Loading...
HomeMy WebLinkAbout20151212 Ver 1_More Info Received_20151202C. Proposed Impacts Inventory ❑ P ❑ T ❑ Yes ❑ No 1. Buffer Impacts ❑ P ❑ T ❑ Yes ❑ No 1 a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba B5 ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Total buffer impacts 480 320 Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ mitigation) required? (sq ft) (sq ft) or Temporary (T) 131 ® P [-IT Bridge Allowable Unnamed ❑ Yes ® No 480 320 Permanent B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No E34 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 480 320 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. A bridge is being built over the zone 1 buffer area to minimize impact to the buffer. The bridge crossing was intentionally located on a section of the stream that is only --2' wide to minimize the impact in the buffer. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Bridge design will be used to increase the distance required for the pilings and minimize buffer impact. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer ❑ Yes ® No mitigation? 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a ❑ Yes ❑ No mitigation bank or NC EEP proposed? 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 5 of 6 C. Proposed Impacts Inventory ❑ P ❑ T ❑ Yes ❑ No 1. Buffer Impacts ❑ P ❑ T ❑ Yes ❑ No 1 a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba B5 ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Total buffer impacts 480 320 Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ mitigation) required? (sq ft) (sq ft) or Temporary (T) 131 ® P [-IT Bridge Allowable Unnamed ❑ Yes ® No 480 320 Permanent B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No E34 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 480 320 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. A bridge is being built over the zone 1 buffer area to minimize impact to the buffer. The bridge crossing was intentionally located on a section of the stream that is only --2' wide to minimize the impact in the buffer. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Bridge design will be used to increase the distance required for the pilings and minimize buffer impact. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer ❑ Yes ® No mitigation? 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a ❑ Yes ❑ No mitigation bank or NC EEP proposed? 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 5 of 6