M200.7 ICP 1 0.144 mg/L 0.009 0.045 09/22/22 23:19 aeh Sulfur,dissolved M200.7 ICP 1 39.0 * mg/L 0.25 1.25 09/22/22 5:03 wtc Sulfur,total M200.7 ICP 1 38.4 mg/L 0.25 1.25 09/22/22 23:19 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:18 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:16 mfm Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/21/22 20:18 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:16 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 5:03 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:19 aeh Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 5:03 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 23:19 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00058 mg/L 0.0001 0.0005 09/21/22 10:18 kja Uranium,total M200.8 ICP-MS 1 0.00063 mg/L 0.0001 0.0005 09/19/22 14:16 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 5:03 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 23:19 aeh Zinc,dissolved M200.8 ICP-MS 1 0.0080 B mg/L 0.006 0.015 09/21/22 10:18 kja Zinc,total M200.8 ICP-MS 1 0.0135 B mg/L 0.006 0.015 09/22/22 16:01 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 3 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-01 Project ID: 8000177267 Date Sampled: 09/13/22 11:30 Sample ID: PL-2-10 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 48.5 mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 48.5 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 2.0 * mg/L 2 09/14/2216:24 emk Demand(5 day) Carbon,total inorganic SM5310B 20 <20 UH mg/L 20 100 10/13/22 0:46 bls Carbon,total organic SM5310B 1 5.2 mg/L 1 5 09/22/22 22:43 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 1.4 % 10/18/22 0:00 talc Sum of Anions 3.4 meq/L 10/18/22 0:00 talc Sum of Cations 3.5 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 12 B * mg/L 10 20 10/11/2212:47 anc Demand Chloride SM4500CI-E 1 6.14 mg/L 1 2 09/20/2215:53 mrd Color HACH Color Wheel 1 <5 U * Co/Pt 5 5 09/14/22 15:59 svm Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 09/20/22 14:51 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/16/22 14:42 bls Fluoride SM450OF-C 1 0.22 B mg/L 0.15 0.35 09/20/22 23:25 emk Hardness as CaCO3 SM2340B-Calculation 146 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 145 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 8:01 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 <0.05 U * mg/L 0.05 0.2 09/19/22 11:43 bls w/gas diffusion Phosphate,total Calculation based on total <0.3 U mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 236 * mg/L 20 40 09/19/22 11:59 mrb (TDS)@180C Residue, Non- SM2540D 2 <10 U mg/L 10 40 09/19/22 12:45 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 105 * mg/L 5 25 09/20/22 18:18 mjj Sulfide as S SM4500S2-D 1 <0.02 U * mg/L 0.02 0.1 09/14/22 20:12 jck TDS(calculated) Calculation 207 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.14 10/18/22 0:00 Calc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 4 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-02 Project ID: 8000177267 Date Sampled: 09/13/22 12:20 Sample ID: PL-5-80 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 13:07 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 14:39 aeh Digestion REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 5 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-02 Project ID: 8000177267 Date Sampled: 09/13/22 12:20 Sample ID: PL-5-80 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/21/22 10:19 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/19/22 14:18 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U * mg/L 0.0004 0.002 09/21/22 20:20 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:18 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00385 mg/L 0.0002 0.001 09/21/22 10:19 kja Arsenic,total M200.8 ICP-MS 1 0.00548 mg/L 0.0002 0.001 09/19/22 14:18 mfm Barium,dissolved M200.7 ICP 1 0.0162 B mg/L 0.009 0.035 09/22/22 5:06 wtc Barium,total M200.7 ICP 1 0.0126 B mg/L 0.009 0.035 09/22/22 23:22 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:19 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:18 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/23/22 10:03 wtc Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 23:22 aeh Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 5:06 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 23:22 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:19 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:18 mfm Calcium,dissolved M200.7 ICP 1 65.1 mg/L 0.1 0.5 09/22/22 5:06 wtc Calcium,total M200.7 ICP 1 62.3 mg/L 0.1 0.5 09/22/22 23:22 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:19 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:18 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 5:06 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 23:22 aeh Copper,dissolved M200.8 ICP-MS 1 0.00110 B mg/L 0.0008 0.002 09/21/22 10:19 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:18 mfm Iron,dissolved M200.8 ICP-MS 1 0.0335 * mg/L 0.007 0.02 09/21/22 10:19 kja Iron,total M200.8 ICP-MS 1 0.0640 * mg/L 0.007 0.02 09/19/22 14:18 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:19 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:18 mfm Lithium,dissolved M200.7 ICP 1 0.999 mg/L 0.008 0.04 09/22/22 5:06 wtc Lithium,total M200.7 ICP 1 0.969 mg/L 0.008 0.04 09/22/22 23:22 aeh Magnesium,dissolved M200.7 ICP 1 15.3 mg/L 0.2 1 09/22/22 5:06 wtc Magnesium,total M200.7 ICP 1 14.9 mg/L 0.2 1 09/22/22 23:22 aeh Manganese,dissolved M200.7 ICP 1 3.33 mg/L 0.01 0.05 09/22/22 5:06 wtc Manganese,total M200.7 ICP 1 3.32 mg/L 0.01 0.05 09/22/22 23:22 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:19 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:18 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00095 B mg/L 0.0004 0.001 09/21/22 10:19 kja Nickel,total M200.8 ICP-MS 1 0.00110 mg/L 0.0004 0.001 09/19/22 14:18 mfm Phosphorus,dissolved M200.7 ICP 1 1.15 * mg/L 0.1 0.5 09/22/22 5:06 wtc Phosphorus,total M200.7 ICP 1 1.09 * mg/L 0.1 0.5 09/22/22 23:22 aeh Potassium,dissolved M200.7 ICP 1 5.67 mg/L 0.2 1 09/22/22 5:06 wtc Potassium,total M200.7 ICP 1 5.50 mg/L 0.2 1 09/22/22 23:22 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 09/22/22 5:06 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 6 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-02 Project ID: 8000177267 Date Sampled: 09/13/22 12:20 Sample ID: PL-5-80 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 23:22 aeh Selenium,dissolved M200.8 ICP-MS 1 0.157 * mg/L 0.0001 0.00025 09/21/22 10:19 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/19/22 14:18 mfm Silicon,dissolved M200.7 ICP 1 6.93 mg/L 0.1 0.5 09/22/22 5:06 wtc Silicon,total M200.7 ICP 1 6.44 mg/L 0.1 0.5 09/22/22 23:22 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 13:18 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:18 mfm Sodium,dissolved M200.7 ICP 1 13.3 mg/L 0.2 1 09/22/22 5:06 wtc Sodium,total M200.7 ICP 1 12.5 mg/L 0.2 1 09/22/22 23:22 aeh Strontium,dissolved M200.7 ICP 1 0.223 mg/L 0.009 0.045 09/22/22 5:06 wtc Strontium,total M200.7 ICP 1 0.213 mg/L 0.009 0.045 09/22/22 23:22 aeh Sulfur,dissolved M200.7 ICP 1 98.2 mg/L 0.25 1.25 09/22/22 5:06 wtc Sulfur,total M200.7 ICP 1 31.1 mg/L 0.25 1.25 09/22/22 23:22 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:19 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:18 mfm Thorium,dissolved M200.8 ICP-MS 2 <0.002 U mg/L 0.002 0.01 09/23/22 21:29 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:18 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 5:06 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:22 aeh Titanium,dissolved M200.7 ICP 1 0.0077 B mg/L 0.005 0.025 09/22/22 5:06 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 23:22 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00034 B mg/L 0.0001 0.0005 09/21/22 10:19 kja Uranium,total M200.8 ICP-MS 1 0.00043 B mg/L 0.0001 0.0005 09/19/22 14:18 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 5:06 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 23:22 aeh Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/21/22 10:19 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 16:03 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 7 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75816-02 Project ID: 8000177267 Date Sampled: 09/13/22 12:20 Sample ID: PL-5-80 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 153 * mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 153 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 18.0 * mg/L 2 09/14/2216:31 emk Demand(5 day) Carbon,total inorganic SM5310B 20 21.4 BH mg/L 20 100 10/13/22 1:06 bls Carbon,total organic SM5310B 1 3.0 B mg/L 1 5 09/22/22 23:32 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 3.6 % 10/18/22 0:00 talc Sum of Anions 5.4 meq/L 10/18/22 0:00 talc Sum of Cations 5.8 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 39 mg/L 10 20 10/11/2212:58 anc Demand Chloride SM4500CI-E 1 11.3 mg/L 1 2 09/20/2215:54 mrd Color HACH Color Wheel 1 5 * Co/Pt 5 5 09/14/22 16:02 svm Cyanide, Free D6888-09/OIA-1677-09 1 0.418 * mg/L 0.003 0.01 09/27/22 13:42 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/16/22 14:43 bls Fluoride SM450OF-C 1 0.27 B mg/L 0.15 0.35 09/20/22 23:33 emk Hardness as CaCO3 SM2340B-Calculation 226 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 217 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 8:12 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 4.13 * mg/L 0.05 0.2 09/19/22 11:45 bls w/gas diffusion Phosphate,total Calculation based on total 3.4 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 332 * mg/L 20 40 09/19/22 12:02 mrb (TDS)@180C Residue, Non- SM2540D 4 <20 U mg/L 20 80 09/19/22 12:48 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 96.2 mg/L 5 25 09/20/22 18:18 mjj Sulfide as S SM450os2-D 75 20.4 mg/L 1.5 7.5 09/14/22 20:16 jck TDS(calculated) Calculation 308 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.08 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 6-221 01 81 056 Page 8 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800)334-5493 ExplanationsReport Header Batch A distinct set of samples analyzed at a specific time Found Value of the QC Type of interest Limit Upper limit for RPD,in%. Lower Lower Recovery Limit,in% (except for LCSS,mg/Kg) MDL Method Detection Limit. Same as Minimum Reporting Limit unless omitted or equal to the PQL(see comment#5). Allows for instrument and annual fluctuations. PCN/SCN A number assigned to reagents/standards to trace to the manufacturer's certificate of analysis PQL Practical Quantitation Limit. Synonymous with the EPA term"minimum level". QC True Value of the Control Sample or the amount added to the Spike Rec Recovered amount of the true value or spike added,in%(except for LCSS,mg/Kg) RPD Relative Percent Difference,calculation used for Duplicate QC Types Upper Upper Recovery Limit,in% (except for LCSS,mg/Kg) 1k Sample Value of the Sample of interest QC Sample Types AS Analytical Spike(Post Digestion) LCSWD Laboratory Control Sample-Water Duplicate ASD Analytical Spike(Post Digestion)Duplicate LFB Laboratory Fortified Blank CCB Continuing Calibration Blank LFM Laboratory Fortified Matrix CCV Continuing Calibration Verification standard LFMD Laboratory Fortified Matrix Duplicate DUP Sample Duplicate LRB Laboratory Reagent Blank ICB Initial Calibration Blank MS Matrix Spike ICV Initial Calibration Verification standard MSD Matrix Spike Duplicate /CSAB Inter-element Correction Standard-A plus B solutions PBS Prep Blank-Soil LCSS Laboratory Control Sample-Soil PBW Prep Blank-Water LCSSD Laboratory Control Sample-Soil Duplicate PQV Practical Quantitation Verification standard LCSW Laboratory Control Sample-Water SDL Serial Dilution QC Sample Type Explanations Blanks Verifies that there is no or minimal contamination in the prep method or calibration procedure. Control Samples Verifies the accuracy of the method,including the prep procedure. Duplicates Verifies the precision of the instrument and/or method. Spikes/Fortified Matrix Determines sample matrix interferences,if any. Standard Verifies the validity of the calibration. ACZ Qualifiers e . B Analyte concentration detected at a value between MDL and PQL.The associated value is an estimated quantity. H Analysis exceeded method hold time. pH is a field test with an immediate hold time. L Target analyte response was below the laboratory defined negative threshold. U The material was analyzed for,but was not detected above the level of the associated value. The associated value is either the sample quantitation limit or the sample detection limit. FIRM Ww"NAW. -A (1) EPA 600/4-83-020. Methods for Chemical Analysis of Water and Wastes,March 1983. (2) EPA 600/R-93-100. Methods for the Determination of Inorganic Substances in Environmental Samples,August 1993. (3) EPA 600/R-94-111. Methods for the Determination of Metals in Environmental Samples-Supplement I,May 1994. (4) EPA SW-846. Test Methods for Evaluating Solid Waste. (5) Standard Methods for the Examination of Water and Wastewater. (1) QC results calculated from raw data. Results may vary slightly if the rounded values are used in the calculations. (2) Soil,Sludge,and Plant matrices for Inorganic analyses are reported on a dry weight basis. (3) Animal matrices for Inorganic analyses are reported on an"as received"basis. (4) An asterisk in the"XQ"column indicates there is an extended qualifier and/or certification qualifier associated with the result. (5) If the MDL equals the PQL or the MDL column is omitted,the PQL is the reporting limit. For a complete list of ACZ's Extended Qualifiers,please click: https:Hacz.com/wp-content/uploads/2019/04/F,xt-Qual-List.pdf REP001.03.15.02 L7581 6-221 01 81 056 Page 9 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. Accrod Environmental Steamboat Downhill Drive �� • • EnvlrOrmental Steamboat Springs,CO 80487 Testing (970)879-6590 Name:D.Morgan Warren Address:348 Ho!855-9910 In Road Company:Albemarle Corporation Kings Mountain086 E-mail:morgan.warren@albemarle.com Telephone:(770) Copy of Report to: Name:Chris Garrett(SWCA),Amy Prestia(SRK) E-mail: cgarrett@swca.com,aprestia@srk.com Company: SWCA,SRK Telephone: i Invoice to: Name: Lisa Smith Address:4250 Congress Street,Suite 900 Company: Albemarle Corporation Charlotte,NC 28209 E-mail:lisa.smith@albemarle.com Telephone:(520)878-7899 Copy a Name: Address: Company: `y1 S' �r �f C E-mail: C Telephone: tf (7 C1 If sample(s)received past holding time(HT),or if insufficient HT remains to complete YES analysis before expiration,shall ACZ proceed with requested short HT analyses? NO 1'NO'then ACZ will oo—t client for further instruction.Y reRher'YES"nor'NO'le indirsa d,ACZ will proceed with the requested analyses,even if HT is expired,and data w11 be qualifk Are samples for SDWA Compliance Monitoring? Yes No If yes,please include state forms.Results will be reported to PQL for Colorado. Samplers Name:- ampler's Site Information State NC Zip code 28086 Time Zone ET '1 shut to the authenticity and wfidity of this sample.I understand that Intentionally mislabeling the timeldatell cation or 'Samplers Signature: tampering with the aampla in.,ay.k emaidered fraud and punishable by state L­ PROJECT INFORMATION Quote#: PO#:8000177267(Water Quality Sampling) Y Reporting state for compliance testing:NC to p U r�TT t J ti` Check box if samples include NRC licensed material? o i`r • •• V _L_A) 1W $D ZZ W VM tux. SW(Surface Water)-GW(Ground Water) W W(Waste Water).DW(Drinking Water)•SL(Sludge)-SO(Soil)-OL(Oil)•Other(Specify) t71�_ Please refer to ACES terms&conditions located on the reverse side of this COC. RELINQUISHEDD• BY: DATEMME 01 O (a — Qualtrax�O. 1984 Revision#: 2 White-Return with sample. Yellow-Retain for your records. V. O Q L75816-2210181056 Page 25 of 25 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-01 Project ID: 8000177267 Date Sampled: 09/13/22 10:00 Sample ID: PL-2-80 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 13:20 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 14:52 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Pagel of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-01 Project ID: 8000177267 Date Sampled: 09/13/22 10:00 Sample ID: PL-2-80 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/21/22 10:21 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/19/22 14:20 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 20:25 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:20 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00411 mg/L 0.0002 0.001 09/21/22 10:21 kja Arsenic,total M200.8 ICP-MS 1 0.00560 mg/L 0.0002 0.001 09/19/22 14:20 mfm Barium,dissolved M200.7 ICP 1 0.0165 B mg/L 0.009 0.035 09/22/22 5:09 wtc Barium,total M200.7 ICP 1 0.0130 B mg/L 0.009 0.035 09/22/22 23:25 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:21 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:20 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/23/22 10:06 wtc Bismuth,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:25 aeh Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 5:09 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 23:25 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:21 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:20 mfm Calcium,dissolved M200.7 ICP 1 66.1 mg/L 0.1 0.5 09/22/22 5:09 wtc Calcium,total M200.7 ICP 1 63.7 mg/L 0.1 0.5 09/22/22 23:25 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:21 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:20 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 5:09 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 23:25 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:21 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:20 mfm Iron,dissolved M200.8 ICP-MS 1 0.0201 mg/L 0.007 0.02 09/21/22 10:21 kja Iron,total M200.8 ICP-MS 1 0.0699 mg/L 0.007 0.02 09/19/22 14:20 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:21 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:20 mfm Lithium,dissolved M200.7 ICP 1 1.01 mg/L 0.008 0.04 09/22/22 5:09 wtc Lithium,total M200.7 ICP 1 0.985 mg/L 0.008 0.04 09/22/22 23:25 aeh Magnesium,dissolved M200.7 ICP 1 15.5 mg/L 0.2 1 09/22/22 5:09 wtc Magnesium,total M200.7 ICP 1 15.2 mg/L 0.2 1 09/22/22 23:25 aeh Manganese,dissolved M200.7 ICP 1 3.46 mg/L 0.01 0.05 09/22/22 5:09 wtc Manganese,total M200.7 ICP 1 3.42 mg/L 0.01 0.05 09/22/22 23:25 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:21 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:20 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00089 B mg/L 0.0004 0.001 09/21/22 10:21 kja Nickel,total M200.8 ICP-MS 1 0.00112 mg/L 0.0004 0.001 09/19/22 14:20 mfm Phosphorus,dissolved M200.7 ICP 1 1.13 mg/L 0.1 0.5 09/22/22 5:09 wtc Phosphorus,total M200.7 ICP 1 1.10 mg/L 0.1 0.5 09/22/22 23:25 aeh Potassium,dissolved M200.7 ICP 1 5.79 mg/L 0.2 1 09/22/22 5:09 wtc Potassium,total M200.7 ICP 1 5.57 mg/L 0.2 1 09/22/22 23:25 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 5:09 wtc REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 2 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-01 Project ID: 8000177267 Date Sampled: 09/13/22 10:00 Sample ID: PL-2-80 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 23:25 aeh Selenium,dissolved M200.8 ICP-MS 1 0.124 * mg/L 0.0001 0.00025 09/21/22 10:21 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/19/22 14:20 mfm Silicon,dissolved M200.7 ICP 1 6.98 mg/L 0.1 0.5 09/22/22 5:09 wtc Silicon,total M200.7 ICP 1 6.53 mg/L 0.1 0.5 09/22/22 23:25 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 13:20 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:20 mfm Sodium,dissolved M200.7 ICP 1 13.5 mg/L 0.2 1 09/22/22 5:09 wtc Sodium,total M200.7 ICP 1 12.8 mg/L 0.2 1 09/22/22 23:25 aeh Strontium,dissolved M200.7 ICP 1 0.226 mg/L 0.009 0.045 09/22/22 5:09 wtc Strontium,total M200.7 ICP 1 0.217 mg/L 0.009 0.045 09/22/22 23:25 aeh Sulfur,dissolved M200.7 ICP 1 101 mg/L 0.25 1.25 09/22/22 5:09 wtc Sulfur,total M200.7 ICP 1 32.0 * mg/L 0.25 1.25 09/22/22 23:25 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:21 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:20 mfm Thorium,dissolved M200.8 ICP-MS 2 <0.002 U mg/L 0.002 0.01 09/23/22 21:31 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:20 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 5:09 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:25 aeh Titanium,dissolved M200.7 ICP 1 0.0079 B mg/L 0.005 0.025 09/22/22 5:09 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 23:25 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00035 B mg/L 0.0001 0.0005 09/21/22 10:21 kja Uranium,total M200.8 ICP-MS 1 0.00044 B mg/L 0.0001 0.0005 09/19/22 14:20 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 5:09 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 23:25 aeh Zinc,dissolved M200.8 ICP-MS 1 0.0142 B mg/L 0.006 0.015 09/21/22 10:21 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 16:05 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 3 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-01 Project ID: 8000177267 Date Sampled: 09/13/22 10:00 Sample ID: PL-2-80 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 152 mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 152 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 18.0 * mg/L 2 09/14/2216:39 emk Demand(5 day) Carbon,total inorganic SM5310B 20 <20 UH mg/L 20 100 10/13/22 1:52 bls Carbon,total organic SM5310B 1 3.0 B mg/L 1 5 09/22/22 23:48 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 4.4 % 10/18/22 0:00 talc Sum of Anions 5.4 meq/L 10/18/22 0:00 talc Sum of Cations 5.9 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 42 * mg/L 10 20 10/11/2213:09 anc Demand Chloride SM4500CI-E 1 11.8 mg/L 1 2 09/20/2215:54 mrd Color HACH Color Wheel 1 <5 U * Co/Pt 5 5 09/14/22 16:05 svm Cyanide, Free D6888-09/OIA-1677-09 1 0.376 mg/L 0.003 0.01 09/27/22 13:44 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 0.0037 B mg/L 0.003 0.01 09/16/22 14:44 bls Fluoride SM450OF-C 1 0.28 B mg/L 0.15 0.35 09/20/22 23:41 emk Hardness as CaCO3 SM2340B-Calculation 229 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 222 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 8:23 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 4.12 * mg/L 0.05 0.2 09/19/22 11:46 bls w/gas diffusion Phosphate,total Calculation based on total 3.4 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 334 mg/L 20 40 09/19/22 12:04 mrb (TDS)@180C Residue, Non- SM2540D 4 <20 U mg/L 20 80 09/19/22 12:50 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 97.4 mg/L 5 25 09/20/22 18:18 mjj Sulfide as S SM450os2-D 75 24.6 * mg/L 1.5 7.5 09/14/22 20:27 jck TDS(calculated) Calculation 311 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.07 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 4 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-02 Project ID: 8000177267 Date Sampled: 09/13/22 10:30 Sample ID: PL-2-50 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 13:47 wgm Total Hot Plate M200.2 ICP 09/21/22 15:06 aeh Digestion Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 5 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-02 Project ID: 8000177267 Date Sampled: 09/13/22 10:30 Sample ID: PL-2-50 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/21/22 10:23 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/19/22 14:21 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U * mg/L 0.0004 0.002 09/21/22 20:27 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:21 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00515 mg/L 0.0002 0.001 09/21/22 10:23 kja Arsenic,total M200.8 ICP-MS 1 0.00541 mg/L 0.0002 0.001 09/19/22 14:21 mfm Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 5:24 wtc Barium,total M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 23:28 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:23 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:21 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/23/22 10:09 wtc Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 23:28 aeh Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 5:24 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 23:28 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:23 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:21 mfm Calcium,dissolved M200.7 ICP 1 56.4 mg/L 0.1 0.5 09/22/22 5:24 wtc Calcium,total M200.7 ICP 1 55.4 mg/L 0.1 0.5 09/22/22 23:28 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:23 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:21 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 5:24 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 23:28 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:23 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:21 mfm Iron,dissolved M200.8 ICP-MS 1 0.0670 * mg/L 0.007 0.02 09/21/22 10:23 kja Iron,total M200.8 ICP-MS 1 0.0743 * mg/L 0.007 0.02 09/19/22 14:21 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:23 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:21 mfm Lithium,dissolved M200.7 ICP 1 0.827 mg/L 0.008 0.04 09/22/22 5:24 wtc Lithium,total M200.7 ICP 1 0.820 mg/L 0.008 0.04 09/22/22 23:28 aeh Magnesium,dissolved M200.7 ICP 1 12.8 mg/L 0.2 1 09/22/22 5:24 wtc Magnesium,total M200.7 ICP 1 12.8 mg/L 0.2 1 09/22/22 23:28 aeh Manganese,dissolved M200.7 ICP 1 0.849 * mg/L 0.01 0.05 09/22/22 5:24 wtc Manganese,total M200.7 ICP 1 0.852 mg/L 0.01 0.05 09/22/22 23:28 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:23 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:21 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00110 mg/L 0.0004 0.001 09/21/22 10:23 kja Nickel,total M200.8 ICP-MS 1 0.00127 mg/L 0.0004 0.001 09/19/22 14:21 mfm Phosphorus,dissolved M200.7 ICP 1 0.30 B mg/L 0.1 0.5 09/22/22 5:24 wtc Phosphorus,total M200.7 ICP 1 0.27 B mg/L 0.1 0.5 09/22/22 23:28 aeh Potassium,dissolved M200.7 ICP 1 4.91 mg/L 0.2 1 09/22/22 5:24 wtc Potassium,total M200.7 ICP 1 4.82 mg/L 0.2 1 09/22/22 23:28 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 09/22/22 5:24 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 6 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-02 Project ID: 8000177267 Date Sampled: 09/13/22 10:30 Sample ID: PL-2-50 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/22/22 23:28 aeh Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/30/22 13:22 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/19/22 14:21 mfm Silicon,dissolved M200.7 ICP 1 3.37 mg/L 0.1 0.5 09/22/22 5:24 wtc Silicon,total M200.7 ICP 1 3.22 mg/L 0.1 0.5 09/22/22 23:28 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 13:22 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:21 mfm Sodium,dissolved M200.7 ICP 1 11.1 mg/L 0.2 1 09/22/22 5:24 wtc Sodium,total M200.7 ICP 1 10.6 mg/L 0.2 1 09/22/22 23:28 aeh Strontium,dissolved M200.7 ICP 1 0.174 mg/L 0.009 0.045 09/22/22 5:24 wtc Strontium,total M200.7 ICP 1 0.169 mg/L 0.009 0.045 09/22/22 23:28 aeh Sulfur,dissolved M200.7 ICP 1 41.8 * mg/L 0.25 1.25 09/22/22 5:24 wtc Sulfur,total M200.7 ICP 1 40.8 * mg/L 0.25 1.25 09/22/22 23:28 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:23 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:21 mfm Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/23/22 21:33 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:21 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 5:24 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/22/22 23:28 aeh Titanium,dissolved M200.7 ICP 1 0.0075 B mg/L 0.005 0.025 09/22/22 5:24 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/22/22 23:28 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00053 mg/L 0.0001 0.0005 09/21/22 10:23 kja Uranium,total M200.8 ICP-MS 1 0.00061 mg/L 0.0001 0.0005 09/19/22 14:21 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 5:24 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 23:28 aeh Zinc,dissolved M200.8 ICP-MS 1 0.0127 B mg/L 0.006 0.015 09/21/22 10:23 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 16:11 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 7 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75817-02 Project ID: 8000177267 Date Sampled: 09/13/22 10:30 Sample ID: PL-2-50 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 93.1 mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 93.1 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 3.0 * mg/L 2 09/14/2216:46 emk Demand(5 day) Carbon,total inorganic SM5310B 20 <20 UH mg/L 20 100 10/13/22 2:02 bls Carbon,total organic SM5310B 1 3.9 B mg/L 1 5 09/23/22 0:04 mjj1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 2.2 % 10/18/22 0:00 talc Sum of Anions 4.4 meq/L 10/18/22 0:00 talc Sum of Cations 4.6 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 420 mg/L 10 20 10/11/2213:20 anc Demand Chloride SM4500CI-E 1 6.14 mg/L 1 2 09/20/2215:55 mrd Color HACH Color Wheel 1 <5 U Co/Pt 5 5 09/14/22 16:08 svm Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U mg/L 0.003 0.01 09/20/22 15:01 mjj1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U * mg/L 0.003 0.01 09/16/22 14:47 bls Fluoride SM450OF-C 1 0.24 B mg/L 0.15 0.35 09/20/22 23:49 emk Hardness as CaCO3 SM2340B-Calculation 194 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 191 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 1 0.495 * mg/L 0.05 0.2 09/19/22 11:50 bls w/gas diffusion Phosphate,total Calculation based on total 0.837 B mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 286 mg/L 20 40 09/19/22 12:07 mrb (TDS)@180C Residue, Non- SM2540D 2 <10 U * mg/L 10 40 09/19/22 12:53 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 112 mg/L 5 25 09/20/22 18:18 mjj Sulfide as S SM450os2-D 1 0.256 * mg/L 0.02 0.1 09/14/22 20:31 jck TDS(calculated) Calculation 262 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.09 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 7-221 01 81 100 Page 8 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800)334-5493 ExplanationsReport Header Batch A distinct set of samples analyzed at a specific time Found Value of the QC Type of interest Limit Upper limit for RPD,in%. Lower Lower Recovery Limit,in% (except for LCSS,mg/Kg) MDL Method Detection Limit. Same as Minimum Reporting Limit unless omitted or equal to the PQL(see comment#5). Allows for instrument and annual fluctuations. PCN/SCN A number assigned to reagents/standards to trace to the manufacturer's certificate of analysis PQL Practical Quantitation Limit. Synonymous with the EPA term"minimum level". QC True Value of the Control Sample or the amount added to the Spike Rec Recovered amount of the true value or spike added,in%(except for LCSS,mg/Kg) RPD Relative Percent Difference,calculation used for Duplicate QC Types Upper Upper Recovery Limit,in% (except for LCSS,mg/Kg) 1k Sample Value of the Sample of interest QC Sample Types AS Analytical Spike(Post Digestion) LCSWD Laboratory Control Sample-Water Duplicate ASD Analytical Spike(Post Digestion)Duplicate LFB Laboratory Fortified Blank CCB Continuing Calibration Blank LFM Laboratory Fortified Matrix CCV Continuing Calibration Verification standard LFMD Laboratory Fortified Matrix Duplicate DUP Sample Duplicate LRB Laboratory Reagent Blank ICB Initial Calibration Blank MS Matrix Spike ICV Initial Calibration Verification standard MSD Matrix Spike Duplicate /CSAB Inter-element Correction Standard-A plus B solutions PBS Prep Blank-Soil LCSS Laboratory Control Sample-Soil PBW Prep Blank-Water LCSSD Laboratory Control Sample-Soil Duplicate PQV Practical Quantitation Verification standard LCSW Laboratory Control Sample-Water SDL Serial Dilution QC Sample Type Explanations Blanks Verifies that there is no or minimal contamination in the prep method or calibration procedure. Control Samples Verifies the accuracy of the method,including the prep procedure. Duplicates Verifies the precision of the instrument and/or method. Spikes/Fortified Matrix Determines sample matrix interferences,if any. Standard Verifies the validity of the calibration. ACZ Qualifiers e . B Analyte concentration detected at a value between MDL and PQL.The associated value is an estimated quantity. H Analysis exceeded method hold time. pH is a field test with an immediate hold time. L Target analyte response was below the laboratory defined negative threshold. U The material was analyzed for,but was not detected above the level of the associated value. The associated value is either the sample quantitation limit or the sample detection limit. FIRM Ww"NAW. -A (1) EPA 600/4-83-020. Methods for Chemical Analysis of Water and Wastes,March 1983. (2) EPA 600/R-93-100. Methods for the Determination of Inorganic Substances in Environmental Samples,August 1993. (3) EPA 600/R-94-111. Methods for the Determination of Metals in Environmental Samples-Supplement I,May 1994. (4) EPA SW-846. Test Methods for Evaluating Solid Waste. (5) Standard Methods for the Examination of Water and Wastewater. (1) QC results calculated from raw data. Results may vary slightly if the rounded values are used in the calculations. (2) Soil,Sludge,and Plant matrices for Inorganic analyses are reported on a dry weight basis. (3) Animal matrices for Inorganic analyses are reported on an"as received"basis. (4) An asterisk in the"XQ"column indicates there is an extended qualifier and/or certification qualifier associated with the result. (5) If the MDL equals the PQL or the MDL column is omitted,the PQL is the reporting limit. For a complete list of ACZ's Extended Qualifiers,please click: https:Hacz.com/wp-content/uploads/2019/04/F,xt-Qual-List.pdf REP001.03.15.02 L7581 7-221 01 81 100 Page 9 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. IAccr•dked 2773 Downhill Drive 05�1 Environmental Steamboat Springs,CO 80487 AMR T"fing (970)879-6590 Name:D.Morgan Warren Address:348 Holiday Inn Road Company:Albemarle Corporation Kings Mountain,NC 28086 E-mail:morgan.warren@albemarle.com Telephone:(770)855-9910 Copy of Report to: Name:Chris Garrett(SWCA),Amy Prestia(SRK) E-mail: cgarrett@swca.com,aprestia@srk.com Company: SWCA,SRK Telephoner Invoice to: Name: Lisa Smith Address:4250 Congress Street,Suite 900 Company: Albemarle Corporation Charlotte,NC 28209 E-mail:lisa.smith@albemarle.com Telephone:(520)878-7899 Copy of Invoice to: Name: Zjohya Address: Company: 15WCA 1 tut NIL, $2 E-mail: %c6qVA, a swca a Cd1 1,n,,1 Telephone: If samples)received past holding time(HT),or if insufficient HT remains to complete YES analysis before expiration,shall ACZ proceed with requested short HT analyses? NO r'NO"than ACZ will contact client for further Instruction.r neRher"YES"nor'NO"a indicated,ACZ will proceed with the requested analyses,aws,I HT u expired,and data will be qualified Are samples for SDWA Compliance Monitoring? YesL_j No If yes,please include state forms.Results will be reported to PQL for Colorado. Sampler's Name: Vw`(. mpler's Site Information State NC Zip code 28086 Time Zone ET 'I attest to the authemlcily and validity of this sample.I understand that intentionally mislabeling the lime/date/location or 'Sampler's Signature: tampedng with the sample in anyway,is rAnaidered fraud and punishable by state law. PROJECT •• • REQUESTED Quote#: a J `m PO#:8000177267(Water Quality Sampling) M h �/ :° (per Reporting state for compliance testing:NC a U Check box if samples include NRC licensed material? o -1 FL -Z 0 1 Z? 00 i t 2 —Sb 212 030 till as as Matrix SW(Surface Water)•GW(Ground Water)-WW(Waste Water) DW(Drinking Water)•SL(Sludge)-SO(Soil)-OL(Oil)-Other(Sped ) REMARKS N Please refer to ACZ's terms&conditions located on the reverse side of this COC. 0 RELINQUISHED : Y: DATE:TIME RECEIVED BY: DATE:TIME t0 t IQ` Qualtrax ID: 1984 Revision#: 2' White-Return With sample. Yellow-Retain for your records. r L7581 7-221 01 81 100 Page 25 of 25 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-01 Project ID: 8000177267 Date Sampled: 09/13/22 15:00 Sample ID: PL-8-50 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 14:00 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 16:26 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Pagel of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-01 Project ID: 8000177267 Date Sampled: 09/13/22 15:00 Sample ID: PL-8-50 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL PQL Date Analyst Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/21/22 10:25 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/19/22 14:23 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 10:25 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:23 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00514 mg/L 0.0002 0.001 09/21/22 10:25 kja Arsenic,total M200.8 ICP-MS 1 0.00520 mg/L 0.0002 0.001 09/19/22 14:23 mfm Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/22/22 5:27 wtc Barium,total M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/23/22 13:23 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:25 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:23 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/23/22 10:12 wtc Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/26/22 20:12 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 5:27 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/23/22 13:23 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:25 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:23 mfm Calcium,dissolved M200.7 ICP 1 55.6 mg/L 0.1 0.5 09/22/22 5:27 wtc Calcium,total M200.7 ICP 1 54.2 * mg/L 0.1 0.5 09/23/22 13:23 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:25 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:23 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 5:27 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/23/22 13:23 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:25 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:23 mfm Iron,dissolved M200.8 ICP-MS 1 0.0589 * mg/L 0.007 0.02 09/21/22 10:25 kja Iron,total M200.8 ICP-MS 1 0.0719 * mg/L 0.007 0.02 09/19/22 14:23 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:25 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:23 mfm Lithium,dissolved M200.7 ICP 1 0.815 mg/L 0.008 0.04 09/22/22 5:27 wtc Lithium,total M200.7 ICP 1 0.812 mg/L 0.008 0.04 09/23/22 13:23 aeh Magnesium,dissolved M200.7 ICP 1 12.6 mg/L 0.2 1 09/22/22 5:27 wtc Magnesium,total M200.7 ICP 1 12.5 mg/L 0.2 1 09/23/22 13:23 aeh Manganese,dissolved M200.7 ICP 1 0.845 * mg/L 0.01 0.05 09/22/22 5:27 wtc Manganese,total M200.7 ICP 1 0.847 mg/L 0.01 0.05 09/23/22 13:23 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:25 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:23 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00114 mg/L 0.0004 0.001 09/21/22 10:25 kja Nickel,total M200.8 ICP-MS 1 0.00124 mg/L 0.0004 0.001 09/19/22 14:23 mfm Phosphorus,dissolved M200.7 ICP 1 0.25 B mg/L 0.1 0.5 09/22/22 5:27 wtc Phosphorus,total M200.7 ICP 1 0.31 B mg/L 0.1 0.5 09/23/22 13:23 aeh Potassium,dissolved M200.7 ICP 1 4.82 mg/L 0.2 1 09/22/22 5:27 wtc Potassium,total M200.7 ICP 1 4.76 mg/L 0.2 1 09/23/22 13:23 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 09/22/22 5:27 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 2 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-01 Project ID: 8000177267 