STORMWATER MANAGEMENT PLAN
(Version 3.00; Released August 2021)
FOR NCDOT PROJECTS
WBS Element: BP14.R042.3
TIP/Prof No: SF-740013 County(ies): Polk Page 1 of 2
General Project Information
WBS Element:
BP14.R042.3 ITIP Number: SF-740013 I Project Type: 113ridge Replacement I Date: 3/21/2024
NCDOT Contact:
Zach Shuler
Contractor) Designer:
TGS Engineers / Ben Henegar, PE
Address:
345 Toot Hollow Road
Address:
706 Hillsborough St., Suite 200
Bryson City, NC 28713
Raleigh, NC 27603
Phone:
828-488-0902
Phone:
919-773-8887 Ext. 123
Email:
ztshuler ncdot. ov
Email:
bhene ar
t se ineers.com
City/Town:
Tryon, NC
County(ies):
Polk
RiverBasin(s):
Broad
CAMACounty?
No
Wetlands within Project Limits?
No
Project Description
Project Length (lin. miles or feet):
0.052 Miles Surrounding Land Use: IRural Residental and Agricultural
Proposed Project
Project Built -Upon Area (ac.)
0.158 lac.
0.115 lac.
Typical Cross Section Description:
Two 10.0' paved travel lanes with 2.3' paved shoulders at bridge.
Two 9.0' paved travel lanes.
Annual Avg Daily Traffic (veh/hrlday):
I Design/Future: 1 610 1 Year: 12043
1 Existing: 1 500 1 Year: 1 2023
General Project Narrative:
The project involves the replacement of Bridge No. 740013 over North Pacolet River on SR 1128 (Howard Gap Rd) in Polk County. The proposed 100' long by 27' wide (24" cored
(Description of Minimization of Water
slab) two -span bridge would replace the existing 69.2' long by 20.1' wide (timber deck on steel I-beam) two -span bridge at the existing location. The proposed grade will be
Quality Impacts)
approximately 0.3' above the existing grade.
The proposed bridge will have no direct discharge into North Pacolet River. Deck drains on the bridge are proposed, however no deck drains are proposed overwater. Stormwater
runoff from the proposed bridge will flow to inlets on the north end of the bridge. All proposed stormwater runoff will be discharged as far away from the stream and at the lowest
velocities as practicable.
Project minimum measures include:
>Maximizing shoulder section.
>Providing adequate ground cover.
>Stabilizing embankments and drainage ditches.
>Providing adequate energy dissipation.
>Utilizing natural features and drainage pathways - Existing drainage pathways were utilized to the maximum extent practicable.
I lighway North Carolina Department of Transportation
Stormwater m o
_ Highway Stormwater Program
STORMWATER MANAGEMENT PLAN ---
(Version 3.00; Released August 2021) FOR NCDOT PROJECTS
WBS Element: BP14.R042.3 TIP/Prof No.: SF-740013 County(ies): Polk Page 2 of 2
General Project Information
Waterbody Information
Surface Water Body 1 : North Pacolet River
NCDWR Stream Index No.:
9-55-1 1
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Trout Waters Jr)
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
Comments:
NRTR Stream ID:
North Pacolet River
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
iYes
I Deck Drains Discharge Over Buffer? INo
Dissipator Pads Provided in Buffer? INo
Deck Drains Discharge Over Water Body?
I No
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Surface Water Body (2):
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body
Primary Classification:
Supplemental Classification:
Other Stream Classification:
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body?
Deck Drains Discharge Over Buffer?
Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
I
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Surface Water Body 3 : 1
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body
Primary Classification:
Supplemental Classification:
Other Stream Classification:
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body?
Deck Drains Discharge Over Buffer?
Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative) I
E
L
a
T
0
0
0
ci
0
0
E
L
c
0
O
L
T
See Sheet 9 For Index of Sheets
See Sheet For Conventional Plan Sheet Symbols
STATE O F N O R T IH C A R O L I N G
8 AT8 STATE PEaEC EEPEEENCB N0. New
iB
BP14.R042.3 1
N
1135
DIVISION ISION OIL IHIGIHWA Jl S
PPATB PIIa.NQ P.APEOI.NQ DEAAIPI'lai
O
1125
1128 1129 1130
1133
N
BP14.R042.3 WA PE
BP14.R042.3 WA RiW & UTIL.
