Loading...
HomeMy WebLinkAbout20240462 Ver 1_Polk County - B13 - Architecture Effects Package (1.31.24)_20240325jrAM bill .. i 1 . of - Pow PL0057 MILL FARM I N N r BANK STABILIZATION (SEE DETAIL41 PERMANENT DRAINAGE EASEMENT TO BUILD AND MAINTAIN BANK STABILIZATION AND BRIDGE INTERIOR BENT f r _ TEMPORARY CONSTRUCTION r,y EASEMENT TO BUILD FILL ' SLOPES RIGHT OF WAY TO BUILD AND MAINTAIN SHOULDERS AND BRIDGE ABUTMENTS '-� A,..~ "j. qp Y h: DETAIL BANK STABILIZATION ( Not to Scale) NATURAL GROUND EXIST. EXIST. ABUTMENT BENT T=2.0' KEYED -IN (TYP.) CLASS 'II' RIP -RAP (TYP.) -L- STA. 12 + 9 6 i' ; ►�r�7 �iiar r/Sa =iip wup i ////►fir 'q - / 0 1/ �iii or PL0057 KEY_ O RW = RIGHT OF WAY O PDE = PERMANENT DRAINAGE EASEMENT O E = TEMPORARY CONSTRUCTION EASEMENT gas 4 •L— .r BRIDGE #740013 r � L HISTORIC PROPERTY BOUNDARY PRELIM. IMPACTS TO PL0057 4 •L— .r BRIDGE #740013 r � L HISTORIC PROPERTY BOUNDARY PRELIM. IMPACTS TO PL0057 IMPACT TYPE AREA (SF) AREA (ACR) RW 1913.44 0.044 PDE 600.37 0.014 E 669.72 0.015 TOTAL 3183.53 0.073 (-L-1 SR 1128 HOWARD GAP RD. �j —L— (SR 1128 — HOWARD GAP RD) I 27'-0" OUT TO OUT 1'-3" 2'-3" 10'-0" 10'-0" 2'-3" 1'-3" GRADE 12" C3 POINT C3 CONCRETE PARAPET WALL W/ 0.02 0.02 I CONCRETE PARAPET WALL W/ 2—BAR METAL RAIL FT/FT FT/FT 2—BAR METAL RAIL 1001001001001- 100100100 00 9 — 24" CORED SLAB UNITS = 27' TYPICAL SECTION (NOT TO SCALE) : , PICTURE 10 0 --Anon _ h r e; 0 12/07/2023 71(`TI IRS ...... ...... 6r?,- 71It00%TI IC