Date Sampled: 09/13/22 15:00 Sample ID: PL-8-50 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/23/22 13:23 aeh Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/30/22 13:24 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/19/22 14:23 mfm Silicon,dissolved M200.7 ICP 1 3.39 * mg/L 0.1 0.5 09/22/22 5:27 wtc Silicon,total M200.7 ICP 1 3.18 * mg/L 0.1 0.5 09/23/22 13:23 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 13:24 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:23 mfm Sodium,dissolved M200.7 ICP 1 11.0 mg/L 0.2 1 09/22/22 5:27 wtc Sodium,total M200.7 ICP 1 11.3 mg/L 0.2 1 09/23/22 13:23 aeh Strontium,dissolved M200.7 ICP 1 0.171 mg/L 0.009 0.045 09/22/22 5:27 wtc Strontium,total M200.7 ICP 1 0.169 mg/L 0.009 0.045 09/23/22 13:23 aeh Sulfur,dissolved M200.7 ICP 1 41.9 * mg/L 0.25 1.25 09/22/22 5:27 wtc Sulfur,total M200.7 ICP 1 39.2 mg/L 0.25 1.25 09/23/22 13:23 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:25 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:23 mfm Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/21/22 10:25 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:23 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 5:27 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/23/22 13:23 aeh Titanium,dissolved M200.7 ICP 1 0.0061 B mg/L 0.005 0.025 09/22/22 5:27 wtc Titanium,total M200.7 ICP 1 0.0090 B mg/L 0.005 0.025 09/23/22 13:23 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00052 mg/L 0.0001 0.0005 09/21/22 10:25 kja Uranium,total M200.8 ICP-MS 1 0.00058 mg/L 0.0001 0.0005 09/19/22 14:23 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 5:27 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/23/22 13:23 aeh Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/21/22 10:25 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 16:12 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 3 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-01 Project ID: 8000177267 Date Sampled: 09/13/22 15:00 Sample ID: PL-8-50 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 91.8 mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 91.8 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 3.0 * mg/L 2 09/14/2216:53 emk Demand(5 day) Carbon,total inorganic SM5310B 20 <20 UH mg/L 20 100 10/13/22 2:12 bls Carbon,total organic SM5310B 1 3.6 B mg/L 1 5 09/23/22 0:19 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 2.3 % 10/18/22 0:00 talc Sum of Anions 4.3 meq/L 10/18/22 0:00 talc Sum of Cations 4.5 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 <10 U mg/L 10 20 10/11/2213:31 anc Demand Chloride SM4500CI-E 1 6.06 mg/L 1 2 09/20/2215:55 mrd Color HACH Color Wheel 1 15 * Co/Pt 5 5 09/14/22 16:14 svm Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U mg/L 0.003 0.01 09/20/22 15:03 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/16/22 14:48 bls Fluoride SM450OF-C 1 0.24 B mg/L 0.15 0.35 09/20/22 23:57 emk Hardness as CaCO3 SM2340B-Calculation 191 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 187 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 8:33 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 0.546 * mg/L 0.05 0.2 09/19/22 11:52 bls w/gas diffusion Phosphate,total Calculation based on total 0.961 B mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 290 mg/L 20 40 09/19/22 12:09 mrb (TDS)@180C Residue, Non- SM2540D 4 <20 U mg/L 20 80 09/19/22 12:56 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 108 * mg/L 5 25 09/20/22 18:21 mjj Sulfide as S SM4500S2-D 3.75 1.04 mg/L 0.075 0.375 09/14/22 20:35 jck TDS(calculated) Calculation 256 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.13 10/18/22 0:00 Calc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 4 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-02 Project ID: 8000177267 Date Sampled: 09/13/22 14:30 Sample ID: PL-8-80 Date Received: 09114122 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/15/22 14:13 wgm Total Hot Plate M200.2 ICP-MS 09/18/22 11:15 mfm Digestion Total Hot Plate M200.2 ICP 09/21/22 16:39 aeh Digestion REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 5 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-02 Project ID: 8000177267 Date Sampled: 09/13/22 14:30 Sample ID: PL-8-80 Date Received: 09114122 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/21/22 10:27 kja Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/19/22 14:25 mfm Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 10:27 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/19/22 14:25 mfm Arsenic,dissolved M200.8 ICP-MS 1 0.00320 mg/L 0.0002 0.001 09/21/22 10:27 kja Arsenic,total M200.8 ICP-MS 1 0.00531 mg/L 0.0002 0.001 09/19/22 14:25 mfm Barium,dissolved M200.7 ICP 1 0.0156 B mg/L 0.009 0.035 09/22/22 5:30 wtc Barium,total M200.7 ICP 1 0.0155 B mg/L 0.009 0.035 09/23/22 13:26 aeh Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 10:27 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/19/22 14:25 mfm Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/23/22 10:27 wtc Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/26/22 20:15 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/22/22 5:30 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/23/22 13:26 aeh Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 10:27 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/19/22 14:25 mfm Calcium,dissolved M200.7 ICP 1 65.9 mg/L 0.1 0.5 09/22/22 5:30 wtc Calcium,total M200.7 ICP 1 63.8 * mg/L 0.1 0.5 09/23/22 13:26 aeh Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 10:27 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/19/22 14:25 mfm Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/22/22 5:30 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/23/22 13:26 aeh Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 10:27 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/19/22 14:25 mfm Iron,dissolved M200.8 ICP-MS 1 0.0098 B * mg/L 0.007 0.02 09/21/22 10:27 kja Iron,total M200.8 ICP-MS 1 0.0439 * mg/L 0.007 0.02 09/19/22 14:25 mfm Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:27 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:25 mfm Lithium,dissolved M200.7 ICP 1 1.01 mg/L 0.008 0.04 09/22/22 5:30 wtc Lithium,total M200.7 ICP 1 1.000 mg/L 0.008 0.04 09/23/22 13:26 aeh Magnesium,dissolved M200.7 ICP 1 15.5 mg/L 0.2 1 09/22/22 5:30 wtc Magnesium,total M200.7 ICP 1 15.2 mg/L 0.2 1 09/23/22 13:26 aeh Manganese,dissolved M200.7 ICP 1 3.34 mg/L 0.01 0.05 09/22/22 5:30 wtc Manganese,total M200.7 ICP 1 3.30 mg/L 0.01 0.05 09/23/22 13:26 aeh Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 10:27 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/19/22 14:25 mfm Nickel,dissolved M200.8 ICP-MS 1 0.00080 B mg/L 0.0004 0.001 09/21/22 10:27 kja Nickel,total M200.8 ICP-MS 1 0.00110 mg/L 0.0004 0.001 09/19/22 14:25 mfm Phosphorus,dissolved M200.7 ICP 1 1.17 mg/L 0.1 0.5 09/22/22 5:30 wtc Phosphorus,total M200.7 ICP 1 1.12 mg/L 0.1 0.5 09/23/22 13:26 aeh Potassium,dissolved M200.7 ICP 1 5.78 mg/L 0.2 1 09/22/22 5:30 wtc Potassium,total M200.7 ICP 1 5.62 mg/L 0.2 1 09/23/22 13:26 aeh Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 09/22/22 5:30 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 6 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-02 Project ID: 8000177267 Date Sampled: 09/13/22 14:30 Sample ID: PL-8-80 Date Received: 09114122 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/23/22 13:26 aeh Selenium,dissolved M200.8 ICP-MS 1 0.107 * mg/L 0.0001 0.00025 09/21/22 10:27 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U * mg/L 0.0001 0.00025 09/19/22 14:25 mfm Silicon,dissolved M200.7 ICP 1 7.19 * mg/L 0.1 0.5 09/22/22 5:30 wtc Silicon,total M200.7 ICP 1 6.68 * mg/L 0.1 0.5 09/23/22 13:26 aeh Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 13:26 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:25 mfm Sodium,dissolved M200.7 ICP 1 13.5 mg/L 0.2 1 09/22/22 5:30 wtc Sodium,total M200.7 ICP 1 13.0 mg/L 0.2 1 09/23/22 13:26 aeh Strontium,dissolved M200.7 ICP 1 0.225 mg/L 0.009 0.045 09/22/22 5:30 wtc Strontium,total M200.7 ICP 1 0.222 mg/L 0.009 0.045 09/23/22 13:26 aeh Sulfur,dissolved M200.7 ICP 1 94.0 * mg/L 0.25 1.25 09/22/22 5:30 wtc Sulfur,total M200.7 ICP 1 31.6 * mg/L 0.25 1.25 09/23/22 13:26 aeh Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 10:27 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/19/22 14:25 mfm Thorium,dissolved M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/21/22 10:27 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/19/22 14:25 mfm Tin,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/22/22 5:30 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/23/22 13:26 aeh Titanium,dissolved M200.7 ICP 1 0.0074 B mg/L 0.005 0.025 09/22/22 5:30 wtc Titanium,total M200.7 ICP 1 0.0071 B mg/L 0.005 0.025 09/23/22 13:26 aeh Uranium,dissolved M200.8 ICP-MS 1 0.00033 B mg/L 0.0001 0.0005 09/21/22 10:27 kja Uranium,total M200.8 ICP-MS 1 0.00043 B mg/L 0.0001 0.0005 09/19/22 14:25 mfm Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/22/22 5:30 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/23/22 13:26 aeh Zinc,dissolved M200.8 ICP-MS 1 0.0066 B mg/L 0.006 0.015 09/21/22 10:27 kja Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/22/22 16:14 mfm REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 7 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75818-02 Project ID: 8000177267 Date Sampled: 09/13/22 14:30 Sample ID: PL-8-80 Date Received: 09114122 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 173 mg/L 2 20 09/20/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U mg/L 2 09/20/22 0:00 emk Hydroxide as CaCO3 1 <2 U mg/L 2 20 09/20/22 0:00 emk Total Alkalinity 1 173 * mg/L 2 20 09/20/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 19.0 * mg/L 2 09/14/2217:00 emk Demand(5 day) Carbon,total inorganic SM5310B 1 <1 UH mg/L 1 5 10/13/22 2:22 bls Carbon,total organic SM5310B 1 3.1 B mg/L 1 5 09/23/22 0:34 mJ1 (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 0.9 % 10/18/22 0:00 talc Sum of Anions 5.8 meq/L 10/18/22 0:00 talc Sum of Cations 5.9 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 40 * mg/L 10 20 10/11/2213:42 anc Demand Chloride SM4500CI-E 1 12.6 mg/L 1 2 09/20/2215:57 mrd Color HACH Color Wheel 1 5 * Co/Pt 5 5 09/14/22 16:17 svm Cyanide, Free D6888-09/OIA-1677-09 2 <0.006 UH * mg/L 0.006 0.02 10/10/22 18:26 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 0.0035 B mg/L 0.003 0.01 09/16/22 14:49 bls Fluoride SM450OF-C 1 0.29 B mg/L 0.15 0.35 09/21/22 0:05 emk Hardness as CaCO3 SM2340B-Calculation 228 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 222 mg/L 0.2 5 10/18/22 0:00 talc (total) Lab Filtration(0.45um SOPWC050 1 09/20/22 8:44 mlh filter) Nitrogen,ammonia M350.1 Auto Salicylate 1 4.37 * mg/L 0.05 0.2 09/19/22 11:53 bls w/gas diffusion Phosphate,total Calculation based on total 3.5 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 334 mg/L 20 40 09/19/22 12:12 mrb (TDS)@180C Residue, Non- SM2540D 4 <20 U mg/L 20 80 09/19/22 12:58 mrb Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 91.6 * mg/L 5 25 09/20/22 18:21 mjj Sulfide as S SM450os2-D 37.5 16.6 * mg/L 0.75 3.75 09/14/22 20:39 jck TDS(calculated) Calculation 319 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.05 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L7581 8-221 01 81 1 03 Page 8 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800)334-5493 ExplanationsReport Header Batch A distinct set of samples analyzed at a specific time Found Value of the QC Type of interest Limit Upper limit for RPD,in%. Lower Lower Recovery Limit,in% (except for LCSS,mg/Kg) MDL Method Detection Limit. Same as Minimum Reporting Limit unless omitted or equal to the PQL(see comment#5). Allows for instrument and annual fluctuations. PCN/SCN A number assigned to reagents/standards to trace to the manufacturer's certificate of analysis PQL Practical Quantitation Limit. Synonymous with the EPA term"minimum level". QC True Value of the Control Sample or the amount added to the Spike Rec Recovered amount of the true value or spike added,in%(except for LCSS,mg/Kg) RPD Relative Percent Difference,calculation used for Duplicate QC Types Upper Upper Recovery Limit,in% (except for LCSS,mg/Kg) 1k Sample Value of the Sample of interest QC Sample Types AS Analytical Spike(Post Digestion) LCSWD Laboratory Control Sample-Water Duplicate ASD Analytical Spike(Post Digestion)Duplicate LFB Laboratory Fortified Blank CCB Continuing Calibration Blank LFM Laboratory Fortified Matrix CCV Continuing Calibration Verification standard LFMD Laboratory Fortified Matrix Duplicate DUP Sample Duplicate LRB Laboratory Reagent Blank ICB Initial Calibration Blank MS Matrix Spike ICV Initial Calibration Verification standard MSD Matrix Spike Duplicate /CSAB Inter-element Correction Standard-A plus B solutions PBS Prep Blank-Soil LCSS Laboratory Control Sample-Soil PBW Prep Blank-Water LCSSD Laboratory Control Sample-Soil Duplicate PQV Practical Quantitation Verification standard LCSW Laboratory Control Sample-Water SDL Serial Dilution QC Sample Type Explanations Blanks Verifies that there is no or minimal contamination in the prep method or calibration procedure. Control Samples Verifies the accuracy of the method,including the prep procedure. Duplicates Verifies the precision of the instrument and/or method. Spikes/Fortified Matrix Determines sample matrix interferences,if any. Standard Verifies the validity of the calibration. ACZ Qualifiers e . B Analyte concentration detected at a value between MDL and PQL.The associated value is an estimated quantity. H Analysis exceeded method hold time. pH is a field test with an immediate hold time. L Target analyte response was below the laboratory defined negative threshold. U The material was analyzed for,but was not detected above the level of the associated value. The associated value is either the sample quantitation limit or the sample detection limit. FIRM Ww"NAW. -A (1) EPA 600/4-83-020. Methods for Chemical Analysis of Water and Wastes,March 1983. (2) EPA 600/R-93-100. Methods for the Determination of Inorganic Substances in Environmental Samples,August 1993. (3) EPA 600/R-94-111. Methods for the Determination of Metals in Environmental Samples-Supplement I,May 1994. (4) EPA SW-846. Test Methods for Evaluating Solid Waste. (5) Standard Methods for the Examination of Water and Wastewater. (1) QC results calculated from raw data. Results may vary slightly if the rounded values are used in the calculations. (2) Soil,Sludge,and Plant matrices for Inorganic analyses are reported on a dry weight basis. (3) Animal matrices for Inorganic analyses are reported on an"as received"basis. (4) An asterisk in the"XQ"column indicates there is an extended qualifier and/or certification qualifier associated with the result. (5) If the MDL equals the PQL or the MDL column is omitted,the PQL is the reporting limit. For a complete list of ACZ's Extended Qualifiers,please click: https:Hacz.com/wp-content/uploads/2019/04/F,xt-Qual-List.pdf REP001.03.15.02 L7581 8-221 01 81 1 03 Page 9 of 25 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. Accredited 2773 Downhill Drive MIN Environmental Steamboat Springs,CO 80487 L Testing (970)879-6590 Name:D.Morgan Warren Address:348 Holiday Inn Road Company:Albemarle Corporation Kings Mountain,NC 28086 E-mail:morgan.warren@albemarle.com Telephone:(770)855-9910 Copy of Report to: Name: Chris Garrett(SWCA), meSR E-mail: cgarrett@swca.com,aprestia@srk.com Company: SWCA,SR Telephone: Invoice to: Name: Lisa Smith Address:4250 Congress Street,Suite 900 Company: Albemarle Corporation Charlotte,NC 28209 E-mail:lisa.smith@albemarle.com Telephone:(520)878-7899 Copy of Invoice to: Name: Address: XM /� Company: wc, 7 Gl�l Af C L�f E-mail: oS ", G Svim. Telephone: If sample(s)received past holding time(HT),or if insufficient HT remains to complete YES analysis before expiration,shall ACZ proceed with requested short HT analyses? NO H'NO"then ACZ wig contact eMnt for bather imt—don.9 neither"YES-nor"Nl is indicated,ACZ will pro J with the requested amlyses,even H HT Is expired,and data wSl be qualified Are samples for SDWA Compliance Monitoring? Yes No If yes,please include 1s,,tate forms.Results will be reported to PQL for.Colorado. Sampler's Name t t Sampler's Site Information State NC Zip code 28086 Time Zone ET *Sampler's Signature• •1 moat to the authenticity and vasdity of thia sample.I uMersbM that imentbmlty mislabeling ins gme/date/bcagon or tampering with the sample in anyway,is comidered fraud and punishable by State Law. PROJECTe- Quote#: y fi G pO#:8000177267(Water Quality Sampling) .> ;g 3 Reporting state for compliance testing:NC U Check box if samples include NRC licensed material? w ( a J V -!o SAMPLE0 N . 12, L— —50 2 2 p ! 1 r I 1 2 Matrix SW(Surface Water)•GW(Ground Water)•W W(Waste Water)-DW(Drinking Water)•SL(Sludge)-SO(Soil)-OL(Oil) Other(Specity) REMARKS Please refer to ACZ's terms&conditions located on the reverse side of this COC_ RELINOU17,HED BY: s• s s 7 Qua trax ID: 1984 Revision#: 2 White-Return with sample. Yellow-Retain for your records. L7581 8-221 01 81 1 03 Page 25 of 25 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75862-06 Project ID: 8000177267 Date Sampled: 09114122 11:00 Sample ID: PL-8-10 Date Received: 09/15/22 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL PQL Date Analyst Cyanide,total M335.4-Manual Distillation 09/19/22 10:34 wgm Total Hot Plate M200.2 ICP 09/23/22 11:35 aeh Digestion Total Hot Plate M200.2 ICP-MS 09/20/22 13:14 kja Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L75862-221 01 81 1 1 5 Page 21 of 65 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75862-06 Project ID: 8000177267 Date Sampled: 09114122 11:00 Sample ID: PL-8-10 Date Received: 09/15/22 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 0.0076 B mg/L 0.005 0.015 09/21/22 11:52 kja Aluminum,total M200.8 ICP-MS 1 0.0097 B mg/L 0.005 0.015 09/21/22 17:56 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 19:20 kja Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/21/22 17:56 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00547 mg/L 0.0002 0.001 09/21/22 11:52 kja Arsenic,total M200.8 ICP-MS 1 0.00635 mg/L 0.0002 0.001 09/21/22 17:56 kja Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 09/23/22 18:00 wtc Barium,total M200.7 ICP 1 0.0100 B mg/L 0.009 0.035 09/27/22 23:17 kehl Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/21/22 11:52 kja Beryllium,total M200.8 ICP-MS 1 <0.00008 U * mg/L 0.00008 0.00025 09/21/22 17:56 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/23/22 18:00 wtc Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 09/27/22 23:17 kehl Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/23/22 18:00 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 09/28/22 13:58 wtc Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/21/22 11:52 kja Cadmium,total M200.8 ICP-MS 1 <0.00005 U * mg/L 0.00005 0.00025 09/21/22 17:56 kja Calcium,dissolved M200.7 ICP 1 36.8 * mg/L 0.1 0.5 09/23/22 18:00 wtc Calcium,total M200.7 ICP 1 38.2 mg/L 0.1 0.5 09/27/22 23:17 kehl Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 11:52 kja Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/21/22 17:56 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/23/22 18:00 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 09/27/22 23:17 kehl Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 11:52 kja Copper,total M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/21/22 17:56 kja Iron,dissolved M200.8 ICP-MS 1 <0.007 U * mg/L 0.007 0.02 09/21/22 11:52 kja Iron,total M200.8 ICP-MS 1 0.0103 B * mg/L 0.007 0.02 09/21/22 17:56 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 11:52 kja Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 17:56 kja Lithium,dissolved M200.7 ICP 1 0.773 mg/L 0.008 0.04 09/23/22 18:00 wtc Lithium,total M200.7 ICP 1 0.803 mg/L 0.008 0.04 09/27/22 23:17 kehl Magnesium,dissolved M200.7 ICP 1 11.2 mg/L 0.2 1 09/23/22 18:00 wtc Magnesium,total M200.7 ICP 1 12.1 mg/L 0.2 1 09/27/22 23:17 kehl Manganese,dissolved M200.7 ICP 1 <0.01 U * mg/L 0.01 0.05 09/23/22 18:00 wtc Manganese,total M200.7 ICP 1 0.015 B mg/L 0.01 0.05 09/27/22 23:17 kehl Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 11:52 kja Molybdenum,total M200.8 ICP-MS 1 <0.0002 U mg/L 0.0002 0.0005 09/21/22 17:56 kja Nickel,dissolved M200.8 ICP-MS 1 0.00083 B mg/L 0.0004 0.001 09/21/22 11:52 kja Nickel,total M200.8 ICP-MS 1 0.00100 mg/L 0.0004 0.001 09/21/22 17:56 kja Phosphorus,dissolved M200.7 ICP 1 <0.1 U * mg/L 0.1 0.5 09/23/22 18:00 wtc Phosphorus,total M200.7 ICP 1 <0.1 U * mg/L 0.1 0.5 09/27/22 23:17 kehl Potassium,dissolved M200.7 ICP 1 4.32 mg/L 0.2 1 09/23/22 18:00 wtc Potassium,total M200.7 ICP 1 4.63 mg/L 0.2 1 09/27/22 23:17 kehl Scandium,dissolved M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/23/22 18:00 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L75862-221 01 81 1 1 5 Page 22 of 65 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75862-06 Project ID: 8000177267 Date Sampled: 09114122 11:00 Sample ID: PL-8-10 Date Received: 09/15/22 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 09/27/22 23:17 kehl Selenium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/21/22 19:20 kja Selenium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.00025 09/21/22 17:56 kja Silicon,dissolved M200.7 ICP 1 1.24 mg/L 0.1 0.5 09/23/22 18:00 wtc Silicon,total M200.7 ICP 1 1.27 mg/L 0.1 0.5 09/27/22 23:17 kehl Silver,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 19:20 kja Silver,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 17:56 kja Sodium,dissolved M200.7 ICP 1 10.2 mg/L 0.2 1 09/23/22 18:00 wtc Sodium,total M200.7 ICP 1 10.5 mg/L 0.2 1 09/27/22 23:17 kehl Strontium,dissolved M200.7 ICP 1 0.147 mg/L 0.009 0.045 09/23/22 18:00 wtc Strontium,total M200.7 ICP 1 0.154 mg/L 0.009 0.045 09/27/22 23:17 kehl Sulfur,dissolved M200.7 ICP 1 37.7 mg/L 0.25 1.25 09/23/22 18:00 wtc Sulfur,total M200.7 ICP 1 38.7 mg/L 0.25 1.25 09/27/22 23:17 kehl Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 11:52 kja Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/21/22 17:56 kja Thorium,dissolved M200.8 ICP-MS 1 <0.001 U * mg/L 0.001 0.005 09/21/22 19:20 kja Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 09/21/22 17:56 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/23/22 18:00 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 09/27/22 23:17 kehl Titanium,dissolved M200.7 ICP 1 0.0062 B mg/L 0.005 0.025 09/23/22 18:00 wtc Titanium,total M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 09/28/22 13:58 wtc Uranium,dissolved M200.8 ICP-MS 1 0.00058 mg/L 0.0001 0.0005 09/21/22 11:52 kja Uranium,total M200.8 ICP-MS 1 0.00063 mg/L 0.0001 0.0005 09/21/22 17:56 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/27/22 21:05 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 09/27/22 23:17 kehl Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/21/22 11:52 kja Zinc,total M200.8 ICP-MS 1 <0.006 U * mg/L 0.006 0.015 09/21/22 17:56 kja REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L75862-221 01 81 1 1 5 Page 23 of 65 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L75862-06 Project ID: 8000177267 Date Sampled: 09114122 11:00 Sample ID: PL-8-10 Date Received: 09/15/22 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 49.6 * mg/L 2 20 09/27/22 0:00 jck CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 09/27/22 0:00 jck Hydroxide as CaCO3 1 <2 U * mg/L 2 20 09/27/22 0:00 jck Total Alkalinity 1 49.6 * mg/L 2 20 09/27/22 0:00 jck Biochemical Oxygen SM521OB/HACH10360 1 2.0 * mg/L 2 09/16/22 9:49 emk Demand(5 day) Carbon,total inorganic SM5310B 1 11.9 H mg/L 1 5 10/13/22 4:08 bls Carbon,total organic SM5310B 1 4.9 B mg/L 1 5 09/28/22 11:58 bls (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -2.9 % 10/18/22 0:00 talc Sum of Anions 3.5 meq/L 10/18/22 0:00 talc Sum of Cations 3.3 meq/L 10/18/22 0:00 talc Chemical Oxygen M410.4 1 19 B mg/L 10 20 10/11/2215:32 anc Demand Chloride SM4500CI-E 1 6.35 mg/L 1 2 09/19/2210:46 bls Color HACH Color Wheel 1 <5 U * Co/Pt 5 5 09/15/22 16:41 mrb Cyanide, Free D6888-09/OIA-1677-09 1 <0.003 U * mg/L 0.003 0.01 09/27/22 14:12 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/20/22 17:08 gkk Fluoride SM450OF-C 1 0.25 B mg/L 0.15 0.35 09/21/2216:03 emk Hardness as CaCO3 SM2340B-Calculation 138 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 145 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 1 <0.05 U * mg/L 0.05 0.2 09/20/22 9:46 bls w/gas diffusion Phosphate,total Calculation based on total <0.3 U mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 214 mg/L 20 40 09/20/22 12:19 mrb (TDS)@180C Residue, Non- SM2540D 1 5.0 B * mg/L 5 20 09/19/22 13:18 svm Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 108 * mg/L 5 25 09/20/2217:33 mjj1 Sulfide as S SM450os2-D 1 <0.02 U * mg/L 0.02 0.1 09/15/22 18:01 jck TDS(calculated) Calculation 208 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.03 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L75862-221 01 81 1 1 5 Page 24 of 65 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. / I Accredited 2773 Downhill Drive • • , Environmental Steamboat Springs,CO 80487 ) - Testing (970)879-6590 Name: Address: Company: E-mail: Telephone: Copy of Report Name: E-mail: Company: Telephone: Invoice a Name: Address: Company: E-mail: Telephone: ..y of Inva to: Name: S Voj Address: �Q Company: J C Llohe FS22-3 E-mail: VA-Q SVY .Q. Cb M Telephone: If sample(s)received past holding time(HT),or if insufficient HT remains to complete YES analysis before expiration,shalt ACZ proceed with requested short HT analyses? NO If"NO"then ACZ will contact client for further irstrnwY!on.If neither"YES"nor"No"is indicated,ACZ will proceed with the requested analyses,even if HT is expired,and data will be qualified Are samples for SDWA Compliance Monitoring? YesL_j No If yes,please include state forms(.nResults will be reported to PQL for Colorado. Sampler's Name: �-o_y(i(a MCA I Sampler's Site Information State Zip code Time Zone "Sampler's Signature: -1 attest to the authenticity and validity of this sample.I understand that intentionally mislabeling the time/date/location or tampering with the sample in anyway,is considered fraud and punishable by State Law. PROJECT INFORMATION ANALYSES REQUESTED Quote#: _ 2 PO#: c Reporting state for compliance testing: to 1 0 —W 77 or Check box if samples include NRC licensed material? w 3 I J`v SVV_1 0Sw g -l- Oa SW o K 2Z 1 i/Y I t4 7 7 130D SW 7" MA nk SUS _ 10 K D • d rvA _T7+- ix (Surface Wate GW(Ground Water) WW(Waste Water) DW(Drinking Water) SL(Sludge) SO(Soil) OL(Oil) Other(Specify) REMARKS "0 O 7 O C •.r ro Please refer to ACZ's terms&conditions located on the reverse side of this COC. �VRELINQUISHED e RECEIVED . �wr L7&afi2av22101sih115 Revision#: 2 White-Return with sample. Yellow-Retain for your records. of 65 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-01 Project ID: Date Sampled: 09/22/22 10:30 Sample ID: PL-DEEP-160 Date Received: 09/23/22 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/27/22 15:38 wgm Total Hot Plate M200.2 ICP-MS 09/29/22 18:06 kja Digestion Total Hot Plate M200.2 ICP 09/30/22 19:38 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Pagel of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-01 Project ID: Date Sampled: 09/22/22 10:30 Sample ID: PL-DEEP-160 Date Received: 09/23/22 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 0.0105 B mg/L 0.005 0.015 09/30/22 15:56 mfm Aluminum,total M200.8 ICP-MS 1 0.0077 B mg/L 0.005 0.015 10/03/22 11:08 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/30/22 15:56 mfm Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 10/03/22 11:08 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00533 mg/L 0.0002 0.001 09/30/22 15:56 mfm Arsenic,total M200.8 ICP-MS 1 0.00650 mg/L 0.0002 0.001 10/03/22 11:08 kja Barium,dissolved M200.7 ICP 1 0.0372 mg/L 0.009 0.035 10/05/22 20:30 wtc Barium,total M200.7 ICP 1 0.0426 mg/L 0.009 0.035 10/06/22 2:07 wtc Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/30/22 15:56 mfm Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 10/03/22 11:08 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/10/22 23:21 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/06/22 2:07 wtc Boron,dissolved M200.7 ICP 1 0.036 B mg/L 0.03 0.1 10/05/22 20:30 wtc Boron,total M200.7 ICP 1 0.043 B mg/L 0.03 0.1 10/06/22 2:07 wtc Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/30/22 15:56 mfm Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 10/03/22 11:08 kja Calcium,dissolved M200.7 ICP 1 65.9 mg/L 0.1 0.5 10/05/22 20:30 wtc Calcium,total M200.7 ICP 1 69.7 mg/L 0.1 0.5 10/06/22 2:07 wtc Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/30/22 15:56 mfm Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 10/03/22 11:08 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/05/22 20:30 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/06/22 2:07 wtc Copper,dissolved M200.8 ICP-MS 1 0.00103 B mg/L 0.0008 0.002 09/30/22 15:56 mfm Copper,total M200.8 ICP-MS 1 0.00388 mg/L 0.0008 0.002 10/03/22 11:08 kja Iron,dissolved M200.8 ICP-MS 1 0.0613 * mg/L 0.007 0.02 09/30/22 15:56 mfm Iron,total M200.8 ICP-MS 1 0.0670 * mg/L 0.007 0.02 10/03/22 11:08 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 15:56 mfm Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:08 kja Lithium,dissolved M200.7 ICP 1 21.5 mg/L 0.008 0.04 10/05/22 20:30 wtc Lithium,total M200.7 ICP 1 21.5 mg/L 0.008 0.04 10/06/22 2:07 wtc Magnesium,dissolved M200.7 ICP 1 15.4 mg/L 0.2 1 10/10/22 23:21 kehl Magnesium,total M200.7 ICP 1 16.3 mg/L 0.2 1 10/06/22 2:07 wtc Manganese,dissolved M200.7 ICP 1 4.07 mg/L 0.01 0.05 10/05/22 20:30 wtc Manganese,total M200.7 ICP 1 4.22 mg/L 0.01 0.05 10/06/22 2:07 wtc Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 09/30/22 15:56 mfm Molybdenum,total M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 10/03/22 11:08 kja Nickel,dissolved M200.8 ICP-MS 1 0.00217 mg/L 0.0004 0.001 09/30/22 15:56 mfm Nickel,total M200.8 ICP-MS 1 0.00222 mg/L 0.0004 0.001 10/03/22 11:08 kja Phosphorus,dissolved M200.7 ICP 1 17.0 * mg/L 0.1 0.5 10/05/22 20:30 wtc Phosphorus,total M200.7 ICP 1 17.0 * mg/L 0.1 0.5 10/06/22 2:07 wtc Potassium,dissolved M200.7 ICP 1 6.51 mg/L 0.2 1 10/05/22 20:30 wtc Potassium,total M200.7 ICP 1 7.38 mg/L 0.2 1 10/06/22 2:07 wtc Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 10/05/22 20:30 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 2 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-01 Project ID: Date Sampled: 09/22/22 10:30 Sample ID: PL-DEEP-160 Date Received: 09/23/22 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 10/06/22 2:07 wtc Selenium,dissolved M200.8 ICP-MS 1 0.138 * mg/L 0.0001 0.00025 09/30/22 15:56 mfm Selenium,total M200.8 ICP-MS 2 <0.0002 U * mg/L 0.0002 0.0005 10/06/22 11:24 kja Silicon,dissolved M200.7 ICP 1 18.4 mg/L 0.1 0.5 10/05/22 20:30 wtc Silicon,total M200.7 ICP 1 16.9 * mg/L 0.1 0.5 10/06/22 2:07 wtc Silver,dissolved M200.8 ICP-MS 10 <0.001 U mg/L 0.001 0.005 10/06/22 17:33 mfm Silver,total M200.8 ICP-MS 2 <0.0002 U mg/L 0.0002 0.001 10/06/22 11:24 kja Sodium,dissolved M200.7 ICP 1 20.2 mg/L 0.2 1 10/05/22 20:30 wtc Sodium,total M200.7 ICP 1 20.6 mg/L 0.2 1 10/06/22 2:07 wtc Strontium,dissolved M200.7 ICP 1 0.213 mg/L 0.009 0.045 10/05/22 20:30 wtc Strontium,total M200.7 ICP 1 0.229 mg/L 0.009 0.045 10/06/22 2:07 wtc Sulfur,dissolved M200.7 ICP 1 457 mg/L 0.25 1.25 10/10/22 23:21 kehl Sulfur,total M200.7 ICP 1 2.33 * mg/L 0.25 1.25 10/06/22 2:07 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 15:56 mfm Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:08 kja Thorium,dissolved M200.8 ICP-MS 10 <0.01 U * mg/L 0.01 0.05 10/06/22 17:33 mfm Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 10/03/22 11:08 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/05/22 20:30 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/06/22 2:07 wtc Titanium,dissolved M200.7 ICP 1 0.0077 B mg/L 0.005 0.025 10/11/22 16:42 kehl Titanium,total M200.7 ICP 1 0.0060 B mg/L 0.005 0.025 10/06/22 2:07 wtc Uranium,dissolved M200.8 ICP-MS 1 0.00027 B mg/L 0.0001 0.0005 09/30/22 15:56 mfm Uranium,total M200.8 ICP-MS 1 0.00042 B mg/L 0.0001 0.0005 10/03/22 11:08 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/05/22 20:30 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/06/22 2:07 wtc Zinc,dissolved M200.8 ICP-MS 1 0.0124 B mg/L 0.006 0.015 09/30/22 15:56 mfm Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 10/03/22 11:08 kja REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 3 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-01 Project ID: Date Sampled: 09/22/22 10:30 Sample ID: PL-DEEP-160 Date Received: 09/23/22 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 509 mg/L 2 20 10/06/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 10/06/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 10/06/22 0:00 emk Total Alkalinity 1 509 * mg/L 2 20 10/06/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 58.8 * mg/L 2 09/23/2214:04 emk Demand(5 day) Carbon,total inorganic SM5310B 20 101 mg/L 20 100 10/14/22 19:56 bls Carbon,total organic SM5310B 1 10.2 mg/L 1 5 09/30/22 2:36 bls (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -17.1 % 10/18/22 0:00 talc Sum of Anions 12 meq/L 10/18/22 0:00 talc Sum of Cations 8.5 meq/L 10/18/22 0:00 talc Chemical Oxygen WG552902 1 ***112*** * mg/L 10 20 10/17/2211:37 UPLD Demand Chloride SM4500CI-E 10 48.6 mg/L 10 20 09/30/2214:28 mJ1 Color HACH Color Wheel 1 20 * Co/Pt 5 5 09/23/22 19:30 jck Cyanide, Free D6888-09/OIA-1677-09 20 <0.06 U * mg/L 0.06 0.2 09/27/22 16:30 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 1 <0.006 U mg/L 0.006 0.02 09/28/229:48 bls Fluoride WG552618 1 ***0.33*** B mg/L 0.15 0.35 10/13/22 9:58 UPLD Hardness as CaCO3 SM2340B-Calculation 228 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 241 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 5 36.9 * mg/L 0.25 1 09/29/22 12:38 bls w/gas diffusion Phosphate,total Calculation based on total 53 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 496 * mg/L 20 40 09/28/22 16:41 mrb (TDS)@180C Residue, Non- WG552746 2 <10 UH * mg/L 10 40 10/13/22 16:05 REDO Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 1 6.2 mg/L 1 5 10/10/2211:53 mjj1 Sulfide as S SM450os2-D 150 72.2 * mg/L 3 15 09/26/22 17:31 jck TDS(calculated) Calculation 515 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 0.96 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 4 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-02 Project ID: Date Sampled: 09/22/22 11:30 Sample ID: PL-DEEP-140 Date Received: 09/23/22 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/27/22 15:50 wgm Total Hot Plate M200.2 ICP-MS 09/29/22 18:16 kja Digestion Total Hot Plate M200.2 ICP 09/30/22 19:52 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 5 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-02 Project ID: Date Sampled: 09/22/22 11:30 Sample ID: PL-DEEP-140 Date Received: 09/23/22 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/30/22 15:58 mfm Aluminum,total M200.8 ICP-MS 1 0.0051 B mg/L 0.005 0.015 10/03/22 11:10 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/30/22 15:58 mfm Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 10/03/22 11:10 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00278 mg/L 0.0002 0.001 09/30/22 15:58 mfm Arsenic,total M200.8 ICP-MS 1 0.00503 mg/L 0.0002 0.001 10/03/22 11:10 kja Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 10/05/22 20:33 wtc Barium,total M200.7 ICP 1 0.0131 B mg/L 0.009 0.035 10/06/22 2:17 wtc Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/30/22 15:58 mfm Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 10/03/22 11:10 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/10/22 23:24 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/06/22 2:17 wtc Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/05/22 20:33 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/06/22 2:17 wtc Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/30/22 15:58 mfm Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 10/03/22 11:10 kja Calcium,dissolved M200.7 ICP 1 61.7 mg/L 0.1 0.5 10/05/22 20:33 wtc Calcium,total M200.7 ICP 1 64.5 mg/L 0.1 0.5 10/06/22 2:17 wtc Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/30/22 15:58 mfm Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 10/03/22 11:10 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/05/22 20:33 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/06/22 2:17 wtc Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/30/22 15:58 mfm Copper,total M200.8 ICP-MS 1 0.00101 B mg/L 0.0008 0.002 10/03/22 11:10 kja Iron,dissolved M200.8 ICP-MS 1 0.0276 * mg/L 0.007 0.02 09/30/22 15:58 mfm Iron,total M200.8 ICP-MS 1 0.0391 * mg/L 0.007 0.02 10/03/22 11:10 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 15:58 mfm Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:10 kja Lithium,dissolved M200.7 ICP 1 0.979 mg/L 0.008 0.04 10/05/22 20:33 wtc Lithium,total M200.7 ICP 1 1.01 mg/L 0.008 0.04 10/06/22 2:17 wtc Magnesium,dissolved M200.7 ICP 1 15.2 mg/L 0.2 1 10/10/22 23:24 kehl Magnesium,total M200.7 ICP 1 15.9 mg/L 0.2 1 10/06/22 2:17 wtc Manganese,dissolved M200.7 ICP 1 3.20 mg/L 0.01 0.05 10/05/22 20:33 wtc Manganese,total M200.7 ICP 1 3.29 mg/L 0.01 0.05 10/06/22 2:17 wtc Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 09/30/22 15:58 mfm Molybdenum,total M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 10/03/22 11:10 kja Nickel,dissolved M200.8 ICP-MS 1 0.00092 B mg/L 0.0004 0.001 09/30/22 15:58 mfm Nickel,total M200.8 ICP-MS 1 0.00087 B mg/L 0.0004 0.001 10/03/22 11:10 kja Phosphorus,dissolved M200.7 ICP 1 1.11 mg/L 0.1 0.5 10/05/22 20:33 wtc Phosphorus,total M200.7 ICP 1 1.16 * mg/L 0.1 0.5 10/06/22 2:17 wtc Potassium,dissolved M200.7 ICP 1 5.49 mg/L 0.2 1 10/05/22 20:33 wtc Potassium,total M200.7 ICP 1 5.70 mg/L 0.2 1 10/06/22 2:17 wtc Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 10/05/22 20:33 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 6 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-02 Project ID: Date Sampled: 09/22/22 11:30 Sample ID: PL-DEEP-140 Date Received: 09/23/22 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 10/06/22 2:17 wtc Selenium,dissolved M200.8 ICP-MS 10 0.153 * mg/L 0.001 0.0025 10/06/22 17:35 mfm Selenium,total M200.8 ICP-MS 2 <0.0002 U * mg/L 0.0002 0.0005 10/06/22 11:26 kja Silicon,dissolved M200.7 ICP 1 6.98 mg/L 0.1 0.5 10/05/22 20:33 wtc Silicon,total M200.7 ICP 1 6.69 * mg/L 0.1 0.5 10/06/22 2:17 wtc Silver,dissolved M200.8 ICP-MS 10 <0.001 U mg/L 0.001 0.005 10/06/22 17:35 mfm Silver,total M200.8 ICP-MS 2 <0.0002 U mg/L 0.0002 0.001 10/06/22 11:26 kja Sodium,dissolved M200.7 ICP 1 12.6 mg/L 0.2 1 10/05/22 20:33 wtc Sodium,total M200.7 ICP 1 13.1 mg/L 0.2 1 10/06/22 2:17 wtc Strontium,dissolved M200.7 ICP 1 0.210 mg/L 0.009 0.045 10/05/22 20:33 wtc Strontium,total M200.7 ICP 1 0.222 mg/L 0.009 0.045 10/06/22 2:17 wtc Sulfur,dissolved M200.7 ICP 1 142 mg/L 0.25 1.25 10/10/22 23:24 kehl Sulfur,total M200.7 ICP 1 32.2 mg/L 0.25 1.25 10/06/22 2:17 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 15:58 mfm Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:10 