Loading...
HomeMy WebLinkAbout20070010 Ver 1_Application_20070102 2 0 0~ 0 p 1 0 Office Use Only: Form Version March OS USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing ~r~i~ 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information ~ ~~ll~~ 1. Owner/Applicant Information JAN ~ -. 7Qp7 Name: David Combs Mailing Address: 518 Clifton Road ~.~.~.~~ ~ gya~~t ~tu~l~ Rockv Mount NC 27804 !"~!tl'~ Telephone Number~252)937-2121 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: J ~ Keller Company Affiliation: Keller Environmental Mailing Address: 7921 Haymarket Lane Raleigh NC 27615 Telephone Number: (919) 844-7437 Fax Number: (919) 844-7438 E-mail Address: iav(q~kellerenvironmental com Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Wildberry Drive Stream Crossing 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 3841 1 951 2482 4. Location County: Nash Nearest Town: Rocky Mount Subdivision name (include phase/lot number): Windstone Directions to site (include road numbers/names, landmarks, etc.): Take US64 to Winstead Ave N• turn right on English Rd• turn right on Shearin Rd• turn left on Nicodemus Mile. Site is '/2 mile on left. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.5850 °N 77.5000 °W 6. Property size (acres): 44.41 7. Name of nearest receiving body of water: Stoney Creek 8. River Basin: Tar-Pamlico (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Site is comprised of an unnamed tributary (UT) to Stoney Creek pond and existing homes A sewer line also exists southerly adjacent to the UT to Stoney Creek along the entire corridor. Site is also surrounded existing residential ne~hborhoods Page 2 of 8 10. Describe the overall project in detail, including the type of equipment to be used: One road crossing is proposed to provide road connectivity between Hunter Hill Road, Nicodemus Mile and existing road arteries Equipment to be used includes pumps, trackhoes bulldozers and other land grading and bridge equipment. _ __ 11. Explain the purpose of the proposed work: The proposed impacts to the stream area will be necessary to complete Wildberry Drive The location of this connector road is in accordance with the City of Rocky Mount Transportation Plan. It will provide connectivity between adjacent subdivisions and roads, IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USAGE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Jay Keller met with Mr. Mike Horan of NC Division of Water Qualit~on September 8 2005 It was determined that the unnamed tributary to Stoney Creek was a perennial stream the on-site pond was built in high-ground and not subject to the Tar-Pamlico River Buffer Rules alongwith the drainageway below it. Mr Keller also met with Mrs. Jean Manuele during Fall 2005. She confirmed the on-site wetlands and streams depicted. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Provide a written description of the proposed impacts: Permanent impacts to streams totaling 60 linear feet are anticipated for this project The Wildberry Drive stream crossing will involve 40-feet of triple 60-inch diameter RCP's. _ 2. Individually list wetland impacts. Types of impacts include, but are not ltmtted to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, i ~~ a, +,. t,,.+l, ~*,. ..+, rA onfl flnnrlinn .~G 0.1 U Wetland Impact Site Number (indicate on map) 1G1~' 11J1 1111~/uv,...r ~.a Type of Impact ~ - ^~ - - ---' - - T e of Wetland YP (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Ftoodplain (ves/no) Distance to Nearest Stream (linear feet) Area of ]mpact (acres) Total Wetland Impact (acres) ~ 3. List the total acreage (estimated) of all existing wetlands on the property: 3 Acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams meet ha innlnrlarl Tn ralrnlatP. acrPaae mnltinly length X width_ then divide by 43.560. Stream Impact Number (indicate on ma) Stream Name v Type of Impact v Perennial or Intermittent? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) Wildberry Drive UT To Stoney Creek Culverts & headwalls Perennial 6 60 0.008 I Total Stream Impact (by length and acreage) 60 0.008 5. Individually List all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fall avravatinn r1re~Iaina flnnrlina rlrainaue hulkheads_ etc. Open Water Impact Site Number v V Name of Waterbody v Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, Area of Impact (indicate on ma) (if applicable) ocean, etc.) (acres) I Total Open Water Impact (acres) 0 ~~ Page 4 of 8 6. List the cumulative impact to all Waters of the U.S. resulting from the pro~ect: Stream Impact (acres): 0.008 Wetland Impact (acres): 0 O en Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.008 Total Stream Impact (linear feet): 60 7. Isolated Waters Do any isolated waters exist on the property? ®Yes ^ No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or Linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. None _ __ 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) 12. Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The proposed Wildberry Drive crossinq_was strategically placed to connect with the subdivisions to the west and north. The location of this connector road is in accordance with the City of Rocky Mount Transportation Plan. It will provide connectivity between adjacent subdivisions and roads. The crossing was also placed perpendicular in a fairly linear stream corridor and headwalls were utilized to minimize stream and buffer impacts. The culverts will be placed at least 1-foot below the stream bed in accordance to best management practices (BMP's) to allow aquatic passage. The secondary culverts will be placed at a higher elevation to promote primary flows in the middle culvert. Page 5 of 8 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.ne.us/ncwetlands/strm ig'de.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The proposed proiect should not be required to provide mitigation for the proposed impacts. This is due the efforts of the developer's team to avoid jurisdictional areas to the maximum extent possible. A wide riparian corridor in excellent condition exists along the entire site corridor of the unnamed tributary to Stoney Creek. Over eleven-acres and 2,300-feet of stream is protected by a conservation easement on this site. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Page 6 of 8 Amount of stream mitigation requested (linear feet): n/a Amount of buffer mitigation requested (square feet): n/a Amount of Riparian wetland mitigation requested (acres): n/a Amount ofNon-riparian wetland mitigation requested (acres): n/a Amount of Coastal wetland mitigation requested (acres): n/a IX. X. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ^ No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether aNEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ^ 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (s uare feet) Multiplier Required Miti ation 1 3,600 3 (2 for Catawba) 10,800 2 2,400 1.5 3,600 Total 6,000 14,400 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. R~arian buffer mitigation is not required. Page 7 of 8 XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss Stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious tevel. Tote! acreage 44 41 Acres Impervious areas: existinq-~1-acre; proposed-10 95 Acres 10 95 Ac/44 41 Ac = 25%. Proposed impervious surfaces include roads and driveways (4 07 Ac )~ roofs storage and porches (6.88 Ac.). Please refer to Nutrient Removal Work Sheet. While under construction, temporary, custom sedimentation basins will be installed outside of the wetlands and streams to protect them against sedimentation along with other appropriate sedimentation and erosion control measures in compliance with the DWQ and Nash County Sedimentation and Erosion Control requirements. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. To City of Rock Mount Waste Water Treatment Plant. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: No, this project will provide connectivity for this subdivision and existinq surrounding communities along Hunter Hill Road and Nicodemus Mile. /a ~a ~r ~~6 ~~`" ~ Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8