Loading...
HomeMy WebLinkAboutNCG160143_NOV_20240325 dM STATE a Anq ROY COOPER - Governor ELIZABETH S.BISER wu a2 Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality 3/25/2024 CERTIFIED MAIL: 7022 1670 0000 9974 8143 RETURN RECEIPT REQUESTED Fred Smith Company ATTN: Matt Baugnon 701 Corporate Center Dr Raleigh NC 27607 Subject: NOTICE OF VIOLATION (Case #: NOV-2024-PC-0210) NPDES Stormwater General Permit NCG160143 Fred Smith Company Kitty Hawk Asphalt.Plant Dare County Dear Mr. Baugnon: On 3/20/2024, Varun Prakash from the Washington Regional Office of the Division of Energy, Mineral and. Land Resources (DEMLR), conducted a site inspection for the Kitty Hawk Asphalt Plant located at 934 W Kitty Hawk Rd, Kitty Hawk, NC 27949, Dare County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Michael Ward, Plant Manager was also present during the inspection and his time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Individual Permit NCG160143. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Duck Pond Creek, class SC waters in the Kitty Hawk Bay. As a result of the site inspection, the following permit conditions violation(s) are noted: 1) Stormwater Pollution Prevention Plan (SPPP) Per Part B, a Stormwater Pollution Prevention Plan (SPPP) has not been developed and recorded. 2) Analytical Monitoring Per Part B, Analytical monitoring has not been conducted and/or recorded in accordance with permit requirements. 3) Qualitative Monitoring Per Part C, Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. Other Observations D_E Q�� North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 2 7 69 9-1 612 Honhi uaoun oou•�o m ao.nn 919.707.9200 Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response You are asked to respond to this office, in writing, within 30 calendar days from the receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. Action Items A copy of the Compliance Inspection Report is enclosed for your review and further action. Thank you for your attention to this matter. This office is considering sending a recommendation for enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues. Your response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to $25,000 per day for each violation. Should you have any questions regarding these matters. please contact Varun Prakash or myself at (252) 948-3859. Sincerely, Samir Dumpor, PE Regional Engineer DEMLR Enclosure: Compliance Inspection Report ec: Toby Vinson, Jr., PE, CPESC, CPM, Interim Director— DEMLR Brad Cole, PE, Chief of Regional Operations— DEMLR DEMLR NPDES Stormwater Permit Laserfiche File cc: WARO - DEMLR, Stormwater Files