kja Thorium,dissolved M200.8 ICP-MS 10 <0.01 U * mg/L 0.01 0.05 10/06/22 17:35 mfm Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 10/03/22 11:10 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/05/22 20:33 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/06/22 2:17 wtc Titanium,dissolved M200.7 ICP 1 0.0071 B mg/L 0.005 0.025 10/11/22 16:45 kehl Titanium,total M200.7 ICP 1 0.0053 B mg/L 0.005 0.025 10/06/22 2:17 wtc Uranium,dissolved M200.8 ICP-MS 1 0.00042 B mg/L 0.0001 0.0005 09/30/22 15:58 mfm Uranium,total M200.8 ICP-MS 1 0.00042 B mg/L 0.0001 0.0005 10/03/22 11:10 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/05/22 20:33 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/06/22 2:17 wtc Zinc,dissolved M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 09/30/22 15:58 mfm Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 10/03/22 11:10 kja REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 7 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-02 Project ID: Date Sampled: 09/22/22 11:30 Sample ID: PL-DEEP-140 Date Received: 09/23/22 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 127 mg/L 2 20 10/06/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 10/06/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 10/06/22 0:00 emk Total Alkalinity 1 127 * mg/L 2 20 10/06/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 18.0 * mg/L 2 09/23/2214:16 emk Demand(5 day) Carbon,total inorganic SM5310B 20 33.8 B mg/L 20 100 10/14/22 20:06 bls Carbon,total organic SM5310B 1 3.2 B mg/L 1 5 09/30/22 3:25 bls (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 2.8 % 10/18/22 0:00 talc Sum of Anions 5.3 meq/L 10/18/22 0:00 talc Sum of Cations 5.6 meq/L 10/18/22 0:00 talc Chemical Oxygen WG552902 1 ***42*** * mg/L 10 20 10/17/2211:49 UPLD Demand Chloride SM4500CI-E 1 12.6 mg/L 1 2 09/30/2214:09 mJ1 Color HACH Color Wheel 1 20 * Co/Pt 5 5 09/23/22 19:32 jck Cyanide, Free D6888-09/OIA-1677-09 10 <0.03 U * mg/L 0.03 0.1 09/27/22 16:32 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/28/229:49 bls Fluoride WG552618 1 ***0.36*** mg/L 0.15 0.35 10/13/2210:06 UPLD Hardness as CaCO3 SM2340B-Calculation 217 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 227 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 1 4.22 mg/L 0.05 0.2 09/29/22 11:52 bls w/gas diffusion Phosphate,total Calculation based on total 3.6 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 338 * mg/L 20 40 09/28/22 16:44 mrb (TDS)@180C Residue, Non- WG552746 2 <10 UH * mg/L 10 40 10/13/22 16:07 REDO Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 116 * mg/L 5 25 10/10/2211:55 mjj1 Sulfide as S SM450os2-D 37.5 22.7 * mg/L 0.75 3.75 09/26/22 17:47 jck TDS(calculated) Calculation 309 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.09 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 8 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-03 Project ID: Date Sampled: 09/22/22 12:30 Sample ID: PL-DEEP-120 Date Received: 09/23/22 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/27/22 16:03 wgm Total Hot Plate M200.2 ICP-MS 09/29/22 18:27 kja Digestion Total Hot Plate M200.2 ICP 09/30/22 20:32 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 9 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-03 Project ID: Date Sampled: 09/22/22 12:30 Sample ID: PL-DEEP-120 Date Received: 09/23/22 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/30/22 16:00 mfm Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 10/03/22 11:12 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/30/22 16:00 mfm Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 10/03/22 11:12 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00274 mg/L 0.0002 0.001 09/30/22 16:00 mfm Arsenic,total M200.8 ICP-MS 1 0.00504 mg/L 0.0002 0.001 10/03/22 11:12 kja Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 10/05/22 20:36 wtc Barium,total M200.7 ICP 1 0.0134 B mg/L 0.009 0.035 10/06/22 2:26 wtc Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/30/22 16:00 mfm Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 10/03/22 11:12 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/10/22 23:27 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/06/22 2:26 wtc Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/05/22 20:36 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/06/22 2:26 wtc Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/30/22 16:00 mfm Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 10/03/22 11:12 kja Calcium,dissolved M200.7 ICP 1 60.8 * mg/L 0.1 0.5 10/05/22 20:36 wtc Calcium,total M200.7 ICP 1 64.9 mg/L 0.1 0.5 10/06/22 2:26 wtc Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/30/22 16:00 mfm Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 10/03/22 11:12 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/05/22 20:36 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/06/22 2:26 wtc Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/30/22 16:00 mfm Copper,total M200.8 ICP-MS 1 0.00221 mg/L 0.0008 0.002 10/03/22 11:12 kja Iron,dissolved M200.8 ICP-MS 1 0.0201 * mg/L 0.007 0.02 09/30/22 16:00 mfm Iron,total M200.8 ICP-MS 1 0.0358 * mg/L 0.007 0.02 10/03/22 11:12 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 16:00 mfm Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:12 kja Lithium,dissolved M200.7 ICP 1 0.963 mg/L 0.008 0.04 10/05/22 20:36 wtc Lithium,total M200.7 ICP 1 1.02 mg/L 0.008 0.04 10/06/22 2:26 wtc Magnesium,dissolved M200.7 ICP 1 14.9 mg/L 0.2 1 10/10/22 23:27 kehl Magnesium,total M200.7 ICP 1 15.9 mg/L 0.2 1 10/06/22 2:26 wtc Manganese,dissolved M200.7 ICP 1 3.15 mg/L 0.01 0.05 10/05/22 20:36 wtc Manganese,total M200.7 ICP 1 3.33 mg/L 0.01 0.05 10/06/22 2:26 wtc Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 09/30/22 16:00 mfm Molybdenum,total M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 10/03/22 11:12 kja Nickel,dissolved M200.8 ICP-MS 1 0.00097 B mg/L 0.0004 0.001 09/30/22 16:00 mfm Nickel,total M200.8 ICP-MS 1 0.00080 B mg/L 0.0004 0.001 10/03/22 11:12 kja Phosphorus,dissolved M200.7 ICP 1 1.07 mg/L 0.1 0.5 10/05/22 20:36 wtc Phosphorus,total M200.7 ICP 1 1.15 * mg/L 0.1 0.5 10/06/22 2:26 wtc Potassium,dissolved M200.7 ICP 1 5.50 mg/L 0.2 1 10/05/22 20:36 wtc Potassium,total M200.7 ICP 1 5.73 mg/L 0.2 1 10/06/22 2:26 wtc Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 10/05/22 20:36 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 10 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-03 Project ID: Date Sampled: 09/22/22 12:30 Sample ID: PL-DEEP-120 Date Received: 09/23/22 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 10/06/22 2:26 wtc Selenium,dissolved M200.8 ICP-MS 10 0.0961 * mg/L 0.001 0.0025 10/06/22 17:36 mfm Selenium,total M200.8 ICP-MS 2 <0.0002 U * mg/L 0.0002 0.0005 10/06/22 11:27 kja Silicon,dissolved M200.7 ICP 1 6.79 * mg/L 0.1 0.5 10/05/22 20:36 wtc Silicon,total M200.7 ICP 1 6.65 mg/L 0.1 0.5 10/06/22 2:26 wtc Silver,dissolved M200.8 ICP-MS 10 <0.001 U mg/L 0.001 0.005 10/06/22 17:36 mfm Silver,total M200.8 ICP-MS 2 <0.0002 U mg/L 0.0002 0.001 10/06/22 11:27 kja Sodium,dissolved M200.7 ICP 1 12.5 mg/L 0.2 1 10/05/22 20:36 wtc Sodium,total M200.7 ICP 1 13.6 mg/L 0.2 1 10/06/22 2:26 wtc Strontium,dissolved M200.7 ICP 1 0.208 mg/L 0.009 0.045 10/05/22 20:36 wtc Strontium,total M200.7 ICP 1 0.224 mg/L 0.009 0.045 10/06/22 2:26 wtc Sulfur,dissolved M200.7 ICP 1 142 mg/L 0.25 1.25 10/10/22 23:27 kehl Sulfur,total M200.7 ICP 1 30.7 mg/L 0.25 1.25 10/06/22 2:26 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 16:00 mfm Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:12 kja Thorium,dissolved M200.8 ICP-MS 10 <0.01 U * mg/L 0.01 0.05 10/06/22 17:36 mfm Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 10/03/22 11:12 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/05/22 20:36 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/06/22 2:26 wtc Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 10/06/22 18:43 wtc Titanium,total M200.7 ICP 1 0.0062 B mg/L 0.005 0.025 10/06/22 2:26 wtc Uranium,dissolved M200.8 ICP-MS 1 0.00044 B mg/L 0.0001 0.0005 09/30/22 16:00 mfm Uranium,total M200.8 ICP-MS 1 0.00040 B mg/L 0.0001 0.0005 10/03/22 11:12 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/05/22 20:36 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/06/22 2:26 wtc Zinc,dissolved M200.8 ICP-MS 1 0.0115 B mg/L 0.006 0.015 09/30/22 16:00 mfm Zinc,total M200.8 ICP-MS 1 0.0629 mg/L 0.006 0.015 10/03/22 11:12 kja REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 11 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-03 Project ID: Date Sampled: 09/22/22 12:30 Sample ID: PL-DEEP-120 Date Received: 09/23/22 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 129 mg/L 2 20 10/06/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 10/06/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 10/06/22 0:00 emk Total Alkalinity 1 129 * mg/L 2 20 10/06/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 18.0 * mg/L 2 09/23/2214:28 emk Demand(5 day) Carbon,total inorganic SM5310B 20 32.1 B mg/L 20 100 10/14/22 20:16 bls Carbon,total organic SM531OB 1 3.0 B mg/L 1 5 09/30/22 3:49 bls (TOC) Cation-Anion Balance Calculation Cation-Anion Balance 0.0 % 10/18/22 0:00 talc Sum of Anions 5.5 meq/L 10/18/22 0:00 talc Sum of Cations 5.5 meq/L 10/18/22 0:00 talc Chemical Oxygen WG552902 1 ***41*** * mg/L 10 20 10/17/2212:00 UPLD Demand Chloride SM4500CI-E 1 14.3 mg/L 1 2 09/30/2214:09 mjj1 Color HACH Color Wheel 1 10 * Co/Pt 5 5 09/23/22 19:35 jck Cyanide, Free D6888-09/OIA-1677-09 5 <0.015 U * mg/L 0.015 0.05 09/27/22 16:34 mjj1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/28/229:50 bls Fluoride WG552618 1 ***0.35*** B mg/L 0.15 0.35 10/13/2210:14 UPLD Hardness as CaCO3 SM2340B-Calculation 213 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 228 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 1 4.21 mg/L 0.05 0.2 09/29/22 11:53 bls w/gas diffusion Phosphate,total Calculation based on total 3.6 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 342 mg/L 20 40 09/28/22 16:47 mrb (TDS)@180C Residue, Non- WG552746 2 <10 UH mg/L 10 40 10/13/22 16:10 REDO Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 121 mg/L 5 25 10/10/22 11:55 mjj1 Sulfide as S SM450OS2-D 75 21.5 * mg/L 1.5 7.5 09/26/22 17:53 jck TDS(calculated) Calculation 315 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.09 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 12 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-04 Project ID: Date Sampled: 09/22/22 13:00 Sample ID: PL-DEEP-100 Date Received: 09/23/22 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/27/22 16:15 wgm Total Hot Plate M200.2 ICP-MS 09/29/22 18:37 kja Digestion Total Hot Plate M200.2 ICP 09/30/22 20:46 aeh Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 13 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-04 Project ID: Date Sampled: 09/22/22 13:00 Sample ID: PL-DEEP-100 Date Received: 09/23/22 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 0.0076 B mg/L 0.005 0.015 09/30/22 16:02 mfm Aluminum,total M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 10/03/22 11:14 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/30/22 16:02 mfm Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 10/03/22 11:14 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00320 mg/L 0.0002 0.001 09/30/22 16:02 mfm Arsenic,total M200.8 ICP-MS 1 0.00506 mg/L 0.0002 0.001 10/03/22 11:14 kja Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 10/05/22 20:39 wtc Barium,total M200.7 ICP 1 0.0135 B mg/L 0.009 0.035 10/06/22 2:30 wtc Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/30/22 16:02 mfm Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 10/03/22 11:14 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/10/22 23:31 kehl Bismuth,total M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/06/22 2:30 wtc Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/05/22 20:39 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/06/22 2:30 wtc Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/30/22 16:02 mfm Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 10/03/22 11:14 kja Calcium,dissolved M200.7 ICP 1 60.8 * mg/L 0.1 0.5 10/05/22 20:39 wtc Calcium,total M200.7 ICP 1 65.7 mg/L 0.1 0.5 10/06/22 2:30 wtc Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/30/22 16:02 mfm Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 10/03/22 11:14 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/05/22 20:39 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/06/22 2:30 wtc Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/30/22 16:02 mfm Copper,total M200.8 ICP-MS 1 0.00152 B mg/L 0.0008 0.002 10/03/22 11:14 kja Iron,dissolved M200.8 ICP-MS 1 0.0210 * mg/L 0.007 0.02 09/30/22 16:02 mfm Iron,total M200.8 ICP-MS 1 0.0359 * mg/L 0.007 0.02 10/03/22 11:14 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 16:02 mfm Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:14 kja Lithium,dissolved M200.7 ICP 1 0.963 mg/L 0.008 0.04 10/05/22 20:39 wtc Lithium,total M200.7 ICP 1 1.03 mg/L 0.008 0.04 10/06/22 2:30 wtc Magnesium,dissolved M200.7 ICP 1 14.9 mg/L 0.2 1 10/10/22 23:31 kehl Magnesium,total M200.7 ICP 1 16.1 mg/L 0.2 1 10/06/22 2:30 wtc Manganese,dissolved M200.7 ICP 1 3.15 mg/L 0.01 0.05 10/05/22 20:39 wtc Manganese,total M200.7 ICP 1 3.37 mg/L 0.01 0.05 10/06/22 2:30 wtc Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 09/30/22 16:02 mfm Molybdenum,total M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 10/03/22 11:14 kja Nickel,dissolved M200.8 ICP-MS 1 0.00106 mg/L 0.0004 0.001 09/30/22 16:02 mfm Nickel,total M200.8 ICP-MS 1 0.00080 B mg/L 0.0004 0.001 10/03/22 11:14 kja Phosphorus,dissolved M200.7 ICP 1 1.07 mg/L 0.1 0.5 10/05/22 20:39 wtc Phosphorus,total M200.7 ICP 1 1.20 * mg/L 0.1 0.5 10/06/22 2:30 wtc Potassium,dissolved M200.7 ICP 1 5.48 mg/L 0.2 1 10/05/22 20:39 wtc Potassium,total M200.7 ICP 1 5.82 mg/L 0.2 1 10/06/22 2:30 wtc Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 10/05/22 20:39 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 14 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-04 Project ID: Date Sampled: 09/22/22 13:00 Sample ID: PL-DEEP-100 Date Received: 09/23/22 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 10/06/22 2:30 wtc Selenium,dissolved M200.8 ICP-MS 10 0.0937 * mg/L 0.001 0.0025 10/06/22 17:38 mfm Selenium,total M200.8 ICP-MS 2 <0.0002 U * mg/L 0.0002 0.0005 10/06/22 11:29 kja Silicon,dissolved M200.7 ICP 1 6.74 mg/L 0.1 0.5 10/05/22 20:39 wtc Silicon,total M200.7 ICP 1 6.52 mg/L 0.1 0.5 10/06/22 2:30 wtc Silver,dissolved M200.8 ICP-MS 10 <0.001 U mg/L 0.001 0.005 10/06/22 17:38 mfm Silver,total M200.8 ICP-MS 2 <0.0002 U mg/L 0.0002 0.001 10/06/22 11:29 kja Sodium,dissolved M200.7 ICP 1 12.5 mg/L 0.2 1 10/05/22 20:39 wtc Sodium,total M200.7 ICP 1 13.3 mg/L 0.2 1 10/06/22 2:30 wtc Strontium,dissolved M200.7 ICP 1 0.209 mg/L 0.009 0.045 10/05/22 20:39 wtc Strontium,total M200.7 ICP 1 0.226 mg/L 0.009 0.045 10/06/22 2:30 wtc Sulfur,dissolved M200.7 ICP 1 152 mg/L 0.25 1.25 10/10/22 23:31 kehl Sulfur,total M200.7 ICP 1 31.1 mg/L 0.25 1.25 10/06/22 2:30 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 16:02 mfm Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:14 kja Thorium,dissolved M200.8 ICP-MS 10 <0.01 U * mg/L 0.01 0.05 10/06/22 17:38 mfm Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 10/03/22 11:14 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/05/22 20:39 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/06/22 2:30 wtc Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 10/06/22 18:47 wtc Titanium,total M200.7 ICP 1 0.0053 B mg/L 0.005 0.025 10/06/22 2:30 wtc Uranium,dissolved M200.8 ICP-MS 1 0.00047 B mg/L 0.0001 0.0005 09/30/22 16:02 mfm Uranium,total M200.8 ICP-MS 1 0.00040 B mg/L 0.0001 0.0005 10/03/22 11:14 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/05/22 20:39 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/06/22 2:30 wtc Zinc,dissolved M200.8 ICP-MS 1 0.0108 B mg/L 0.006 0.015 09/30/22 16:02 mfm Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 10/03/22 11:14 kja REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 15 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-04 Project ID: Date Sampled: 09/22/22 13:00 Sample ID: PL-DEEP-100 Date Received: 09/23/22 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 139 mg/L 2 20 10/06/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 10/06/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 10/06/22 0:00 emk Total Alkalinity 1 139 * mg/L 2 20 10/06/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 19.0 * mg/L 2 09/23/2214:40 emk Demand(5 day) Carbon,total inorganic SM5310B 1 28.6 * mg/L 1 5 10/13/22 19:05 bls Carbon,total organic SM5310B 1 2.9 B mg/L 1 5 09/30/22 4:00 bls (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -0.9 % 10/18/22 0:00 talc Sum of Anions 5.6 meq/L 10/18/22 0:00 talc Sum of Cations 5.5 meq/L 10/18/22 0:00 talc Chemical Oxygen WG552902 1 ***42*** * mg/L 10 20 10/17/2212:12 UPLD Demand Chloride SM4500CI-E 1 13.6 mg/L 1 2 09/30/2214:11 mJ1 Color HACH Color Wheel 1 20 * Co/Pt 5 5 09/23/22 19:37 jck Cyanide, Free D6888-09/OIA-1677-09 5 <0.015 U * mg/L 0.015 0.05 09/27/22 16:36 mJ1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U mg/L 0.003 0.01 09/28/229:51 bls Fluoride WG552618 1 ***0.35*** mg/L 0.15 0.35 10/13/2210:22 UPLD Hardness as CaCO3 SM2340B-Calculation 213 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 230 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 1 4.21 mg/L 0.05 0.2 09/29/22 11:55 bls w/gas diffusion Phosphate,total Calculation based on total 3.7 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 342 mg/L 20 40 09/28/22 16:49 mrb (TDS)@180C Residue, Non- WG552746 1 <5 UH * mg/L 5 20 10/13/22 16:13 REDO Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 118 mg/L 5 25 10/10/2211:55 mjj1 Sulfide as S SM450os2-D 75 25.1 * mg/L 1.5 7.5 09/26/22 17:58 jck TDS(calculated) Calculation 318 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.08 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 16 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-05 Project ID: Date Sampled: 09/22/22 13:30 Sample ID: PL-DEEP-80 Date Received: 09/23/22 Sample Matrix: Surface Water Inorganic Prep MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Cyanide,total M335.4-Manual Distillation 09/27/22 16:27 wgm Total Hot Plate M200.2 ICP 09/30/22 21:00 aeh Digestion Total Hot Plate M200.2 ICP-MS 09/29/22 18:47 kja Digestion AP REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 17 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-05 Project ID: Date Sampled: 09/22/22 13:30 Sample ID: PL-DEEP-80 Date Received: 09/23/22 Sample Matrix: Surface Water Metals Analysis MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Aluminum,dissolved M200.8 ICP-MS 1 <0.005 U mg/L 0.005 0.015 09/30/22 16:04 mfm Aluminum,total M200.8 ICP-MS 1 0.0106 B mg/L 0.005 0.015 10/03/22 11:19 kja Antimony,dissolved M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 09/30/22 16:04 mfm Antimony,total M200.8 ICP-MS 1 <0.0004 U mg/L 0.0004 0.002 10/03/22 11:19 kja Arsenic,dissolved M200.8 ICP-MS 1 0.00389 mg/L 0.0002 0.001 09/30/22 16:04 mfm Arsenic,total M200.8 ICP-MS 1 0.00541 mg/L 0.0002 0.001 10/03/22 11:19 kja Barium,dissolved M200.7 ICP 1 <0.009 U mg/L 0.009 0.035 10/05/22 20:42 wtc Barium,total M200.7 ICP 1 0.0139 B mg/L 0.009 0.035 10/06/22 2:33 wtc Beryllium,dissolved M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 09/30/22 16:04 mfm Beryllium,total M200.8 ICP-MS 1 <0.00008 U mg/L 0.00008 0.00025 10/03/22 11:19 kja Bismuth,dissolved M200.7 ICP 1 <0.04 U * mg/L 0.04 0.2 10/10/22 23:34 kehl Bismuth,total M200.7 ICP 1 0.059 B mg/L 0.04 0.2 10/06/22 2:33 wtc Boron,dissolved M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/05/22 20:42 wtc Boron,total M200.7 ICP 1 <0.03 U mg/L 0.03 0.1 10/06/22 2:33 wtc Cadmium,dissolved M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 09/30/22 16:04 mfm Cadmium,total M200.8 ICP-MS 1 <0.00005 U mg/L 0.00005 0.00025 10/03/22 11:19 kja Calcium,dissolved M200.7 ICP 1 58.8 * mg/L 0.1 0.5 10/05/22 20:42 wtc Calcium,total M200.7 ICP 1 64.3 mg/L 0.1 0.5 10/06/22 2:33 wtc Chromium,dissolved M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 09/30/22 16:04 mfm Chromium,total M200.8 ICP-MS 1 <0.0005 U mg/L 0.0005 0.002 10/03/22 11:19 kja Cobalt,dissolved M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/05/22 20:42 wtc Cobalt,total M200.7 ICP 1 <0.02 U mg/L 0.02 0.05 10/06/22 2:33 wtc Copper,dissolved M200.8 ICP-MS 1 <0.0008 U mg/L 0.0008 0.002 09/30/22 16:04 mfm Copper,total M200.8 ICP-MS 1 <0.0008 U * mg/L 0.0008 0.002 10/03/22 11:19 kja Iron,dissolved M200.8 ICP-MS 1 0.0269 * mg/L 0.007 0.02 09/30/22 16:04 mfm Iron,total M200.8 ICP-MS 1 0.0801 * mg/L 0.007 0.02 10/03/22 11:19 kja Lead,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 16:04 mfm Lead,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:19 kja Lithium,dissolved M200.7 ICP 1 0.923 mg/L 0.008 0.04 10/05/22 20:42 wtc Lithium,total M200.7 ICP 1 1.01 mg/L 0.008 0.04 10/06/22 2:33 wtc Magnesium,dissolved M200.7 ICP 1 14.5 mg/L 0.2 1 10/10/22 23:34 kehl Magnesium,total M200.7 ICP 1 15.7 mg/L 0.2 1 10/06/22 2:33 wtc Manganese,dissolved M200.7 ICP 1 3.33 mg/L 0.01 0.05 10/05/22 20:42 wtc Manganese,total M200.7 ICP 1 3.58 mg/L 0.01 0.05 10/06/22 2:33 wtc Molybdenum,dissolved M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 09/30/22 16:04 mfm Molybdenum,total M200.8 ICP-MS 1 <0.0002 U * mg/L 0.0002 0.0005 10/03/22 11:19 kja Nickel,dissolved M200.8 ICP-MS 1 0.00085 B mg/L 0.0004 0.001 09/30/22 16:04 mfm Nickel,total M200.8 ICP-MS 1 0.00086 B mg/L 0.0004 0.001 10/03/22 11:19 kja Phosphorus,dissolved M200.7 ICP 1 1.02 mg/L 0.1 0.5 10/05/22 20:42 wtc Phosphorus,total M200.7 ICP 1 1.13 * mg/L 0.1 0.5 10/06/22 2:33 wtc Potassium,dissolved M200.7 ICP 1 5.31 mg/L 0.2 1 10/05/22 20:42 wtc Potassium,total M200.7 ICP 1 5.67 mg/L 0.2 1 10/06/22 2:33 wtc Scandium,dissolved M200.7 ICP 1 <0.05 U * mg/L 0.05 0.2 10/05/22 20:42 wtc REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 18 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-05 Project ID: Date Sampled: 09/22/22 13:30 Sample ID: PL-DEEP-80 Date Received: 09/23/22 Sample Matrix: Surface Water Scandium,total M200.7 ICP 1 <0.05 U mg/L 0.05 0.2 10/06/22 2:33 wtc Selenium,dissolved M200.8 ICP-MS 10 0.107 * mg/L 0.001 0.0025 10/06/22 17:48 mfm Selenium,total M200.8 ICP-MS 2 <0.0002 U * mg/L 0.0002 0.0005 10/06/22 11:31 kja Silicon,dissolved M200.7 ICP 1 6.30 mg/L 0.1 0.5 10/05/22 20:42 wtc Silicon,total M200.7 ICP 1 6.34 mg/L 0.1 0.5 10/06/22 2:33 wtc Silver,dissolved M200.8 ICP-MS 10 <0.001 U mg/L 0.001 0.005 10/06/22 17:48 mfm Silver,total M200.8 ICP-MS 2 <0.0002 U mg/L 0.0002 0.001 10/06/22 11:31 kja Sodium,dissolved M200.7 ICP 1 12.0 mg/L 0.2 1 10/05/22 20:42 wtc Sodium,total M200.7 ICP 1 13.0 mg/L 0.2 1 10/06/22 2:33 wtc Strontium,dissolved M200.7 ICP 1 0.201 mg/L 0.009 0.045 10/05/22 20:42 wtc Strontium,total M200.7 ICP 1 0.221 mg/L 0.009 0.045 10/06/22 2:33 wtc Sulfur,dissolved M200.7 ICP 1 115 * mg/L 0.25 1.25 10/10/22 23:34 kehl Sulfur,total M200.7 ICP 1 32.4 mg/L 0.25 1.25 10/06/22 2:33 wtc Thallium,dissolved M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 09/30/22 16:04 mfm Thallium,total M200.8 ICP-MS 1 <0.0001 U mg/L 0.0001 0.0005 10/03/22 11:19 kja Thorium,dissolved M200.8 ICP-MS 10 <0.01 U * mg/L 0.01 0.05 10/06/22 17:48 mfm Thorium,total M200.8 ICP-MS 1 <0.001 U mg/L 0.001 0.005 10/03/22 11:19 kja Tin,dissolved M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/05/22 20:42 wtc Tin,total M200.7 ICP 1 <0.04 U mg/L 0.04 0.2 10/06/22 2:33 wtc Titanium,dissolved M200.7 ICP 1 <0.005 U mg/L 0.005 0.025 10/06/22 18:50 wtc Titanium,total M200.7 ICP 1 0.0059 B mg/L 0.005 0.025 10/06/22 2:33 wtc Uranium,dissolved M200.8 ICP-MS 1 0.00050 B mg/L 0.0001 0.0005 09/30/22 16:04 mfm Uranium,total M200.8 ICP-MS 1 0.00043 B mg/L 0.0001 0.0005 10/03/22 11:19 kja Vanadium,dissolved M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/05/22 20:42 wtc Vanadium,total M200.7 ICP 1 <0.01 U mg/L 0.01 0.025 10/06/22 2:33 wtc Zinc,dissolved M200.8 ICP-MS 1 0.0113 B mg/L 0.006 0.015 09/30/22 16:04 mfm Zinc,total M200.8 ICP-MS 1 <0.006 U mg/L 0.006 0.015 10/03/22 11:19 kja REPIN.02.06.05.01 "Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 19 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487(800)334-5493 Albemarle ACZ Sample ID: L76157-05 Project ID: Date Sampled: 09/22/22 13:30 Sample ID: PL-DEEP-80 Date Received: 09/23/22 Sample Matrix: Surface Water Wet Chemistry MethodParameter EPA Dilution Result Qual XQ Units MDL •• �. Alkalinity as CaCO3 SM2320B-Titration Bicarbonate as 1 127 mg/L 2 20 10/06/22 0:00 emk CaCO3 Carbonate as CaCO3 1 <2 U * mg/L 2 10/06/22 0:00 emk Hydroxide as CaCO3 1 <2 U * mg/L 2 20 10/06/22 0:00 emk Total Alkalinity 1 127 * mg/L 2 20 10/06/22 0:00 emk Biochemical Oxygen SM521OB/HACH10360 1 17.0 * mg/L 2 09/23/2214:52 emk Demand(5 day) Carbon,total inorganic SM5310B 1 29.5 * mg/L 1 5 10/13/22 19:15 bls Carbon,total organic SM5310B 1 2.9 B mg/L 1 5 09/30/22 4:22 bls (TOC) Cation-Anion Balance Calculation Cation-Anion Balance -2.8 % 10/18/22 0:00 talc Sum of Anions 5.6 meq/L 10/18/22 0:00 talc Sum of Cations 5.3 meq/L 10/18/22 0:00 talc Chemical Oxygen WG552902 1 ***37*** * mg/L 10 20 10/17/2212:24 UPLD Demand Chloride SM4500CI-E 1 13.3 mg/L 1 2 09/30/2214:11 mjj1 Color HACH Color Wheel 1 20 * Co/Pt 5 5 09/23/22 19:40 jck Cyanide, Free D6888-09/OIA-1677-09 5 <0.015 U * mg/L 0.015 0.05 09/27/22 16:38 mjj1 Cyanide,total M335.4-Colorimetricw/distillation 0.5 <0.003 U * mg/L 0.003 0.01 09/28/229:52 bls Fluoride WG552618 1 ***0.34*** B mg/L 0.15 0.35 10/13/2210:43 UPLD Hardness as CaCO3 SM2340B-Calculation 207 mg/L 0.2 5 10/18/22 0:00 talc (dissolved) Hardness as CaCO3 SM2340B-Calculation 225 mg/L 0.2 5 10/18/22 0:00 talc (total) Nitrogen,ammonia M350.1 Auto Salicylate 1 3.69 * mg/L 0.05 0.2 09/29/22 11:58 bls w/gas diffusion Phosphate,total Calculation based on total 3.5 mg/L 0.3 2 10/18/22 0:00 talc Phosphorus Residue, Filterable SM2540C 1 326 * mg/L 20 40 09/28/22 16:52 mrb (TDS)@180C Residue, Non- WG552746 2 <10 UH * mg/L 10 40 10/13/22 16:15 REDO Filterable(TSS) @105C Sulfate D516-02/-07/-11-TURBIDIMETRIC 5 129 * mg/L 5 25 10/10/22 11:56 mjj1 Sulfide as S SM450OS2-D 37.5 22.1 * mg/L 0.75 3.75 09/26/22 18:20 jck TDS(calculated) Calculation 318 mg/L 10/18/22 0:00 talc TDS(ratio- Calculation 1.03 10/18/22 0:00 talc measured/calculated) REPIN.02.06.05.01 *Please refer to Qualifier Reports for details. L761 57-221 01 81 21 2 Page 20 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800)334-5493 ExplanationsReport Header Batch A distinct set of samples analyzed at a specific time Found Value of the QC Type of interest Limit Upper limit for RPD,in%. Lower Lower Recovery Limit,in% (except for LCSS,mg/Kg) MDL Method Detection Limit. Same as Minimum Reporting Limit unless omitted or equal to the PQL(see comment#5). Allows for instrument and annual fluctuations. PCN/SCN A number assigned to reagents/standards to trace to the manufacturer's certificate of analysis PQL Practical Quantitation Limit. Synonymous with the EPA term"minimum level". QC True Value of the Control Sample or the amount added to the Spike Rec Recovered amount of the true value or spike added,in%(except for LCSS,mg/Kg) RPD Relative Percent Difference,calculation used for Duplicate QC Types Upper Upper Recovery Limit,in% (except for LCSS,mg/Kg) 1k Sample Value of the Sample of interest QC Sample Types AS Analytical Spike(Post Digestion) LCSWD Laboratory Control Sample-Water Duplicate ASD Analytical Spike(Post Digestion)Duplicate LFB Laboratory Fortified Blank CCB Continuing Calibration Blank LFM Laboratory Fortified Matrix CCV Continuing Calibration Verification standard LFMD Laboratory Fortified Matrix Duplicate DUP Sample Duplicate LRB Laboratory Reagent Blank ICB Initial Calibration Blank MS Matrix Spike ICV Initial Calibration Verification standard MSD Matrix Spike Duplicate /CSAB Inter-element Correction Standard-A plus B solutions PBS Prep Blank-Soil LCSS Laboratory Control Sample-Soil PBW Prep Blank-Water LCSSD Laboratory Control Sample-Soil Duplicate PQV Practical Quantitation Verification standard LCSW Laboratory Control Sample-Water SDL Serial Dilution QC Sample Type Explanations Blanks Verifies that there is no or minimal contamination in the prep method or calibration procedure. Control Samples Verifies the accuracy of the method,including the prep procedure. Duplicates Verifies the precision of the instrument and/or method. Spikes/Fortified Matrix Determines sample matrix interferences,if any. Standard Verifies the validity of the calibration. ACZ Qualifiers e . B Analyte concentration detected at a value between MDL and PQL.The associated value is an estimated quantity. H Analysis exceeded method hold time. pH is a field test with an immediate hold time. L Target analyte response was below the laboratory defined negative threshold. U The material was analyzed for,but was not detected above the level of the associated value. The associated value is either the sample quantitation limit or the sample detection limit. FIRM Ww"NAW. -A (1) EPA 600/4-83-020. Methods for Chemical Analysis of Water and Wastes,March 1983. (2) EPA 600/R-93-100. Methods for the Determination of Inorganic Substances in Environmental Samples,August 1993. (3) EPA 600/R-94-111. Methods for the Determination of Metals in Environmental Samples-Supplement I,May 1994. (4) EPA SW-846. Test Methods for Evaluating Solid Waste. (5) Standard Methods for the Examination of Water and Wastewater. (1) QC results calculated from raw data. Results may vary slightly if the rounded values are used in the calculations. (2) Soil,Sludge,and Plant matrices for Inorganic analyses are reported on a dry weight basis. (3) Animal matrices for Inorganic analyses are reported on an"as received"basis. (4) An asterisk in the"XQ"column indicates there is an extended qualifier and/or certification qualifier associated with the result. (5) If the MDL equals the PQL or the MDL column is omitted,the PQL is the reporting limit. For a complete list of ACZ's Extended Qualifiers,please click: https:Hacz.com/wp-content/uploads/2019/04/F,xt-Qual-List.pdf REP001.03.15.02 L761 57-221 01 81 21 2 Page 21 of 49 This data has not been fully reviewed in accordance with ACZ Laboratories, Inc.'s quality system and is subject to change without notice. / IAccredited 2773 Downhill Drive Environmental Steamboat Springs,CO 80487 �//( • Testing (970)879-6590LA Name: by a vi "CL y V C v\ Address: ?4 t H o l% I v v% liZA Company: CcW orrA-vk6v'\ +AIv1 C 2j"(o�(Q 'a E-mail: Vie✓� ° 1�DCa`�1A,(1 m Telephone: C1 a Copy of Report Name: 3o5\1Hc, A\W-" (SWCA CX r GUYVC E-mail:'1D51nNa-AI1tV%93vvcq-C_tM; Arfs} v„cr�,.00"t Company: $W C A Telephone: (Q 6 - 1 S ------ Invoice to: Name: Address: Company: E-mail: Telephone: Copy of Invoice to: Name: Address: Company: E-mail: Telephone: x �t If sample(s)received past holding time(HT),or if insufficient HT remains to complete YES -� analysis before expiration,shall ACZ proceed with requested short HT analyses? NO If"NO"then ACZ will contact client for further instruction.If neither"YES"nor"Na'is indicated,ACZ will proceed with the requested analyses,even if HT is expired data will be qualified Are samples for SDWA Compliance Monitoring? Yes No If yes,please include state forms.Results will be reported to PQL for Colorado. Sampler's Name:J C \(t mpler's Site Information State NG Zip code ?A4�1,r? Time Zone E Lim •I attest to the authenticity and validity of this sample.I understand that intentionally mislabeling the timeldatellocation or 'Sampler's Signature: tampering with the sample in anyway,is considered fraud and punishable M State Law. PROJECT •RION ANALYSES REQUESTED(attach list or Lise quote number) Quote#: :n rA V m s PO#: c � 1 a� d •0 Repotting state for compliance testing: 1 S j ) I p v d c� Check box if samples include NRC licensed material? w ° ,�. H k �6 I r p� o =o 91 QL a L- e - 1 b O 22 22 " 10 30 10 ;Q 'Deep- 1140 51 Z 22 1130 L- "o �.� hit L- 1Z2 2le-.133D 10 L,—S goo J PL_g q3o ) _71- ------- P - t>--vejp1 u ao Matrix SW(Surface Water) GW(Ground Water) WW(Waste Water) DW(Drinking Water) SL(Sludge) SO(Soil) OL(Oil) Other(Specify) REMARKS Please refer to ACZ's terms&conditions located on the reverse side of this COC. RELINQUISHED ■ ■ ■ g Y: �a L761 i'a �11�1811M Revision#: 2 White-Return with sample. Yellow-Retain for your records. 1� APPENDIX B Field Parameter Results Table C-1. Field Parameters PL-02 (April 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 0 23.2 109.2 9.1 432.7 8.3 116.8 5 22.7 111.2 9.35 421.3 8.3 108.9 10 17.2 105.1 9.66 420.9 8.1 101.5 15 11.7 36.6 3.87 440.8 7.5 103.4 20 9.5 9.4 1.05 439.1 7.2 105.2 25 8.8 2.4 0.27 442.1 7.0 105.7 30 8.5 1.1 0.13 442 6.9 103.8 35 8.4 0.8 0.1 442.9 6.8 101.8 40 8.4 0.9 0.11 443.8 6.9 98.7 45 8.4 0.8 0.09 443.6 6.9 96.1 50 8.4 0.7 0.08 443.9 6.9 93.7 55 8.4 0.7 0.08 445.9 6.9 92 60 8.4 0.6 0.07 443.7 8.2 -140.1 65 8.6 0.7 0.08 535.8 8.1 -153.6 70 8.6 -0.3 0 557 8.1 -181.7 75 8.6 -1.1 0 557.4 8.3 -199.3 80 8.6 -1.1 0 556.6 8.3 -202.3 85 8.6 -1.1 0 558.6 8.1 -203.3 Table C-2. Field Parameters PL-05 (April 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 90 8.6 -0.6 0 557 7.3 -206.2 85 8.6 -0.9 0 558.1 7.3 -213.8 80 8.6 -0.9 0 556.3 7.4 -220 75 8.6 -1 0 549.3 7.4 -221.7 C-1 Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 70 8.6 -1 0 540.8 7.4 -222.8 65 8.5 -0.4 0 499.3 7.5 -221.9 60 8.3 0.9 0.1 443.5 7.5 -180.6 55 8.3 0.9 0.1 443.5 7.5 -170.5 50 8.4 0.8 0.09 443.5 7.5 -156.8 45 8.4 0.7 0.08 442.8 7.4 -149.9 40 8.4 0.6 0.07 442.1 7.5 -145.6 35 8.5 0.7 0.08 442.2 7.5 -140.9 30 8.6 0.6 0.07 441.9 7.5 -135.4 25 8.8 0.8 0.1 438.5 7.4 -129.3 20 9.4 4.5 0.5 437.8 7.4 -119.6 15 11.6 31.6 3.34 438.1 7.5 -89.6 10 16.5 85.9 8.18 424.1 8.2 -35.6 5 19.3 106.7 9.59 417 8.7 14.8 Table C-3. Field Parameters PL-08 (April 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/CM) Potential(mV) 90 8.6 -1 0 559.1 7.5 -219.5 85 8.6 -1.2 0 557.5 7.6 -223.2 80 8.6 -1.3 0 549.9 7.6 -224.1 75 8.6 -0.8 0 549.9 7.6 -225.4 70 8.6 -1.1 0 542.2 7.6 -226.1 65 8.5 -0.4 0 518.7 7.6 -223.9 60 8.4 0.7 0.08 443.5 7.5 -162.7 55 8.4 0.6 0.07 443.8 7.4 -145.2 50 8.4 0.6 0.07 443.6 7.4 -128.7 C-2 Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 45 8.4 0.6 0.07 443.6 7.5 -125 40 8.4 0.6 0.07 442.3 7.5 -120 35 8.5 0.5 0.06 442.3 7.5 -116.4 30 8.6 0.6 0.07 442.9 7.5 -114.4 25 8.9 0.7 0.08 440 7.4 -112 20 9.4 4.3 0.48 438.6 7.4 -98.6 15 11.9 19.9 2.09 438.1 7.4 -62.8 10 15.9 62.7 6.04 435.1 7.7 -17.8 5 19.7 107.4 9.57 416.9 8.7 10.2 Table C-4. Field Parameters PL-02 (May 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/Cm) Potential(mV) 90 8.7 39.1 4.55 509.8 7.9 -244.5 85 8.7 22.5 2.62 509.6 7.7 -257.3 80 8.7 17 1.97 509.5 7.7 -266.8 75 8.7 13.4 1.56 506.2 7.6 -272.4 70 8.7 11.6 1.35 502.6 7.6 -275.8 65 8.6 10 1.17 484.7 7.6 -281.2 60 8.4 9.1 1.06 409.4 7.6 -273.6 55 8.4 8.4 0.99 405.9 7.5 -272 50 8.4 6.9 0.8 405.5 7.5 -261.3 45 8.4 6.4 0.74 405.2 7.5 -260.9 40 8.6 5.6 0.65 405.2 7.7 -258.6 35 8.8 5.3 0.61 404.3 7.6 -258.1 30 9.4 5.5 0.63 402.1 7.6 -258.5 25 12.2 11.9 1.27 400.8 7.6 -239.6 C-3 Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 20 17.5 73.6 7.02 394.1 7.8 -216.7 15 22.8 93.8 8.08 383.6 9.0 -236 10 24.8 106.7 8.85 386.3 9.1 -237.4 5 24.8 104.7 8.67 388.3 9.1 -284.3 Table C-5. Field Parameters PL-05 (May 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 90 8.7 7.4 0.86 509 7.6 -315.3 85 8.7 3.9 0.45 509 7.1 -332.2 80 8.7 3.9 0.45 506.6 7.6 -334.1 75 8.5 3.6 0.42 462.7 7.7 -332 70 8.6 - - 500.3 8.3 -351.7 65 8.5 8.6 1.01 448.6 8.2 -350 60 8.4 4.9 0.57 424.3 8.1 -335.9 55 8.4 3.6 0.42 407.1 7.7 -325.5 50 8.5 3.2 0.37 405.7 7.5 -321.7 45 8.4 3 0.35 407.9 7.9 -314.9 40 8.4 2.9 0.34 407.1 6.1 -314.9 35 8.5 2.9 0.34 405.4 8.0 -313.6 30 8.7 2.8 0.33 404.9 6.8 -313.3 25 9.7 3.6 0.41 416.6 7.9 -310.5 20 12.8 17.9 1.9 405.2 7.8 -260.5 15 20.7 80.8 7.23 309.1 8.6 -239.3 10 23.9 97 8.17 400.2 9.2 -282.5 5 2 101.9 8.42 392.6 9.2 -291.7 C-4 Table C-6. Field Parameters PL-08 (May 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 90 8.7 6.2 0.72 510.7 7.7 -361.4 85 8.7 4.4 0.51 510.4 7.6 -361.6 80 8.7 4.3 0.51 510.3 7.7 -351.3 75 8.7 4.2 0.49 509.4 7.6 -362.4 70 8.7 3.4 0.39 503.8 7.6 -360.3 65 8.6 2.2 0.26 484.7 7.7 -355.4 60 8.5 1.9 0.21 434.1 7.7 -335.8 55 8.4 1.8 0.21 408.1 7.5 -326.2 50 8.4 1.7 0.2 408.2 7.5 -323.8 45 8.4 1.7 0.2 407.9 7.5 -322.4 40 8.5 1.6 0.19 409.8 7.5 -316.6 35 8.6 1.7 0.2 400.4 7.4 -315.4 30 8.7 1.7 0.19 403 7.5 -315.8 25 9.2 1.9 0.22 403.6 7.4 -311.5 20 10.1 2.4 0.27 405.5 7.4 -291.2 15 12.7 8.4 0.89 405 7.4 -265.2 10 18.2 57.2 5.39 402.2 7.7 -233.6 5 23.5 103.8 8.81 308.2 9.1 -264.2 Table C-7. Field Parameters PL-02 (September 2022) Depth(ft) Temperature(°C) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (NS/cm) Potential(mV) 98 8.7 0.56 632.8 7.1 -255.7 95 8.7 0.42 631.5 7.1 -262.8 90 8.7 0.38 627.9 7.1 -270.7 85 8.7 0.36 624.4 7.1 -275.6 C-5 Depth(ft) Temperature(°C) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 80 8.6 0.41 613.1 7.1 -278.1 75 8.6 0.42 613.4 7.1 -282.1 70 8.6 0.44 604.8 7.1 -282.6 65 8.5 0.56 570.4 7.1 -279.4 60 8.4 0.72 510.8 7.2 -263.3 55 8.4 0.75 511 7.1 -157.8 50 8.4 0.76 511.1 7.1 -256.5 45 8.5 0.77 510.7 7.2 -257.6 40 8.7 0.76 511.7 7.2 -261.8 35 9.2 0.73 514.5 7.2 -271.8 30 10.5 0.67 515.7 7.3 -265.3 25 13.2 0.53 522.6 7.4 -258.4 20 13.4 0.74 522.6 7.6 -209.5 15 24.1 0.31 540.1 7.6 -198.6 10 26.5 3.77 440.7 8.1 -118.6 5 26.8 4.82 431.9 8.7 -71 Table C-8. Field Parameters PL-05 (September 2022) Depth(ft) Temperature(°C) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/CM) Potential(mV) 98 8.7 0.44 629.5 7.3 -264.6 95 8.7 0.38 625.5 7.1 -287.8 90 8.7 0.3 624.2 7.1 -290.3 85 8.6 0.31 626.4 7.1 -294.4 80 8.6 0.33 622.9 7.1 -301.9 75 8.6 0.37 618.2 7.1 -303.6 70 8.6 0.47 605.2 7.1 -302.8 C-6 Depth(ft) Temperature(°C) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 65 8.5 0.56 583.7 7.2 -303.2 60 8.4 0.73 518.2 7.1 -291.6 55 8.4 0.77 513.6 7.2 -289.4 50 8.4 0.77 513.5 7.2 -279.1 45 8.5 0.76 513.4 7.2 -276.3 40 8.6 0.76 513.8 7.2 -276.6 35 9.1 0.74 516 7.2 -281.9 30 10.1 0.69 517.3 7.3 -285.3 25 12.6 0.58 522.6 7.3 -283.7 20 18.4 0.35 540.6 7.5 -288.2 15 26.7 3.83 433.3 8.2 -211 10 26.8 4.62 433.8 8.7 -180.9 5 26.9 5.31 432.2 8.9 -86.4 Table C-9. Field Parameters PL-08 (September 2022) Depth(ft) Temperature(°C) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/CM) Potential(mV) 98 8.6 1.37 638.2 6.9 -277.6 95 8.6 1.2 632.4 6.9 -285.9 90 8.6 1.1 634 7.0 -276.5 85 8.6 1.09 634.9 7.0 -294.4 80 8.7 1.05 634.3 7.1 -299.4 75 8.6 1.03 627.2 7.1 -300.8 70 8.6 1.05 614.2 7.2 -304.2 65 8.5 1.09 521.5 7.3 -299.5 60 8.4 1.13 528.3 7.2 -281.6 55 8.4 0.99 517.1 7.1 -280.6 C-7 Depth(ft) Temperature(°C) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/cm) Potential(mV) 50 8.4 0.95 517.5 7.2 -278.6 45 8.5 0.93 516.9 7.2 -280.3 40 8.6 0.94 517.2 7.2 -283 35 9 0.91 520.1 7.3 -288.8 30 10.2 0.83 519.9 7.3 -284.3 25 12.5 0.68 525 7.4 -287.6 20 18.3 0.44 543 7.5 -273.3 15 26.7 3.84 434.1 8.3 -207.4 10 26.9 5.04 432.4 8.8 -182.2 5 27.3 5.11 432.6 8.9 -160.2 Table C-10. Field Parameters PL-DEEP (September 2022) Depth(ft) Temperature(°C) Dissolved Oxygen(%) Dissolved Oxygen Specific Conductivity pH Oxidation Reduction (mg/L) (PS/Cm) Potential(mV) 160 25.3 2.6 0.21 20.2 6.5 -319.8 140 23.9 7.2 0.61 582 7.1 -326.1 120 24.5 4 0.33 579 6•9 -324.2 100 25.5 3.2 0.26 580 7•0 -332.1 80 18.8 2 0.19 568 6•9 -326.3 70 18.2 2.4 0.23 540.7 7.0 -326.1 60 19 2.7 0.25 518.6 7.1 -325.4 50 19.5 2.8 0.25 469.5 7.1 -306.9 40 18.7 2.4 0.22 470 7.1 -289.6 30 19.5 2.2 0.2 472.3 7.1 -286.1 20 24.7 4.9 0.41 489.7 7.4 -268.9 10 27.7 70.1 5.51 397 8•6 -219.1 C-8 APPLICATION FORM 2E Section 7.1 Attachment Engineering Alternative Analysis Kings Mountain Lithium Project Engineering Alternative Analysis NPDES Individual Permit Application NOVEMBER 2022 PREPARED FOR Albemarle Corporation PREPARED BY SWCA Environmental Consultants KINGS MOUNTAIN LITHIUM PROJECT ENGINEERING ALTERNATIVE ANALYSIS NPDES INDIVIDUAL PERMIT APPLICATION Prepared for Albemarle Corporation 348 Holiday Inn Drive Kings Mountain, NC 28086 Prepared by SWCA Environmental Consultants 9319 Robert D. Snyder Road, Suite 436 Charlotte, NC 28223 (980) 305-5730 www.swca.com SWCA Project No. 70316 November 2022 Engineering Alternative Analysis in Support of NPDES Application ABSTRACT/EXECUTIVE SUMMARY To support the application of a North Carolina National Pollutant Discharge Elimination System (NPDES)to discharge water that has accumulated in an historic mine pit on-site,an Engineering Alternatives Analysis(EAA) for the Albemarle Kings Mountain Lithium Project(Project) has been prepared. The proposed discharge under the NPDES application includes dewatering an existing mine pit, conveyance of pit water to the South Creek Reservoir prior to discharging to Kings Creek. The proposed outfall is the northeastern edge of South Creek Reservoir,which has an outfall consisting of two 36-inch high density polyethylene (HDPE)pipes. The approximate location of the existing outfall is 35°12'42.70"N, 81°21'19.05"W. Kings Creek, a North Carolina Class C perennial stream with its headwater near the existing mine pit,bisects the site before flowing south through a culvert under Interstate 85 (1-85). Proposed alternatives reviewed for this analysis include connection to a wastewater treatment plant, land application,water reuse, as well as a combination of alternatives. Based on the analysis,pipeline connection to TJ Ellison WTP was the only feasible alternative, although a combination of land application and discharge to Kings Creek was also possible.A 20-year Present Value of Costs Analysis indicates that the Direct Discharge Alternative is the most cost effective based on the short duration of discharge (1 —2 years). Engineering Alternative Analysis in Support of NPDES Application This page intentionally left blank. Engineering Alternative Analysis in Support of NPDES Application CONTENTS 1 Introduction..........................................................................................................................................1 2 EAA Step 1: Discharge Evaluation.....................................................................................................1 2.1 Applicant Information.................................................................................................................. 