HomeMy WebLinkAbout20240151 Ver 1_More Info Received_20240313Baker, Caroline D
From: Marine Construction LLC Office <office@ marineconstructionI1c.com>
Sent: Wednesday, March 13, 2024 11:15 PM
To: Hoy, Arnie
Subject: [External] Re: 20240151 Everett Shoreline
Attachments: Everett Site Plan_ Replanting Plan.pdf, Everett Trees.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hello Arnie,
I've attached a more detailed site plan of the work we're proposing at DWR #20240151 / Everett Shoreline.
1. 1 have included pictures of the trees we're requesting to remove. The trees need to be removed due to how much the
root systems are undermined since the existing seawall failed years ago allowing the shoreline to erode.
2. 1 have attached an updated copy of page 2 of 4 from the application showing the corrected impacts matching the site
plan drawing.
3. The 10' wide by 120' long temporary access corridor/ construction corridor is needed so there can be a safe pathway
to move material/ block and install the proposed seawall safely. The access corridor will be returned to it's natural state
prior to completion of construction.
4. The temporary construction corridor is figured to be 10' x 50'. The drawing submitted just had it broken into a 10'
wide corridor along the shoreline plus a 40' long corridor equaling the total length of 50'.
I'd be happy to meet with you on -site if needed.
Thank you,
Addie Ledford
Marine Construction LLC
PO Box 6400
Hickory, NC 28603
Office@MarineConstructionLLC.com
Office: (828) 495-3040