Loading...
HomeMy WebLinkAboutSW1231201_Supplement-EZ Form_20240325 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Bobby N Setzer State Fish Hatchery Renovation 2 Project Area(ac) 41.17 3 Coastal Wetland Area(ac) p 4 Surface Water Area(ac) 3.91 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 1 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 IDisconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 SiNa Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Tit€e: Ben Cathay 28 Organization: McGill Associates 29 Street address: 55 Broad St. 30 City,State,Zip: Asheville,NC 28801 31 Phone number(s): 828-252-0575 32 Email: Ben.Cathey@mcgillassociates.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Desrgner CA 1111111tiii!!11l1//// ZZ SEA Signature of Designer _0344 l ,, N ......... ,,,. /!!!lYj111111111111` Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 if so,number of drainage areas/SCMs. 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is aUpart of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM 5W Wetland 5 Total drainage area sq ft 1,793,365 207,867 6 Onsite drainage area sq ft 1,793,365 207,867 7 Offsite drainage area sq ft 0 0 8 Total BUA in project sq ft) 1 379602 sf 133351 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) NIA NIA New BUA not on subdivided lots(subject to 10 permitting) sf 242627 sf 80128 sf 11 Offsite BUA(sg ft NIA NIA 12 Breakdown of new BUA not on subdivided lots: Parking sq ft 37801 sf 3981 sf Sidewalk sq ft) 4485 sf 2889 sf Roof(sq ft) 175855 sf 73258 sf Roadway(sq ft 24486 sf NIA Future(sq ft) NIA NIA Other,please specify in the comment box below sq ft) NIA NIA New infiltrating permeable pavement on 13 Isubdivided lots(sq ft) NIA NIA Now infiltrating permeable pavement not on 14 subdivided lots(sq ft) NIA NIA Existing BUA that will remain(not subject to 15 permitting)(sq ft) 136975 sf 53223 sf 16 Existing BUA that is alreadK permitted sq ft NIA NIA 17 Existing BUA that will be removed(sq ft) 160848 sf 38187 sf 18 Percent BUA 21% 64% 19 IDesign storm inches 1.0 in 20 IDesign volume of SCM(cu ft) 9308 cf 21 lCalculation method for design volume Discrete NRCS ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Other Impervious=hatchery operations/raceways #10-Note:Includes existing BUA that is being replaced #17 Note:Includes BUA that is being removed and replaced by'new'BUA STORMWATER WETLAND 11 Drai nage area number SCM 1 2 Minimum required treatment volume cu ft 8868 cf' 3 Is the SCM shed 10 t eat the SW from all surfaces"at build-out? Yes:, 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(RV)? 3A Does the SCM have retaining walls,gabfcn walls or other 6 e Ineered side slo s? No Are the Inlets,outlets,and receiving stream protected from erosion 7 10 ear storm)? Yes Is there an overflow or bypass for Inflow volume In excess of the 8 design volume? Yes 9 What Is the method for dewaterIng the SCM for maintenance? Pump(preferred) 10 If applicaNe,will the SCM be Leaned out after construction? Yes 11 Does the maintenance access oompty with General MDC 8? Yes 12 Does the 4airage easement comply with General MDC 9? NIA 13 If the SCM Is on a single family lot,does(will?)the plat comply with NIA General MDC 10 7 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Ran that complies with General MDC 12? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an INC licensed fessional7 Yes ;r NW FIROM _ b 18 Des 9 308 `.c 19 Are the Inlet(s)and outlet located in a manner that avoids short- Yes clrcuitl P 20 Are berms or baffies provided to im rove the flowpath? No 21 Does the orifice drawdown from below the top surface of the 1,es perma I? Does the wetland minimize Impacts to the recelving channel from the 22 Yes 1-vr.24-hr storm? 23 Is a trash rack or other device provided to protect the outlet system? " Yes IIeYvfions. Elevation,peak attenuation above temporary pool(if applicable) 24 2336 W fmsl Elevation,temporary pool(top of the temporary Inundatlor zone) 25 fmsl �'2334.25 26 Elevation permanent poolto of the shallow water zone fmsl 2333.00 27 Elevatioh,bottom of shallow water Zone fmsl '233225 Elevation,bottom of forebay deep pool at deepest paint(at forebay 28 entrance)(ims] 232917 29 Elevation,bottom of forebay deep pool at shallowest point(at 2329 87 foreba exit fmsl 30 Elevation,bottom of non-forebay deep pool at deepest pelnl(fmsl) 2330 00 PfciTdny Zcires ...1 31 Area,total surface area of the SW wetland at temporary pool elev 10 203 00 (sq(t 32 Area,temporary inundation zone at temporary I elev. sq ft 3823 00 33 Area,shallow water zone at temporary, I all(ag ft 4 3t38.00 ?"; 34 Area rebayattemporary pool elev. s ft ::11,183.01) 35 Area,non-forebay deep I at teme2rary pooi ell ft ;'M.00 Percent area provided,temporary inundation zone(should be 30- 3fi 46% 37 Percent area provided,shallow water zone should be 35-45 36 Percent area provided,deep (forebay) should be 10-15°! 39 Percent area provided,deep pool(non-forebay)(should be 5-16%) Gaples Ow O Mlet . 40 Peak attenuation depth above terne2raa inundation zone inches 21 to 41 Temporary inundation zone depth(temporary pool to permanent 15 in I inches 42 Shallow water zone depth{permanent pool to bottom of wetland] In 9 Inches 43 Depth,forebay at entrance(permanent pool to bottom of forebay ' entrance)(Inches Depth,forebay at exit(permanent pool to bottom of forebay exit) on Inches 45 Depth,non-forebay deep pools(permanent pool to deep pool bottom Inches 46 If there is an orifice,diameter Inches See Note; 47 If the is a weir,weir height Inches MI M there Is a weir,weir le Inches 49 DrawdOwn lime for the temporary (days) 2.75 Wetland 3 8:59 AM 311912024 STORMWATER WETLAND Sol and Pfunts 50 Sol[amendment depth inches 12 in 61 Hasa Boll amendmenl specfflcation been rovlded7 Yes 52 Has a landsoaping plan that meets SW Welland MDO(12)been Y es provided? 53 Number of plants per 200 square feel(#)In the shal[cw water zone: 54 hoes the temporary Inundation zone planting comply with SW Yes' Wetland MSC 14 7 55 Are the dam structure and temporary rill slopes planted In non- Y� clum f turf rass? 56 JWN cattails be pianted in the wetland? No Please use this space to provide any additional Information about the 57 stormwaterwetiand(s): Ur*# pr 12:No easemeals ovided'bacause R is not privetety owned land.. Line i.46"Ori"is 1.5'in diemetet.' Line#53:�83.8 plants p4r M d have been prayided in ttie shallow weber w{1;830'ptants Or:4,3B8 so' Wetland 4 8:58 AM 3/1.9/2024