1 2.2 Project Description and Proposed Discharge Location................................................................ 1 3 EAA Step 2: Non-Municipal Flow Projections..................................................................................4 4 EAA Step 3: Evaluate Technologically Feasible Alternatives..........................................................4 4.1 Alternative A: Connection to an Existing Wastewater Treatment System...................................5 4.1.1 Alternative Al. Pump to TJ Ellison Water Treatment Plant...............................................5 4.1.2 Alternative A2: Pump to Pilot Creek Wastewater Treatment Plant....................................6 4.2 Alternative B: Land Application..................................................................................................6 4.3 Alternative C: Wastewater Reuse.................................................................................................7 4.4 Alternative D: Direct Discharge to Kings Creek via South Reservoir.........................................7 4.5 Alternative E: Combination of Alternatives.................................................................................7 5 EAA Step 4: Evaluation of the Economic Feasibility of the Alternatives .......................................8 5.1 Alternative Al PVCA: Pipeline Connection TJ Ellison WTP......................................................8 5.2 Alternative D: Direct Discharge to Kings Creek via South Reservoir.........................................9 5.3 Alternative E: Direct Discharge to Kings Creek and On-site Evaporation..................................9 5.4 Comparison of Present Value of Costs Analysis..........................................................................9 6 References Cited/Literature Cited....................................................................................................11 Appendices Appendix A. Capital and Recurring Costs Figures Figure1.Project Area....................................................................................................................................3 Figure 2. Discharge to Kings Creek..............................................................................................................4 Tables Table 1. Summary of Present Value Cost Analysis......................................................................................9 iii Engineering Alternative Analysis in Support of NPDES Application 1 INTRODUCTION On behalf of Albemarle Corporation(Albemarle), SWCA Environmental Consultants(SWCA)has prepared this Engineering Alternatives Analysis(EAA) for the Albemarle Kings Mountain Lithium Project(Project)located in Cleveland County,North Carolina. This EAA is in support of a permit application under the North Carolina National Pollutant Discharge Elimination System(NPDES)to discharge water that has accumulated in an inactive mine pit on-site. Mining activities associated with the Kings Mountain spodumene deposit began as early as the late 19' century with full scale production beginning with the issuance of a mining permit in 1950. Mining activities ceased later in the 20t'century; as a result of mine closure,pit dewatering activities were ceased and the pit was allowed to fill unencumbered, save a discreet period where a portion of the water was provided to an adjacent aggregate quarry operated by Martin Marietta Materials, . Water entering the mine pit is a combination of surface flow,groundwater inflow, and direct precipitation,to fill a volume currently estimated at approximately Ibillion gallons.As the global market for lithium increases, Albemarle is evaluating reopening the Kings Mountain Mine to resume mining the spodumene deposit. Dewatering the historic mine pit is necessary to resume mining operations. Dewatering is anticipated to take between 8 and 24 months, and to be a one-time discharge event.As such an Individual Permit(Application Form 2E Manufacturing, Commercial, Mining, and Silvicultural Facilities Which Discharge Only Nonprocess Wastewater)has been prepared, and includes an Engineering Analysis(SWCA,2022) and this Engineering Alternatives Analysis(EAA). The North Carolina Division of Water Resources Environmental Engineering Analysis Guidance Document for new or expanding wastewater treatment plant was used as the basis for preparing this document. 2 EAA STEP 1 : DISCHARGE EVALUATION 2.1 Applicant Information Applicant: Kings Mountain Lithium Project Mailing Address 348 Holiday Inn Drive,Kings Mountain,NC 28086 Facility Address 348 Holiday Inn Drive, Kings Mountain,NC 28086 EAA Preparer SWCA Environmental Consultants Mailing Address 9319 Robert D. Snyder Rd, Ste. 436, Charlotte,NC 28223 Contact Person Josh Allen,PE Phone number 919.624.1458 2.2 Project Description and Proposed Discharge Location The Project Site(Site)is located approximately 1 mile south of downtown Kings Mountain in Cleveland County,North Carolina and consists primarily of historically mined land,forested land,maintained utility rights of-way, and industrial mining processing facilities(Figure 1). 1 Engineering Alternative Analysis in Support of NPDES Application Albemarle proposes to dewater an existing mine pit and recommence active mining,with the water from the pit lake to be discharged to Kings Creek. The current dewatering configuration under consideration is conveyance of pit water to the South Creek Reservoir located onsite prior to discharging to Kings Creek. The proposed outfall is the northeastern edge of South Creek Reservoir,which consists of two 36-inch HDPE pipes. The approximate location of the outfall is 35°12'42.70"N, 81°21'19.05"W. The proposed configuration is shown in Figure 2. Kings Creek,a North Carolina Class C perennial stream with its headwaters occurring near the existing mine pit,bisects the site before flowing south through a culvert under Interstate 85 (1-85). The Project Reach studied for the purpose of this report extends from the headwaters of Kings Creek to where Kings Creek leaves the Site approximately 2,000 linear feet downstream of the 1-85 culvert. The total length of the studied reach of Kings Creek(Project Reach)is approximately 6,080 linear feet. Based on the measured and observed condition of the existing stream bed and banks,minor increases in flow due to the mine pit dewatering is not expected to adversely impact the banks of Kings Creek, and no discernible change to the stream competency or stability is expected. Additionally,the increase in flow is not expected to increase flood elevations beyond the subject property line or adversely impact adjacent properties. Water quality of the discharge water contained within the pit varies with depth,however,does not exceed Class C standards. The proposed action will use South Creek Reservoir as an equalization pond to allow for lower temperature and oxygen levels in the lower portion of the pit to adjust to ambient levels prior to discharge to Kings Creek. The water quality of Kings Creek has the following noteworthy parameters: • Ammonia and sulfide concentrations were below the detection limits • Sulfate concentrations range from 70 to 145 mg/L. • pH is circumneutral range from 7.2 to 7.5. • Temperature ranged from 16°C, above the discharge point,to 25°C, at and below the discharge point. An aquatic assessment of all onsite waterbodies indicated that all species of fish,crustaceans,and bivalves encountered during surveying are listed as Least Concern by the International Union for Conservation of Nature.No Federal or State aquatic species of concern occur in the Project area. According to the United States Geological Survey(USGS), the streamflow characteristics for Kings Creek at the proposed discharge location are as follows: • Annual 7Q10 low-flow yields are 0.13 to 0.38 csfm(average approximately 0.19 csfm,median about 0.17 csfin); • Annual 30Q2 low-flow yields are 0.35 to 0.68 csfin(average about 0.47 csfin,median about 0.44 csfin); • Winter 7Q10 low flow yields are 0.23 to 0.58 csfin(average about 0.35 csfm,median about 0.33 csfin); • Annual 7Q2 low flow yields are 0.26 to 0.6 csfm(average about 0.37 csfin and median about 0.34 csfm); and 2 Engineering Alternative Analysis in Support of NPDES Application • Average annual discharge yields are 1.2 to 1.4 csfm(both average and median are about 1.3 csfin). oll - f:J• ` f I / 1 Ai' `) s t0 �o I f,. 14 p k KINGS MOUNTAIN LITHIUM MINE Cleveland County,NC o 1 000 2.0 00 USGS Map Project Area USES 75 Quadrangle: �FeEt �Melcr Kings Mountain,NC,35081-63 0 310 620 NAD 1983 StatePlane North Carolina FIPS 3200 Feet 35.216°N 81.3483-W, N aria Map:ESRI AmGIS Online, A 0,000 accessed September 2022 Updated: 7 022 /�� ■ ��� Project No .70316 J W Layout.02_USGS_v2 ENVIRONMENTAL CONSULTANTS Figure 1. Project Area. 3 Engineering Alternative Analysis in Support of NPDES Application - Figure 2. Discharge to Kings Creek 3 EAA STEP 2: NON-MUNICIPAL FLOW PROJECTIONS Development of population projections required for Step 2 apply to municipal treatment facilities as a means to quantify flow and load increases due to population change. Albemarle does not own or operate any municipal treatment facilities, and projected water flow is independent of population changes. Additionally,this permit is being applied for as a single use permit to dewater an inactive mine pit that has accumulated surface water runoff, groundwater inflow, and direct precipitation since operations ceased.Albemarle requires the ability to discharge 5.040 MGD (3,500 gpm)to dewater the inactive mine pit. Dewatering is expected to last approximately 8 to 24 months. 4 EAA STEP 3: EVALUATE TECHNOLOGICALLY FEASIBLE ALTERNATIVES North Carolina Department of Environment requires new or expanding wastewater discharge must consider the feasibility of other wastewater disposal methods in addition to direct discharge. The EEAA Guidance Document provided by the North Carolina Division of Water Resources outlines the preparation protocol and the alternatives that must be considered in the study. 4 Engineering Alternative Analysis in Support of NPDES Application Six alternatives are considered for technical feasibility and environmental soundness and has been used as a basis for reviewing potential alternatives to direct description. A description of each alternative and discussion of the technical feasibility is described below. Alternatives considered are: A. Connection to an Existing Wastewater Treatment System B. Land Application C. Wastewater Reuse D. Direct Discharge to Surface Waters E. Combination of Alternatives 4.1 Alternative A: Connection to an Existing Wastewater Treatment System Alternative A necessitates applicants consider the feasibility of connecting to an existing wastewater treatment system that holds a valid NPDES or Non-Discharge Permit. When considering connection with an existing wastewater treatment system, applicants must consider the following parameters: • Existing sewer lines within a five-mile radius or expand the radius beyond five miles if that is cost effective for the project. • Gravity drain systems must be considered if sewer lines do not exist. • Flow acceptance of existing wastewater treatment systems. • Evaluation of piping/pumps/resources necessary to connect with existing wastewater treatment plant. • Present Value Cost Analysis for connecting to existing wastewater treatment system. 4.1.1 Alternative Al. Pump to TJ Ellison Water Treatment Plant The TJ Ellison Water Treatment Plant(WTP)is a municipal water treatment plant located approximately 6 miles from the Project Site in Kings Mountain,North Carolina. The TJ Ellison WTP is a current NPDES permit holder and has a permitted capacity of 12.0 MGD. Alternative Al is connection by force main to an existing water treatment system. Based on a 2018 NPDES permit renewal application submittal,the TJ Ellison Water Treatment Plant has a water treatment capacity of 12 MGD.At a discharge of 5.040 MGD,Albemarle site water would represent approximately 42%of TJ Ellison WTP influent.. Alternative Al is only feasible if water is conveyed via connection by force main to an existing water treatment system.An existing wastewater pipeline enters the Kings Mountain property at the northeast corner of the property along Quarry Road. SWCA will request as-built drawings from the Kings Mountain municipality to determine whether existing pipeline is large enough to accommodate 3,500 gpm; however, for the purpose of this exercise SWCA assumes that the pipeline has sufficient capacity. 5 Engineering Alternative Analysis in Support of NPDES Application 4.1.2 Alternative A2: Pump to Pilot Creek Wastewater Treatment Plant The Pilot Creek Wastewater Treatment Plant(WWTP) is a municipal wastewater treatment plant located approximately 7 miles from the Project site in Kings Mountain,North Carolina. The Pilot Creek WWTP is a current NPDES permit holder and has a permitted capacity of 6.0 MGD. Alternative A2 is connection by force main to an existing wastewater treatment system. Based on a 2018 NPDES permit renewal application,the Pilot Creek WWTP has a design flow rate of 6.0 MGD. At a discharge rate of 5.040 MGD, dewatering of the existing mine pit would represent approximately 84%of Pilot Creek WWTP. Operational data included in the 2018 permit renewal application indicates that the Pilot Creek WWTP has an annual average flow rate of 1.857 MGD and maximum daily flow rate of 4.297 MGD. Alternative A2 is deemed not technically feasible as a single discharge alternative because Albemarle's daily discharge of 5.040 MGD exceeds Pilot Creek's remaining hydraulic capacity of 4.143 MGD under typical operating conditions. 4.2 Alternative B: Land Application Alternative B is the land application disposal and components include individual/community onsite subsurface systems, drip irrigation,and spray irrigation. As part of this alternative,the following was considered: • An estimate of base case hydraulic loading rate. • An assessment of the availability of land. • A description of the non-discharge application system. • A present value cost analysis for the reclaimed water system. For this study,Alternative B is to land apply water by spray irrigation via a non-discharge permit. To estimate the acreage required for land application, soil drainage rates were calculated using an average soil drainage rate for land owned by Albemarle in the immediate vicinity of the pit lake(NRCS Web Soil Survey). The soil classification is UdC—udorthents, loamy, 0 to 15% slopes—with a K,at that ranges from 0.00 in/hr to 1.98 in/hr. Land application for subsurface seepage is not a feasible discharge method because the most conservative seepage rate is 0.00 in/hr. Precipitation and evapotranspiration data was retrieved from the NC CRONOS database for Station ID KEHO in Shelby,North Carolina(annual rate of 34.72). Evapotranspiration data was retrieved from Maysville,North Carolina(annual rate of 39.75 inches). To calculate the land required for atmospheric evaporation disposal,the annual Class A Pan Evaporation rate of 39.75 inches(3.3125 feet)per year with an evaporation adjustment rate of 75%was used Using these values,the land required for atmospheric evaporation disposal can be calculated as follows: 1,839,600,000 gallons Area = Volume _ year = 1,704.31 acres Evaporation Rate 39.75 inches year 6 Engineering Alternative Analysis in Support of NPDES Application Of the 1,403 acres that Albemarle currently owns at the Project Site, only 534 acres north of the I-85 are suitable for land application. As such,there is insufficient land area for adequate land disposal. Finally,land application is primarily suitable for rural areas with high infiltration rates.While Albemarle does own over 1,000 acres,the land is generally unsuitable for land application due to reclaimed, low infiltration waste rock piles and steep slopes. 4.3 Alternative C: Wastewater Reuse Alternative C requires the evaluation of reusing all or a portion of the water generated. Examples of reuse that are provided in the EAA Guidance Document include: irrigation,toilet flushing,backwashing, and commercial and industrial uses. The guidance document specifically notes that some of the reuse applications may overlap with uses identified in Alternative B. On-site reuse as a single point discharge alternative was not deemed feasible as the quantity of water pumped from the pit lake greatly exceeds onsite need. With a planned dewatering rate of 3,500 gallons per minute,the pit lake will supply 5,040,000 gallons of water per day. The City of Kings Mountain delivered 74,977 cubic meters(19,806,828 gallons) of water to Albemarle in 2021,which averages to a daily demand of 54,265.3 gallons per day. As such,Albemarle's onsite water needs could only consume 1.08%percent of the daily dewatered volume. Reuse at facilities in the community was evaluated. A 5-mile radius was selected as the practical distance for a cost-effective pipeline. The recreational lakes that are operated by the city are separated from the site by a major US interstate(1-85) and these lakes are fed by streams which keeps them at capacity. Moss Reservoir,the City of Kings Mountain water supply,is approximately 7 miles from the site with the town of Kings Mountain and a divided major highway lying in between.No additional facilities within the 5- mile radius would require enough water that is not already supplied by others. 4.4 Alternative D: Direct Discharge to Kings Creek via South Reservoir The proposed discharge to Kings Creek is shown in Figure 2 and described in Section 2.2. Detailed analysis of potential impacts to Kings Creek are detailed in a supporting Engineering Analysis(SWCA, 2022). 4.5 Alternative E: Combination of Alternatives Alternative E is the evaluation of a combination of wastewater alternatives that would minimize or eliminate a direct discharge alternative. An example of a suggested combination is to consider whether the facility can operate a land application system during the dry season when stream flows are at their lowest and provide less dilution and operate an NPDES discharge system during the wet season when soils may not be as amenable to land application and the receiving stream provides its greatest dilution. For this study,Alternative E is land application in addition to direct discharge to Kings Creek. The land application system will be sized to irrigate 536 acres which the maximum number of acres that Albemarle owns that is suitable land application(as identified in Alternative B). With an annual evaporation rate of 39.75 inches,the amount of what that can be consumed annually is 578,549,211 gallons per year, or 1,100 gpm. The remaining flow that cannot be consumed by spray irrigation(2,400 gpm)will be discharged to Kings Creek via South Reservoir as described in Alternative D. 7 Engineering Alternative Analysis in Support of NPDES Application 5 EAA STEP 4: EVALUATION OF THE ECONOMIC FEASIBILITY OF THE ALTERNATIVES To provide valid cost comparisons among all technologically feasible wastewater alternatives identified in Step 3,a 20-year Present Value of Costs Analysis(PVCA)was performed. A preliminary design level effort was considered appropriate for comparing feasible options and their associated costs. For the PVCA cost comparison, all future expenditures were converted to a present value cost at the beginning of the 20-year planning period. A discount rate is used in the analysis and represents the time value of money(the ability of money to earn interest). Present value is also referred to as "present discounted value" or"present worth". One year of sustaining costs are included in the PVCA calculation as pit dewatering is expected to last eight months. The PVCA includes costs associated with construction, startup and annual operation and maintenance of a facility. The standard formula for computing the present value is: n Ct PV = Co + (1 +r) t=1t Where: PV=Present value of costs Co=Costs incurred in the present year Ct=Costs incurred in time t n=Ending year of the life of the facility r=EPA discount rate(2.25%based fiscal year 2022) A PVCA was prepared for Alternatives Al, D, and E.Alternatives A2,B,and C were deemed not technically feasible. The PVCA assumes that capital costs are incurred in year 1 and operational costs are incurred in year 2 at the current EPA discount rate of 2.25%. Costs past year two were not relevant to the PVCA calculation because the existing mine pit will be completely dewatered by the end of year 2. 5.1 Alternative Al PVCA: Pipeline Connection TJ Ellison WTP Capital costs for Alternative Al include a discharge pump station and a pipeline to connect the pit to the existing municipal pipeline at the edge of the property. The PVCA assumes that upgrades to the TJ Ellison WTP are not required for the facility to accept the additional flow as the facility is currently constructed and permitted for 12 MGD. Recurring costs incurred in year 2 include: • TJ Ellison WTP Sewer Use Fees • Operation and maintenance • Laboratory analysis 8 Engineering Alternative Analysis in Support of NPDES Application • Labor • Energy 5.2 Alternative D: Direct Discharge to Kings Creek via South Reservoir Alternative D is direct discharge of water to Kings Creek via the South Creek Reservoir. Capital costs for Alternative D include a discharge pump station and a new pipeline connecting the existing mine pit to South Reservoir. Recurring costs incurred in year 2 include: • Operation and maintenance • Laboratory analysis • Labor • Energy 5.3 Alternative E: Combination of Alternatives - Direct Discharge to Kings Creek and On-site Evaporation Alternative E includes the combination use of on-site evaporation as well as direct discharge to Kings Creek. Capital costs for Alternative E include a discharge pump station, spray evaporators,pumps and instrumentation to feed the evaporators, and a new pipeline to connect the existing mine pit to South Reservoir. Recurring costs incurred in year 2 include: • Operation and maintenance • Laboratory analysis • Additional labor • Energy 5.4 Comparison of Present Value of Costs Analysis A detailed comparison of the PVCA is displayed below in Table 1. Table 1. Summary of Present Value Cost Analysis Alternative Description Present Value(Million$) Al Pipeline Connection to TJ Ellison WTP $15.1 9 Engineering Alternative Analysis in Support of NPDES Application Alternative Description Present Value(Million$) A2 Pipeline Connection to Pilot Creek WWTP Not Feasible B Land Application Not Feasible C Reuse Not Feasible D Direct Discharge to Kings Creek via South Reservoir $2.2 E Direct Discharge to Kings Creek and On-site Evaporation $3.3 Alternatives A2,B, and C are not feasible. Alternative A2 is deemed not technically feasible as a single discharge alternative because Albemarle's daily discharge of 5.040 MGD exceeds Pilot Creek's remaining hydraulic capacity of 4.143 MGD under typical operating conditions. Alternative B is not feasible because Albemarle does not own sufficient land to consume 3,500 gpm land application. Alternative C is not feasible because Albemarle's daily external water consumption is 1.08%of the proposed pit watering flow. While Alternative Al is feasible, it is nearly 500%more expensive than the next considered alternative rendering this alternative not economically feasible. The high PVCA for this alternative is driven by high disposal fees associated with utilizing a municipal treatment system.While alternative E is feasible it is 50%more expensive than Alternative D. Additionally, investment in the extensive evaporation system required to execute Alternative E is not an environmentally friendly alternative because discharge of the historic pit lake is projected to be completed within two years. Based on the PVCA and the analysis performed herein, direct discharge to Kings Creek is deemed the most environmentally sound alternative of the economically viable alternatives for the dewatering of the pit lake. 10 Engineering Alternative Analysis in Support of NPDES Application 6 REFERENCES CITED/LITERATURE CITED SWCA. 2022. Kings Creek Stability and Water Quality Assessment, Kings Mountain Lithium Mining Project, Cleveland County,North Carolina. 11 APPENDIX A Capital and Recurring Costs Alternatives A, D, E Alteranative Al Pump to TJ Ellison Water Treatment Plant CAPITAL COSTS(Year 1) Item Description Unit Quantity Unit Cost Estimated Cost Pipeline to Existing Sewer Connection ft 4,417 $ 100 $ 441,700 Discharge Pump Station EA 1 $ 500,000 $ 500,000 Flow Meter EA 1 $ 4,500 $ 4,500 Subtotal $ 946,200 Labor Allowance 20% $ 189,240 Subtotal $ 1,135,440 Overhead and Profits 15% $ 170,316 General Contractor month 6 $ 25,000 $ 150,000 s Subtotal $ 1,455,756 Contingency 25% $ 363,939 Subtotal $ 1,819,695 Permitting $ 15,000 Engineering Design Costs 2% $ 36,394 Total $ 1,871,089 RECURRING COSTS(Year 2) Item Description Unit Quantity Unit Cost Estimated Cost Energy Discharge Pump kW-hr 250,000 $ 0.12 $ 29,700 Labor 1 employee hr 2,080 $ 35 $ 72,800 Laboratory Costs Annual Laboratory Costs $ 50,000 Subotal $ 152,500 2.25% Discount Rate $ 149,144 FEES(Year 2) Description Unit Quantity Unit Cost Estimated Cost Sewer Use Fees Availability Charge(/1,000 gallon) GPD 5,040,000 4.41 $ 22,226 Volume Charge(/1,000 gallon) GPD 5,040,000 2.87 $ 14,465 Annual Sewer Fees $ 139392,288 2.25% Discount Rate $ 13,097,592 TOTAL $ 15,117,825 A-1 Alternative D Direct Discharge to Kings Creek via South Reservoir CAPITAL COSTS(Year 1) Item Description Unit Quantity Unit Cost Estimated Cost Pipeline to Existing Sewer Connection ft 5375 100 $ 537,500 Discharge Pump Station EA 1 500,000 $ 500,000 Flow Meter EA 1 4500 $ 4,500 Subtotal $ 1,042,000 Labor Allowance 20% $ 208,400 Subtotal $ 1,250,400 Overhead and Profits 15% $ 187,560 General Contractor months 6 25000 $ 150,000 Subtotal $ 1,587,960 Contingency 25% $ 396,990 Subtotal $ 1,984,950 Permitting $ 15,000 Engineering Design Costs 2% $ 39,699 Total $ 2,039,649 RECURRING COSTS(Year 2) Item Description Unit Quantity Unit Cost Estimated Cost Energy Discharge Pump kW-hr 250,000 $ 0.12 $ 29,700.00 Labor 1 employee hr 2,080 $ 35 $ 72,800 Laboratory Annual Laboratory Costs $ 50,000 Subtotal $ 152,500 2.25% Discount Rate $ 149,144 TOTAL $ 2,188,793 A-2 Alternative E-Combination of Direct Discharge to Kings Creek and On-site Evaporation CAPITAL COSTS(Year 1) Item Description Unit Quantity Unit Cost Estimated Cost Pipeline to Existing Sewer Connection ft 5,375 $ 100 $ 537,500 Landshark Wastewater Evaporator EA 10 $ 50,000 $ 500,000 Feed Pumps EA 10 $ 10,000 $ 100,000 Discharge Pump Station EA 1 $ 500,000 $ 500,000 Flow Meter EA 1 $ 4,500 $ 4,500 Subtotal $ 1,642,000 Labor Allowance 20% $ 328,400 Subtotal $ 1,970,400 Overhead and Profits 15% $ 295,560 General Contractor months 6 $ 25,000 $ 150,000 Subtotal $ 2,415,960 Contingency 25% $ 603,990 Subtotal $ 3,019,950 Permitting $ 15,000 Engineering Design Costs 2% $ 60,399 Total $ 3,095,349 RECURRING COSTS(Year 2) Unit Quantity Unit Cost Estimated Cost Energy Discharge Pump kW/hr 250,000 $ 0.12 $ 29,700.00 Landshark Pumps kW/hr 250,000 $ 0.12 $ 29,700.00 Labor 2 employees hr 4,160 35 $ 145,600 Laboratory Annual Laboratory Costs $ 50,000 Subtotal $ 255,000 2.25% Discount Rate $ 249,389 TOTAL $ 3,344,738 A-3 APPLICATION FORM 2E Section 7.1 Attachment Kings Creek Stability and Water Quality Assessment Kings Creek Stability and Water Quality Assessment Albemarle Kings Mountain Lithium Mining Project Cleveland County, North Carolina NOVEMBER 2022 PREPARED FOR Albemarle Corporation PREPARED BY SWCA Environmental Consultants KINGS CREEK STABILITY AND WATER QUALITY ASSESSMENT KINGS MOUNTAIN LITHIUM MINING PROJECT CLEVELAND COUNTY, NORTH CAROLINA Prepared for Albemarle Corporation 348 Holiday Inn Drive Kings Mountain, North Carolina 28086 Prepared by SWCA Environmental Consultants 9319 Robert D. Snyder Rd, Suite 436 Charlotte, NC 28223 (980) 305-5750 www.swca.com SWCA Project No. 70316 November 2022 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project CONTENTS 1 Introduction..........................................................................................................................................I 1.1 Background................................................................................................................................... 1 1.2 Objectives..................................................................................................................................... 1 2 Stability Assessment.............................................................................................................................1 2.1 Hydrology..................................................................................................................................... 1 2.2 Hydraulic Model...........................................................................................................................2 2.2.1 Methodology.......................................................................................................................2 2.2.2 Results.................................................................................................................................3 2.3 Sediment Classification................................................................................................................4 2.3.1 Field Methodology..............................................................................................................4 2.3.2 Results.................................................................................................................................5 2.4 Stream Bank Analysis ..................................................................................................................6 2.4.1 Field Methodology..............................................................................................................6 2.4.2 Results.................................................................................................................................7 3 Water Quality Assessment...................................................................................................................9 3.1 Existing Water Quality Conditions............................................................................................. 10 3.1.1 Pit Lake Water Quality..................................................................................................... 10 3.1.2 South Creek Reservoir Water Quality.............................................................................. 11 3.1.3 Kings Creek Water Quality............................................................................................... 11 3.1.4 Aquatic Assessment.......................................................................................................... 12 4 Conclusion...........................................................................................................................................13 5 References Cited.................................................................................................................................14 6 Glossary...............................................................................................................................................15 Appendices Appendix A. Project Information Appendix B. Hydrologic and Hydraulic Calculations Appendix C.Field Data Appendix D. Hydraulic Model Results Appendix E. Water Quality Laboratory Results—Pit Lake Appendix F. Kings Creek Water Quality Laboratory Results—Kings Creek Appendix G. Aquatic Life Report Figures Figure 1. Looking upstream Kings Creek at a representative riffle streambed.............................................5 Figure 2. Representative very low/low BEHI/NBS stream bank..................................................................8 Figure 3. Representative moderate BEHI/NBS stream bank........................................................................8 Figure 4. Water Quality Sampling Locations. ............................................................................................ 10 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project Tables Table 1. Existing Peak Discharges................................................................................................................2 Table 2. Hydraulic Parameter Average Summary........................................................................................3 Table3. Flooding Depth Summary...............................................................................................................4 Table 4. Stream Bank Analysis Summary....................................................................................................7 Table 5. List of Aquatic Species of Concern with the Potential to Occur in Cleveland County,NC......... 12 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project 1 INTRODUCTION On behalf of Albemarle Corporation(Albemarle), SWCA Environmental Consultants(SWCA)has prepared this Kings Creek Stability and Water Quality Assessment for the Albemarle Kings Mountain Lithium Mining Project(Project),located in Cleveland County,North Carolina(Appendix A). 1 .1 Background Albemarle proposes to dewater an existing pit lake and recommence active mining,with the water from the pit lake to be discharged to Kings Creek. The current dewatering configuration under consideration is conveyance of pit water to the South Creek Reservoir prior to discharging to Kings Creek. The proposed outfall is the northeastern edge of South Creek Reservoir,which has two existing 36-inch gravity-fed drainpipes. The approximate location of the existing gravity fed drainpipes is 35' 12'42.70"N, 81°21'19.05"W. The 1,403-acre Project Site(Site) is located approximately 1 mile south of downtown Kings Mountain, North Carolina, and consists primarily of historically mined land, forested land,maintained utility rights-of-way, and industrial mining processing facilities. Kings Creek,a North Carolina Class C perennial stream with its headwater near the existing mine pit, bisects the site before flowing south through a culvert under Interstate 85 (1-85). The Project Reach studied for the purpose of this report extends from the headwaters of Kings Creek to where Kings Creek leaves the Site approximately 2,000 linear feet downstream of the 1-85 culvert. The total length of the studied reach of Kings Creek(Project Reach) is approximately 6,080 linear feet. 1 .2 Objectives This report describes the methods and results of assessments performed to evaluate the impact of discharging water from the existing mine pit water to Kings Creek,as well as SWCA's recommendations for the dewatering process. The main objectives of these assessments were to evaluate current channel stability and water quality conditions and to assess impacts, if any,to Kings Creek in order to ensure National Pollutant Discharge Elimination System(NPDES) compliance is met. Potential impacts are based on four major factors: • changes in flow rate • impacts to the physical structure of Kings Creek(potential for increased total suspended solids (TSS)or turbidity) • impacts to water chemistry • impacts to the aquatic system(i.e., sensitive species) 2 STABILITY ASSESSMENT 2.1 Hydrology In order to estimate expected flows through the Project Reach and evaluate channel stability, a desktop hydrologic analysis of the watershed was completed. The 1-year, 100-year, and 24-hour storm events were studied to represent a near-bankfull storm event and a major flood event. 