04
108
11222
zBP14.R042.3
POLK CO LINTY
WA CONST.
d,
1128
CL
1123 108
OR PACO T 1510
<
LOCATION: BRIDGE #740013 OVER NORTH PACOLET RIVER
RIVER
PROJECT 1511
ON SR 1128 (HOWARD GAP RD)
�' •
1121 LOCATION
108 1507
L,L
O
V
176
TYPE
OF WORK: GRADING, DRAINAGE, PAVING, AND
STRUCTURE
I�/,q\
1107 1111 1506
1506
2077
�11
\
PERMIT DRAWINGS
1508
O
VICINITY MAP
03-21-2024
PERMIT DRAWING
SHEET 1 OF 4
OFFSITE DETOUR (NCDOT MAINTAINED)
-L- STA. 11 + 75.00
END BRIDGE
BEGIN PROJECT
SITE 1
-L- STA.
13 + 64.19
BP14.R042.3
TO NC 108
LYNN ROAD
GO K"_
HOWARD GAP RD. QP 5�
i SR 1128
TO SR 1123
CANEBREAK ROAD
F
f
---- ------
-------
------------ L
Ev9-47*
—L
-L- STA. 14 + 50.00
END PROJECT
BEGIN
BRIDGE
BP14.R042.3
-L- STA. 12 + 61.81
0
CLEARING ON THIS PROJECT SHALL BE PERFORMED
A
TO
THE LIMITS ESTABLISHED BY METHOD II.
DOCUMENT NOT CONSIDERED FINAL
�• •
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES
UNLESS ALL SIGNATURES COMPLETED
r\
v
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
NCDOT CONTACT. ZAC H
S H U L E R
HYDRA ULICS ENGINEER
PLANS PREPARED BY:
PLANS PREPARED FOR:
20
10 0 20 40
ADT 2023 = 500
NOR
®� N
S TI ENGINEERS
NORTH CAROLINA DEPARTMENT
OF TRANSPORATION
ADT 2043 = 610
T _ % *
TOTAL LENGTH ROADWAY
PROJECT #BP14.R042.3 =0.033 MILES
zo I W. MNC 2 1ST.50
- SI-IELBY, NC 28 150
PH 170 )476-0003
�� CORP. LICENSE NOa C-0275
DIVISION 14
345 TOOT HOLLOW RD.
BRYSON CITY, NC 2BT 13
<y�°
�®
S�
PLANS
3
V = 35 MPH
TOTAL LENGTH STRUCTURE
PROJECT #BP14.R042.3 =0.019 MILES
P.E.
SIGNATURE:
TOTAL LENGTH PROJECT #BP14.R042.3 =0.052 MILES
RIGHT OF WAY DATE:
OCT. 18 2023
JIMMY L. TERRY, PE
20 10 0 20 40
PROFILE (HORIZONTAL)
* TTST =3% DUAL =3%
FUNC CLASS =
�� a
ROADWAY DESIGN
ENGINEER
PROJECT ENGINEER
UQ
2 0 4 8
LOCAL, RURAL
LETTING DATE:4
AUSTIN R. TURNER,
P
SUB—REGIONAL TIER
OCT. 18, 2023
PROJECT DESIGN ENGINEER
PROFILE (VERTICAL)
2024 STANDARD SPECIFICATIONS
P.E-
SIGNATURE:
uo 00000
0000.■
o00 onr� nNrru a..r<a. o000
:ao 00000
1............................................a\.mom
00000
000iouN uc3ae ciGu.00 o.
1......................■.......................MORE
1.......................................N......MINIS
MENEEMEME.
1...........NCZ7...Ol.fi........r\
1.........rUY..LO
�J ..fir............\
..................
..................
I.o..nocaou+l eN.000u0000.
a0000u000.
pro 00000 00000
00000.or. oourra ran
uo 00000
0000.■
o00 onr� nNrru a..r<a. o000
:ao 00000
1............................................a\.mom
00000
000iouN uc3ae ciGu.00 o.
1......................■.......................MORE
1.......................................N......MINIS
MENEEMEME.
1...........NCZ7...Ol.fi........r\
1.........rUY..LO
�J ..fir............\
..................
..................
I.o..nocaou+l eN.000u0000.
a0000u000.
pro 00000 00000
00000.or. oourra ran
WETLAND AND SURFACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
NRTR
Map ID
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 12+95 to 13+65
Bank Stabilization
North Pacolet River
0.017
97
1A
-L- 13+00 to 13+60
Dewatering / Diversion
North Pacolet River
0.025
20
TOTALS:
0.017
0.025
97
20
NOTES:
Revised 2018 Feb