Loading...
HomeMy WebLinkAbout20240462 Ver 1_Polk County - B13 - NCWRC Comment Letter (10.31.23)_202403259 North Carolina Wildlife Resources Commission 9 Cameron Ingram, Executive Director October 31, 2023 Patrick J. Breedlove Division PDEA Engineer N.C. Department of Transportation, Division 14 345 Toot Hollow Road Bryson City, N.C. 28713 Subject Scoping Comments on Replacement of Bridge 13 over North Pacolet River on Howard Gap Road (SR 1128), Polk County. BP14.R042.3 Dear Patrick, The North Carolina Department of Transportation (NCDOT) invited comments from the North Carolina Wildlife Resources Commission (NCWRC) on the subject bridge replacement. The project is being developed as an emergency design -build. The NCWRC offers the following comments on the project to conserve the affected wildlife resources and to promote wildlife -based recreation in accordance with the applicable provisions of the state and federal Environmental Policy Acts (G.S. 113A-lthrough 113-10; 1 NCAC 25 and 42 U.S.C. 4332(2)(c), respectively), the Clean Water Act of 1977 (33 U.S.C. 466 et seq.) and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). Standard Comments (NOTE specific recommendations follow these standard comments) NCWRC standard recommendations for bridge and culvert replacement projects of this scope include: 1. New bridges or other channel spanning structures are recommended over culverts because they typically require minimal if any stream impacts. The clearances of bridges allow for human access and wildlife passage, fish passage, and navigation by boaters. Unlike bridges, culverts can prove difficult to dewater during construction, which can lead to extended periods of channel instability and erosion. 2. Bridge deck drains should not discharge directly into streams. 3. Live concrete should not be allowed to contact water in or discharge to streams 4. If possible, bridge supports (bents) should not be placed in stream channels. Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 BP14.R042.3 Page 2 October 31, 2023 Polk County 5. Applicable measures from the current NCDOT Erosion and Sediment Control Design and Construction Manual should be implemented and maintained during construction. Matting used in riparian areas should not contain nylon mesh because it entangles and kills wildlife. Coir matting should be used on unstable stream banks that are steep or susceptible to high water and matting should be securely anchored with wooden stakes according to NCDOT specifications. 6. Temporary detours and access roads should be designed and located to avoid wetland impacts, to minimize clearing, and avoid destabilizing stream banks. Tree stumps and root mats should be left where possible under and along temporary access roads to limit streambank disturbance and promote regrowth of vegetation. Temporary fills should be removed to original ground elevations upon the completion of the project. Disturbed areas should be seeded, or mulched, and native tree species should be planted with a spacing of 10'x10'. 7. A clear strip of streambank (rip rap free) of 10 feet in width should remain on each side of the channel underneath bridges to facilitate wildlife passage. Smaller widths are also beneficial where there are narrow abutment setbacks. Alternatively, a "wildlife path" can be constructed with a top - dressing of finer stone if full bank plating is required. These measures should also incorporate any ditch line plating. 8. NCDOT biologists should be notified about streams that contain threatened or endangered species. Special measures to protect these sensitive species may be required. NCDOT should also contact the U.S. Fish and Wildlife Service for information on requirements of the Endangered Species Act as it relates to the project. 9. All work in or adjacent to streams should be conducted in dry work areas. Sandbags, cofferdams, or other clean diversion structures should be used where possible to avoid excavation in flowing water. 10. Heavy equipment should be operated from the banks rather than in stream channels to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. 11. Only clean, sediment -free rock should be used as temporary fill (causeways) and fill material should be removed with minimal disturbance of the natural stream bottom when construction is completed. 12. During geotechnical investigations, equipment should be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, and hydraulic fluids. The following recommendations apply to corrugated pipes, reinforced concrete pipes, or concrete box culvert structures: 1. Culverts and pipes must be designed to allow for aquatic life passage in accordance with current NCDOT Guidelines for Drainage Studies and Hydraulic Design. This typically includes burial of a single low flow barrel at least 1 foot below the natural streambed and backfilling with native material. If multiple barrels are required, then the high flow barrel(s) should be placed on or near a bankfull elevation. These "flood" barrels should be reconnected to benches and include sills on the upstream ends to restrict or divert base flow into the low barrel. Barrels with sills should be filled with sediment to avoid standing water. If rip rap is used for backfilling, then it should also be topped with native or other finer material to facilitate wildlife passage. In accordance with NCDOT Guidelines BP 14.R042.3 Polk County Page 3 October 31, 2023 for Drainage Studies and Hydraulic Design, alternating or notched baffles should typically be installed in base flow culverts that are steep or longer than 40-50 linear feet in a manner that mimics the existing stream flow pattern and profile. 2. Riprap should be minimized on banks and avoided on streambeds except where bed scour may be expected. Rip rap placed on the streambed should be embedded or "keyed -in" to prevent or shorten the duration of subsurface streamflow. 3. If multiple pipes or cells are used, then at least one pipe or box should be designed to remain dry during normal flows to allow for wildlife passage. 4. Culverts or pipes should be aligned with the existing channel alignment whenever possible. Channel widening should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity, disrupts aquatic life passage, and causes sediment deposition that requires increased maintenance. Replacement of the existing bridge or culvert in the same location with road closure is typically recommended to minimize impacts. If road closure is not feasible, then a temporary detour should be designed and located to avoid wetland impacts, minimize the need for clearing, and avoid destabilizing stream banks. If the structure will be on a new alignment, then the old structure and the approach fills should be removed from the 100-year floodplain. Approach fills should be removed down to the natural ground elevation. The area should be stabilized with grass and planted with native tree species. NCDOT should restore the area to wetlands if the area reclaimed was previously wetlands. Specific Comments The North Pacolet River (C Tr) is trout habitat that supports naturally reproducing populations of Rainbow Trout (Oncorynchus mykiss) in its upper reaches. The lower portion of this stream is sandy and trout spawning likely does not occur near or downstream of the bridge. This project should not need to adhere to the trout moratorium for any applicable permits. While trout are not a concern, Broad River Spiny Crayfish (Cambarus spicatus, NC Threatened) are found in the North Pacolet River and may be present at the bridge site. The NCWRC would appreciate being apprised of the construction schedule, once known, so that the bridge area can be surveyed for these crayfish and any animals moved, as needed. A notice a few weeks before construction, or an invitation to any preconstruction meeting, is requested. My contact information can be used in any communication with construction staff (e.g., green sheet commitments, contract notes). Please contact me at david.mchenrya,ncwildlife.org or (828) 476-1966 if you have any questions about these comments. Thank you for the opportunity to review and comment on this project. The NCWRC looks forward to assisting as needed as the project develops further. Cordially, Dave McHenry, NCWRC Western DOT Coordinator