1 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project The watershed was divided into four sub-basins delineated to points of analysis along the Project Reach using QL1 LiDAR data from North Carolina's Spatial Data records. Points of analysis were selected based on where there were significant changes in drainage area, such as inflow points or in-stream culverts. The most upstream sub-basin, Sub-basin 1, does not include the drainage area that flows into the existing pit lake or the Martin Marietta quarry since the outflows from those features are controlled through pumping processes. A composite curve number was assigned to each sub-basin based on land cover derived from the latest available aerial imagery and soil types present according to the Natural Resources Conservation Service (MRCS)Web Soil Survey. The subject watershed was classified as industrial,residential,or wooded land cover with silty loam soils of Hydrologic Soil Groups(HSGs) `B' and `C'. Precipitation data was obtained from NOAA Atlas 14 for Cleveland County,North Carolina. Peak discharges were computed in the Hydraflow Hydrographs Extension for AutoCAD Civil 3D using the NRCS TR-55 method(USDA,NRCS 1986). Baseflow conditions were calculated using field readings from an existing onsite v-notch weir in Kings Creek located just upstream of I-85. A summary of discharges are presented in Table 1 below. Hydrologic calculations and watershed drainage maps are provided in Appendix B. Table 1. Existing Peak Discharges Point of Analysis Baseflow Discharge(cfs) 1-Year Peak Discharge(cfs) 100-Year Peak Discharge(cfs) 1 0.5 37.8 256.9 2 0.5 165.6 1,004.1 3 0.5 258.9 2,057.3 4 0.5 579.1 3,635.2 Note:Discharge values are derived from watershed hydrology and do not include proposed dewatering flow or existing inflow from the adjacent mining operation. cfs=cubic feet per second 2.2 Hydraulic Model A hydraulic model provides quantitative results of channel hydraulics, such as channel velocities, shear stresses, and flood elevations, critical to the evaluation of channel stability. Kings Creek was modeled using US Army Corp of Engineers(USACE)HEC-RAS Version 6.1.0 software(USACE 2021). Hydraulic parameters for stability assessment were computed using the peak discharge estimates and geometry data of the existing channel. 2.2.1 Methodology A 1-Dimensional steady-state model was created to compare existing and proposed channel hydraulics and the effects of the proposed dewatering flow through the Project Reach. Channel geometry of Kings Creek was derived from cross section survey data provided by Geospatial Professionals, Inc. (GPI) and QL1 LiDAR data.A Manning's n roughness coefficient based on aerial imagery and field reconnaissance was assumed as 0.035 within the channel,which is representative of a clean,winding stream channel, and 0.10 for the well-vegetated left and right over banks (Arcement et. al. 1989). Existing stream structures including bridges, culverts, and weirs were integrated into the model based on survey data provided by GPI. 2 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project Steady-state models require both upstream and downstream boundary condition data. Since the upstream water surface elevation was not available for each flood event, a critical depth was assumed for the upstream boundary condition. The downstream boundary condition was calculated based on normal depth.Normal depth is derived from the average energy grade line slope which is assumed constant and equivalent to the downstream bed slope of Kings Creek, calculated at 0.012. Four scenarios were run and analyzed for Kings Creek: • existing conditions, • proposed additional discharge conditions, • existing conditions with Martin-Marietta quarry pumping, and • proposed additional discharge conditions with Martin-Marietta quarry pumping. The existing and proposed conditions used identical geometry and boundary condition data with the only variance being the flow data. Existing flows were based on watershed hydrology and the estimated peak flows for the 1-year, 100-year,and baseflow events. Additional inflow to Kings Creek from the adjacent Martin-Marietta quarry was added at cross section 65+73.11 and estimated as a constant 2,250 gpm (5.01 cfs),provided by Martin Marietta. Proposed conditions assumed an additional 3,500 gpm(7.80 cfs) of constant flow enter Kings Creek at cross section 38+80.56,representative of the proposed dewatering flow from the inactive Albemarle pit lake. Combined,this represents a constant flow of 5,750 gpm(12.81 cfs)into Kings Creek below the discharge point during the dewatering event. Additional data pertaining to hydraulic modelling methodology and results are presented in Appendix B. 2.2.2 Results The results of the hydraulic model were evaluated in terms of channel stability and flooding potential and are summarized in the following sections. 2.2.2.1 STABILITY Channel stability was assessed based on permissible velocities and shear stresses on the channel banks during the baseflow and bankfull events, since negligible differences were found in the 100-year storm event.Assuming long native grass vegetation cover on the banks of Kings Creek,the permissible velocity was 6 ft/s and the permissible shear stress 1.71b/ft2 in order to maintain channel stability(Fischenich, 2001).A summary of the hydraulic model results can be found in Table 2. Table 2. Hydraulic Parameter Average Summary Storm Event Existing Velocity(ft/s) Proposed Velocity Existing Shear Stress Proposed Shear (ft/s) (Ib/ftz) Stress(lb/ft2) Baseflow 1.94 2.09 0.26 0.29 1-Year 5.55 5.56 1.22 1.22 100-Year 8.33 8.33 2.03 2.03 Note:All values are an average of the hydraulic model results for the stream channel across the entire Project Reach. The most significant changes are found to occur in the baseflow condition. Only minor increases in these values are seen between existing and proposed conditions, and Kings Creek is well within the velocity 3 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project and shear thresholds in the proposed condition. This indicates that the increase in flow due to the pit lake dewatering is not expected to adversely impact the stability of Kings Creek. 2.2.2.2 FLOODING EXTENTS The downstream end of the Project Reach is confined by an accumulation of branches and sediment, alternatively referred to as Weir#7.Adjacent property owners have voiced concerns about flooding caused by Weir#7 in the existing condition. Potential flooding extents were assessed to ensure the additional flows do not result in encroachment onto adjacent properties. Negligible increases in flooding depth associated with the added discharge are anticipated in the area surrounding Weir#7 based on the hydraulic model results summarized in Table 3.Using a surface derived from QL1 LiDAR data, a 2-Dimensional steady-state HEC-RAS model was created to estimate flooding extents for the 100-year storm event. Flooding is not expected to extend beyond the subject property line or impact adjacent properties as shown in Appendix D. Table 3. Flooding Depth Summary Storm Event Pond Depth—Existing Conditions(ft) Pond Depth—Proposed Conditions(ft) Baseflow 0.70 0.80 1-Year 3.04 3.05 100-Year 7.67 7.68 Note:All values are an average of the hydraulic model results for the stream channel across the entire Project Reach. SWCA performed desktop and field assessments to evaluate the Project's watershed hydrology and existing fluvial geomorphologic conditions of the Project Reach. These assessments provide good indicators for determining the overall channel stability of Kings Creek. The methodologies applied are described in the following sections. 2.3 Sediment Classification Stream bed and bank material play a significant role in channel hydraulics. Classification of the sediment material and its composition help to estimate erosion rates, sediment supply,and overall channel stability. 2.3.1 Field Methodology The Wolman Pebble Count is a commonly used methodology to classify stream bed material and develop a median particle size(1350)for a given reach. The median particle size is an essential parameter in sediment transport calculations used to assess channel stability(Wolman 1954). Wolman Pebble Count procedure involves recording size measurements of a minimum of 100 random particle samples collected as an observer traverses the stream in a zig-zag pattern.Four SWCA employees completed Wolman Pebble Counts at 15 locations along Kings Creek in June 2022. Since the purpose of this assessment is to determine stream stability,particle samples were collected at riffle features only. Riffles control stream slope and experience the highest velocities and shear stresses making them most prone to instability. One hundred particle samples were measured with field rulers at each riffle location. Size measurements were recorded based on the sample's b-axis, or the limiting size in which the particle would pass through a sieve or gravelometer. Larger boulders or embedded particles were measured along the shortest visible axis. 4 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project With the collected data, a particle curve was developed for each of the 15 sample riffle locations by plotting the size distribution against frequency. The median particle size,Dso,was determined using the curve and noting where 50%of the samples are equal to or smaller than the particle size. The same methodology was used to calculate the Dsa and D95 for each riffle. 2.3.2 Results The Dso at the 15 sampled riffle locations ranged from fine gravel(6-8 mm)to very coarse gravel(48- 64 mm).An average Dso was calculated across the entire Project Reach and determined to be approximately 15 mm,which classifies as a medium gravel stream. Figure 1 displays existing representative conditions in the Kings Creek streambed. This determination corresponds with observations made in the field that a high percentage of the stream material was gravel. The Dso and D95 calculated for Kings Creek were 56 mm and 130 mm,respectively, indicating the presence of larger cobble and boulders as well. Bedrock grade control was also noted throughout the Project Reach.All data collection results are presented in Appendix C. r / F t aR�� 5 � d �a s� Figure 1. Looking upstream Kings Creek at a representative riffle streambed. Sediment transport is the initiation of particle movement downstream and a key indicator in assessing overall channel stability and potential for increases in Total Suspended Solids(TSS)or turbidity. Stream competency is a measure of the maximum particle size a stream can transport. Therefore,the Dso,Dso, and D95 for a reach can help provide an estimate of how much sediment is entrained, or being transported, at different flow rates or storm events. The Shields relation is a common method to estimate stream competency, or the ability to move the largest particle made available to the channel,based on critical shear stress calculated in a stream channel (USDA,NRCS 2007). 5 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project As determined by the HEC-RAS model,the average bankfull shear stress experienced by Kings Creek is estimated to be 1.21bs/ft2. Competency calculations indicate the expected movable particle size, as a result,would fall between 94 and 170 mm,which falls between the D84 and D95 for the observed Project Reach. This is indicative of a degrading or incising system. During field assessments,there were no visual indicators noted that corroborated this conclusion,rather,Kings Creek appeared to be in a dynamic equilibrium. SWCA assumes that this is likely a result of the pebble counts under-representing the presence of bed rock grade control observed in the field. The presence of bed rock in the channel bed would prevent any incision from occurring. The proposed additional discharge is expected to increase shear stress by only 1%(0.01 lbs/ft2)when comparing existing to proposed shear stress within the HEC- RAS model. This small increase in shear stress, from 1.21bs/ft2 to 1.21 lbs/ft2, does not change the expected movable particle size,and therefore,no discernible change to the stream competency or stability is expected. 2.4 Stream Bank Analysis In addition to classification of streambed material, an analysis of stream bank condition is important in estimating erosion potential and overall channel stability. Much of the suspended sediment found in streams can be attributed to eroding stream banks. While some natural erosion is expected in a stable stream,changes in watershed hydrology or sediment load due to anthropogenic influences increases the potential for a deviation from naturally occurring erosion. Since flow in Kings Creek is expected to increase as a result of the proposed mine pit dewatering, a stream bank analysis was performed to estimate the allowable dewatering flow that would ensure no adverse impacts to the existing stream banks. 2.4.1 Field Methodology The Bank Erosion Hazard Index(BEHI)is a tool that can be used in the field to assess existing stream bank conditions and erosion potential(Rosgen 2001).Values are assigned to five bank condition parameters: • bank to bankfull height ratio, • root depth, • root density, • surface protection, and • bank angle. The parameters are scored and summed to determine the BEHI rating for a given stream section. BEHI ratings are categorized from"very low"to"extreme",which aids in the understanding of the areas with the highest erosion potential.A field assessment was completed by SWCA in June 2022. The Project Reach was assessed in stream bank sections of varying lengths based on observed changing bank conditions. Left and right banks were evaluated separately. In addition to BEHI, a Near Bank Stress(NBS)Analysis was performed in the field as an additional approach to evaluate stream bank condition(Rosgen 2001). There are seven NBS methods for evaluating stream banks—SWCA utilized Method 1 which involves observing the location of flow relative to the bank to determine erosion potential.NBS ratings are scored from"very low"to"extreme"for each section of bank. 6 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project 2.4.2 Results SWCA walked approximately 5,100 feet of the Project Reach,between the headwater wetlands and the I- 85 culvert, and observed stream banks with good vegetation coverage and a moderately shallow bank angle. Channel flows were primarily concentrated in the center of the channel with very little signs of undercutting or erosion near the stream banks. As a result,a majority of the stream banks scored as "very low"or"low"in BEHI and NBS ratings,indicative of stable stream banks with low erosion potential. Table 4 summarizes the BEHI and NBS classifications given to the observed Project Reach. Additional field data is presented in Appendix C. Table 4. Stream Bank Analysis Summary BEHI Classification NBS Classification Bank Length(ft) Reach Portion Very Low Very Low 735 14% Very Low Low 632 12% Low Low 3,461 68% Moderate Moderate 300 6% Based on the measured and observed condition of the existing stream banks,minor increases in flow due to the mine pit dewatering is not expected to adversely impact the banks of Kings Creek. The section of stream with the highest erosion potential(moderate BEHI and NBS ratings)is located upstream of the proposed discharge point and is not expected to be impacted by additional discharge associated with pit dewatering. Figure 2 displays the existing representative conditions in a very low/low BEHI/NBS stream bank and Figure 3 displays the existing representative conditions in a moderate BEHI/NHS stream bank. 7 err _ S T. f l\ '. •j � � - Two Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project 3 WATER QUALITY ASSESSMENT In addition to impacts to stream stability,impacts to water quality in Kings Creek were assessed. Quarterly baseline water quality sampling commenced in the second quarter of 2022. Water quality sampling locations are presented in Figure 4. The sampling points that are pertinent to this memo are: Surface Water Sampling Locations Sample ID Location Specific sampling location KMSW-3 Kings Creek at Weir#7(below Club Collect from weir overflow;area may be Lake at property boundary) inaccessible due to flooding KMSW-3a Kings Creek at Weir(below South Collect from weir overflow Creek Reservoir) KMSW-8 South Creek Reservoir Collect near outlet structure,from bank KMSW-10 Kings Creek above admin building Collect from bank with access from parking lot. Pit Lake Water Sampling Locations Pit Lake Location Depth(feet) P L-2 10 PL-2 50 PL-2 80 PL-5 10 PL-5 50 PL-5 80 PL-8 10 PL-8 50 PL-8 80 Water quality samples have been collected for the second quarter and third quarter of 2022. However, laboratory results for the third quarter of 2022 are still pending at the time in which this report is written. Water results for the pit lake(Appendix E) South Reservoir and Kings Creek(Appendix F)are compared to North Carolina water quality standards for Class C waters. 9 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project KMMV- i 00 f. DDK f .. 0 / Figure 4. Water Quality Sampling Locations. 3.1 Existing Water Quality Conditions 3.1.1 Pit Lake Water Quality Analytical results are presented in Appendix E, compared to North Carolina Class C Water Quality Standards and summarized below Shallow pit lake waters • The shallow pit lake waters are circumneutral to slightly alkaline,with a pH range of 7.7 to 9.1. • The temperature has an average temperature of 22°C. • The water is oxygenated,with PL-2 and PL-5 exceeding an oxygen saturation of 8 mg/L. Dissolved oxygen at PL-8 is under-saturated at 5.4 mg/L,which could be attributed to less mixing with surface waters at PL-8 compared to PL-2 and PL-5. 10 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project • There was no exceedance of Class C water quality standards(Appendix E). Medium depth pit lake waters(-50 feet) • The medium depth pit lake waters are circumneutral to alkaline,with a pH range of approximately 7.5-9.2. • The temperature is cooler and more homogonous than shallow pit lake waters with a range of 8.4°C to 8.5°C. • The medium depth pit lake waters are largely depleted of oxygen to anoxic,with a dissolved oxygen concentration ranging from 0.2 mg/L to 0.8 mg/L. The lack of dissolved iron at medium depths indicates the dissolved oxygen concentration may trend towards low oxic. • There was no exceedance of Class C water quality standards for metals concentrations. Deep pit lake waters(>-80 feet) • The deep pit lake waters are circumneutral,with a pH of approximately 7.6. • The temperature is homogonous and consistent with the medium depth pit lake waters with measurement of 8.7°C at the three sampling locations. • Like the medium depth pit lake,the deep pit lake waters are anoxic with a dissolved oxygen concentration ranging from 0.45 mg/L to 1.97 mg/L. The presence of moderate concentrations of sulfide(18.4 mg/L to 29.2 mg/L) is indicative of fully anoxic conditions. • The presence of ammonia(3.61 mg/L to 3.93 mg/L)in deep pit lake waters support reducing conditions in the deeper lake. • There was no exceedance of Class C water quality standards for metal concentrations. 3.1.2 South Creek Reservoir Water Quality South Creek Reservoir will be used as an equalization pond prior to discharge to Kings Creek. Current water quality within South Reservoir does not exceed any water quality standards, other than slightly lower dissolved oxygen. The current water within the reservoir will initially be discharged into Kings Creek 3.1.3 Kings Creek Water Quality One water quality sample was collected above the discharge point and two water samples were collected from Kings Creek—one at Weir#3 (KMSW-3) immediately below the discharge point and one further downstream at Weir#7 (KMSW-3a)near the property boundary. The water samples were generally similar from upstream of the discharge point,the discharge point and the downstream of the discharge point,with the exception of dissolved oxygen. Upstream and downstream samples were anoxic,while the discharge point had reasonable oxygen levels. Water quality of Kings Creek compared with several water quality parameters of the pit lake include: • Ammonia and sulfide concentrations were below the detection limits. • Sulfate concentrations range from 70 to 145 mg/L. • pH is circumneutral range from 7.2 to 7.5. 11 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project • Temperature ranged from 16°C above the discharge point to 25°C at and below the discharge point. • North Carolina Class C Water Quality Standards were not exceeded for any metal analytes. This includes hardness-dependent water quality standards for both the hardness of the pit lake and the hardness at 100 mg/L 3.1.4 Aquatic Assessment SWCA conducted an aquatic habitat assessment to determine the aquatic faunal assemblage of the ponds and streams within the Project area(Appendix G). SWCA conducted a desktop analysis of publicly available information to characterize the lake,pond,wetland, and stream habitat within the Project area that would be surveyed. SWCA previously conducted a wetland and waterbody delineation in February and March of 2022 (SWCA 2022a). Observations from these surveys were also utilized when determining suitable habitat and sampling areas for the aquatic surveys. These sources were also used to determine a short list of aquatic species of concern with the potential to occur in the Project area(Table 5). Seven state-listed aquatic species were identified as having the potential to occur in the Project area,although none were listed as state threatened or endangered.No federally listed aquatic species were identified. More detailed species descriptions are provided under separate cover in SWCA's(2022b)Federally and State-Listed Species Report for the Kings Mountain Lithium Mine, Cleveland County,North Carolina. Table 5. List of Aquatic Species of Concern with the Potential to Occur in Cleveland County, NC Common Name Scientific Name Presence State Status Habitat Likelihood "Carolina"Quillback Carpiodes sp.cf. Low Significantly rare P:Yadkin-Pee Dee,Catawba, Broad,and (fish) cyprinus Roanoke drainages Seagreen Darter Etheostoma Low Significantly rare MP:Catawba and Broad drainages (fish) thalassinum Yellowfin Shiner Notropis lutipinnis Very Low Special concern MP:Savannah and Little Tennessee[only (fish) the Savannah drainage is listed as SC] Carolina Foothills Cambarus johni Moderate Significantly rare MP:headwater streams in the Yadkin-Pee Crayfish Dee,Catawba,and Broad drainages Broad River Stream Cambarus lenati Low Significantly rare P:streams in the Broad River drainage Crayfish French Broad River Cambarus reburrus Very Low Significantly rare M:streams in the French Broad, Little Crayfish Tennessee,and Savannah drainages Broad River Spiny Cambarus spicatus Very Low Special concern P:streams in the Broad River drainage Crayfish NC State Status:E=endangered,T=Threatened,SC=Special concern,SR=significantly rare Region:M=mountain,P=Piedmont SWCA utilized three main methods to assess the aquatic habitats observed within the Albemarle properties: trapping fish within pond habitats, electrofishing in streams, and visual and tactile surveys of streams for aquatic macroinvertebrates(primarily freshwater mollusks and crayfish). Aquatic surveys were conducted between August 22nd through August 26th, 2022.All collected animals were identified to species and released at their capture location. Additional data including animal lengths and sexual characteristics was collected. 12 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project All species of fish, crustaceans, and bivalves encountered during surveying are listed as Least Concern by the International Union for Conservation of Nature. The results of SWCA's aquatic survey indicate that no Federally or State aquatic species of concern occur in the Project area. Because there is no evidence of rare species occurring within the survey areas, SWCA is not providing any management recommendations beyond the typical water quality best management practices. Fish species composition differed between pond and creek habitats. Only five fish species were observed within the ponds surveyed,versus 11 species within creek habitat.Bluegill was the most common species, occurring in all ponds and all creeks surveyed. This common sunfish species,as well as three other species observed within pond habitats(redbreast sunfish, largemouth bass, and spotted bass)were also observed within some stream sections. Pumpkinseed was only observed in South Creek Reservoir. While there is no exceedance of North Carolina water quality standards for Class C waters for waters to be discharged from both South Reservoir and the pit lake, several constituents may impact aquatic life identified within Kings Creek without equilibration in South Reservoir,notably temperature,dissolved oxygen and dissolved sulfide. Based on the available data,residence time in South Reservoir as well as the drop over rip rap from the culverts to the discharge point in Kings Creek will support equilibration of these constituents to levels appropriate for discharge. 4 CONCLUSION Based on the existing conditions detailed in this report,the following design considerations are recommended: • Dewatering flows from the existing mine pit shall not exceed 3,500 gpm(7.80 cfs). • Based on the estimated volume of water to be discharged to Kings Creek,the anticipated discharge rate, and the allowing for regular maintenance of the system, dewatering is anticipated to take between 10 and 24 months to complete. • Water quality sampling and analysis,combined with geochemical modeling is ongoing to further evaluate potential impacts to Kings Creek through this proposed action. If the proposed discharges into Kings Creek meet the recommendations within this report,then the requirements set forth regarding the stream stability and water quality will be met without additional analysis. However,modifications to the proposed flow regime may require that this analysis be revised. Some modifications that would require this analysis to be revised include: • Changes in measured water quality concentrations,performed annually. • Significant changes in the watershed that result in increased runoff to the Project Reach. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as the project moves forward. 13 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project 5 REFERENCES CITED Arcement, George J. Jr., Schneider,Verne R. 1989. Guide for Selecting Manning's Roughness Coefficients for Natural Channels and Flood Plains. United States Government Printing Office. U.S. Department of Transportation, Federal Highway Administration. Fischenich, Craig. 2001.Stability Thresholds for Stream Restoration Materials. Vicksburg,Mississippi: Ecosystem Management and Restoration Research Program(EMRRP). USAE Research and Development Center,Environmental Laboratory. Natural Resources Conservation Service(MRCS). 2007.Part 654 Stream Restoration Design National Engineering Handbook. Chapter H:Rosgen Geomorphic Channel Design. USDA. Rosgen. D. L. 1942. Watershed Assessment of River Stability and Sediment Supply (WARSSS). Fort Collins,Colorado: Wildland Hydrology. Rosgen,D. L. 2001.A Practical Method of Computing Streambank Erosion Rate.Pagosa Springs, Colorado: US EPA. State of North Carolina Department of Environmental Quality(NCDEQ)Division of Energy,Mineral, and Land Resources. 2021. General Permit No. NCG020000. To discharge stormwater, mine dewatering, and process wastewater under the National Pollutant Discharge Elimination System. North Carolina: DEQ. SWCA Environmental Consultants(SWCA). 2022a. Wetland and Waterbody Delineation Report for the Albemarle Kings Mountain Lithium Mining Project, Cleveland County, North Carolina. April. SWCA. 2022b.Federally and State-Listed Species Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina. September. United States Army Corps of Engineers. 2021.HEC-RAS Version 6.1.0. United States Environmental Protection Agency(USEPA). 2022.National Pollutant Discharge Elimination System (NPDES). US EPA. United States Department of Agriculture(USDA),Nation Resources Conservation Service(MRCS). 1986. Urban Hydrology for Small Watersheds: TR-SS. USDA. United States Geological Survey(USGS). 2014. Topographic Data Quality Levels (QLs). USGS's 3D Elevation Program. Wolman,M. Gordon. 1954.A method of sampling coarse river-bed material. American Geophysical Union. 14 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project 6 GLOSSARY Anthropogenic. Environmental change caused or influenced by people. Bankfull Event. A frequently occurring peak flow event whose stage represents the incipient point of flooding. It is often associated with a return period of 1-2 years,with an average of 1.5 years(Rosgen 1942). B-Axis. The intermediate axis, or the pebble's diameter(Rosgen 1942). BEHI. Bank Erosion Hazard Index. A process-integration approach that evaluates the susceptibility to erosion for multiple erosional processes (Rosgen 1942). Critical Depth. The depth at which the energy of the flow is minimized. Curve Number. A hydrologic parameter based on land use, soil type, and soil moisture to describe stormwater runoff potential for a specified drainage area. D50. The particle size when the cumulative percentage meets 50% of the total particles. Dsa. The particle size when the cumulative percentage meets 84%of the total particles. D95. The particle size when the cumulative percentage meets 95%of the total particles. Degrading.A lowering of local base level over time due to channel incision processes (Rosgen 1942). Dewater. To drain or remove water from a flooded area. Fluvial. Of or found in a river. Geomorphologic. The study of the origin and evolution of the configuration of landforms. Gravelometer.A gravel template/device used to classify particles into class sizes. Headwater. A tributary stream of a river close to or forming part of its source. Hydraulics. The branch of science and technology concerned with the conveyance of liquids through pipes and channels, especially as a source of mechanical force or control Hydrology. The branch of science concerned with the properties of the earth's water,and especially its movement in relation to land. Incising. A process relating to abandonment of an active floodplain and a lowering of local base level (Rosgen 1942). Manning's n Roughness Coefficient. Represents an empirically derived resistance coefficient to compute velocity(Rosgen 1942). NBS. Near Bank Stress.Assessment in a Bank Assessment for Non-point source Consequences of Sediment(BANCS)model associated with energy distribution against streambanks(Rosgen 1942). 15 Kings Creek Stability and Water Quality Assessment—Kings Mountain Lithium Mining Project National Pollutant Discharge Elimination System.A permit program created in 1972 by the Clean Water Act that addresses water pollution by regulating point sources that discharge pollutants to waters of the United States. (USEPA 2022). Perennial. A stream that has continuous flow of surface water year-round during a typical year. Permissible Velocities. The highest velocity at which water may be carried safely in a channel. LiDAR. Light Detection and Ranging.A remote sensing system used to collect topographic data. LiDAR images are helpful in areas with heavy vegetation because they depict the terrain and stream features by removing vegetation effects (Rosgen 1942). QLl.Quality Level 1. A quality level assigned to LiDAR that has a vertical accuracy of 10 cm, a nominal pulse spacing of less than or equal to 0.35m,and a digital elevation cell size of 0.5m. QL1 is second only to QLO(USGS 2014). Shear Stress. The frictional force per unit area causing flow resistance along the channel boundary. Measured as a depth and slope product multiplied by the specific weight of water(Rosgen 1942). Sieve.A tool consisting of wire meshes or perforations held in a frame through which finer particles of a mixture of various sizes may pass. Used to determine the particle size distribution of a stream bed. Steady-state model. A HEC-RAS model where discharge remains constant throughout the entire model run. The discharge-stage ratings will represent a kinematic flow. Stream Competency. The ability of a river to move the largest particle made available from the immediate upstream supply(Rosgen 1942). TSS. Total Suspended Sediment. The portion of the total sediment load of rivers that is carried in the water column(Rosgen 1942). Turbidity.The measure of relative clarity of a liquid. 16 APPENDIX A Project Information Vicinity Map Soils Data fiS a° e Rd e Pe st % Creek �G�\ \� '1201R - o W t�9ht Rd N D p 85 der �arr I i a e�son R. 1- 0-0eth9 ce, �,dOIA Potts o p ew•goutheM•kt� Y" Kings y ° - Krrgs Mountain 41 .. - Country --- - Club .� ' \ E Ridge St t etbY Rd Rd Bea,On Creek Kings I ��nterGury -- 1a\ Mountain m l �r �- vs O Crowders Mo I 0 e\ °rt9 8t 3ntlt I �pJ Mounta in State Park _ n��r2c pae ?r .1692`t 4> - Oaty Ra eA°` a CD I i. Be t S,� \4F `KINGS MO TAIN t o N V ! m c I l C, G Love VaIAL 0 6 1p .� t1617r� y o Project Reach(Kings Creek) �a Albermarle Property Line `Ortgel�,c" Background: 2019 ESRI Imagery KINGS MOUNTAIN LITHIUM MINING PROJECT Sale,Created By: K..GAt Gallt SWCA KINGS CREEK D-PrdBce Allen SWCA Project N. 70316 Dale Produced: September 30,2022 Cleveland County, North Carolina NAD 1983 StatePlane North Carolina FIPS 3200 Feet ENVIRONMENTAL CONSULTANTS 9 4,800 9,600 VICINITY MAP Feet Kilometers 0 1.5 3 E to W cold St Kings i w c3 Mountain E cold St _ m Qa S a�.p�cA St h `. h P,me st 05 �'Ba No �' _ Bndgos D, O '�- St 'St Beason Greek S a � Hawlf,p e y c C mS e �.'� .p Giexent S Rd 61 I oI kpbmok Rd a O` ao IlkP 9\ yd Ln Ch. B11 CP � 1002h Q\ O c a' p b Y- O_ , 1964 R L Ln a P6 P� PJ41 Se _ o` �s�a •1006e � c Pn �` Gage M 9yd r Z City Lake o • n Project Reach(Kings Creek) Project Watershed o 0 e a+rx .� Hydrologic Soil Group e,1 B 5 a C P D o°a W Background: USGS Web Soil Survey KINGS MOUNTAIN LITHIUM MINING PROJECT Sale,Created By: N..GAt Gallt SWCA KINGS CREEK D-P,dBce A SWCA Project N. 70316 Dale Producetl: September 30,2022 Cleveland County, North Carolina NAD 1983 StatePlane North Catollna FIPS 3200 Feet ENVIRONMENTAL CONSULTANTS 0 2,000 a,000 SOILS MAP Fee, Kilometers 0 os , APPENDIX B Hydrologic and Hydraulic Calculations Season Creek _ - \ 0� CV oesDent CIS �Owbrook Rd 'e, Go Pam, IN J7ln �y.(a r for o ��a Oaf* r r %� ° SUB-BASIN 1 Area = 96.9 Ac. SUB-BASIN 2 CN = 71.5 ooz h Area = 222.5 Ac. Tc = 58.6 min CN = 74 Tc = 36.4 min o� SUB-BASIN 3 Area = 509 Ac. CN = 65 Tc = 51.9 min SUB-BASIN 4 Area = 465 Ac. CN = 78 Tc = 49.7 min G7 l rd 06/ y Mt � J a F C? - GT9 _ Ke Fid C City Lake J �pt Project Reach(Kings Creek) 161 Existing Stream 4 _ Drainage Area Background: 2019 ESR1 imagery KINGS MOUNTAIN LITHIUM MINING PROJECT / Scale: G,Ilt Created By: I... 600 - SWCA KINGS CREEK Reviewed By: Allen SWCA Protect No.: 70316 Date Produced: August 08,2022 Cleveland County, North Carolina NAD 1983 State Plane North Carolina FIPS 3200 Feet ENVIRONMENTAL CONSULTANTS ° 1,500 3,000 DRAINAGE MAP Fe S Kilometers 0 0.5 1 I Watershed Model Schematic HydraflowHydrographs Extension for Autodesk®Civil 3D®byAutodesk,Inc.v2022 5 6 7 Project: KingsMtn.gpw Wednesday, 08/ 10/2022 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 1 DA1 Hydrograph type = SCS Runoff Peak discharge = 37.81 cfs Storm frequency = 1 yrs Time to peak = 12.50 hrs Time interval = 5 min Hyd. volume = 282,808 cuft Drainage area = 96.900 ac Curve number = 71.5 Basin Slope = 2.2 % Hydraulic length = 10248 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 2 DA2 Hydrograph type = SCS Runoff Peak discharge = 132.89 cfs Storm frequency = 1 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 720,215 cuft Drainage area = 222.500 ac Curve number = 74 Basin Slope = 5.6 % Hydraulic length = 3739 ft Tc method = TR55 Time of conc. (Tc) = 36.40 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 3 DA3 Hydrograph type = SCS Runoff Peak discharge = 105.03 cfs Storm frequency = 1 yrs Time to peak = 12.50 hrs Time interval = 5 min Hyd. volume = 958,828 cuft Drainage area = 509.000 ac Curve number = 65 Basin Slope = 3.1 % Hydraulic length = 8470 ft Tc method = TR55 Time of conc. (Tc) = 51.90 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3 Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 4 DA4 Hydrograph type = SCS Runoff Peak discharge = 320.30 cfs Storm frequency = 1 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 1,917,437 cuft Drainage area = 465.000 ac Curve number = 78* Basin Slope = 2.2 % Hydraulic length = 8310 ft Tc method = TR55 Time of conc. (Tc) = 49.70 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 "Composite(Area/CN)_[(465.000 x 78)]/465.000 DA4 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 5 DA1-Comb Hydrograph type = Combine Peak discharge = 165.62 cfs Storm frequency = 1 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 1,003,023 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 319.400 ac DA1-Comb Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 6 DA3-Comb Hydrograph type = Combine Peak discharge = 258.92 cfs Storm frequency = 1 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 1,961,852 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 828.400 ac DA3-Comb Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 6 Hyd No. 1 Hyd No. 2 Hyd No. 3 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 7 DA4-Comb Hydrograph type = Combine Peak discharge = 579.06 cfs Storm frequency = 1 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 3,879,287 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 1293.400 ac DA4-Comb Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 640.00 640.00 560.00 560.00 480.00 480.00 400.00 400.00 320.00 320.00 240.00 240.00 160.00 160.00 80.00 80.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (hrs) Hyd No. 4 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 1 DA1 Hydrograph type = SCS Runoff Peak discharge = 59.77 cfs Storm frequency = 2 yrs Time to peak = 12.50 hrs Time interval = 5 min Hyd. volume = 418,987 cuft Drainage area = 96.900 ac Curve number = 71.5 Basin Slope = 2.2 % Hydraulic length = 10248 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1 Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 2 DA2 Hydrograph type = SCS Runoff Peak discharge = 201.51 cfs Storm frequency = 2 yrs Time to peak = 12.25 hrs Time interval = 5 min Hyd. volume = 1,042,159 cuft Drainage area = 222.500 ac Curve number = 74 Basin Slope = 5.6 % Hydraulic length = 3739 ft Tc method = TR55 Time of conc. (Tc) = 36.40 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2 Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 3 DA3 Hydrograph type = SCS Runoff Peak discharge = 193.16 cfs Storm frequency = 2 yrs Time to peak = 12.50 hrs Time interval = 5 min Hyd. volume = 1,534,142 cuft Drainage area = 509.000 ac Curve number = 65 Basin Slope = 3.1 % Hydraulic length = 8470 ft Tc method = TR55 Time of conc. (Tc) = 51.90 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3 Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 4 DA4 Hydrograph type = SCS Runoff Peak discharge = 461.08 cfs Storm frequency = 2 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 2,682,404 cuft Drainage area = 465.000 ac Curve number = 78* Basin Slope = 2.2 % Hydraulic length = 8310 ft Tc method = TR55 Time of conc. (Tc) = 49.70 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 "Composite(Area/CN)_[(465.000 x 78)]/465.000 DA4 Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 490.00 490.00 420.00 420.00 350.00 350.00 280.00 280.00 210.00 210.00 140.00 140.00 70.00 70.