HomeMy WebLinkAbout20240462 Ver 1_Polk County - B13 - Architecture Effects Package (1.31.24)_20240325jrAM
bill
.. i
1
. of -
Pow
PL0057 MILL FARM I N N
r
BANK STABILIZATION
(SEE DETAIL41
PERMANENT DRAINAGE
EASEMENT TO BUILD AND
MAINTAIN BANK STABILIZATION
AND BRIDGE INTERIOR BENT
f r _
TEMPORARY CONSTRUCTION r,y
EASEMENT TO BUILD FILL
' SLOPES
RIGHT OF WAY TO BUILD AND
MAINTAIN SHOULDERS AND
BRIDGE ABUTMENTS
'-� A,..~
"j. qp
Y
h:
DETAIL
BANK STABILIZATION
( Not to Scale)
NATURAL
GROUND EXIST.
EXIST. ABUTMENT
BENT
T=2.0' KEYED -IN
(TYP.)
CLASS 'II' RIP -RAP
(TYP.)
-L- STA. 12 + 9 6
i'
; ►�r�7 �iiar r/Sa =iip
wup i
////►fir 'q - /
0
1/
�iii
or
PL0057
KEY_
O RW = RIGHT OF WAY
O PDE = PERMANENT DRAINAGE EASEMENT
O E = TEMPORARY CONSTRUCTION EASEMENT
gas
4
•L— .r
BRIDGE #740013
r �
L
HISTORIC PROPERTY BOUNDARY
PRELIM. IMPACTS TO PL0057
4
•L— .r
BRIDGE #740013
r �
L
HISTORIC PROPERTY BOUNDARY
PRELIM. IMPACTS TO PL0057
IMPACT TYPE
AREA (SF)
AREA (ACR)
RW
1913.44
0.044
PDE
600.37
0.014
E
669.72
0.015
TOTAL
3183.53
0.073
(-L-1 SR 1128 HOWARD GAP RD.
�j —L— (SR 1128 — HOWARD GAP RD)
I
27'-0" OUT TO OUT
1'-3" 2'-3" 10'-0" 10'-0" 2'-3" 1'-3"
GRADE 12"
C3 POINT C3
CONCRETE PARAPET WALL W/ 0.02 0.02 I CONCRETE PARAPET WALL W/
2—BAR METAL RAIL FT/FT FT/FT 2—BAR METAL RAIL
1001001001001- 100100100 00
9 — 24" CORED SLAB UNITS = 27'
TYPICAL SECTION
(NOT TO SCALE) : ,
PICTURE 10
0
--Anon
_ h
r
e;
0
12/07/2023
71(`TI IRS
...... ......
6r?,-
71It00%TI IC