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 5 DA1-Comb Hydrograph type = Combine Peak discharge = 252.95 cfs Storm frequency = 2 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 1,461,146 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 319.400 ac DA1-Comb Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 6 DA3-Comb Hydrograph type = Combine Peak discharge = 428.51 cfs Storm frequency = 2 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 2,995,290 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 828.400 ac DA3-Comb Q (cfs) Hyd. No. 6 --2 Year Q (cfs) 480.00 480.00 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 6 Hyd No. 1 Hyd No. 2 Hyd No. 3 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 7 DA4-Comb Hydrograph type = Combine Peak discharge = 885.93 cfs Storm frequency = 2 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 5,677,694 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 1293.400 ac DA4-Comb Q (cfs) Hyd. No. 7 --2 Year Q (cfs) 889.00 889.00 762.00 762.00 635.00 635.00 508.00 508.00 381.00 381.00 254.00 254.00 127.00 127.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (hrs) Hyd No. 4 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 1 DA1 Hydrograph type = SCS Runoff Peak discharge = 129.45 cfs Storm frequency = 10 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 852,343 cuft Drainage area = 96.900 ac Curve number = 71.5 Basin Slope = 2.2 % Hydraulic length = 10248 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 5.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 2 DA2 Hydrograph type = SCS Runoff Peak discharge = 414.83 cfs Storm frequency = 10 yrs Time to peak = 12.25 hrs Time interval = 5 min Hyd. volume = 2,045,626 cuft Drainage area = 222.500 ac Curve number = 74 Basin Slope = 5.6 % Hydraulic length = 3739 ft Tc method = TR55 Time of conc. (Tc) = 36.40 min Total precip. = 5.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 3 DA3 Hydrograph type = SCS Runoff Peak discharge = 505.44 cfs Storm frequency = 10 yrs Time to peak = 12.50 hrs Time interval = 5 min Hyd. volume = 3,478,109 cuft Drainage area = 509.000 ac Curve number = 65 Basin Slope = 3.1 % Hydraulic length = 8470 ft Tc method = TR55 Time of conc. (Tc) = 51.90 min Total precip. = 5.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3 Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 560.00 560.00 490.00 490.00 420.00 420.00 350.00 350.00 280.00 280.00 210.00 210.00 140.00 140.00 70.00 70.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 4 DA4 Hydrograph type = SCS Runoff Peak discharge = 881.72 cfs Storm frequency = 10 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 4,995,593 cuft Drainage area = 465.000 ac Curve number = 78* Basin Slope = 2.2 % Hydraulic length = 8310 ft Tc method = TR55 Time of conc. (Tc) = 49.70 min Total precip. = 5.29 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 "Composite(Area/CN)_[(465.000 x 78)]/465.000 DA4 Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 882.00 882.00 756.00 756.00 630.00 630.00 504.00 504.00 378.00 378.00 252.00 252.00 126.00 126.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 5 DA1-Comb Hydrograph type = Combine Peak discharge = 523.88 cfs Storm frequency = 10 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 2,897,970 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 319.400 ac DA1-Comb Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 560.00 560.00 480.00 480.00 400.00 400.00 320.00 320.00 240.00 240.00 160.00 160.00 80.00 80.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 6 DA3-Comb Hydrograph type = Combine Peak discharge = 997.02 cfs Storm frequency = 10 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 6,376,079 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 828.400 ac DA3-Comb Q (cfs) Hyd. No. 6-- 10 Year Q (cfs) 1001.00 1001.00 858.00 858.00 715.00 715.00 572.00 572.00 429.00 429.00 286.00 286.00 143.00 143.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 6 Hyd No. 1 Hyd No. 2 Hyd No. 3 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 7 DA4-Comb Hydrograph type = Combine Peak discharge = 1862.58 cfs Storm frequency = 10 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 11,371,670 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 1293.400 ac DA4-Comb Q (cfs) Hyd. No. 7-- 10 Year Q (cfs) 1869.00 1869.00 1602.00 1602.00 1335.00 1335.00 1068.00 1068.00 801.00 801.00 534.00 534.00 267.00 267.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (hrs) Hyd No. 4 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 1 DA1 Hydrograph type = SCS Runoff Peak discharge = 256.94 cfs Storm frequency = 100 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 1,647,608 cuft Drainage area = 96.900 ac Curve number = 71.5 Basin Slope = 2.2 % Hydraulic length = 10248 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 7.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 2 DA2 Hydrograph type = SCS Runoff Peak discharge = 790.46 cfs Storm frequency = 100 yrs Time to peak = 12.25 hrs Time interval = 5 min Hyd. volume = 3,850,723 cuft Drainage area = 222.500 ac Curve number = 74 Basin Slope = 5.6 % Hydraulic length = 3739 ft Tc method = TR55 Time of conc. (Tc) = 36.40 min Total precip. = 7.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2 Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 791.00 791.00 678.00 678.00 565.00 565.00 452.00 452.00 339.00 339.00 226.00 226.00 113.00 113.00 11 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 3 DA3 Hydrograph type = SCS Runoff Peak discharge = 1114.87 cfs Storm frequency = 100 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 7,262,949 cuft Drainage area = 509.000 ac Curve number = 65 Basin Slope = 3.1 % Hydraulic length = 8470 ft Tc method = TR55 Time of conc. (Tc) = 51.90 min Total precip. = 7.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3 Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 1120.00 1120.00 960.00 960.00 800.00 800.00 640.00 640.00 480.00 480.00 320.00 320.00 160.00 160.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 4 DA4 Hydrograph type = SCS Runoff Peak discharge = 1598.31 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 9,037,386 cuft Drainage area = 465.000 ac Curve number = 78* Basin Slope = 2.2 % Hydraulic length = 8310 ft Tc method = TR55 Time of conc. (Tc) = 49.70 min Total precip. = 7.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 "Composite(Area/CN)_[(465.000 x 78)]/465.000 DA4 Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 1603.00 1603.00 1374.00 1374.00 1145.00 1145.00 916.00 916.00 687.00 687.00 458.00 458.00 229.00 229.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 5 DA1-Comb Hydrograph type = Combine Peak discharge = 1004.08 cfs Storm frequency = 100 yrs Time to peak = 12.25 hrs Time interval = 5 min Hyd. volume = 5,498,330 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 319.400 ac DA1-Comb Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 1008.00 1008.00 864.00 864.00 720.00 720.00 576.00 576.00 432.00 432.00 288.00 288.00 144.00 144.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 2 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 6 DA3-Comb Hydrograph type = Combine Peak discharge = 2057.33 cfs Storm frequency = 100 yrs Time to peak = 12.42 hrs Time interval = 5 min Hyd. volume = 12,761,280 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 828.400 ac DA3-Comb Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 2058.00 2058.00 1764.00 1764.00 1470.00 1470.00 1176.00 1176.00 882.00 882.00 588.00 588.00 294.00 294.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 6 Hyd No. 1 Hyd No. 2 Hyd No. 3 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Wednesday,08/10/2022 Hyd. No. 7 DA4-Comb Hydrograph type = Combine Peak discharge = 3635.22 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 5 min Hyd. volume = 21,798,660 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 1293.400 ac DA4-Comb Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 3640.00 3640.00 3120.00 3120.00 2600.00 2600.00 2080.00 2080.00 1560.00 1560.00 1040.00 1040.00 520.00 520.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 7 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (hrs) Hyd No. 4 HYDRAULIC MODEL- FLOW DATA SUMMARY Existing Conditions w/o MM Pumping w/MM Pumping River Storm Event Storm Event Station 1-Year 100-Year Baseflow 1-Year 100-Year Baseflow 7084.53 37.81 256.94 0.50 37.81 256.94 0.50 6573.11 37.81 256.94 0.50 42.82 261.95 5.51 5512.73 165.62 1004.08 0.50 170.63 1009.09 5.51 3880.56 258.92 2057.33 0.50 263.93 2062.34 5.51 3072.5111 579.06 3635.22 0.50 11 584.07 3640.23 5.51 Proposed Conditions w/o MM Pumping w/MM Pumping River Storm Event Storm Event Station 1-Year 100-Year Baseflow 1-Year 100-Year Baseflow 7084.53 37.81 256.94 0.50 37.81 256.94 0.50 6573.11 37.81 256.94 0.50 42.82 261.95 5.51 5512.73 165.62 1004.08 0.50 170.63 1009.09 5.51 3880.56 266.72 2065.13 8.30 271.73 2070.14 13.31 3072.5111 586.86 3643.02 8.30 11 591.87 3648.03 13.31 q1 -'Iµ,�a. _� •, ;�� - , Martin-Marietta f _ Mine a t f Albemarle ;.��` s ` Mining it 110 IN '1 aW � 5512.73 � 'e / _ 2 0 0 '498.70 O� 12g3 9S +V •A T�' �F` tip . Project Cross Sections Project Reach(Kings Creek) Y' Background: Mg ESR1 imagery KINGS MOUNTAIN LITHIUM MINING PROJECT Sale' 21,6°° A Created By: S.AMl SWCA KINGS CREEK D-PrdBy: A,3 SWCA Project No.: 70316 Dale Produced: September 30,2022 Cleveland County, North Carolina NAD 1983 StatePlane North C—lina FIPS 3200 Feet ENVIRONMENTAL CONSULTANTS 0 1,500 3,000 HYDRAULIC MODEL MAP ee` Kilometers 0 0.5 1 APPENDIX C Field Data Pebble Count Summary Entrainment Graph BEHUNBS Assessment Map PEBBLE COUNT SUMMARY STREAM:KINGS CREEK-All XS Summary Data DATE:6/2022 REACHES:XS4-XS 18 1 FtRM:SwcA Bed Form Distribution(By Cross Section) xS D50(mm) CLASSIFICATION Cumulative Pebble Size-frequency Graph xs4 48-64 Very coarse Gravel Kings Creek-All Cross Sections XS5 8-12 Medium Gravel XS6 16-24 Coarse Gravel 100.00% XS7 16-24 Coarse Gravel XS8 24-32 Coarse Gravel 90.00% ------ ------ ------ ----- ------ ------- XS9 12-16 Medium Gravel XS10 6-8 Fine Gravel 80.001, ------- ------ ------ — ---- ------- ------- XS11 12-16 Medium Gravel XS12 8-12 Medium Gravel XS 13 32-48 Very Coarse Gravel 70.00% ------- ------ ------ ------ ------ — XS 14 32-48 Very Coarse Gravel XS15 8-12 Medium Gravel 60.00% ------- ------- ------- ------- ------- ------- XS16 64-96 Small Cobble c XS17 12-16 Medium Gravel 50.00% ------- ------ ------ ------- ------ XS18 6-8 Fine Gravel w w a Kin s Creek-All XS Pebble Count Data 40.00% ------- ------- ------- ------- ------- ------- Particle Size Cumulative Count %Finer 0.062 103 6.67% 30.00% ------ ------ -- - ------ ------ ------ 0.062-0.125 108 6.99% 0.125-0.25 130 8.41% 20.00% ------- ------- ----- ------- ------ ------- 0.25-0.5 166 10.74% 0.5-1 210 13.59% 1-2 257 16.63% 10.00% ------ ----- ------ ----- ------ ------ 2-4 317 20.52% 4-6 381 24.66% 0.00% 6-8 461 29.84% 0.01 0.1 1 10 100 1000 10000 8-12 622 40.26% Particle Size(mm) 12-16 783 50.68% 16-24 955 61.81% 24-32 1089 70.49% 32-48 1210 78.32% 48-96 1405 90.94% Kings Creek-Pebble Count-All XS Summary 64-96 1405 90.94% 96-128 1454 94.11% 128-192 1495 96.76% D50(All Data): 12-16mm 384-512 1516 98.12% Classification(All Data): Medium Gravel Bed Stream(Rosgen Channel Material Class 4) 512-1024 1521 98.45% 1024-2048 1522 98.51% 2048-4096 1529 98.96% Bedrock 1545 100.00% WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 4 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 41 41 34% Very Fine .062-.125 0 34% Fine .125-.25 0 34% Medium .25-.50 SANDS 3 3 37% Coarse .50-1.0 5 1 1 1 1 1 5 1 41% Vry Coarse 1.0-2 1 1 42% Very Fine 2-4 3 3 44% Fine 4-6 4 4 48% Fine 6-8 0 48% Medium 8-12 AV 5 5 52% Medium 12-16 ELS 8 8 58% Coarse 16-24 7 7 64% Coarse 24-32 5 5 68% Vry Coarse 32-48 9 9 76% Vry Coarse 48-64 8 8 83% 0.21-0.31 Small 64-96 6 6 88% 0.31-0.42 Small 96-128 COBB 2 2 89% 0.42-0.63 Large 128-192 LE 3 3 92% 0.63-0.84 Large 192-256 6 6 97% 0.84-1.26 Small 256-384 2 2 98% 1.26-1.68 Small 384-512 0 98% 1.68-3.36 Medium 512-1024 B R D 0 98% 3.36-6.72 Lrg 1024-2048 0 98% 6.72-13.43 Vry Lrg 2048-4096 0 98% Bedrock >4096 BDRK 2 2 100% FEATURE SAMPLED Sum 120.0 1005/o Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ------ ------ ------ 80.00% ----- ----- ----- ---- ----- ----- 70.00% ----- ----- ----- ----- ----- ----- 60.00% ------ ------ ------ ------ ------ ------ v c LL c 50.00% ----- ----- --- ----- ----- ----- UJ U U1 d 40.00% ----- -- ----- ------ ----- ----- 30.00% ------ ----- ----- ------ ------ ------ 20.00% ------ ----- ----- ------ ------ ------ 10.00% ----- ----- ----- ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 5 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 9 9 8% Very Fine .062-.125 0 8% Fine .125-.25 0 8% Medium .25-.50 SANDS 4 4 12% Coarse .50-1.0 9 9 20% Vry Coarse 1.0-2 2 2 22% Very Fine 2-4 6 6 28% Fine 4-6 5 5 32% Fine 6-8 9 9 40% Medium 8-12 AV 15 15 54% Medium 12-16 ELS 16 16 69% Coarse 16-24 16 16 83% Coarse 24-32 7 7 90% Vry Coarse 32-48 2 2 92% Vry Coarse 48-64 2 2 94% 0.21-0.31 Small 64-96 2 2 95% 0.31-0.42 Small 96-128 COBB 2 2 97% 0.42-0.63 Large 128-192 LE 0 97% 0.63-0.84 Large 192-256 0 97% 0.84-1.26 Small 256-384 0 97% 1.26-1.68 Small 384-512 0 97% 1.68-3.36 Medium 512-1024 B R D 0 97% 3.36-6.72 Lrg 1024-2048 0 97% 6.72-13.43 Vry Lrg 2048-4096 3 3 100% Bedrock >4096 BDRK p 100% FEATURE SAMPLED Sum 109.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ------ ------ ------ 80.00% ----- ----- ----- ----- ----- ----- 70.00% ----- ----- ----- ----- ----- ----- 60.00% ------ ------ ------ ------ ------ ------ v c LL c 50.00% ----- ----- --- ----- ----- ----- UJ U U1 d 40.00% ----- ----- — — ----- ----- ----- 30.00% ------ ---- ------ ------ ------ 20.00% --- — ------ ------ ------ ------ 10.00% ----- ----- — ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM:KINGS CREEK-XS 6 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE mm Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 1 1 1% Very Fine .062-.125 1 1 2% Fine .125-.25 0 2% Medium .25-.50 SANDS 3 3 5% Coarse .50-1.0 2 2 7% Vry Coarse 1.0-2 2 2 9% VeryFine 2-4 3 3 11% Fine 4-6 6 6 17% Fine 6-8 8 8 25% Medium 8-12 11 11 35% Medium 12-16 ELS 11 1 1 1 11 46% Coarse 16-24 10 1 10 55% Coarse 24-32 9 9 64% Vry Coarse 32-48 9 9 72% Vry Coarse 48-64 10 10 82% 0.21-0.31 Small 64-96 12 12 93% 0.31-0.42 Small 96-128 COBB 3 3 96% 0.42-0.63 Large 128-192 LE 2 2 98% 0.63-0.84 Large 192-256 0 98% 0.84-1.26 Small 256-384 1 1 99% 1.26-1.68 Small 384-512 0 99% 1.68-3.36 Medium 512-1024 B LR D 1 1 100% 3.36-6.72 Lrg 1024-2048 0 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK I p 100% FEATURE SAMPLED Sum 105.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ --- — ------ ------ 80.00% ----- ----- ----- --- ----- ----- 70.00% ----- ----- ----- ----- ----- ----- 60.00% ------ ------ ------ ------ ------ ------ v c LL c 50.00% ----- ----- ----- ----- ----- ----- U U) d 40.00% ----- ----- ----- ----- ----- ----- 30.00% ------ ----- ---- ------ ------ ------ 20.00% ------ ----- — --- ------ ------ ------ 10.00% ----- ----- ----- ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 7 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 3 3 3% Very Fine .062-.125 0 3% Fine .125-.25 0 3% Medium .25-.50 SANDS 0 3% Coarse .50-1.0 2 2 5% Vry Coarse 1.0-2 1 1 6% Very Fine 2-4 2 2 8% Fine 4-6 3 3 11% Fine 6-8 3 3 14% Medium 8-12 AV 11 11 25% Medium 12-16 ELS 14 14 39% Coarse 16-24 11 11 50% Coarse 24-32 14 14 64% Vry Coarse 32-48 3 3 67% Vry Coarse 48-64 4 4 71% 0.21-0.31 Small 64-96 10 10 81% 0.31-0.42 Small 96-128 COBB 6 6 87% 0.42-0.63 Large 128-192 LE 9 9 96% 0.63-0.84 Large 192-256 1 1 97% 0.84-1.26 Small 256-384 0 97% 1.26-1.68 Small 384-512 1 1 98% 1.68-3.36 Medium 512-1024 B R D 2 2 100% 3.36-6.72 Lrg 1024-2048 0 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK 0 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ------ ------ ------ 80.00% ----- ----- ----- -- — ----- ----- 70.00% ----- ----- ----- --- ----- ----- 60.00% ------ ------ ------ ------ ------ ------ v c LL c 50.00% ----- ----- ----- ----- ----- ----- U U) d 40.00% ----- ----- ----- ------ ----- ----- 30.00% ------ ------ ------ ------ ------ ------ 20.00% ------ ------ ---- ------ ------ ------ 10.00% ----- ----- ---- ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 8 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 2 2 2% Very Fine .062-.125 0 2% Fine .125-.25 0 2% Medium .25-.50 SANDS 0 2% Coarse .50-1.0 1 1 3% Vry Coarse 1.0-2 4 4 7% Very Fine 2-4 5 5 12% Fine 4-6 2 2 14% Fine 6-8 0 14% Medium 8-12 AV 6 6 20% Medium 12-16 ELS 9 9 30% Coarse 16-24 13 13 43% Coarse 24-32 10 10 53% Vry Coarse 32-48 19 19 72% Vry Coarse 48-64 17 1 17 90% 0.21-0.31 Small 64-96 8 8 98% 0.31-0.42 Small 96-128 COBB 2 2 100% 0.42-0.63 Large 128-192 LE 0 100% 0.63-0.84 Large 192-256 0 100% 0.84-1.26 Small 256-384 0 100% 1.26-1.68 Small 384-512 0 100% 1.68-3.36 Medium 512-1024 B R D 0 100% 3.36-6.72 Lrg 1024-2048 0 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK p 100% FEATURE SAMPLED Sum 98.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ -- --- ------ ------ 80.00% ----- ----- ----- ---- ----- ----- 70.00% ----- ----- ----- ----- ----- ----- 60.00% ------ ------ ------ ----- ------ ------ v c LL c 50.00% ----- ----- ----- ----- ----- ----- U U) d 40.00% ----- ----- ----- ------ ------ 30.00% ------ ------ ------ ------ ------ ------ 20.00% ------ ------ ----- ------ ------ ------ 10.00% ----- ----- ----- ------ ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM:KINGS CREEK-XS 9 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE mm Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 7 7 6% Very Fine .062-.125 0 6% Fine .125-.25 1 1 7% Medium .25-.50 SANDS 3 3 10% Coarse .50-1.0 4 4 14% Vry Coarse 1.0-2 0 14% Very Fine 2-4 4 4 17% Fine 4-6 6 6 23% Fine 6-8 3 3 1 25% Medium 8-12 14 14 38% Medium 12-16 ELS 19 1 19 55% Coarse 16-24 20 1 1 1 20 74% Coarse 24-32 22 1 22 94% Vry Coarse 32-48 3 3 96% Vry Coarse 48-64 1 1 97% 0.21-0.31 Small 64-96 1 1 98% 0.31-0.42 Small 96-128 COBB 0 98% 0.42-0.63 Large 128-192 LE 0 98% 0.63-0.84 Large 192-256 0 98% 0.84-1.26 Small 256-384 1 1 99% 1.26-1.68 Small 384-512 1 1 100% 1.68-3.36 Medium 512-1024 B R D 0 100% 3.36-6.72 Lrg 1024-2048 0 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK I 0 100% FEATURE SAMPLED Sum 110.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ------ ------ ------ 80.00% ----- ----- ----- ------ ------ ------ 70.00% ----- ----- ----- ------ ------ ------ 60.00% ------ ------ ------ ------ ------ ------ v c LL c 50.00% ----- ----- ----- ----- ------ ------ U U) d 40.00% ----- ----- ----- ------ ------ ------ 30.00% ------ ------ --- ------ ------ ------ 20.00% ------ ------ ----- ------ ------ ------ 10.00% ----- ----- ----- ------ ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 10 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 3 3 3% Very Fine .062-.125 0 3% Fine .125-.25 3 3 6% Medium .25-.50 SANDS 3 3 9% Coarse .50-1.0 2 2 10% Vry Coarse 1.0-2 7 7 17% Very Fine 2-4 15 15 31% Fine 4-6 15 15 46% Fine 6-8 9 9 54% Medium 8-12 AV 20 20 73% Medium 12-16 ELS 12 12 85% Coarse 16-24 8 8 92% Coarse 24-32 2 2 94% Vry Coarse 32-48 2 2 96% Vry Coarse 48-64 2 2 98% 0.21-0.31 Small 64-96 0 98% 0.31-0.42 Small 96-128 COBB 0 98% 0.42-0.63 Large 128-192 LE 0 98% 0.63-0.84 Large 192-256 0 98% 0.84-1.26 Small 256-384 0 98% 1.26-1.68 Small 384-512 0 98% 1.68-3.36 Medium 512-1024 B R D 1 1 99% 3.36-6.72 Lrg 1024-2048 1 1 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK 0 100% FEATURE SAMPLED Sum 105.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ------ ------ ------ 80.00% ----- ----- ----- ----- ----- ----- 70.00% ----- ----- ---- ----- ----- ----- 60.00% ------ ------ --- — ------ ------ ------ v c LL c 50.00% ----- ----- — --- ----- ----- ----- U U) d 40.00% ----- ----- ---- ----- ----- ----- 30.00% ------ ------ ------ ------ ------ ------ 20.00% ------ ------ ------ ------ ------ ------ 10.00% ----- ----- ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 11 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 10 10 10% Very Fine .062-.125 1 1 11% Fine .125-.25 7 7 18% Medium .25-.50 SANDS 2 2 20% Coarse .50-1.0 4 4 24% Vry Coarse 1.0-2 1 1 26% Very Fine 2-4 0 26% Fine 4-6 2 2 28% Fine 6-8 3 3 31% Medium 8-12 AV 12 12 43% Medium 12-16 ELS 11 11 54% Coarse 16-24 13 13 67% Coarse 24-32 12 12 80% Vry Coarse 32-48 5 5 85% Vry Coarse 48-64 2 2 87% 0.21-0.31 Small 64-96 1 1 88% 0.31-0.42 Small 96-128 COBB 3 3 91% 0.42-0.63 Large 128-192 LE 4 4 95% 0.63-0.84 Large 192-256 1 1 96% 0.84-1.26 Small 256-384 0 96% 1.26-1.68 Small 384-512 0 96% 1.68-3.36 Medium 512-1024 B R D 0 96% 3.36-6.72 Lrg 1024-2048 0 96% 6.72-13.43 Vry Lrg 2048-4096 0 96% Bedrock >4096 BDRK 4 4 100% FEATURE SAMPLED Sum 98.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ----- ------ ------ 80.00% ----- ----- ----- ----- ----- ----- 70.00% ----- ----- ----- ----- ----- ----- 60.00% ------ ------ ------ ------ ------ ------ v c LL c 50.00% ----- ----- ----- ----- ----- ----- U U) d 40.00% ----- ----- ---- ----- ----- ----- 30.00% ------ ----- -- — ------ ------ ------ 20.00% ------ ----- ------ ------ ------ 10.00% --`` ----- ----- ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 12 DATE: 5/10/2022 Reach:XS12 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 8 8 8% Very Fine .062-.125 0 8% Fine .125-.25 3 3 11% Medium .25-.50 SANDS 2 2 13% Coarse .50-1.0 1 1 14% Vry Coarse 1.0-2 3 3 17% Very Fine 2-4 1 1 18% Fine 4-6 6 6 24% Fine 6-8 19 19 43% Medium 8-12 AV 18 18 61% Medium 12-16 ELS 11 11 72% Coarse 16-24 12 12 84% Coarse 24-32 9 9 93% Vry Coarse 32-48 1 1 94% Vry Coarse 48-64 1 1 95% 0.21-0.31 Small 64-96 1 1 96% 0.31-0.42 Small 96-128 COBB 1 1 97% 0.42-0.63 Large 128-192 LE 1 1 98% 0.63-0.84 Large 192-256 0 98% 0.84-1.26 Small 256-384 0 98% 1.26-1.68 Small 384-512 0 98% 1.68-3.36 Medium 512-1024 B R D 0 98% 3.36-6.72 Lrg 1024-2048 0 98% 6.72-13.43 Vry Lrg 2048-4096 0 98% Bedrock >4096 BDRK 2 2 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 12 100.00% 90.00% ------ ------ ------ ------ ------ ------ 80.00% ----- ----- ----- ----- ----- ----- 70.00% ----- ----- ----- ----- ----- ----- 60.00% ------ ------ ----- ------ ------ ------ v c LL c 50.00% ----- ----- --- ----- ----- ----- U U) d 40.00% ----- ----- — -- ------ ----- ----- 30.00% ------ ----- --- ------ ------ ------ 20.00% ------ ----- ----- ------ ------ ------ T 10.00% ----- ----- ----- ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 13 DATE: 5/10/2022 Reach:XS13 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 1 1 1% Very Fine .062-.125 0 1% Fine .125-.25 0 1% Medium .25-.50 SANDS 0 1% Coarse .50-1.0 2 2 3% Vry Coarse 1.0-2 3 3 6% Very Fine 2-4 2 2 8% Fine 4-6 0 8% Fine 6-8 2 2 10% Medium 8-12 AV 3 3 13% Medium 12-16 ELS 8 8 21% Coarse 16-24 13 13 34% Coarse 24-32 10 10 44% Vry Coarse 32-48 21 21 65% Vry Coarse 48-64 8 1 8 73% 0.21-0.31 Small 64-96 15 15 88% 0.31-0.42 Small 96-128 COBB 4 4 92% 0.42-0.63 Large 128-192 LE 5 5 97% 0.63-0.84 Large 192-256 1 1 98% 0.84-1.26 Small 256-384 0 98% 1.26-1.68 Small 384-512 0 98% 1.68-3.36 Medium 512-1024 B R D 0 98% 3.36-6.72 Lrg 1024-2048 0 98% 6.72-13.43 Vry Lrg 2048-4096 1 1 99% Bedrock >4096 BDRK 1 1 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 13 100.00% 90.00% ----- ------ ------ --- ----- ----- 80.00% ------ ------ ------ — -- ----- ----- 70.00% ------ ----- ------ -- ---- ------ ----- 60.00% ----- ----- ----- ----- ----- ----- v c LL c 50.00% ----- ----- ----- ----- ----- ----- U N d 40.00% ------ ----- ------ ------ ------- ------- 30.00% ----- ----- ----- ----- ----- ----- 20.00% ----- ----- ----- ----- ----- ----- 10.00% — ------- -- — ------ ------- ------- 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 14 DATE: 5/10/2022 Reach:XS14 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 0 0% Very Fine .062-.125 0 0% Fine .125-.25 0 0% Medium .25-.50 SANDS 0 0% Coarse .50-1.0 0 0% Vry Coarse 1.0-2 0 0% Very Fine 2-4 0 0% Fine 4-6 0 0% Fine 6-8 0 0% Medium 8-12 AV 3 1 1 1 1 1 3 3% Medium 12-16 ELS 9 9 12% Coarse 16-24 9 9 21% Coarse 24-32 18 18 39% Vry Coarse 32-48 21 21 60% Vry Coarse 48-64 18 18 78% 0.21-0.31 Small 64-96 14 1 1 1 1 14 92% 0.31-0.42 Small 96-128 COBB 3 3 95% 0.42-0.63 Large 128-192 LE 1 1 96% 0.63-0.84 Large 192-256 2 2 98% 0.84-1.26 Small 256-384 1 1 99% 1.26-1.68 Small 384-512 0 99% 1.68-3.36 Medium 512-1024 B R D 0 99% 3.36-6.72 Lrg 1024-2048 0 99% 6.72-13.43 Vry Lrg 2048-4096 1 1 100% Bedrock >4096 BDRK 0 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 14 100.00% 90.00% ----- ------ ------ --- — ----- ----- 80.00% ------ ------ ------ -- --- ------ ------ 70.00% ------ ----- ------ ---- ------ ------ 60.00% ----- ----- ------ ---- ----- ----- v c LL c 50.00% ----- ----- ------ ----- ----- ----- UJ L d 40.00% ------ ----- ------ ----- ------ ------ 30.00% ----- ----- ------ ------ ----- ----- 20.00% ----- ----- ------ ------ ----- ----- 10.00% ------ ----- ------ ------ ------ ------ 0.00% — 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 15 DATE: 5/10/2022 Reach:XS15 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 1 1 1% Very Fine .062-.125 1 1 2% Fine .125-.25 4 4 6% Medium .25-.50 SANDS 9 9 15% Coarse .50-1.0 5 5 20% Vry Coarse 1.0-2 11 11 31% Very Fine 2-4 9 9 40% Fine 4-6 2 2 42% Fine 6-8 7 7 49% Medium 8-12 AV 9 9 58% Medium 12-16 ELS 10 10 68% Coarse 16-24 12 12 80% Coarse 24-32 7 7 87% Vry Coarse 32-48 9 9 96% Vry Coarse 48-64 2 1 2 98% 0.21-0.31 Small 64-96 1 1 1 1 1 1 1 99% 0.31-0.42 Small 96-128 COBB 1 1 100% 0.42-0.63 Large 128-192 LE 0 100% 0.63-0.84 Large 192-256 0 100% 0.84-1.26 Small 256-384 0 100% 1.26-1.68 Small 384-512 0 100% 1.68-3.36 Medium 512-1024 B R D 0 100% 3.36-6.72 Lrg 1024-2048 0 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK 0 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 15 100.00% 90.00% ----- ------ ------ ----- ------ ------ 80.00% ------ ------ ------ ------ ------ ------ 70.00% ------ ----- ------ ------ ------ ------ 60.00% ----- ----- ------ ------ ------ ------ v c LL c 50.00% ----- ----- --- ------ ------ ------ L d 40.00% ------ ----- ----- ------ ------ ------ 30.00% ----- ----- ------ ------ ------ ------ 20.00% ----- --- — ------ ------ ------ ------ 10.00% ------ ------ ------ ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 16 DATE: 5/10/2022 Reach:XS16 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 1 1 1% Very Fine .062-.125 0 1% Fine .125-.25 0 1% Medium .25-.50 SANDS 0 1% Coarse .50-1.0 1 1 1 1 1 0 1 1% Vry Coarse 1.0-2 0 1% Very Fine 2-4 1 1 2% Fine 4-6 1 1 3% Fine 6-8 0 3% Medium 8-12 AV 4 1 1 1 1 1 4 7% Medium 12-16 ELS 2 2 9% Coarse 16-24 4 4 13% Coarse 24-32 0 13% Vry Coarse 32-48 9 9 22% Vry Coarse 48-64 11 11 33% 0.21-0.31 Small 64-96 29 1 1 1 1 29 62% 0.31-0.42 Small 96-128 COBB 18 18 80% 0.42-0.63 Large 128-192 LE 11 11 91% 0.63-0.84 Large 192-256 1 1 92% 0.84-1.26 Small 256-384 1 1 1 93% 1.26-1.68 Small 384-512 0 93% 1.68-3.36 Medium 512-1024 B R D 0 93% 3.36-6.72 Lrg 1024-2048 1 0 93% 6.72-13.43 Vry Lrg 2048-4096 0 93% Bedrock >4096 BDRK 7 7 100% FEATURE SAMPLED Sum 100.0 1005/o Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 16 100.00% 90.00% ----- ------ ------ ------ ------ ------ 80.00% ------ ------ ------ ------ ------ ------ 70.00% ------ ----- ------ ----- ------ ------ 60.00% ----- ----- ------ -- — ----- ----- v c LL c 50.00% ----- ----- ----- -- -- ----- ----- U N d 40.00% ------ ----- ------ -- -- ------ ------ 30.00% ----- ----- ----- — --- ----- ----- 20.00% ----- ----- ----- ----- ----- ----- 10.00% — ------- ------ ------ ------ ------ 0.00 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 17 DATE: 5/10/2022 Reach:XS17 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C I 1 1% Very Fine .062-.125 0 1% Fine .125-.25 3 3 4% Medium .25-.50 SANDS 5 5 9% Coarse .50-1.0 6 6 15% Vry Coarse 1.0-2 5 5 20% Very Fine 2-4 3 3 23% Fine 4-6 5 5 28% Fine 6-8 7 7 35% Medium 8-12 AV 14 14 49% Medium 12-16 ELS 10 10 59% Coarse 16-24 14 14 73% Coarse 24-32 6 6 79% Vry Coarse 32-48 7 7 86% Vry Coarse 48-64 2 2 88% 0.21-0.31 Small 64-96 5 5 93% 0.31-0.42 Small 96-128 COBB 2 2 95% 0.42-0.63 Large 128-192 LE 4 4 99% 0.63-0.84 Large 192-256 0 99% 0.84-1.26 Small 256-384 1 1 100% 1.26-1.68 Small 384-512 0 100% 1.68-3.36 Medium 512-1024 B R D 0 100% 3.36-6.72 Lrg 1024-2048 0 100% 6.72-13.43 Vry Lrg 2048-4096 0 100% Bedrock >4096 BDRK 0 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 17 100.00% 90.00% ----- ------ ------ -- -- ------ ------ 80.00% ------ ------ ------ ------ ------ ------ 70.00% ------ ----- ------ ------ ------ ------ 60.00% ----- ----- ----- ----- ----- ----- v c LL c 50.00% ----- ----- ---- ----- ----- ----- UJ L d 40.00% ------ ----- --- ------ ------ ------ 30.00% ----- ----- --- ----- ----- ----- 20.00% ----- ----- ------ ----- ----- ----- 10.00% ------ — ------ ------ ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) WOLMAN REPRESENTATIVE PEBBLE COUNT STREAM: KINGS CREEK-XS 18 DATE: 5/10/2022 Reach:XS18 CREW:S.MILLER PARTICLE TALLY COUNTS BY TRANSECT ft PARTICLE Tom Tot Tot Comb 1 2 3 4 5 6 7 8 9 10 Pool Riff Tot %CUM Silt/Clay <.062 S/C 15 15 15% Very Fine .062-.125 2 2 17% Fine .125-.25 1 1 18% Medium .25-.50 SANDS 2 2 20% Coarse .50-1.0 1 1 21% Vry Coarse 1.0-2 7 7 28% Very Fine 2-4 6 6 34% Fine 4-6 7 7 41% Fine 6-8 10 10 51% Medium 8-12 AV 16 16 67% Medium 12-16 ELS 11 11 78% Coarse 16-24 10 10 88% Coarse 24-32 3 3 91% Vry Coarse 32-48 1 1 92% Vry Coarse 48-64 1 1 93% 0.21-0.31 Small 64-96 1 1 94% 0.31-0.42 Small 96-128 COBB 2 2 96% 0.42-0.63 Large 128-192 LE 1 1 97% 0.63-0.84 Large 192-256 0 97% 0.84-1.26 Small 256-384 0 97% 1.26-1.68 Small 384-512 0 97% 1.68-3.36 Medium 512-1024 B R D 1 1 98% 3.36-6.72 Lrg 1024-2048 0 98% 6.72-13.43 Vry Lrg 2048-4096 2 2 100% Bedrock >4096 BDRK p 100% FEATURE SAMPLED Sum 100.0 100% Length Proportion No.Units Sampled Transect Feature Length Width REACH 1 POOL 2 RIFFLE 3 RUN 4 5 6 7 8 9 10 Cumulative Pebble Size-frequency Graph Kings Creek-XS 18 100.00% 90.00% ----- ------ ------ ----- ----- ----- 80.00% ------ ------ ------ ------ ------ ------ 70.00% ------ ----- ------ ------ ------ ------ 60.00% ----- ----- ---- ----- ----- ----- v c LL c 50.00% ----- ----- -- -- ----- ----- ----- UJ L d 40.00% ------ ----- ---- ------ ------ ------ 30.00% ----- ----- ------ ----- ----- ----- 20.00% ----- Y =- - ------ ----- ----- ----- 10.00% ------ ----- ------ ------ ------ ------ 0.00% 0.01 0.1 1 10 100 1000 10000 Particle Size(mm) Entrainment Calculation 1WO01 f JIM so 3W Colorado Data: Power Trendline • • *el pus 170 mm R2 = 0.838 94 mm 0 v g g - L* o m •s� m ® •j 20 0 E 10 - -� p i 4 • 3IF 2 i Power Tre ine. .5 Leopold.Wolman 3 filer(1964) lip 3 • Dia (ter+)- 77 zc,042 2 R2=0.9 0 g .01 10 .al A105 .1 Z .3 .4.5 1 2 3 45 10 Tc= CRITICAL SHEAR STRESS Obs/ft2) Laboratory and field data on critical shear stress required to initiate movement of grains(Leopold.Wolman,do~tiller. 1%4). The solid line is the Shields curve of the threshold of motion; transposed from the 9 versus Rg form into the present form, in which critical shear stress is plotted as a function of grain diameter. • Leopold.Wolman&Mlller(1964) Colorado Data (Wddland Hydrology) Figure 3-11. Critical shear stress required to initiate movement of bed-matenal grains following the Shields relation (Leopold et al . 1964). as modified by field data from Colorado (Rosgen- 2006b Rosgen and Silvey. 2007) Appendix 2 Example BEHI Forms BEHI Field Form - Complete Location description: Analysis by: Date: Latitude: Longitude: BEHI A B C D E category Bank BH Root RDH Root RD Surface SP Bank angle BA height score depth score density score protection score score Very low e.0-1.1 1 0- 100 1 80- 100 1 - 100 0-20 1 Low 1.1-1.2 3 50-89 3 C7 -79 3 55-79 3 -60 Moderate 1.3—1.5 5 30-49 5 30-54 5 30-54 1 5 61-80 5 High 1.6-2.0 7 15-29 7 15 -29 7 15-29 7 81-90 7 Very high 2.1-2.8 8.5 5- 14 8.5 5 - 14 8.5 10-14 8.5 91 - 119 8.5 Extreme >2.8 10 <5 10 < 5 10 < 14 10 > 119 10 Material adjustment(F) Stratification adjustment (G) Total Score Bedrock-automatically Very low <=y7er No adjust (Sum A-G) a Boulder -automatically Low Single layer (+) 5 Cobble (-) 10 Multiple layers (+) 10 Gravel or mostly gravel (+) 5 Sand or mostly sands (+) 10 160 2° loam No adjust 10 10 Clay (-) 20 180 0 BEHI Category: Very low-----., Low Moderate High Very high Extreme <_ 9.5 10 - 19.5 20 - 29.5 30-39.5 40-45 >45 Comments: 5 Appendix 2 BEHI Field Form - Complete Location description: XS6 Analysis by: Date: Latitude: Longitude: BEHI A B C D E category Bank BH Root RDH Root RD Surface SP Bank angle BA height score depth score density score protection score score Very low 1.0—1.1 1 4 80- 100 1 80- 100 1 0-20 1 Low 1.1-1.2 3 50-89 3 5 -79 3 5-79 -60 Moderate 1.3—1.5 5 30-49 5 30-54 5 30-54 5 61-80 5 High 1.6-2.0 7 15-29 7 15 -29 7 15-29 7 81-90 7 Very high —2.8 8 5- 14 8.5 5 - 14 8.5 10-14 8.5 91 - 119 8.5 Extreme >2.8 10 <5 10 < 5 10 < 14 10 > 119 10 Material adjustment(F) Stratification adjustment (G) Total Score Bedrock-automatically Very low <=y7er No adjust (Sum A-G) a Boulder -automatically Low Single layer (+) 5 Cobble (-) 10 Multiple layers (+) 10 23'5r160Lrave ormostly gravel (+) 5Sand or mostly sands (+) 10VSilt/loam No adjustment 10Clay (-) 20 0 BEHI Category: Very low Low o erate High Very high Extreme <_9.5 10 - 19.5 -29. 30-39.5 40-45 >45 Comments: 5 } ` 4 to - r •'� i • 3 ' r i Stream Cross Sections Stream NBS Assessment Low �t 7 Moderate Very Low Y' J Stream BEHI Assessment 4'' A' � s Very Low Low Moderate .` Background: 2019 ESRI Imagery KINGS MOUNTAIN LITHIUM MINING PROJECT Sale: 4,8°° Created By: S.Miller SWCA KINGS CREEK Datewedoco SWCA Project No.: 70316 Dale Produced: September 30,2022 Cleveland County, North Carolina NAD 1983 StatePlane North Carolina FIPS 3200 Feet ENVIRONMENTAL CONSULTANTS 0 400 ao0 BEHTINBS ASSESSMENT ee` Kilometers 0 0.1 0.2 APPENDIX D Hydraulic Model Results HEC-RAS Results Flooding Extents Map HEC-RAS RESULTS SUMMARY Existing Conditions Baseflow w/o Martin Marietta Pumping w/Martin Marietta Pumping Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth River Station (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) (cfs) (ft) (ft/ft) (sq ft) (ft) NO (lb/sq ft) 7084.53 0.5 827.54 0.047 0.25 2.27 2.04 0.31 0.21 0.5 827.54 0.047 0.25 2.27 2.04 0.31 0.21 6970.99 0.5 822.35 0.004 0.49 1.79 1.02 0.06 0.4 0.5 822.35 0.004 0.49 1.79 1.02 0.06 0.4 6769.53 0.5 820.35 0.059 0.34 6.39 1.46 0.2 0.11 0.5 820.35 0.059 0.34 6.39 1.46 0.2 0.11 6573.11 0.5 807.2 0.076 0.21 2.34 2.34 0.42 0.18 5.51 807.5 0.064 1.19 4.09 4.62 1.13 0.48 6374.24 0.5 803.47 0.011 0.43 3.17 1.16 0.09 0.27 5.51 803.85 0.013 2.2 5.53 2.51 0.3 0.65 6188 0.5 800.16 0.034 0.37 5.1 1.36 0.15 0.14 5.51 800.4 0.029 1.84 6.7 2.99 0.48 0.38 5849.03 Culvert Culvert 5512.73 0.5 798.71 0.021 0.37 3.54 1.36 0.14 0.21 5.51 799.01 0.021 2.33 9.82 2.37 0.32 0.51 5381.62 0.5 797.84 0.003 0.99 10.41 0.5 0.02 0.2 5.51 798.14 0.003 4.32 11.19 1.28 0.08 0.5 5182.72 0.5 796.19 0.038 0.24 1.77 2.09 0.3 0.27 5.51 796.52 0.034 2.16 11.45 2.55 0.4 0.6 4979.85 0.5 795.49 0.000 2.58 8.88 0.19 0 0.48 5.51 796.13 0.000 10.59 14.33 0.52 0.01 1.12 4912.83 0.5 795.48 0.000 2.68 6.69 0.19 0 0.54 5.51 796.11 0.000 7.91 10.05 0.7 0.02 1.17 4904.8 Bridge Bridge 4895.33 0.5 795.47 0.002 0.75 3.32 0.67 0.03 0.31 5.51 796.05 0.003 3.52 6.15 1.57 0.1 0.89 4783.02 0.5 794.85 0.039 0.28 2.83 1.78 0.24 0.2 5.51 795.17 0.030 2.08 9.49 2.65 0.4 0.52 4588.29 0.5 792.08 0.000 1.55 3.91 0.32 0.01 0.79 5.51 792.68 0.001 4.78 6.86 1.15 0.05 1.39 4472.17 0.5 791.97 0.039 0.42 7.94 1.18 0.13 0.09 5.51 792.16 0.029 2.02 8.73 2.73 0.42 0.28 4443.04 Culvert Culvert 4423.67 0.5 791.7 0.048 0.35 5.73 1.44 0.18 0.07 5.51 791.94 0.028 1.88 7.04 2.93 0.46 0.31 4401.23 0.5 791.09 0.005 0.65 5.11 0.77 0.04 0.18 5.51 791.42 0.009 2.6 6.8 2.12 0.22 0.51 4397.08 Bridge Bridge 4387.93 0.5 790.9 0.013 0.6 8.42 0.83 0.06 0.18 5.51 791.09 0.014 3.09 14.67 1.79 0.19 0.37 4180.75 0.5 786.58 0.038 0.27 2.44 1.87 0.25 0.22 5.51 786.93 0.028 1.8 6.33 3.06 0.5 0.57 3987.74 0.5 782.98 0.000 7.16 9.46 0.07 0 1.24 5.51 783.65 0.000 14.66 12.76 0.38 0 1.91 3880.56 0.5 782.98 0.000 18.91 20.58 0.03 0 1.95 5.51 783.65 0.000 33.72 23.67 0.16 0 2.62 3849.88 Inl Struct IN Struct 3837.39 0.5 779.23 0.037 0.28 2.79 1.77 0.23 0.19 5.51 779.56 0.028 1.8 6.31 3.06 0.5 0.52 3778.17 0.5 777.39 0.027 0.51 9.72 0.98 0.09 0.08 5.51 777.54 0.043 1.91 10.02 2.88 0.5 0.23 3623.04 0.5 775.78 0.002 1.1 7.47 0.46 0.01 0.18 5.51 776.12 0.003 4.31 10.86 1.28 0.08 0.52 3609.43 Bridge Bridge 3584.03 0.5 775.66 0.026 0.47 7.68 1.07 0.1 0.09 5.51 775.84 0.031 2.24 11.79 2.46 0.37 0.27 3408.21 0.5 775.4 0.000 8.71 14.24 0.06 0 0.98 5.51 775.56 0.000 11.06 14.63 0.5 0.01 1.14 3238.09 Culvert Culvert 3072.51 0.5 775.16 0.040 0.29 3.14 1.72 0.23 0.18 5.51 775.43 0.023 2.11 8.13 2.61 0.37 0.45 2630.22 0.5 773.36 0.001 1 4.44 0.5 0.01 0.33 5.51 773.96 0.001 5.56 10.64 0.99 0.04 0.93 2177.95 0.5 771.9 0.040 0.3 3.53 1.65 0.21 0.16 5.51 772.2 0.029 1.98 8.21 2.79 0.43 0.46 1870.27 0.5 771.25 0.000 2.58 8.36 0.19 0 0.65 5.51 771.82 0.000 9.5 15.92 0.58 0.01 1.22 1498.7 0.5 771.14 0.002 0.97 7.31 0.52 0.02 0.29 5.51 771.52 0.002 5.54 27.88 0.99 0.05 0.67 1243.95 0.5 769.61 0.043 0.28 3.1 1.77 0.24 0.18 5.51 769.91 0.030 1.95 8.05 2.82 0.44 0.48 1004.91 0.5 764.59 0.012 0.47 4.11 1.08 0.08 0.26 5.51 764.95 0.012 2.4 6.73 2.3 0.26 0.62 AVERAGE: 1.04 0.12 0.36 AVERAGE: 1.94 0.26 0.70 HEC-RAS RESULTS SUMMARY Existing Conditions -Year w/o Martin Marietta Pumping w/Martin Marietta Pumping Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth River Station (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) 7084.53 37.81 828.82 0.017 8.51 11.53 5.76 1.13 1.49 37.81 828.82 0.017 8.51 11.53 5.76 1.13 1.49 6970.99 37.81 823.17 0.124 5.04 11.29 11.87 5.48 1.22 37.81 823.17 0.124 5.04 11.29 11.87 5.48 1.22 6769.53 37.81 820.96 0.023 9.32 18.88 4.12 0.73 0.72 37.81 820.96 0.023 9.32 18.88 4.12 0.73 0.72 6573.11 37.81 807.84 0.275 3 6.79 12.6 7.31 0.82 42.82 807.93 0.226 3.6 7.67 11.89 6.38 0.91 6374.24 37.81 804.56 0.021 7.11 8.25 5.32 1.05 1.36 42.82 804.65 0.021 7.82 8.57 5.48 1.1 1.45 6188 37.81 802.06 0.002 16.27 10.17 2.32 0.17 2.04 42.82 802.21 0.002 17.82 10.36 2.4 0.18 2.19 5849.03 Culvert Culvert 5512.73 165.62 801.16 0.004 43.33 35.18 4.32 0.52 2.66 170.63 801.2 0.004 44.31 35.45 4.36 0.52 2.7 5381.62 165.62 799.59 0.017 23.39 16.39 7.19 1.57 1.95 170.63 799.62 0.017 23.97 16.64 7.24 1.59 1.98 5182.72 165.62 799.16 0.001 68.74 33.82 2.66 0.18 3.24 170.63 799.2 0.001 70.2 33.92 2.69 0.19 3.28 4979.85 165.62 798.91 0.001 62.29 25.94 2.84 0.2 3.9 170.63 798.95 0.001 63.3 26.09 2.89 0.2 3.94 4912.83 165.62 798.75 0.002 50.24 22.95 3.37 0.3 3.81 170.63 798.79 0.002 51.08 23.11 3.42 0.31 3.85 4904.8 Bridge Bridge 4895.33 165.62 798.15 0.013 26.1 15.7 6.35 1.21 2.99 170.63 798.18 0.013 26.5 15.82 6.44 1.24 3.02 4783.02 165.62 796.82 0.012 27.83 18.12 5.95 1.09 2.17 170.63 796.87 0.012 28.7 18.22 5.95 1.08 2.22 4588.29 165.62 795.94 0.003 43.27 23.06 4.39 0.49 4.65 170.63 796.03 0.003 45.23 23.66 4.39 0.48 4.74 4472.17 165.62 795.86 0.001 63.21 24.28 2.62 0.18 3.98 170.63 795.96 0.001 65.43 24.66 2.61 0.17 4.08 4443.04 Culvert Culvert 4423.67 165.62 793.78 0.017 23.93 17.32 6.94 1.48 2.15 170.63 793.82 0.016 24.48 17.51 6.99 1.49 2.19 4401.23 165.62 792.86 0.036 19.64 17.66 8.43 2.4 1.95 170.63 792.88 0.036 20.04 17.83 8.52 2.44 1.97 4397.08 Bridge Bridge 4387.93 165.62 792.4 0.018 25.27 21.26 6.89 1.49 1.68 170.63 792.43 0.018 25.86 21.34 6.95 1.51 1.71 4180.75 165.62 788.49 0.019 23.2 16.37 7.14 1.61 2.13 170.63 788.52 0.019 23.65 16.44 7.21 1.63 2.16 3987.74 165.62 785.7 0.002 59.46 33.94 3.29 0.29 3.96 170.63 785.72 0.002 60.19 33.96 3.36 0.3 3.98 3880.56 258.92 785.56 0.001 96.04 41.64 3.03 0.22 4.53 263.93 785.58 0.001 96.88 41.68 3.07 0.23 4.55 3849.88 Inl Struct IN Struct 3837.39 258.92 781.63 0.017 36.31 23.53 7.13 1.54 2.59 263.93 781.65 0.016 36.83 23.63 7.17 1.55 2.61 3778.17 258.92 779.52 0.029 25.95 14.17 9.98 2.94 2.21 263.93 779.55 0.029 26.39 14.23 10 2.94 2.24 3623.04 258.92 780.14 0.002 71.83 23.37 3.6 0.32 4.54 263.93 780.16 0.002 72.27 23.43 3.65 0.33 4.56 3609.43 Bridge Bridge 3584.03 258.92 780.12 0.002 87.87 36.03 2.95 0.23 4.55 263.93 780.14 0.002 88.54 36.25 2.98 0.23 4.57 3408.21 258.92 779.98 0.001 112.9 34.31 2.29 0.13 5.56 263.93 780 0.001 113.41 34.44 2.33 0.13 5.58 3238.09 Culvert Culvert 3072.51 579.06 779.53 0.004 166.47 163.84 6.34 0.88 4.55 584.07 779.54 0.004 167.11 165.04 6.37 0.89 4.56 2630.22 579.06 777.6 0.005 188.86 284.06 6 0.9 4.57 584.07 777.61 0.005 191.55 284.35 6.01 0.9 4.58 2177.95 579.06 775.42 0.005 174.94 185.36 4.91 0.65 3.68 584.07 775.43 0.005 176.05 185.86 4.93 0.65 3.69 1870.27 579.06 774.39 0.003 351.32 290.59 3.8 0.39 3.79 584.07 774.4 0.003 353.58 291.15 3.81 0.39 3.8 1498.7 579.06 773.47 0.002 538.57 458.35 3.3 0.3 2.62 584.07 773.48 0.002 540.66 458.38 3.31 0.3 2.63 1243.95 579.06 772.15 0.009 311.54 393.27 6.59 1.17 2.72 584.07 772.16 0.009 315.12 394.12 6.58 1.16 2.73 1004.91 579.06 768.89 0.012 69.8 27.49 8.3 1.79 4.56 584.07 768.91 0.012 70.25 27.58 8.31 1.79 4.58 AVERAGE: 5.53 1.22 3.01 AVERAGE: 5.55 1.20 3.04 HEC-RAS RESULTS SUMMARY Existing Conditions 100-Year w/o Martin Marietta Pumping w/Martin Marietta Pumping Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth River Station (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) 7084.53 256.94 831.09 0.013 45.69 20.83 10.39 2.54 3.76 256.94 831.09 0.013 45.69 20.83 10.39 2.54 3.76 6970.99 256.94 824.55 0.112 29.12 25.29 21.41 12.92 2.6 256.94 824.55 0.112 29.12 25.29 21.41 12.92 2.6 6769.53 256.94 822.36 0.012 47.7 42.24 7.15 1.43 2.12 256.94 822.36 0.012 47.7 42.24 7.15 1.43 2.12 6573.11 256.94 814.46 0.000 379.44 103.69 1.31 0.03 7.44 261.95 814.85 0.000 420.67 104.81 1.22 0.03 7.83 6374.24 256.94 814.44 0.000 315.61 49.42 1.3 0.03 11.24 261.95 814.84 0.000 335.38 50.37 1.26 0.03 11.64 6188 256.94 814.44 0.000 543.76 74.62 0.82 0.01 14.42 261.95 814.84 0.000 569.68 75.59 0.8 0.01 14.82 5849.03 Culvert Culvert 5512.73 1004.08 804.76 0.005 129.73 50.81 9.16 1.66 6.26 1009.09 804.77 0.005 130.07 50.83 9.18 1.66 6.27 5381.62 1004.08 803.61 0.007 144.6 43.73 10.66 2.3 5.97 1009.09 803.62 0.007 145.17 43.82 10.68 2.31 5.98 5182.72 1004.08 803.94 0.001 264.94 51.03 5.22 0.5 8.02 1009.09 803.95 0.001 265.68 51.07 5.24 0.5 8.03 4979.85 1004.08 803.45 0.002 223.92 44.7 6.42 0.75 8.44 1009.09 803.46 0.002 224.45 44.74 6.44 0.75 8.45 4912.83 1004.08 803.32 0.002 201.2 42.1 6.31 0.75 8.38 1009.09 803.33 0.002 201.68 42.15 6.33 0.75 8.39 4904.8 Bridge Bridge 4895.33 1004.08 802.58 0.005 152.85 38.28 8.91 1.56 7.42 1009.09 802.58 0.005 152.97 38.29 8.95 1.58 7.42 4783.02 1004.08 802.54 0.002 181.33 34.31 6.91 0.88 7.89 1009.09 802.54 0.002 181.42 34.32 6.94 0.89 7.89 4588.29 1004.08 802.4 0.001 358.49 86.63 6.2 0.67 11.11 1009.09 802.41 0.001 358.61 86.64 6.23 0.68 11.12 4472.17 1004.08 802.48 0.000 321.71 57.55 3.4 0.21 10.6 1009.09 802.49 0.000 321.83 57.56 3.41 0.21 10.61 4443.04 Culvert Culvert 4423.67 1004.08 797.21 0.011 80.55 49.65 12.58 3.27 5.58 1009.09 797.23 0.011 80.82 49.75 12.6 3.28 5.6 4401.23 1004.08 794.59 0.053 61.71 31.69 16.88 7.5 3.68 1009.09 794.59 0.053 61.93 31.78 16.91 7.52 3.68 4397.08 Bridge Bridge 4387.93 1004.08 794.5 0.030 76.04 27.6 15.6 5.78 3.78 1009.09 794.51 0.030 76.29 27.64 15.63 5.8 3.79 4180.75 1004.08 791.9 0.011 94.38 25.56 12.07 3.08 5.54 1009.09 791.91 0.011 94.75 25.6 12.09 3.09 5.55 3987.74 1004.08 790.42 0.001 316.28 69.17 5.55 0.58 8.68 1009.09 790.43 0.001 316.54 69.18 5.57 0.58 8.69 3880.56 2057.33 788.26 0.008 265.67 88.98 11.88 2.76 7.23 2062.34 788.28 0.008 267.82 89.15 11.85 2.74 7.25 3849.88 Inl Struct IN Struct 3837.39 2057.33 786.98 0.005 265.56 76.34 9.31 1.7 7.94 2062.34 786.99 0.005 266.52 76.41 9.31 1.7 7.95 3778.17 2057.33 787.19 0.002 399.16 94.6 7.08 0.94 9.88 2062.34 787.2 0.002 400.35 94.68 7.08 0.94 9.89 3623.04 2057.33 787.3 0.001 962.34 231.49 4.88 0.41 11.7 2062.34 787.32 0.001 965.44 231.57 4.87 0.41 11.72 3609.43 Bridge Bridge 3584.03 2057.33 787.33 0.000 1533.31 360.38 2.99 0.16 11.76 2062.34 787.34 0.000 1538.19 360.5 2.99 0.16 11.77 3408.21 2057.33 787.21 0.000 923.48 381.75 3.38 0.2 12.79 2062.34 787.23 0.000 925.37 381.91 3.38 0.2 12.81 3238.09 Culvert Culvert 3072.51 3635.22 783.27 0.011 396.55 475.45 17.44 5.35 8.29 3640.23 783.27 0.011 396.92 475.87 17.45 5.35 8.29 2630.22 3635.22 780.75 0.004 1202.52 423.13 8.61 1.43 7.72 3640.23 780.75 0.004 1203.74 423.18 8.61 1.44 7.72 2177.95 3635.22 777.89 0.007 828.65 286.33 9.92 2.05 6.15 3640.23 777.89 0.007 829.37 286.35 9.92 2.05 6.15 1870.27 3635.22 776.95 0.003 1607.81 592.78 6.66 0.92 6.35 3640.23 776.95 0.003 1609.48 593.07 6.66 0.92 6.35 1498.7 3635.22 775.88 0.003 1666.79 480.31 6.27 0.83 5.03 3640.23 775.88 0.003 1668 480.33 6.28 0.83 5.03 1243.95 3635.22 775.04 0.003 1660.82 510.98 7.21 1.05 5.61 3640.23 775.04 0.003 1661.69 511 7.22 1.05 5.61 1004.91 3635.22 772.71 0.009 785.98 312.76 10.91 2.48 8.38 3640.23 772.72 0.009 788.1 312.88 10.9 2.48 8.39 AVERAGE: 8.33 2.02 7.63 AVERAGE: 8.33 2.03 7.67 HEC-RAS RESULTS SUMMARY Proposed Conditions Baseflow w/o Martin Marietta Pumping w/Martin Marietta Pumping River Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Station (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) 7084.53 0.5 827.54 0.047 0.25 2.27 2.04 0.31 0.21 0.5 827.54 0.047 0.25 2.27 2.04 0.31 0.21 6970.99 0.5 822.35 0.004 0.49 1.79 1.02 0.06 0.4 0.5 822.35 0.004 0.49 1.79 1.02 0.06 0.4 6769.53 0.5 820.35 0.059 0.34 6.39 1.46 0.2 0.11 0.5 820.35 0.059 0.34 6.39 1.46 0.2 0.11 6573.11 0.5 807.2 0.076 0.21 2.34 2.34 0.42 0.18 5.51 807.5 0.064 1.19 4.09 4.62 1.13 0.48 6374.24 0.5 803.47 0.011 0.43 3.17 1.16 0.09 0.27 5.51 803.85 0.013 2.2 5.53 2.51 0.3 0.65 6188 0.5 800.16 0.034 0.37 5.1 1.36 0.15 0.14 5.51 800.4 0.029 1.84 6.7 2.99 0.48 0.38 5849.03 Culvert Culvert 5512.73 0.5 798.71 0.021 0.37 3.54 1.36 0.14 0.21 5.51 799.01 0.021 2.33 9.82 2.37 0.32 0.51 5381.62 0.5 797.84 0.003 0.99 10.41 0.5 0.02 0.2 5.51 798.14 0.003 4.32 11.19 1.28 0.08 0.5 5182.72 0.5 796.19 0.038 0.24 1.77 2.09 0.3 0.27 5.51 796.52 0.034 2.16 11.45 2.55 0.4 0.6 4979.85 0.5 795.49 0.000 2.58 8.88 0.19 0 0.48 5.51 796.13 0.000 10.59 14.33 0.52 0.01 1.12 4912.83 0.5 795.48 0.000 2.68 6.69 0.19 0 0.54 5.51 796.11 0.000 7.91 10.05 0.7 0.02 1.17 4904.8 Bridge Bridge 4895.33 0.5 795.47 0.002 0.75 3.32 0.67 0.03 0.31 5.51 796.05 0.003 3.52 6.15 1.57 0.1 0.89 4783.02 0.5 794.85 0.039 0.28 2.83 1.78 0.24 0.2 5.51 795.17 0.030 2.08 9.49 2.65 0.4 0.52 4588.29 0.5 792.08 0.000 1.55 3.91 0.32 0.01 0.79 5.51 792.68 0.001 4.78 6.86 1.15 0.05 1.39 4472.17 0.5 791.97 0.039 0.42 7.94 1.18 0.13 0.09 5.51 792.16 0.029 2.02 8.73 2.73 0.42 0.28 4443.04 Culvert Culvert 4423.67 0.5 791.7 0.048 0.35 5.73 1.44 0.18 0.07 5.51 791.94 0.028 1.88 7.04 2.93 0.46 0.31 4401.23 0.5 791.09 0.005 0.65 5.11 0.77 0.04 0.18 5.51 791.42 0.009 2.6 6.8 2.12 0.22 0.51 4397.08 Bridge Bridge 4387.93 0.5 790.9 0.013 0.6 8.42 0.83 0.06 0.18 5.51 791.09 0.014 3.09 14.67 1.79 0.19 0.37 4180.75 0.5 786.58 0.038 0.27 2.44 1.87 0.25 0.22 5.51 786.93 0.028 1.8 6.33 3.06 0.5 0.57 3987.74 0.5 783.72 0.000 15.5 13.02 0.03 0 1.98 5.51 783.83 0.000 17.04 13.48 0.32 0 2.09 3880.56 8.3 783.72 0.000 35.25 23.97 0.24 0 2.69 13.31 783.83 0.000 37.99 24.49 0.35 0 2.8 3849.88 Inl Struct Inl Struct 3837.39 8.3 779.66 0.027 2.48 7.31 3.34 0.56 0.62 13.31 779.8 0.025 3.61 8.71 3.68 0.63 0.76 3778.17 8.3 777.58 0.047 2.38 10.11 3.48 0.68 0.27 13.31 777.65 0.052 3.1 10.26 4.3 0.96 0.34 3623.04 8.3 776.21 0.004 5.35 11.1 1.55 0.11 0.61 13.31 776.34 0.004 6.86 11.45 1.94 0.16 0.74 3609.43 Bridge Bridge 3584.03 8.3 775.9 0.029 2.98 12.33 2.78 0.43 0.33 13.31 776.02 0.021 4.5 13.38 2.96 0.44 0.45 3408.21 8.3 775.68 0.000 12.71 14.9 0.65 0.02 1.26 13.31 775.89 0.000 15.93 15.41 0.84 0.02 1.47 3238.09 Culvert Culvert 3072.51 8.3 775.56 0.015 3.24 9.16 2.56 0.32 0.58 13.31 775.8 0.008 5.72 11.8 2.33 0.24 0.82 2630.22 8.3 774.1 0.001 7.12 11.55 1.17 0.06 1.07 13.31 774.25 0.002 8.93 12.61 1.49 0.09 1.22 2177.95 8.3 772.32 0.021 3.11 10.73 2.67 0.37 0.58 13.31 772.56 0.008 6.09 14.3 2.19 0.22 0.82 1870.27 8.3 771.97 0.000 12.02 17.89 0.69 0.02 1.37 13.31 772.17 0.001 15.91 20.58 0.84 0.03 1.57 1498.7 8.3 771.63 0.002 7.52 44.53 1.1 0.06 0.78 13.31 771.77 0.002 11.35 99.59 1.24 0.07 0.92 1243.95 8.3 770 0.028 2.7 9.38 3.08 0.5 0.57 13.31 770.11 0.026 3.92 11.23 3.4 0.57 0.68 1004.91 8.3 765.06 0.012 3.2 7.43 2.59 0.31 0.73 1 13.31 765.22 0.012 4.43 8.25 3 0.39 0.89 AVERAGE: 1.47 0.18 0.561 JAVERAGE: 2.09 0.29 0.80 HEC-RAS RESULTS SUMMARY Proposed Conditions 1-Year w/o Martin Marietta Pumping w/Martin Marietta Pumping River Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Station (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) 7084.53 37.81 828.82 0.017 8.51 11.53 5.76 1.13 1.49 37.81 828.82 0.017 8.51 11.53 5.76 1.13 1.49 6970.99 37.81 823.17 0.124 5.04 11.29 11.87 5.48 1.22 37.81 823.17 0.124 5.04 11.29 11.87 5.48 1.22 6769.53 37.81 820.96 0.023 9.32 18.88 4.12 0.73 0.72 37.81 820.96 0.023 9.32 18.88 4.12 0.73 0.72 6573.11 37.81 807.84 0.275 3 6.79 12.6 7.31 0.82 42.82 807.93 0.226 3.6 7.67 11.89 6.38 0.91 6374.24 37.81 804.56 0.021 7.11 8.25 5.32 1.05 1.36 42.82 804.65 0.021 7.82 8.57 5.48 1.1 1.45 6188 37.81 802.06 0.002 16.27 10.17 2.32 0.17 2.04 42.82 802.21 0.002 17.82 10.36 2.4 0.18 2.19 5849.03 Culvert Culvert 5512.73 165.62 801.16 0.004 43.33 35.18 4.32 0.52 2.66 170.63 801.2 0.004 44.31 35.45 4.36 0.52 2.7 5381.62 165.62 799.59 0.017 23.39 16.39 7.19 1.57 1.95 170.63 799.62 0.017 23.97 16.64 7.24 1.59 1.98 5182.72 165.62 799.16 0.001 68.74 33.82 2.66 0.18 3.24 170.63 799.2 0.001 70.2 33.92 2.69 0.19 3.28 4979.85 165.62 798.91 0.001 62.29 25.94 2.84 0.2 3.9 170.63 798.95 0.001 63.3 26.09 2.89 0.2 3.94 4912.83 165.62 798.75 0.002 50.24 22.95 3.37 0.3 3.81 170.63 798.79 0.002 51.08 23.11 3.42 0.31 3.85 4904.8 Bridge Bridge 4895.33 165.62 798.15 0.013 26.1 15.7 6.35 1.21 2.99 170.63 798.18 0.013 26.5 15.82 6.44 1.24 3.02 4783.02 165.62 796.82 0.012 27.83 18.12 5.95 1.09 2.17 170.63 796.87 0.012 28.7 18.22 5.95 1.08 2.22 4588.29 165.62 795.94 0.003 43.27 23.06 4.39 0.49 4.65 170.63 796.03 0.003 45.23 23.66 4.39 0.48 4.74 4472.17 165.62 795.86 0.001 63.21 24.28 2.62 0.18 3.98 170.63 795.96 0.001 65.43 24.66 2.61 0.17 4.08 4443.04 Culvert Culvert 4423.67 165.62 793.78 0.017 23.93 17.32 6.94 1.48 2.15 170.63 793.82 0.016 24.48 17.51 6.99 1.49 2.19 4401.23 165.62 792.86 0.036 19.64 17.66 8.43 2.4 1.95 170.63 792.88 0.036 20.04 17.83 8.52 2.44 1.97 4397.08 Bridge Bridge 4387.93 165.62 792.4 0.018 25.27 21.26 6.89 1.49 1.68 170.63 792.43 0.018 25.86 21.34 6.95 1.51 1.71 4180.75 165.62 788.49 0.019 23.2 16.37 7.14 1.61 2.13 170.63 788.52 0.019 23.65 16.44 7.21 1.63 2.16 3987.74 165.62 785.74 0.002 60.78 33.97 3.24 0.27 4 170.63 785.76 0.002 61.51 33.99 3.3 0.29 4.02 3880.56 266.72 785.59 0.001 97.35 41.7 3.09 0.23 4.56 271.73 785.61 0.001 98.2 41.74 3.13 0.23 4.58 3849.88 Inl Struct Inl Struct 3837.39 266.72 781.66 0.016 37.12 23.69 7.19 1.56 2.62 271.73 781.69 0.016 37.65 23.79 7.22 1.57 2.65 3778.17 266.72 779.57 0.029 26.68 14.33 10 2.93 2.26 271.73 779.61 0.029 27.14 14.53 10.01 2.94 2.3 3623.04 266.72 780.17 0.002 72.5 23.46 3.68 0.33 4.57 271.73 780.18 0.002 72.94 23.52 3.73 0.34 4.58 3609.43 Bridge Bridge 3584.03 266.72 780.15 0.002 88.91 36.37 3 0.24 4.58 271.73 780.17 0.002 89.6 36.59 3.03 0.24 4.6 3408.21 266.72 780 0.001 113.68 34.5 2.35 0.13 5.58 271.73 780.02 0.001 114.2 34.63 2.38 0.14 5.6 3238.09 Culvert Culvert 3072.51 586.86 779.55 0.004 167.45 165.66 6.39 0.89 4.57 591.87 779.56 0.004 168.12 166.91 6.42 0.9 4.58 2630.22 586.86 777.62 0.005 193.1 284.52 6.02 0.9 4.59 591.87 777.63 0.005 195.58 284.8 6.03 0.9 4.6 2177.95 586.86 775.43 0.005 176.67 186.13 4.94 0.66 3.69 591.87 775.44 0.005 177.77 186.63 4.96 0.66 3.7 1870.27 586.86 774.4 0.003 354.78 291.45 3.81 0.39 3.8 591.87 774.41 0.003 357 292 3.82 0.4 3.81 1498.7 586.86 773.48 0.002 541.95 458.4 3.32 0.3 2.63 591.87 773.48 0.002 544.16 458.44 3.33 0.3 2.63 1243.95 586.86 772.16 0.009 317.03 394.57 6.57 1.16 2.73 591.87 772.17 0.009 320.57 395.4 6.56 1.15 2.74 1004.91 586.86 768.92 0.012 70.5 27.63 8.32 1.79 4.59 1 591.87 768.93 0.012 70.96 27.72 8.34 1.8 4.6 AVERAGE: 5.55 1.22 3.021 JAVERAGE: 5.56 1.20 3.05 HEC-RAS RESULTS SUMMARY Proposed Conditions 100-Year w/o Martin Marietta Pumping w/Martin Marietta Pumping River Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Q Total W.S.Elev E.G.Slope Flow Area Top Width Vel Chnl Shear Chan Depth Station (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) (cfs) (ft) (ft/ft) (sq ft) (ft) (ft/s) (lb/sq ft) 7084.53 256.94 831.09 0.013 45.69 20.83 10.39 2.54 3.76 256.94 831.09 0.013 45.69 20.83 10.39 2.54 3.76 6970.99 256.94 824.55 0.112 29.12 25.29 21.41 12.92 2.6 256.94 824.55 0.112 29.12 25.29 21.41 12.92 2.6 6769.53 256.94 822.36 0.012 47.7 42.24 7.15 1.43 2.12 256.94 822.36 0.012 47.7 42.24 7.15 1.43 2.12 6573.11 256.94 814.46 0.000 379.44 103.69 1.31 0.03 7.44 261.95 814.85 0.000 420.67 104.81 1.22 0.03 7.83 6374.24 256.94 814.44 0.000 315.61 49.42 1.3 0.03 11.24 261.95 814.84 0.000 335.38 50.37 1.26 0.03 11.64 6188 256.94 814.44 0.000 543.76 74.62 0.82 0.01 14.42 261.95 814.84 0.000 569.68 75.59 0.8 0.01 14.82 5849.03 Culvert Culvert 5512.73 1004.08 804.76 0.005 129.73 50.81 9.16 1.66 6.26 1009.09 804.77 0.005 130.07 50.83 9.18 1.66 6.27 5381.62 1004.08 803.61 0.007 144.6 43.73 10.66 2.3 5.97 1009.09 803.62 0.007 145.17 43.82 10.68 2.31 5.98 5182.72 1004.08 803.94 0.001 264.94 51.03 5.22 0.5 8.02 1009.09 803.95 0.001 265.68 51.07 5.24 0.5 8.03 4979.85 1004.08 803.45 0.002 223.92 44.7 6.42 0.75 8.44 1009.09 803.46 0.002 224.45 44.74 6.44 0.75 8.45 4912.83 1004.08 803.32 0.002 201.2 42.1 6.31 0.75 8.38 1009.09 803.33 0.002 201.68 42.15 6.33 0.75 8.39 4904.8 Bridge Bridge 4895.33 1004.08 802.58 0.005 152.85 38.28 8.91 1.56 7.42 1009.09 802.58 0.005 152.97 38.29 8.95 1.58 7.42 4783.02 1004.08 802.54 0.002 181.33 34.31 6.91 0.88 7.89 1009.09 802.54 0.002 181.42 34.32 6.94 0.89 7.89 4588.29 1004.08 802.4 0.001 358.49 86.63 6.2 0.67 11.11 1009.09 802.41 0.001 358.61 86.64 6.23 0.68 11.12 4472.17 1004.08 802.48 0.000 321.71 57.55 3.4 0.21 10.6 1009.09 802.49 0.000 321.83 57.56 3.41 0.21 10.61 4443.04 Culvert Culvert 4423.67 1004.08 797.21 0.011 80.55 49.65 12.58 3.27 5.58 1009.09 797.23 0.011 80.82 49.75 12.6 3.28 5.6 4401.23 1004.08 794.59 0.053 61.71 31.69 16.88 7.5 3.68 1009.09 794.59 0.053 61.93 31.78 16.91 7.52 3.68 4397.08 Bridge Bridge 4387.93 1004.08 794.5 0.030 76.04 27.6 15.6 5.78 3.78 1009.09 794.51 0.030 76.29 27.64 15.63 5.8 3.79 4180.75 1004.08 791.9 0.011 94.38 25.56 12.07 3.08 5.54 1009.09 791.91 0.011 94.75 25.6 12.09 3.09 5.55 3987.74 1004.08 790.44 0.001 317.23 69.19 5.53 0.57 8.7 1009.09 790.44 0.001 317.72 69.2 5.56 0.58 8.7 3880.56 2065.13 788.28 0.008 267.79 89.15 11.87 2.75 7.25 2070.14 788.29 0.008 268.69 89.22 11.87 2.75 7.26 3849.88 Inl Struct Inl Struct 3837.39 2065.13 787 0.005 267.06 76.45 9.31 1.7 7.96 2070.14 787.01 0.005 268.03 76.51 9.31 1.7 7.97 3778.17 2065.13 787.21 0.002 401.01 94.73 7.09 0.94 9.9 2070.14 787.22 0.002 402.21 94.81 7.09 0.94 9.91 3623.04 2065.13 787.32 0.001 967.13 231.61 4.87 0.41 11.72 2070.14 787.34 0.001 970.27 231.69 4.87 0.41 11.74 3609.43 Bridge Bridge 3584.03 2065.13 787.35 0.000 1540.9 360.57 2.99 0.16 11.78 2070.14 787.36 0.000 1545.77 360.69 2.99 0.16 11.79 3408.21 2065.13 787.23 0.000 926.41 381.99 3.38 0.2 12.81 2070.14 787.25 0.000 928.29 382.15 3.38 0.2 12.83 3238.09 Culvert Culvert 3072.51 3643.02 783.27 0.011 397.11 475.99 17.45 5.35 8.29 3648.03 783.28 0.011 397.49 476.24 17.46 5.36 8.3 2630.22 3643.02 780.75 0.004 1204.44 423.22 8.61 1.44 7.72 3648.03 780.75 0.004 1205.72 423.28 8.61 1.44 7.72 2177.95 3643.02 777.89 0.007 829.79 286.37 9.92 2.05 6.15 3648.03 777.9 0.007 830.49 286.39 9.93 2.06 6.16 1870.27 3643.02 776.95 0.003 1610.42 593.23 6.66 0.92 6.35 3648.03 776.95 0.003 1612.23 593.54 6.66 0.92 6.35 1498.7 3643.02 775.88 0.003 1668.67 480.34 6.28 0.83 5.03 3648.03 775.88 0.003 1670.19 480.37 6.28 0.83 5.03 1243.95 3643.02 775.04 0.003 1662.22 511.02 7.22 1.05 5.61 3648.03 775.05 0.003 1664.03 511.07 7.22 1.06 5.62 1004.91 3643.02 772.72 0.009 789.17 312.94 10.9 2.47 8.39 3648.03 772.72 0.009 789.74 312.97 10.91 2.48 8.39 AVERAGE: 8.33 2.02 7.63 AVERAGE: 8.33 2.03 7.68 i j _ r •, _ r VA r �t Pr y . L, •gal' Igo a fr Project Cross Sections Project Reach(Kings Creek) i Albemarle Property Line :. Background: 2019 ESRI Imagery KINGS MOUNTAIN LITHIUM MINING PROJECT / Scale: , Created By: K..GaIltllt SWCA KINGS CREEK Reviewed By: Allen SWCA Protect No.: 20316 Date Produced: Augus[08,2022 Cleveland County, North Carolina NAD 19835tamPlane North Carolina FIPS 3200 Feet ENVIRONMENTAL CONSULTANTS 0 1,000 2,000 100—YEAR FLOOD EXTENTS eeS Kilometers 0 0.3 0.6 APPENDIX E Water Quality Laboratory Results Pit Lake Samples Table E-1. Pit Lake Samples taken May 2022 from Locations PL-2, PL-5, and PI-8, at Depths of 10 Feet, 50 Feet, and 80 Feet Parameter Total/ SW Description Analyte Dissolved Units PL-2-10 PL-2-50 PL-2-80 PL-5-10 PL-5-50 PL-5-80 PL-8-10 PL-8-50 PL-8-80 Quality Standard Metals Aluminum Dissolved mg/L <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.0063B <0.005 <0.005 NS Metals Aluminum Total mg/L 0.0092B <0.005 0.0076E 0.0093B <0.005 <0.005 0.0088B <0.005 <0.005 NS Metals Antimony Dissolved mg/L <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 NS Metals Antimony Total mg/L <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 <0.0004 NS Metals Arsenic Dissolved mg/L 0.00536 0.00517 0.00395 0.00540 0.00519 0.00434 0.00522 0.00521 0.00392 0.15 Metals Arsenic Total mg/L 0.00559 0.00559 0.00504 0.00556 0.00553 0.00516 0.00571 0.00554 0.00516 0.01 Metals Barium Dissolved mg/L <0.007 <0.007 0.0159E <0.007 <0.007 0.0161 B <0.007 <0.007 0.0131 B NS Metals Barium Total mg/L <0.007 <0.007 0.0133B <0.007 <0.007 0.0140B <0.007 <0.007 0.0139B 1 Metals Beryllium Dissolved mg/L <0.00008 <0.00008 <0.00008 <0.00008 <0.00008 0.000082E <0.00008 <0.00008 <0.00008 0.0065 Metals Beryllium Total mg/L <0.00008 <0.00008 <0.00008 <0.00008 <0.00008 <0.00008 <0.00008 <0.00008 <0.00008 NS Metals Bismuth Dissolved mg/L <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 NS Metals Bismuth Total mg/L <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 NS Metals Boron Dissolved mg/L <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 NS Metals Boron Total mg/L <0.03 <0.03 0.033B <0.03 <0.03 0.032B <0.03 <0.03 0.031B NS Metals Cadmium* Dissolved mg/L <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 0.00064 Metals Cadmium Total mg/L <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 <0.00005 NS Metals Calcium Dissolved mg/L 50.0 51.7 62.8 50.4 52.7 63.1 50.9 52.4 60.1 NS Metals Calcium Total mg/L 49.7 52.1 64.2 49.5 51.5 64.6 49.3 53.1 63.5 NS Metals Chromium* Dissolved mg/L <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 0.11556 (for Cr III) Metals Chromium Total mg/L <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 0.00052E <0.0005 <0.0005 <0.0005 NS Metals Cobalt Dissolved mg/L <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 NS Metals Cobalt Total mg/L <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 NS Metals Copper* Dissolved mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.01424 Metals Copper Total mg/L <0.01 <0.01 0.061 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 NS Metals Iron Dissolved mg/L <0.007 <0.007 0.0142E <0.007 <0.007 0.0148B <0.007 <0.007 0.0187B NS Parameter Total/ SW Description Analyte Dissolved Units PL-2-10 PL-2-50 PL-2-80 PL-5-10 PL-5-50 PL-5-80 PL-8-10 PL-8-50 PL-8-80 Quality Standard Metals Iron Total mg/L 0.0186B 0.0268 0.0592 0.0172B 0.0249 0.0880 0.0182B 0.0354 0.0595 NS Metals Lead* Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0005 0.00452 Metals Lead Total mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 NS Metals Lithium Dissolved mg/L 0.790 0.815 0.996 0.794 0.827 1.01 0.800 0.825 0.947 NS Metals Lithium Total mg/L 0.780 0.821 1.02 0.780 0.814 1.02 0.779 0.835 1.01 NS Metals Magnesium Dissolved mg/L 11.5 11.9 14.6 11.6 12.1 14.6 11.7 12.1 13.9 NS Metals Magnesium Total mg/L 11.7 12.3 15.2 11.7 12.2 15.4 11.6 12.6 15.1 NS Metals Manganese Dissolved mg/L <0.01 0.616 3.37 <0.01 0.644 3.41 <0.01 0.690 2.70 NS Metals Manganese Total mg/L 0.066 0.649 3.31 0.047B 0.664 3.51 0.061 0.723 3.32 NS Metals Mercury Dissolved ng/L <0.3 <0.3 <2 <0.3 <0.3 <2 <0.3 <0.3 <2 NS Metals Mercury Total ng/L <0.6 <0.6 <1.5 <0.3 NA <1.5 <0.3 <0.6 <1.5 12 Metals Molybdenum Dissolved mg/L <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 NS Metals Molybdenum Total mg/L <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 NS Metals Nickel" Dissolved mg/L <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 0.08228 Metals Nickel Total mg/L <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 <0.008 0.025 Metals Phosphorus Dissolved mg/L <0.1 0.2713 1.07 <0.1 0.27B 1.09 <0.1 0.25B 0.85 NS Metals Phosphorus Total mg/L <0.1 0.27B 1.12 <0.1 0.2613 1.14 <0.1 0.2813 1.11 NS Metals Potassium Dissolved mg/L 4.39 4.67 5.61 4.42 4.75 5.62 4.48 4.72 5.35 NS Metals Potassium Total mg/L 4.43 4.76 5.76 4.39 4.73 5.77 4.41 4.83 5.69 NS Metals Scandium Dissolved mg/L <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 NS Metals Scandium Total mg/L <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 NS Metals Selenium Dissolved mg/L <0.0001 0.00012B 0.0840 <0.0001 <0.0001 0.0631 <0.0001 <0.0001 0.0411 NS Metals Selenium Total mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 0.005 Metals Silicon Dissolved mg/L 0.62 3.13 6.53 0.61 3.22 6.52 0.62 3.22 5.66 NS Metals Silicon Total mg/L 0.59 2.31 5.39 0.53 2.88 5.61 0.55 3.22 5.83 NS Metals Silver* Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0005 0.00818 Parameter Total/ SW Description Analyte Dissolved Units PL-2-10 PL-2-50 PL-2-80 PL-5-10 PL-5-50 PL-5-80 PL-8-10 PL-8-50 PL-8-80 Quality Standard Metals Silver Total mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 NS Metals Sodium Dissolved mg/L 10.4 10.9 13.1 10.4 11 13.3 10.5 10.8 12.6 NS Metals Sodium Total mg/L 10.1 10.6 13.2 9.98 10.5 13.4 9.94 10.7 12.9 NS Metals Strontium Dissolved mg/L 0.160 0.168 0.222 0.160 0.171 0.224 0.161 0.170 0.208 NS Metals Strontium Total mg/L 0.154 0.165 0.223 0.153 0.164 0.223 0.153 0.168 0.220 NS Metals Sulfur Dissolved mg/L 38.1 40.7 86.4 38.6 41.1 88.2 39.1 40.4 56.0 NS Metals Sulfur Total mg/L 40.1 40.2 34.8 37.8 39.9 35.9 38.6 42.2 34.8 NS Metals Thallium Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0005 NS Metals Thallium Total mg/L <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 NS Metals Thorium Dissolved mg/L <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.005 NS Metals Thorium Total mg/L <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 NS Metals Tin Dissolved mg/L <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 NS Metals Tin Total mg/L <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 <0.04 NS Metals Titanium Dissolved mg/L <0.005 <0.005 <0.005 <0.005 <0.005 0.005313 <0.005 <0.005 <0.005 NS Metals Titanium Total mg/L <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 NS Metals Uranium Dissolved mg/L 0.00068 0.00062 0.00057 0.00066 0.00061 0.00060 0.00067 0.00060 0.00056B NS Metals Uranium Total mg/L 0.00073 0.00065 0.00048B 0.00071 0.00064 0.00044B 0.00071 0.00063 0.00042B NS Metals Vanadium Dissolved mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 NS Metals Vanadium Total mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 NS Metals Zinc" Dissolved mg/L <0.006 <0.006 <0.006 <0.006 <0.006 <0.006 <0.006 <0.006 <0.006 0.18705 Metals Zinc Total mg/L 0.006513 <0.006 <0.006 <0.006 0.0113B 0.0450 <0.006 <0.006 <0.006 NS Radiochemistry Gross alpha - pCi/L -0.41 0.47 0.85 1.5 0.5 2 0.46 2.2 0.29 15 Radiochemistry Gross beta - pCi/L 6.5 4.6 8.9 6.7 11 4.9 4.5 5.7 7.5 50 Radiochemistry Radium 226 Total pCi/L -0.01 -0.02 0.93 -0.03 0.1 0.72 -0.03 0.03 1.2 5 +Alpha Emitting Radium Isotopes Parameter Total/ SW Description Analyte Dissolved Units PL-2-10 PL-2-50 PL-2-80 PL-5-10 PL-5-50 PL-5-80 PL-8-10 PL-8-50 PL-8-80 Quality Standard Radiochemistry Radium 228 total pCi/L 0.87 -0.28 0.80 -0.32 0.1 0.26 0.62 0.86 0.03 5 - Bicarbonate - mg/L 78.5 80.9 125 78.6 80.6 121 67.3 79.5 135 NS as CaCO3 General Carbon Total mg/L 18.7 20.2 33.0 18.6 20.3 31.2 15.8 20.2 33.2 NS inorganic inorganic General Carbon Total mg/L 4.7B 3.2B 2.8B 4.1 B 3.8B 2.9B 4.8B 3.3B 2.8B NS inorganic organic (TOC) General Carbonate as - mg/L <2 <2 <2 <2 <2 <2 <2 <2 <2 NS inorganic CaCO3 General Cation-anion - % -2.4 -3.4 -0.9 -2.4 -2.3 5.7 1.2 -2.3 -3.6 NS inorganic balance General Chloride - mg/L 6.35 6.53 7.52 6.30 6.44 7.42 6.38 6.64 6.50 230 inorganic General Cyanide Free mg/L <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 NS inorganic General Cyanide Total mg/L <0.003H <0.003H <0.003H <0.003H <0.003H 0.0031 BH <0.003H <0.003H <0.003H 0.005 inorganic General Fluoride - mg/L 0.32B 0.34B 0.39 0.32B 0.34B 0.41 0.32B 0.33B 0.34B 1.8 inorganic General Hardness as Dissolved mg/L 172 178 217 174 181 218 175 181 207 NS inorganic CaCO3 Hydroxide as - mg/L <2 <2 <2 <2 <2 <2 <2 <2 <2 NS - CaCO3 General Nitrogen Ammonia mg/L <0.05 0.264 3.93 <0.05 0.284 3.61 <0.05 0.324 3.83 NS inorganic - Residue Filterable mg/L 264 280 352 260 270 332 252 270 320 500 (TDS) @180C Residue Non- mg/L <5 <5 <5 <5 <5 <5 <5 <5 <5 NS filterable (TSS) @105C General Sulfate mg/L 117 128 142 120 126 114 118 127 131 250 inorganic Parameter Total/ SW Description Analyte Dissolved Units PL-2-10 PL-2-50 PL-2-80 PL-5-10 PL-5-50 PL-5-80 PL-8-10 PL-8-50 PL-8-80 Quality Standard General Sulfide as S - mg/L <0.02 <0.02 29.2 <0.02 <0.02 27.0 <0.02 <0.02 18.4 NS inorganic General Sum of - meq/L 4.2 4.5 5.7 4.3 4.5 5.0 4.0 4.5 5.7 NS inorganic anions General Sum of - meq/L 4.0 4.2 5.6 4.1 4.3 5.6 4.1 4.3 5.3 NS inorganic cations General TDS - mg/L 248 264 330 252 264 300 244 264 319 500 inorganic (calculated) a General TDS(ratio- - - 1.06 1.06 1.07 1.03 1.02 1.11 1.03 1.02 1.00 NS inorganic measured/cal culated) General Total - mg/L 78.5 80.9 125 78.6 80.6 121 67.3 79.5 135 NS inorganic alkalinity General Chlorine total Total mg/L <0.100 0.42 <0.100 <0.100 0.51 <0.100 <0.100 0.26 <0.100 0.017 inorganic residual Metals Chromium Dissolved pg/L <10.0 <10.0 <10.0 <10.0 <10.0 <10.0 <10.0 <10.0 <10.0 11 hexavalent General Nitrite - mg/L <0.100 <0.100 <0.100 <0.100 <0.100 <0.100 <0.100 <0.100 <0.100 NS inorganic (NOZ-N) General Nitrate+ - mg/L <0.100 0.212 <0.100 <0.100 0.24 <0.100 <0.100 <0.100 <0.100 10 inorganic Nitrite-N Field parameter Temperature - C 24.80 47.12 47.66 75.02 47.3 47.66 64.76 47.12 47.66 NS Field parameter Specific - pS/cm 386.3 405.5 509.5 400.2 405.7 506.6 402.2 408.2 510.3 NS conductivity Field parameter Oxidation- - my -273.4 -261.3 -266.8 -282.5 -321.7 -334.1 -233.6 -323.8 -351.3 NS reduction potential Field parameter Dissolved - mg/L 8.9 0.8 2.0 8.2 0.4 0.5 5.4 0.2 0.5 <4 oxygen Field parameter Dissolved - % 106.7 6.9 17 97 3.2 3.9 57.2 1.7 4.3 NS oxygen Parameter Total/ SW Description Analyte Dissolved Units PL-2-10 PL-2-50 PL-2-80 PL-5-10 PL-5-50 PL-5-80 PL-8-10 PL-8-50 PL-8-80 Quality Standard Field parameter pH — — 9.12 7.54 7.65 9.19 7.51 7.55 7.74 7.51 7.68 6.5-9.0 Notes: Indicates the analyte standard was calculated using a hardness of 172 mg/L,with the standard being shown for chronic exposure. Detection limits shown represent the method quantitation limit(MQL)as reported by Waypoint Analytical and the method detection limit(MDL)as reported by ACZ Laboratories. NS-No applicable standard. NA-No samples collected. Qualifiers:B-Denotes a concentration greater than the MDL and less than the practical quantitation limit(PQL).H-Indicates that the hold time was missed. Color Coding:Red cells indicate a detection greater than the regulatory standard.Yellow cells indicate a constituent with a detection limit greater than the regulatory standard. Surface Water quality standards refer to North Carolina standards(15A NCAC 0213)for these uses:Water supply,Class C aquatic life,Class C fish consumption. The SW quality standard for dissolved oxygen is a narrative standard. APPENDIX F Water Quality Laboratory Results Kings Creek Laboratory Results Table F-1. Kings Creek and South Reservoir Sample Results Analyte Total/ Units KMSW-8 KMSW-10 KMSW-3a KMSW-3 SW Quality Dissolved Standard South Creek Kings Creek Kings Creek at Kings Creek - Reservoir above Weir#3 near the Administrative Property Building Boundary (Weir#7) Aluminum Dissolved mg/L <0.005 0.0201 <0.005 0.0080E NS Aluminum Total mg/L 0.0102B 0.193 0.0880 0.508 NS Antimony Dissolved mg/L <0.0004 0.00145 <0.0004 <0.0004 NS Antimony Total mg/L <0.0004 0.00156 <0.0004 <0.0004 NS Arsenic Dissolved mg/L 0.00054B 0.00182 0.00082E 0.00172 0.15 Arsenic Total mg/L 0.00069B 0.00298 0.00104 0.00276 0.01 Barium Dissolved mg/L <0.007 0.0318 0.0082E 0.0205E NS Barium Total mg/L 0.0098B 0.0416 0.0123B 0.0243B 1 Beryllium Dissolved mg/L <0.00008 <0.00008 <0.00008 <0.00008 0.0065 Beryllium Total mg/L <0.00008 <0.00008 <0.00008 <0.00008 NS Bismuth Dissolved mg/L <0.04 <0.04 <0.04 <0.04 NS Bismuth Total mg/L <0.04 <0.04 <0.04 <0.04 NS Boron Dissolved mg/L <0.03 0.032 <0.03 <0.03 NS Boron Total mg/L <0.03 <0.03 <0.03 <0.03 NS Cadmium* Dissolved mg/L <0.00005 <0.00005 <0.00005 <0.00005 0.00016 Cadmium Total mg/L <0.00005 <0.00005 <0.00005 <0.00005 NS Calcium Dissolved mg/L 8.25 78.0 34.9 37.0 NS Calcium Total mg/L 8.65 80.7 35.4 39.4 NS Chromium* Dissolved mg/L <0.0005 <0.0005 <0.0005 <0.0005 0.02536 (for Cr III) Chromium Total mg/L <0.0005 0.00164 <0.0005 0.00101 B NS Cobalt Dissolved mg/L <0.02 <0.02 <0.02 <0.02 NS Cobalt Total mg/L <0.02 <0.02 <0.02 <0.02 NS Copper* Dissolved mg/L <0.01 <0.008 <0.01 <0.01 0.00293 Copper Total mg/L <0.01 <0.008 <0.01 <0.01 NS Iron Dissolved mg/L 0.0556 0.0537 0.189 0.0627 NS Iron Total mg/L 0.243 0.465 0.984 1.50 NS Lead* Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 0.00059 Lead Total mg/L <0.0001 <0.0001 <0.0001 0.00048B NS Lithium Dissolved mg/L 0.212 0.0445 1.03 0.920 NS Lithium Total mg/L 0.213 0.0454 1.02 0.932 NS Magnesium Dissolved mg/L 2.89 22.5 9.52 9.75 NS Magnesium Total mg/L 3.01 24.0 9.62 10.4 NS Manganese Dissolved mg/L ` <0.0A� 0.034B 0.637 0.841 Manganese Total mg/L 0.062 0.047B 0.694 1.04 NS F-1 Analyte Total/ Units KMSW-8 KMSW-10 KMSW-3a KMSW-3 SW Quality Dissolved Standard - South Creek Kings Creek Kings Creek at Kings Creek - Reservoir above Weir#3 near the Administrative Property Building Boundary (Weir#7) Mercury Dissolved ng/L <0.3 <0.3 <0.3 <0.3 NS Mercury Total ng/L <0.3 <0.3 0.38B 2.03 12 Molybdenum Dissolved mg/L <0.0002 0.00233 0.00055 0.00076 NS Molybdenum Total mg/L <0.0002 0.00253 0.00057 0.00051 NS Nickel* Dissolved mg/L <0.008 0.00104 <0.008 <0.008 0.01718 Nickel Total mg/L <0.008 0.00167 <0.008 <0.008 0.025 Phosphorus Dissolved mg/L <0.1 <0.1 <0.1 <0.1 NS Phosphorus Total mg/L <0.1 <0.1 <0.1 0.11B NS Potassium Dissolved mg/L 2.01 10.7 3.39 3.10 NS Potassium Total mg/L 1.99 11.4 3.35 3.18 NS Scandium Dissolved mg/L <0.05 <0.05 <0.05 <0.05 NS Scandium Total mg/L <0.05 <0.05 <0.05 <0.05 NS Selenium Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 NS Selenium Total mg/L <0.0001 0.00011B 0.00012B <0.0001 0.005 Silicon Dissolved mg/L 5.00 2.40 6.41 6.90 NS Silicon Total mg/L 4.41 2.72 5.62 5.94 NS Silver" Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 0.00034 Silver Total mg/L <0.0001 <0.0001 <0.0001 <0.0001 NS Sodium Dissolved mg/L 8.16 12.4 11.4 11.2 NS Sodium Total mg/L 8.19 12.7 11.2 13.8 NS Strontium Dissolved mg/L 0.0263B 0.350 0.0751 0.0813 NS Strontium Total mg/L 0.0282B 0.366 0.0762 0.0827 NS Sulfur Dissolved mg/L 3.44 73.4 22.5 22.0 NS Sulfur Total mg/L 3.58 74.9 22.6 24.1 NS Thallium Dissolved mg/L <0.0001 <0.0001 <0.0001 <0.0001 NS Thallium Total mg/L <0.0001 <0.0001 <0.0001 <0.0001 NS Thorium Dissolved mg/L <0.001 <0.001 <0.001 <0.001 NS Thorium Total mg/L <0.001 <0.001 <0.001 <0.001 NS Tin Dissolved mg/L <0.04 <0.04 <0.04 <0.04 NS Tin Total mg/L 0.055B <0.04 <0.04 <0.04 NS Titanium Dissolved mg/L <0.005 0.008713 <0.005 <0.005 NS Titanium Total mg/L <0.005 0.013613 0.007713 0.0263 NS Uranium Dissolved mg/L <0.0001 0.00323 0.00035B 0.00040B NS Uranium Total mg/L <0.0001 0.00326 0.0003913 0.00041 B NS Vanadium Dissolved mg/L <0.01 <0.01 <0.01 <0.01 NS F-2 Analyte Total/ Units KMSW-8 KMSW-10 KMSW-3a KMSW-3 SW Quality Dissolved Standard - - - South Creek Kings Creek Kings Creek at Kings Creek - Reservoir above Weir#3 near the Administrative Property Building Boundary (Weir#7) Vanadium Total mg/L <0.01 <0.01 <0.01 <0.01 NS Zinc" Dissolved mg/L <0.006 <0.006 <0.006 <0.006 0.03864 Zinc Total mg/L <0.006 <0.006 <0.006 <0.006 NS Gross alpha - pCi/L -0.8 0.72 -0.09 0.49 15 Gross beta - pCi/L 2.3 4 5.4 3.6 50 Radium 226+alpha Total pCi/L 0.02 0.16 0.07 -0.46 5 emitting radium isotopes Radium 228 Total pCi/L 0.35 0.06 -0.48 0.17 5 Bicarbonate as - mg/L 34.9 93.7 74.1 79.1 NS CaCO3 Carbon Total mg/L 7.9 22.8 17.9 19.4 NS inorganic Carbon Total organic mg/L 4.3 1.6B 2.3B 2.6B NS (TOC) Carbonate as - mg/L <2 <2 <2 <2 NS CaCO3 Cation-Anion - % -4.3 0.0 -3 -2.9 NS Balance Chloride - mg/L 7.34 7.13 12.6 11.7 230 Cyanide Free mg/L <0.003 <0.003 <0.003 <0.003 NS Cyanide Total mg/L <0.003 <0.003 <0.003 <0.003 0.005 Fluoride - mg/L <0.15 0.16B 0.24B 0.23B 1.8 Hardness as CaCO3 Dissolved mg/L 33 288 287 133 NS Hydroxide as - mg/L <2 <2 <2 <2 NS CaCO3 Nitrogen Ammonia mg/L <0.05 <0.05 <0.05 0.072B NS Residue Filterable mg/L 72 408 448 216 500 (TDS) @180C Residue Non-filterable mg/L <5 <5 10.0B 18.0E NS (TSS) @105C Sulfate - mg/L 11.5 145 214 72.7 250 Sulfide as S - mg/L <0.02 <0.02 <0.02 <0.02 NS Sum of anions - meq/L 1.2 6.7 3.4 3.5 NS Sum of cations - meq/L 1.1 6.3 3.2 3.3 NS TDS(calculated) - mg/L 61.5 375 403 195 500 TDS - 1.17 1.09 1.11 1.11 NS (ratio-measured/ calculated) F-3 Analyte Total/ Units KMSW-8 KMSW-10 KMSW-3a KMSW-3 SW Quality Dissolved Standard - South Creek Kings Creek Kings Creek at Kings Creek - Reservoir above Weir#3 near the Administrative Property Building Boundary (Weir#7) Total alkalinity - mg/L 34.9 170 74.1 79.1 NS Chlorine total Total mg/L <0.100 <0.100 <0.100 <0.100 0.017 residual Chromium Dissolved fag/L <10.0 <10.0 <10.0 <10.0 11 hexavalent Nitrite(NOZ-N) - mg/L <0.100 <0.100 <0.100 <0.100 NS Nitrate+ - mg/L <0.100 0.119 0.189 0.191 10 N itrite-N Temperature - C 23.5 16.4 19.9 24.8 NS Specific conductivity - NS/cm 113.1 981 315 400.6 NS Oxidation reduction - my 66.5 -128.7 23.5 -75.6 NS potential Dissolved oxygen - mg/L 3.64 1.04 6.24 0.62 <4 Dissolved oxygen - % 42.8 10.7 68.6 7.4 NS pH - - i 7.19 7.19 7.53 7i 6.5-9.5 Notes: *Indicates that the analyte standard was calculated using a hardness of 27 mg/L,with the standard being shown for chronic exposure. Detection limits shown represent the method quantitation limit(MQL)as reported by Waypoint Analytical and the method detection limit(MDL)as reported by ACZ Laboratories. NS-No applicable standard. NA-No samples collected. Qualifiers:B-Denotes a concentration greater than the MDL and less than the practical quantitation limit(PQL).H-Indicates that the hold time was missed. Color Coding:Red cells indicate a detection greater than the regulatory standard.Yellow cells indicate a constituent with a detection limit greater than the regulatory standard. Surface Water quality standards refer to North Carolina standards(15A NCAC 026)for these uses:Water supply,Class C aquatic life,Class C fish consumption. The SW quality standard for dissolved oxygen is a narrative standard. Cells highlighted in red indicate result values higher than the water quality standard. Non-detect samples are shown as the method detection limit(MDL). F-4 APPENDIX G Results Aquatic Habitat Assessment Report AQUATIC HABITAT ASSESSMENT REPORT FOR THE KINGS MOUNTAIN LITHIUM MINE, CLEVELAND COUNTY, NORTH CAROLINA Prepared for Albemarle U.S., Inc. 348 Holiday Inn Drive Kings Mountain, North Carolina 28086 Attn: Trevor Chesal Prepared by SWCA Environmental Consultants 113 Edinburgh South Drive, Suite 120 Cary, North Carolina 27511 (919) 212-2200 www.swca.com SWCA Project No. 70316 October 2022 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 CONTENTS 1 Introduction..........................................................................................................................................l 1.1 Location........................................................................................................................................ 1 1.2 Project Area Description............................................................................................................... 1 2 Methods.................................................................................................................................................4 2.1 Desktop Analysis and Previous Surveys......................................................................................4 2.2 Field Surveys................................................................................................................................5 2.2.1 Baited Minnow and Hoop Trap Surveys ............................................................................5 2.2.2 Electrofishing Surveys........................................................................................................7 2.2.3 Aquatic Macroinvertebrate Surveys ...................................................................................7 3 Results....................................................................................................................................................7 3.1 Minnow and Hoop Traps..............................................................................................................7 3.2 Electrofishing Sampling...............................................................................................................8 3.2.1 Aquatic Macroinvertebrate Surveys ................................................................................. 10 4 Summary and Conclusions................................................................................................................10 5 Literature Cited..................................................................................................................................12 Appendices Appendix A. Detailed Survey Maps Appendix B. Photographs Figures Figure1. Project location..............................................................................................................................2 Figure 2. Aerial imagery of the Project area.................................................................................................3 Figure 3. Overview map of aquatic survey areas..........................................................................................6 Tables Table 1. Aquatic Species of Concern with Potential to Occur in Cleveland County,North Carolina..........5 Table 2. Fish Species Caught during Trapping and Electrofishing Surveys in Project Area Ponds andStreams.....................................................................................................................................8 Table 3. Fish Species Observations by Survey Site......................................................................................9 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 1 INTRODUCTION On behalf of Albemarle Corporation(Albemarle), SWCA Environmental Consultants(SWCA)conducted an aquatic habitat assessment for the Kings Mountain Lithium Mining Project(Project)located in southeastern Cleveland County,North Carolina. The primary objective of the assessment was to determine the aquatic faunal assemblage of the ponds and streams within the Project area.Additionally, state-listed species with the potential to occur were surveyed for during this assessment. These data will be used to understand the potential impacts to the aquatic systems that might occur during mine construction and operations,including the discharge of water to Kings Creek during pit dewatering. 1 .1 Location The Project is on private land owned or leased by Albemarle and consists of approximately 1,403 acres (Project area). The Project is located approximately 2 miles south of downtown Kings Mountain,North Carolina, and is located on the U.S. Geological Survey(USGS)Kings Mountain,North Carolina, 7.5-minute quadrangle(Figure 1). The Project area is divided by Interstate 85 (I-85),with the main parcel on the north side of the highway(Main Site—North of I-85)and two smaller parcels on the south side of the highway(Main Site—South of I-85 and Albemarle East Property). The main parcel is bordered by South Battleground Avenue (Highway 216),Parkgrace Road, and Tin Mine Road to the west; Quarry Road to the north; and 1-85 to the south and east. 1 .2 Project Area Description The main parcel is mostly developed/disturbed and includes Albemarle's lithium salts and compound processing facility and Albemarle's Global Technical Center. The west side includes an active drive-in theater,retired paper processing plant, and recreational vehicle(RV)campground. Five utility rights-of-way(ROWS) cross the northern and central portions of the parcel. The parcel directly south of I-85 is mostly undeveloped. The Kings Mountain Gateway Trail goes around the northern and eastern boundaries of this parcel with an access point and parking area off Galilee Church Road. Additionally, three utility ROWS cross the parcel running northeast—southwest. The easternmost parcel(Albemarle East Property), east of York Road, is undeveloped with only a few unpaved roads for access.Undeveloped land in the three parcels consists primarily of forest and wetland habitats. The Project area is surrounded by residential, commercial,and industrial development to the north,west, and south(Figure 2). The Martin Marietta mine borders the Project area to the north. To the east is primarily undeveloped land associated with Crowders Mountain State Park. The Project area is located within the Kings Creek(hydrologic unit code [HUC] 0305010509) and Buffalo Creek(HUC 0305010508)watersheds of the Broad River Basin(North Carolina Department of Environmental Quality [NCDEQ] 2022). The Broad River is located approximately 15 miles west-southwest of the Project area. Kings Creek, a tributary of the Broad River,runs through the Project area.According to the USGS Kings Mountain 7.5-minute quadrangle maps,the headwaters of Kings Creek originate approximately 0.75-mile northeast of the Project area. There are also on-site resources named by Albemarle for Project purposes. These are all man-made features including the Pit Lake,Mud Pond 1,Mud Pond 2,No. 1 Mill Pond,Executive Club Lake, South Creek,and South Creek Reservoir. Pit Lake is a mining pit that has filled with water since mining ceased. Mud Pond 1,Mud Pond 2,and Mill Pond No. 1 are isolated ponds on the Albemarle Main Site—North of 1-85. South Creek is a south-flowing stream on the western portion of the Albemarle Main Site—North of 1-85 with the South Creek Reservoir making up the dammed-up portion that eventually empties in Kings Creek to the east. Executive Club Lake is an old tailings pond on the Albemarle Main Site—South of 1-85 that has an outflow channel to Kings Creek. Small tributaries contribute flow to this lake. 1 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 Fill Uaf..1W CL1Ul7�W�AnSUW L.IY II-:.C� O O - �- �ErtA1AYl7l.Sl�U - r' f KINGS MOUNTAIN LITHIUM MINE t:leveland County,NC Project Area USG57.5'QUadrangle' USGS Map Meters Kings Mountain,NC,35081-B3 0 310 620 NAD 1983 StatePlane North Carolina FIPS 3200 Feet 35.216°N 81.3483°W, N A Base Map.ESRI AroGIS Onlrne. 1:30,QDQ accessed September 2022 Updated:918/2022 Project No.70316 `J W ^' Layout.02_USGS_v2 ENVIRONMENTAL CONSULTANTS Figure 1. Project location. 2 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 } Z4 - dr �� 'Will �7MOD 1` 4 VV A. 1 *7 r � i. U1h:A:LlA1�LAl 771 I KINGS MOUNTAIN LITHIUM MINE Cleveland County,NC 0 2,500 5,000 Project Area USGS7.5'Quadrangle: Feet Aerial Imagery Meters Kings Mountain,INC,35081-63 0 740 1.480 Map NAD 1983 StatePlane North Carolina RIPS 3200 Feet 35.2160N 81.3483°W, N A Base Map.ESR1 AmGIS online, 1:70,000 accessed September 2022 Updated:916/2022 Project No.70316 J W `(�, Layout,03_A.rial ENVIRONMENTAL CONSULTANTS Figure 2. Aerial imagery of the Project area. 3 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 2 METHODS 2.1 Desktop Analysis and Previous Surveys A preliminary desktop analysis was completed for the Project prior to field surveys by using a combination of existing information obtained from available public sources, including published literature, online databases, and geographic information system(GIS)data. The following publicly available data sources were used to characterize the lake,pond,wetland, and stream habitat within the Project area that would be surveyed: • North Carolina Natural Heritage Program's(NCNHP's)An Inventory of the Significant Natural Areas of Cleveland County, North Carolina(NCNHP 2003) • NCNHP List of Rare Animal Species of North Carolina(NCNHP 2020). • NCNHP Element Occurrences,Natural Areas, and Managed Areas Within a One-mile Radius of the Project Area(NCNHP 2022a) • NCNHP Species/Community Search for Cleveland County(NCNHP 2022b) • North Carolina Wildlife Resources Commission(NCWRC)Protected Wildlife Species of North Carolina(NCWRC 2021) • U.S. Fish and Wildlife Service(USFWS)Information for Planning and Consultation Species List for Kings Mountain Area(USFWS 2022a) • USFWS National Wetland Inventory(USFWS 2022b) • USGS National Hydrography Dataset(USGS 2019) SWCA previously conducted a wetland and waterbody delineation in February and March 2022 (SWCA 2022a). Observations from these surveys were also used when determining suitable habitat and sampling areas for the aquatic surveys. SWCA focused aquatic survey efforts on streams with potential suitable habitat for listed species, as well as all larger ponds and reservoirs. Some areas,including small tributary streams,were not surveyed due to minimal habitat or unsuitable habitat for listed species. Upstream aquatic surveys were terminated at points where declining flows, fish density, and fish diversity rendered further sampling unlikely to add to the understanding of the aquatic environment, in terms of either species diversity or detecting sensitive species. Aquatic surveys continued downstream until terminated due to flooding(from beaver dams)or at the Project property boundaries. Flooded areas were surveyed to obtain a representative species diversity but terminated where pools became too deep to electroshock(approximately 1 meter deep). Further sampling of flooded areas with hoop nets was deemed unlikely to add to the understanding of the aquatic environment, as the species transition from the fast-moving aquatic environment in the upper portions of Kings Creek to the typical pool/slow-water environment had already been noted from the electroshocking surveys. The publicly available data sources were also used to determine a short list of aquatic species of concern with the potential to occur in the Project area(Table 1). Seven state-listed aquatic species were identified as having the potential to occur in Cleveland County, although none were listed as state threatened or endangered.No federally listed aquatic species were identified as having the potential to occur.More detailed species descriptions are provided under separate cover in the Federally and State-Listed Species Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina(SWCA 2022b). 4 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 Table 1. Aquatic Species of Concern with Potential to Occur in Cleveland County, North Carolina Common Name Scientific Name Presence Likelihood State Status Habitat "Carolina"quillback Carpiodes sp.cf. Low Significantly rare P:Yadkin-Pee Dee,Catawba, (fish) cyprinus Broad,and Roanoke River drainages Seagreen darter Etheostoma Low Significantly rare MP:Catawba and Broad River (fish) thalassinum drainages Yellowfin shiner Notropis lutipinnis Very low Special concern MP:Savannah and Little (fish) Tennessee River drainages[only the Savannah River drainage is listed as special concern] Carolina foothills Cambarus johni Moderate Significantly rare MP:headwater streams in the crayfish Yadkin-Pee Dee,Catawba,and Broad River drainages Broad River stream Cambarus lenati Low Significantly rare P:streams in the Broad River crayfish drainage French Broad River Cambarus reburrus Very low Significantly rare M:streams in the French Broad, crayfish Little Tennessee,and Savannah River drainages Broad River spiny Cambarus spicatus Very low Special concern P:streams in Broad River drainage crayfish Region:M=mountain,P=Piedmont 2.2 Field Surveys SWCA used three primary methods to assess the aquatic habitats observed within the Albemarle properties: trapping fish within pond habitats, electrofishing in streams, and conducting visual and tactile surveys of streams for aquatic macroinvertebrates(primarily freshwater mollusks and crayfish). Aquatic surveys were conducted August 22 through August 26,2022. All collected animals were identified to the species level and released at their capture location. Additional data including animal lengths and sexual characteristics were collected. 2.2.1 Baited Minnow and Hoop Trap Surveys SWCA deployed baited minnow traps and hoop nets at five locations on the Main Site—North of I-85 (No. 1 Mill Pond,Mud Pond 1,Mud Pond 2, South Creek, and Pit Lake) and one location on Main Site— South of I-85 (Executive Club Lake) (Figure 3;Appendix A).A total of 61 minnow traps and 21 hoop nets were deployed during the survey period. Traps were baited using Purina Aquamax dry fish food. Minnow traps were fully submerged in the water and used to capture fauna larger than the 1/4-inch mesh and smaller than the 1-inch opening of the traps.Hoop nets were partially submerged in water and used to capture fauna larger than the 1/4-inch mesh and smaller than the 4-inch opening.All traps were checked the day after they were placed, and all animals were identified and measured before being released at the same location. 5 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 s� o A 4 Q, e' 1,. Mud Pond 2 - y No.1 -- Mill Pond -. South Creek ! Kings Creek Executive Club Lake Executive Club Lake _ `Y ` Stream 1 LLI b 4 0 Wellman Stream 1 Wellman Stream 2 4 m, ' Kings Creek - Wellman Stream 2 South �yj'� �� � Wellman Stream 2 Creek 1 ET 8 ALBEMARLE KINGS MOUNTAIN Hoop Net Cleveland County NC 0 1,000 2,000 MINE USGS 7.5' uadra le: Kings Mountin,NC,35081-B3 �Fe1 Figure 3.Aquatics Minnow Trap C aMelers a 0 250 soo NAD 1983 StatePlane North Survey Overview Electrofish Survey Carolina FIPS 3200 Feet N --- 35.214°N 81.3482°W Macroinvertebrate Survey eaa.M &sap: Ar GtSG,a. 122,000 0 Project Area Acttasaa OcfW 2022 upaaled.mrarzozz �� ■ �� A 0 Map Index A"u.1—O iO3ta W H lay°uL'AqualcsOverview Apx103t8 Aqualics5urvey [nviaOnNrninl<onfulunrs Figure 3. Overview map of aquatic survey areas. 6 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 2.2.2 Electrofishing Surveys SWCA conducted assessments of four streams within the Albemarle properties(Appendix A; see Figure 3;Appendix A): South Creek,located on the Main Site—North of I-85; Kings Creek,located on the Main Site—North of I-85 and Main Site—South of 1-85; and two unnamed streams located on the Albemarle East Property(referred to as Wellman Stream 1 and Wellman Stream 2). SWCA used a Smith-Root LR-24 backpack electrofishing unit to perform electrofishing sampling within the stream habitat on the Albemarle properties. The electrofishing sampling started at the downstream portion of a site,then moved upstream. Two netters were located on either side of the operator.Affected animals were captured with hand nets and collected in plastic buckets. Fourteen sites representing a total of 2,426 meters of stream habitat were sampled. 2.2.3 Aquatic Macroinvertebrate Surveys SWCA conducted assessments of the four streams listed above.Due to the shallow waters of all four streams, SWCA did not use snorkeling equipment,but rather conducted visual and tactile surveys by wading each of the 14 stream segments within which electroshock fishing had been conducted. In addition, in several cases, SWCA surveyed beyond the electroshocking segments within the main Albemarle property. These sections are designated with an S-number in Figure 3 and the maps in Appendix A. During these surveys,two or three biologists visually scanned the stream bottom for live freshwater mussels, snails,and crayfish, as well as other evidence of these taxa, such as shells. The biologists also conducted tactile searches in areas with soft substrates or where the water was too turbid for visual surveys. Fourteen sites representing a total of 2,712 meters of stream habitat were sampled 3 RESULTS 3.1 Minnow and Hoop Traps In total, 82 baited traps sets were used for sampling the Project area. This included 21 hoop net sets and 61 minnow trap sets. The baited traps had an average sampling time of 20.51 hours per trap. No threatened or endangered species were trapped during the survey period. In total, 957 fish were trapped at the Project site using minnow traps and hoop nets. Bluegill(Lepomis macrochirus)was the most common fish species, accounting for 98.4%of observations. Other fish species trapped included the redbreast sunfish(Lepomis auritus), spotted bass(Micropterus punctulatus),largemouth bass (Micropterus salmoides),and pumpkinseed(Lepomis gibbosus). Other fauna captured in traps included mud turtles(Kinosternon subrubrum),musk turtles(Sternotherus odoratus),painted turtles(Chrysemys picta), a yellow-bellied slider(Trachemys scripta scripta),a northern water snake(Nerodia sipedon), and bullfrog tadpoles and adults(Lithobates catesbeianus). A complete list of fish species encountered in ponds is provided in Table 2. All species have an International Union for Conservation of Nature (IUCN) status of Least Concern,which is a species that the IUCN has classified as not being a priority for species conservation because the species is still abundant in the wild. They are not endangered,vulnerable,threatened,near threatened, or conservation dependent(IUCN 2022);Additionally,none are listed by the USFWS under the Endangered Species Act, 7 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 and none are state listed. Detailed maps of trap locations are in Appendix A, and photographs are in Appendix B. 3.2 Electrofishing Sampling Fourteen stream sections (El—E14)were sampled using backpack electrofishing surveys. South Creek was represented by stream sections E1 through E4.Kings Creek was represented by stream sections E5 through E8.Wellman Stream 1 was represented by stream sections E9 and E10,and Wellman Stream 2 was represented by stream sections El 1 through E14. Each site had an average sampling/shocking time of 14.4 minutes.A total of 2,426 linear meters of stream habitat were sampled. Each electrofishing site was sampled using a single pass only in order to sample the largest area possible. General species composition, abundance, and distribution data were collected in order to identify possible species of concern. In streams, a total of 895 fish were observed from 11 species(see Table 2). The most abundant species observed in the stream habitats was the creek chub(Semotilus atromaculatus),which accounted for 5 1.1%of observed individuals. In-stream riffle/runs were dominated by creek chub,bluehead chub (Nocomis leptocephalus),and rosyside dace(Clinostomus funduloides).Pool structures in the streams were dominated by bluegill and redbreast sunfish. Less common,but also observed in pool structures with woody debris or other cover,were spotted bass and warmouth(Lepomis gulosus). All species have an IUCN status of Least Concern(IUCN 2022);none are listed by the USFWS under the Endangered Species Act, and none are state listed by the NCWRC (see Appendices A and B). Table 2. Fish Species Caught during Trapping and Electrofishing Surveys in Project Area Ponds and Streams Family Common Name Scientific Name Federal Number of Number of Status Observations Observations in in Ponds Streams (Traps) (Electrofishing) Centrarchidae Bluegill Lepomis macrochirus LC 942 182 Pumpkinseed Lepomis gibbosus LC 1 0 Redbreast sunfish Lepomis auritus LC 9 98 Warmouth Lepomis gulosus LC 0 17 White crappie Pomoxis annularis LC 0 1 Spotted bass Micropterus punctulatus LC 2 20 Largemouth bass Micropterus salmoides LC 3 1 Cypriniformes Creek chub Semotilus atromaculatus LC 0 457 Bluehead chub Nocomis leptocephalus LC 0 61 Leuciscidae Rosysid dace Clinostomus funduloides LC 0 47 Poeciliidae Mosquitofish Gambusia affinis LC 0 10 Ictaluridae Flathead catfish Pylodictis olivaris LC 0 1 Total 957 895 LC=IUCN Least Concern 8 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 Table 3. Fish Species Observations by Survey Site Common Name MP1 MP2 N1MP ECL PL SCR E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 Ell E12 E13 E14 Bluegill X X X X X X X X X X X X X White crappie X Pumpkinseed X X Redbreast sunfish X X X X X X X X X Warmouth X X X X X Creek chub X X X X X X X X Bluehead chub X X X X Mosquitofish X X X X X Largemouth bass X X X Spotted bass X X X X X X Rosysid dace X X X X Flathead catfish X MP1 =Mud Pond 1,MP2=Mill Pond 2,N1MP=No.1 Mill Pond,ECL=Executive Club Lake,PL=Pit Lake,SCR=South Creek Reservoir 9 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 3.2.1 Aquatic Macroinvertebrate Surveys Fourteen sites representing a total of 2,712 meters of stream habitat were sampled.No native bivalves were observed in the four streams surveyed. The only freshwater bivalve observed was Asian clam (Corbicula sp.). This is an introduced species of mollusk that is considered invasive. Asian clams were observed only on the Albemarle East Property,in Wellman Stream 2. The presence of Asian clams in Wellman Stream 2 suggests this stream may be capable of supporting native bivalve species as well.No aquatic snail species were observed in the four streams surveyed. One unidentified crayfish was observed, but not caught, in Kings Creek.Numerous individuals of crayfish were observed and captured in the two streams within the Albemarle East Property.All crayfish photographed are members of the Cambarus (Puncticambarus) sp. C(acuminatus)complex.No species within this complex are considered rare. 4 SUMMARY AND CONCLUSIONS The main aquatic habitat types within the Project areas are ponds and creeks. Pond substrate was generally soft silt or muck.Minnow traps and hoop nets were placed at varying depths in ponds to diversify habitat and capture fish from different life stages. The surveyed creeks were generally less than 3 feet in depth and averaged closer to 1 foot in depth. Creek substrate ranged from soft silt and muck to combinations of sand, gravel, cobble, and some boulder. The soft substrates were primarily found in areas of beaver impoundment. Fish species composition differed between pond and creek habitats (see Tables 2 and 3). Only five fish species were observed within the ponds surveyed,versus eleven species within creek habitat. Bluegill was the most common species, occurring in all ponds and all creeks surveyed. This common sunfish species, as well as three other species observed within pond habitats(redbreasted sunfish, largemouth bass, and spotted bass)were also observed within some stream sections.Pumpkinseed was observed only in South Creek Reservoir. Differences in species composition were observed between creeks within the Main Site and the Albemarle East Property.Nine fish species were observed in South Creek and/or Kings Creek within the Main Site, and nine fish species were observed in creeks surveyed in the Albemarle East Property. Species were observed in South Creek(five species),Kings Creek(six species),Wellman Stream 1 (five species), and Wellman Stream 2(seven species). White crappie(Pomoxis annularis)and largemouth bass were observed in the Main Site only, and rosyside dace and flathead catfish(Pylodictis olivaris)were observed only in the Albemarle East Property.All other species were observed in both survey areas. Another notable difference between the creeks of the Main Site versus those of the Albemarle East Property is the apparent low density of crayfish within the Main Site (only one individual observed) in contrast with the numerous crayfish observed within both creeks on the Albemarle East Property. This observation is likely due residential and mine development within and surrounding the Main Site and its aquatic resources, while the Albemarle East Property has remained undeveloped. Overall South Creek showed very low species diversity above the lower sections that were flooded by beaver dams,with the upper stream sections being composed of only creek chub. King's Creek had a significant fish barrier(a low water dam), and no species were observed above the dam except a single mosquito fish. Below the dam, some species diversity was observed including bluehead chub,bluegill, redbreast sunfish, spotted bass, and mosquito fish. The Albemarle East Property streams had the highest species diversity longitudinally across entire stream sections. Sampled sections demonstrated classic species compositions associated with pool vs.riffle run habitats,with deeper pools containing bluegill, warmouth,and occasionally spotted bass. Riffle/run habitats contained primarily chub and dace species 10 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 with some bluegill. Larger-bodied creek chub and rosyside dace were also found in pools with associated woody debris or other cover. All species of fish,crustaceans, and bivalves encountered during surveys are listed as Least Concern by IUCN. The results of SWCA's aquatic survey indicate that it is unlikely that federal or state-listed aquatic species of concern occur in the Project area. Because there is no evidence of rare species occurring within the survey areas, SWCA is not providing any management recommendations beyond the typical water quality best management practices. 11 Aquatic Habitat Assessment Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina October 2022 5 LITERATURE CITED North Carolina Department of Environmental Quality(NCDEQ). 2022. Find Your HUC in North Carolina.Available at: https://ncdenr.maps.arcgis.com/apps/Publiclnformation/index. html?appid=ad3a85aOc6d644aOb97cd069db238ac3#!.Accessed May 2022. North Carolina Natural Heritage Program(NCNHP). 2003.An Inventory of the Significant Natural Areas of Cleveland County, North Carolina. Prepared by North Carolina Natural Heritage Program Office and Foothills Conservancy of North Carolina.April. 2020. List of Rare Animal Species of North Carolina. Available at: https://www.ncnhp.org/media/522/open.Accessed May 2022. 2022a.Natural Heritage Element Occurrences,Natural Areas, and Managed Areas within a One- mile Radius of the Project Area,Albemarle Main Boundary,Project No. 00070316-000-RDU. February 9,2022 2022b. Species/Community Search. Cleveland County.Available at: https://www.ncnhp.org/ data/speciescommunity-search. Accessed August 2022. North Carolina Wildlife Resources Commission(NCWRC). 2021. Protected Wildlife Species of North Carolina. Available at: https://www.ncwildlife.org/Portals/0/Conserving/documents/Protected- Wildlife-Species-of-NC.pdf. Accessed September 2022. SWCA Environmental Consultants(SWCA). 2022a. Wetland and Waterbody Delineation Report for the Albemarle Kings Mountain Lithium Mining Project, Cleveland County, North Carolina. April. 2022b.Federally and State-Listed Species Report for the Kings Mountain Lithium Mine, Cleveland County, North Carolina. September. International Union for Conservation of Nature(IUCN). 2022. Red List of Threatened Species. https://www.iucnredlist.org/. Accessed September 2022 U.S. Fish and Wildlife Service(USFWS). 2022a. Information for Planning and Consultation(IPaC)— Explore Resources. Project Area List.Available at: https://ipac.ecosphere.fws.gov/location/52KWJIY2SZGELBJ5RMERHQX2CE/resources. Accessed February 2022. 2022b.National Wetland Inventory(NWI) Surface Waters and Wetlands.Available at: https://fwsprimary.wim.usgs.gov/wetlands/apps/wetlands-mapper/.Accessed February 2022. U.S. Geological Survey(USGS). 2019.National Hydrography Dataset ver. USGS National Hydrography Dataset Best Resolution(NHD) for Hydrologic Unit(HU)4-2001 (published 20191002). Available at https://www.usgs.gov/national-hydrography/access-national-hydrography-products. Accessed February 2022. 12 APPENDIX A Detailed Survey Maps a q. SOUth Creek 't ALBEMARLE KINGS MOUNTAIN _Macroinvertebrate Cleveland County,NC �FaeL MINE USGS 15 Quadrangle: Map 1.South Survey u M0 80 Kings Mountain,NC,35081-63 a ao ao NAD 1983 StatePlane North Creek survey Electrofish Survey 3s zna FIPS 3200 Feet et N areas. Project Area E.s.Map.E:dARGrs awns. 1:3,000 Accused C—.r— UPdalad:1011I303] /'�� ■ ��� Ma t ol9 Protect N0.1a315 J P Layqul:Aquali0 h— W Aprc.10310 AquaticsSurvey MvgOxMFninL COxfuLrnM3 A-1 South 0 Creek A ,� L ' ft tr. -a" `. 4 t xx w 3� a, _ South Creek ' Reservoir ''s /t a -A r %_ i� JL J s 3 � f, ALBEMARLE KINGS MOUNTAIN Cleveland County,NC o 100 pe MINE Hoop Net USGS 7.5'Quadrangle: 6MMMMMMC:::::M3FBB' Map 2.South 0 40 80 Minnow Trap Kings 1983 State Plane North o 40 ao Creek and South Carolina FURS 3200 Feet Creek Reservoir ___Macroinvertebrate 35.2076°N 81.3608aW N survey areas. Survey A Electrofish Survey Base Map L.ArcGlS Online. 1:3,000 0 Project Area A`uaan�a,vn2 2 `�■/]]]]^ J� PrAq No.1031fi S• - /.l Ma12ot9 Layout Aqualics5rteels J v Y ( � nprc.roars nq a�i�zs�n-ev r..v�sosMrsur<o.sutrurrs A-2 a Al Pit Lake JV `S 4ki f ALBEMARLE KINGS MOUNTAIN Cleveland County,NC MINE Hoop Net �Feal USGS 7.5'Quadrangle: CMeiers Map 3.Pit Lake Minnow Trap Kin9NSAD untan NePIane North C -1330 40 80 survey areas. Carolina FIPS 0 3200 Feet N Project Area 35.2217aN 81.3545-W A Base Map.Esn A'GlS Online. 1:3,000 Atte-0—,2021 -121)22 Project 1 1a31fi J W (L1` M.P Layout Aq alics5rteels u roots ngeas�zs�rvev r..v�aosMrsur<o.sutrurrs A-3 TO Q Q Mud Pondacuo +NO 1 00 > ► Mill Pond f ITfl }�11�''� """ Q '• + Ali mg 406 Pon Mud A� d d 1 �'• ��� Kings Creek _- ALBEMARLE KINGS MOUNTAIN Cleveland County,NC 0 100 700 MINE Hoop Net a• �Feal USGS 7.5'Quadrangle: �Meleus Map 4.Survey Minnow Tra Kings Mountain,NC,35081-B3 0 40 80 p NAD 1983 StatePlane North areas for Mud Carolina FIPS 3200 Feet Pond 1,Mud Pond ___Macroinvertebrate 35.2168°N81.3572aw N 2,and No.1 Mill Survey A Pond. Electrofish Survey Base Map L.ArcGlS Online. 1:3,000 0 Project Area A`uaan�a lvn2 2 `�■/]]]]^ J� PrAq No.7fl31fi S• - /.l Mep/oI9 Layout Aqualics5rteels J v Y ( � Apn.70a1fi nqualicssurveY MvgOaMFHinr<O.fuLrnNrs A-4 V. s' :p ♦ �' �Ot +�ft y MITI Pondfp- �� ?'M.�, ♦ ,r F Gh?0�06 c'F ; P t, r LLYY lIC!(l�y'�'�,yryAsrL'?'Y�I � �,'• i I. l; Il�: South Creek . '. 1 d1'. •' - ,/M1�./ �Y ,_ r y. Kings ° ��r•� . 4' ALBEMARLE KINGS MOUNTAIN Cleveland County,NC B 100 20 MINE Hoop Net USGS 7.5'Quadrangle: 6MMMMMMCMM::M3F11 Map 5.Survey 0 40 80 Minnow Trap Kings 1983 State Plane North o ao ao areas for No. 1 Carolina FIPS 3200 Feet Mill Pond,South ___Macroinvertebrate 35.213°N 81.3531-W N Creek Reservoir, Survey A and Kings Creek. Electrofish Survey Base Map L.ArcGlS Online. 1:3,0O0 0 Project Area A`uaan�a lvnmzi SW /]]]]^A PrAq No.1031fi S• -�/ 1 Map5oI9 Layout A9ualics5rteels J v Y nqx.10a1fi nqualicssurveY MvgOaMFHinr<O.fuLrnNrs A-5 r y� r 71 41 ' 'y a i� f4R. .� .�'' .��- �7�-ram- � �fi ,.�'J'' •"ram OfExecutive .�© * _ Club Lake s Y.: Executive - �r, iP� a; '• 7h 4t' ALBE r r 1 N MINE MARLE KINGS MOUNTAIN A Hoop Net Cleveland County,NC 1106MMMMMMC 20 USGS 1.5'Quadrangle: �naeiers Map 6.Survey Minnow Trap Kings Mountain,INC,35081-83 a ,o ac p NAD 1983 StatePlane North areas for Carolina FIPS 3200 Feet Executive Club 0 Project Area 35.21°N81.3469^w N Lake. A B..Map.EfdArtGIS 0w- 1:3,000 Apcvsfad C—.,— UPdalad:1011I303] /'+� ■ ��� Ma 6o19 Prot-1 I2022D316 J W P Lay out:Aquahi h— Aprc.10316 Aquaticf—y MvgOxMFninL COxfuLrnxtt A-6 f; ?,.i. A J 4s 1 A f+ T,,c/.;+r,it .:2 r - x`, •�A ` 'P `.- m. 1 All "` t Wellman ♦t �., °� .�A k a, Stream 1 4 4- ' 1�� ll Y r Wellman Stream 1 q Sr> • a• ,g -STD •�v: `;yt� �� r�.�..� ..L ��•. �? ^� .$, A� N, - ALBEMARLE KINGS MOUNTAIN Cleveland Coun NC 0 to too MINE Electrofish Survey an Feet USGS 7.5'Quadrangle: Meters Map 7.Survey Pro'ect Area Kings Mountain,NC,35081-83 0 ao 80 NAD 1983 StatePlane North areas for stream Carolina FIPS 3200 Feet sections E9 and 35.2073°N 81.3401°W N E10 on the A Albemarle East B..Man.E.ArtGIS 0w- 1:3,000 Property. AaL»ffaeC—.,2022 UP,j,d 1011I22 D316 /'�� ■ ��� Ma 7019 Protect Nq.16316 J W P Layout:Aqu.hi heats Apx.70316 Aquatics—y MvgOxMFninL COxfuLrnxtt A-7 - Wellman Stream 2 Wellman N 3 Stream 2 � is y�3 „^ f, ' 1 + '..• t �. •4, 2 •�� '�. !' iF• v � �� a � �1��` •�• rn �� ALBEMARLE KINGS MOUNTAIN Cleveland County,NC 0 s0o zoe MINE Electrofish Survey USGS 7.5'Quadr gle: 6MMMMMMC:::::,:3FBB' Map 8.SurveyMaaa Project Area Kings Mountain,INC,NC,3508 North 0 Ao ao NAD 1983 StatePlane North areas for stream Carolina FIPS 3200 Feet sections E12, E13, 35.2017'N81.3402aW N and E14 on the A Albemarle East Base Map L.,A'GIS Online. 1:3,000 Property. A«assaeO—r2022 uaa—a.lanrzozz ^� , )� /� Ma BoI9 Project No.1a316 S A P Layout Aqualica5rteels ro nprx. ars nq�as�zs�,vev r..vaosMrsur<o.sutrutrs A-8 4. �� Y��1� c� _z• \..da '4 y.� '.6� � ''.��1 R� tt• /' .'� _ �.,a Y -.t ,�..: ,� ifs T~' •, \ r s v. }• b ''. �: '�, rr, a f�• , ` ",4 •:-� i •'�` to - mil{` �:' 3 RXas Wellman Stream 2 '�� ,s�' -� a� �{ h°,� �. �• L r ,G IF 41, ALBEMARLE KINGS MOUNTAIN Cleveland County,NC o 100 Zoe MINE Electrofish Survey ty, �Feal USGS 7.5'Quadrangle: �Me�eus Ma 9.Survey Kings Mountain,NC,35081-83 0 40 80 p y Project Area NAD 1983 StatePlane North areas for stream Carolina FIPS 3200 Feet section Ell on 35.2006°N 81.3345*w N the Albemarle A East Property. Base Map Esn A0 2021 Online. t:3,000 Accessetl dUpd—,1- PrAq No.1a S A P Layout Aqualics5rteels np,v.roa,s ngea�i�zs�rvev r..vaosMrsu«o.sutru1rs A-9 APPENDIX B Photo Log I' t' 1. 1. `�� t•-�. +a ��¢i'' ". w•���� ;rF,`` - � -,. Y' ' w. 1� r v • � j i l�41. gg'if Photo 3. Representative habitat for minnow traps at Mud Pond 1. y � y y��� ✓''-k a„1,^ d � ems-� _ .. I Photo 4. Representative habitat for minnow traps at No. 1 Mill Pond. B-2 i y - i fkF dr � , �r 7Nzly„ t: Photo 5. Representative habitat for hoop net placement at No. 1 Mill Pond. AA �aa !4 Photo 6. Representative habitat for minnow traps at South Creek Reservoir. B-3 Aik i y IR AA r� y�1 {e, •+T i 4 `t 4 Q� l` y Photo 9. Representative habitat for minnow traps at Pit Lake. 41 k iIf .. t Photo 10. Representative habitat for minnow traps at Pit Lake. B-5 -- a /`III 1 . Photo 11. Representative habitat for hoop net placement at Pit Lake. q ML 7i i _} r S. �y P M Photo 12. Representative habitat for minnow trap placement at Executive Club Lake. B-6 • • • • • • • • tt t F� a � Fti S a � '- /�� •s N 1� �z�� �;� fir' ��Jr "\Ei� �t �.f -•' > `, �( ,,; ter s � r� , 1 0 �SY r ' ! • ,- ),=- i� -i • • • • • • • • r { !4tM } o- •✓ , -A 'f is l Y yr _1 e �a3 r o-- w . zw i ��� } / s �y v � ti T e _� � �� ;• .F)", ..,4 �y-./ ,fit`''� ".v,:.,.ar'`.''� �•h•�J4•..K - y: •+d-•� - f ,_ ,3'a h -r}".fir al _ ';�, TaME i S • • • • 1 i{i "d' .r' t �SIC �he 'XXi ✓'- -r i APPLICATION FORM 2E Section 7.1 Attachment Plan Set �_ _ . :.< / ,,,,j '.. i /\/;� l,'. (: /'�' _ i%i�i /llN% . /// \� /l/�q // PREPARED BY: N Ilgl// /fj,Y WCA \. '✓�' V A Ih III�// ==a��� / /6%%O/////// ENVIRONMENTAL CONSULTANTS vl /// � �� w E SwCA 171 Ili — i v i iP h, II 713 Edinburgh South Drive,Suite f KINGS MOUNTAIN IIII / ' /� A V I/ FT ///_ / 720Cary North Carolina 275N PIT LAKEA\( ` ;V,/ - \�l)j/ A�\k�v� %�/i // / / S (Pwwwswca com INTAKE�� PREPARED FOR: -sw-s V I �c �� / �/ v �S�,Y% v°ii/iipiy��~ ///ull'�/lull �/ AI'� I� ���`� �'�%:'✓� // ii��\ l/// —� � \�/ -- _,�—.r .KM-SW-S'�< //,t \ll - >= �l ✓ _ - I V I6/'l/Ill ( ��\mil/�/ I / // —- �_ c,f j:I� A PROPOSED ROUTE OF DISCHARGE PIPELINE ( w //ll i_— a I � MATCHLINE 2.1Bd �/i i I,n111 LL ENTRANCE/SECURITY GATE�/ ✓ // W // CESS ROAD i dv 9 �� '1/ -—�-- _ ;✓ill /// // / / .� / FFICE EA PLANT FACILITY / //.' / ' / 0 / �� W D LLU � Z 41 ice//�i� x / /iii�� �y% I_��WEIR#3 W y DPRISOARGE POINT ✓ \ // „'1 1 /�/ V 35"12'42.70"N, E / a1°2a'1s.oe°w /� — / SOUTH CREEK, A l`I ( l ✓�7 / A I// I I AVA \ VAA \j RESERVOIR f, AVA i / it IIIIII 1 �\\VAAA\\ A� /// /// / �/ / / / // I I � / /: I � / / f/ l//'-�'✓ � 'Ui� 1 A A � c MATCHLINE 2.2 MATCHLINE 2.3 ��':�'' VAAA A /� � �:�I / (// I/ i i? w A /.' \ I / I �1 / NOTE 20"HDPE PIPELINE TO BE PLACED ON c � EXISTING INTERNAL ROADS.NO ADDITIONAL < o GROUND DISTURBANCE WILL OCCUR. i I LEGEND i e _ ALBEMARLE PROPERTY BOUNDARY Y d / i/ / / / /� /. 1 y 2'CGNTOUR cs / - / _ / / wEIRM7 f / v I ���/• / / 10'CONTOUR DATE: 70/28/2022 y in EDGE OF PAVED ROAD PROJECTM: 70316.12 KM-SW_g / / //��// / --- ----- EDGE OF DIRT ROAD / I / l l I I \ i I �/ i \/ /� �—��� RAILROAD TRACKS SCALE IN FEET PERENNIAL STREAM '_ WETLAND SHEET ------------------- MATCHLINE 2.1A / /' 'i:' SWCL KIM N 1 I I II ��I // MATCHLi.•••••• uyo dh!/fl iu.i.o��• i�� //�� \ i NEa ENVIRONMENTAL CONSULTANTS ,i�=x- t / �. :` Ae • f.. f�t`s�'G - - - / �;, �� SWCA W E I I I / / '� /' ` ���- _ ��.•• / J/,' _ PROPOSED ROUTE OF - V 113 Edinburgh South Drive,Suite I I /''' ''!�' �i�`, -- �••- / =/,'% _ DISCHARGE PIPELINE ,� \ A 120Cary North Carolina 27511 I XI I I / li% ,' �� -'•••• / �'' �L V A (P)919.292.2200 IIIII I I / j, l '��� •• / / ��` \ ' ( I I I I I III I I j \ I -�'���\��` � �• _ S r3n ''� l l/l 1l/1��Ji�'•■ /l 1l I/I 1E�iII lL 1II II I INl/II I I(l I III/N T1 AI�I 11K Vl�iE�i i;��i I 1�1��I (l �V A\V�\\A�\.��\\�-A��;\.�'Av�A v\���Vv.A:�`.��_�� /-";,_--•���_�■ Al l I/I i 4ii I I - -�_-_- //�-/////// / ////////// /'�/���////.' r I/ -� v-- PREPARED FOR: STORAGE KINGS MOUNTAIN PIT LAK YARD - - -- `- , ' ii � // -----'- /l/1.1 1 1 1 l l / / l l �i A/. //, _ SURVEY(BASE PLAN PREPARED BY: wQ. 16 In Now❑o.❑ooNoQoNN��t.«. i-_-=i-i�--__i i__-_'-_'--_/�/_-__/-�--___-�--%_-_!--�i�,/�A-/-/////_///_-_'///�'`I//'c'/��-/'��-?•-/•24 I-'/r;�'-�`'/�///'-���•�,fi/r_-_/i/\//•/s./�''�'/-�-/�i,-l/��--ii-�--��_-i�/Y-•-_'/r i./_/-�-__/_--/l f�/�-/�- 'j 1/1/��<il II/l I��/l I\/1//�I l\.\///\//-'V//'io�mo/�I/I�s'�i/rw/�V»�,H'lN V",i\/y V��/'1'/iI I�•�I%//I1,//•,//IY'I I/I I/A/,/,•II�i I//■////A■//IA//1'1\1///A�//X'//Ir/\�/1"/////',v,�„//li/./�////1l1�ll• '/�'l�l i`//`n/.1/l�i V'-//l\/Al\/////�/l�\///I/V�////`A/`//�/i�1\//�//\�/k•/A/�//il\llr-�\/v/V/�l/.//'l./'.,/ll/i/li//11'll//O/,ul/,/1/'/l'/�A/v,1lI// A/� i I///mo/�//I.-v�///-'-_I. --_�-I--1�)_/�h�-�n/--ii-%iymo�/_//d1�,�/__L/-`.4._/�i�-I I I!I�,1�1•_/i•/s<�l ue v-r`,''I.I/•/A�—_`�-/./_�_,`��`i�- -`I_mo.A`Iv��-•/A•--_/\•l v•_�Av V_v/•-V AoA v/�v A��_- �/�i/ /=_/;/���_••/••/i•/-Ii_�_/.I•.�/•A�VI•I`I..l`'/I'_1II/I�,�I,V/l\.A--A II/'/AI//l/ / //iI iI i�•�//:•i•I1/� /l ,1 ,i ce //•i•' �l�•'.�y'i//'i%��///�/ � c WL�QywoWIB - o 16 KM-SW-8 PLANT FACILITY LLI W ¢ 0o W zN W _-__ PROPOSED ROUTE OF DISCHARGE PIPELINE W IL U'E _ ___ _ #1POND 6 - *j\ _ i PERMITBOU •KM-SW-S ZdC2J7 14 DATE: 1012812022 qso �q q -moo _- ��. / I \ \ \ \ - - - =6' _ - - - I , I'I �•, /' �. / // n moo, - • \\\. \\ \ \ \ - - m ___- \ _ I I `l� •i•• �// �� / / / i / e'/ %/ PROJECT#: 70316.12 i i � // I / � i� "�� '� ' 'I \ \ \ 1 I �\\� \ \ \� � _--,, ,,;_- i> � _ _ _ � � -�.� \I I I I I�� � •!�� // / / // / / / / � 'i q��� 0 200 400 l i %•... _ �,- _ NOTE: , \� gill I a 1 ,. \ ... _ � �� I / / / / o_ - - \ I I / / NOTE SCALE IN FEET MATCHLINE 2.1A / - - r , • _ .=!_ _ 20"HDPE PIPELINE TO BE PLACED ON ,y ` `\J � / -- $MA CHLINE 2.1 B I I I I 1�1 I / �•� / / / / / / / / / / 20"HDPE PIPELINE TO BE PLACED ON __j- _\ �� EXISTING INTERNAL ROADS.NO ADDITIONAL ���� �i \�� \\ \ _ -- '��j ----- EXISTING INTERNAL ROADS.NO ADDITIONAL -o MATCH 2.1B / / i( i .� _ _ ---___ / / GROUND DISTURBANCE WILL OCCUR. a; /�� / -� • i. o; _ _- E _ ILLO ADDITIONAL ATCHLIN 2.2 I «. ,.� ..��� i.••..•..•R � � � �. GROUND DISTURBANC • / / /' EW ,� .�//, M� �// ' i',�= � / SHEET a _ PREPARED BY: x ATCHLINE 2.1 I I - - MATCHLINE 2.2SWCA ///-N;V,'�/`�l``'/r_`-/-_//>_•//-'i/s_--_i/;/'t/ I/�'/;_-//_//+/ _///-w//l`/`_/�/_//■///�///:��/////_/_i-_-/�/__////-//_�a'/-//I/ /�'\///��/////I///r v/,�/i•///////i/v:�/C/I////\s/'////\//'/'/////'///v///////\//i\////�/%/�////✓'��'L/i///'_///�//////�//•�//////'////1///•/////•�/////////i.�//�/'///////�////'//////�-/////_//////////////__////////__///////-////////A////�///-A////A//i/"/////V//�//I i////�/////o///////-//��/////////��/////��/�/////�/s////��/i/2/ce s�_.i /�/////i/"/////////////�///v/-/�///I�I//0rI�//I/�I///I�//I////;I•I O��•/J`;fi/T/l�;bl_/�/��\l�'�//•A/.�_I/1/lI/�•////./r//�///l///I I�I///Ii/l/Ia//-�iIll/g I//o i jr:v ' ., crmoE�N VZQI>rco RO ax-aaN M xWaE NTA L CONSULTANTS 113Edinburgh South Drive,Suite 120Cary North Carolina 27517 ." 19 292 2200 wswcacom w PREPARED FOR. FL o SURVEYIBASE PLAN PREPARED BY w / KMSW3aa EIR# If PROPOSED ROUTEI / WDISCHARGE PIPELNE Z DISCHARGE CULVERT(S) TO KINGS CREE RRORoseD DISCHARGE POINT 35124270'"N, W/ '�81241905W ILLI 6 W W / I, LU a W m SOUTH CREEK RESERVOIR / o o / z a IN DATE: 10/28/2022_ _ PROJECTM : 70316.12 200 400 / SCALE IN FEET 'm v -- � / ////////// / � / / �� �I �� �I� V � 'i I � A � I I I / / NOTE: d _ // / / ///// / ♦ / / / / ' ,�/.ID s I MATCHLINE 2.2 I / / / 20"HDPE PIPELINE TO BE PLACED ON EXISTING INTERNAL ROADS.NO ADDITIONAL i MATCHLINE 2.3 I / / / // / GROUND DISTURBANCE WILL OCCUR. SHEET , f r r r r , r r PREPARED BY: MATCHLINE 2.2 I I I I / � / I / ' SWCA MATCHLINE 2.3 I J I / l 1 / ' N ENVIRONMENTAL CONSULTANTS / SWCA 113 Edinburgh South Drive,Suite 120Cary North Carolina 27511 (p)919.292.2200 w .sWca.com -f S PREPARED FOR: o %, E I / SURVEYI BASE PLAN PREPARED BY: (L __ / i/ r ' / ' / ' / / oQ. iL a i / ,' / ' /. /, w - / '/ / I W \ ---- /r" v �� a / I J W a w LU I r .. LU WEIR#7 CL , c W / I ' o J E / '_ KM-SW 3 i / - / , /' o oz o /, /�/ / iilil'r / ' , � Ilii� i I ilii °d�'a c z o l W W za z — � S2S a s , r _ / f _ , , I _ I r ' / DATE: 1012812022 PROJECTM: 70316.12 C9 I ' // /''/——— _--_ '/// /'/ // /•// r I\ _ _ D 200 400 mIm SCALE IN FEET C, ----- SHEET SHEET a